Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NOC-AE-000352, Forwards Supplemental Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. Encl Describes How JOG Program Has Been Implemented at STP + (22:45:53, 10 December 2024)
- ML20196A069 + (22:45:54, 10 December 2024)
- U-603104, Submits Rept Re Impact of Changes & Errors in ECCS Evaluation Methodology Used for Cps,Per Requirements of 10CFR50.46(a)(3)(ii).No Changes or Errors Have Been Identified Since Last Rept + (22:45:55, 10 December 2024)
- ML20196A068 + (22:45:55, 10 December 2024)
- IR 05000134/1987004 + (22:45:56, 10 December 2024)
- IR 05000425/1988067 + (22:45:59, 10 December 2024)
- TXX-8816, Updates 880118 Response to Notice of Deviation 445/8731-D-03 Noted in Insp Repts 50-445/87-31 & 50-446/87-23.Corrective Actions:Impell Train C Project Instructions Revised & Rept Issued on Accuracy of Train C Walkdown Data + (22:46:05, 10 December 2024)
- BW990028, Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.5 + (22:46:06, 10 December 2024)
- ML20196A055 + (22:46:06, 10 December 2024)
- ML20196A053 + (22:46:07, 10 December 2024)
- ML20196A051 + (22:46:07, 10 December 2024)
- 05000456/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed + (22:46:08, 10 December 2024)
- ML20196A050 + (22:46:08, 10 December 2024)
- ML20196A047 + (22:46:09, 10 December 2024)
- ML20196A045 + (22:46:10, 10 December 2024)
- ML20196A046 + (22:46:10, 10 December 2024)
- ML20196A043 + (22:46:11, 10 December 2024)
- ML20196A044 + (22:46:11, 10 December 2024)
- ML20196A041 + (22:46:12, 10 December 2024)
- RC-99-0122, Monthly Operating Rept for May 1999 for VC Summer Nuclear Station.With + (22:46:12, 10 December 2024)
- ML20196A038 + (22:46:13, 10 December 2024)
- ML20196A036 + (22:46:14, 10 December 2024)
- ML20196A037 + (22:46:14, 10 December 2024)
- NOC-AE-0559, Forwards STP Commitment Change Summary Rept for Period 981209-990610.Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change + (22:46:15, 10 December 2024)
- ML20196A033 + (22:46:15, 10 December 2024)
- BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With + (22:46:16, 10 December 2024)
- ML20196A029 + (22:46:17, 10 December 2024)
- ML20196A030 + (22:46:17, 10 December 2024)
- ML20196A025 + (22:46:18, 10 December 2024)
- ML20196A019 + (22:46:19, 10 December 2024)
- ML20196A018 + (22:46:20, 10 December 2024)
- ML20196A017 + (22:46:20, 10 December 2024)
- ML20196A015 + (22:46:21, 10 December 2024)
- NOC-AE-000548, Forwards Response to RAI Re Proposed Amends on Replacement SG Water Level Trip Setpoint Differences for Stp,Units 1 & 2.Nothing Contained in Response Should Be Considered Commitment Unless So Specified in Separate Correspondence + (22:46:22, 10 December 2024)
- ML20196A011 + (22:46:22, 10 December 2024)
- BSEP-88-1235, Informs That Reactor & Turbine Bldg Ventilation Flow Rate Measurement Devices Will Be Completed by 890303 Instead of 900113.Plant Mods Required to Correct Design Problems W/Sys Can Be Expedited + (22:46:23, 10 December 2024)
- ML20196A004 + (22:46:24, 10 December 2024)
- ML20196A003 + (22:46:24, 10 December 2024)
- ML20196A002 + (22:46:25, 10 December 2024)
- ML20196A001 + (22:46:26, 10 December 2024)
- ML20196A000 + (22:46:26, 10 December 2024)
- ML20195K456 + (22:46:27, 10 December 2024)
- ML20195K457 + (22:46:27, 10 December 2024)
- ML20195K455 + (22:46:29, 10 December 2024)
- ML20195K454 + (22:46:31, 10 December 2024)
- ML20195K449 + (22:46:32, 10 December 2024)
- ML20195K448 + (22:46:32, 10 December 2024)
- 3F1198-01, Application for Amend to License DPR-72,consisting of LAR 240,re Addition of safety-related diesel-driven Emergency Feedwater Pump.Overview of Proposed Mods Presented to NRC on 980921.Addl Info on post-mod Testing Will Be Sent by 990129 + (22:46:33, 10 December 2024)
- ML20195K443 + (22:46:37, 10 December 2024)
- BSEP-88-1228, Special Rept 1-SR-88-003:on 881120,7-day Time Frame for Limiting Condition for Operation Exceeded.Caused by Fire Door 211 Being out-of-svc to Prevent Wear & Possible Damage to Locking Seals & Interlocks + (22:46:38, 10 December 2024)
- ML20195K442 + (22:46:38, 10 December 2024)
- IR 05000413/1988006 + (22:46:41, 10 December 2024)