Confirms 880125-29 for 10CFR50.49 Equipment Qualification Insp,Per 880113 Telcon.Documents Identified in Attachment 1 Needed One Wk Prior to Insp
ML20196A046
Person / Time
Site: Hope Creek 
Issue date: 01/21/1988
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
Public Service Enterprise Group
References
NUDOCS 8802040235
Download: ML20196A046 (3)


Text

.

r

~ JAN 211989 Docket No. 50-354 Public Service Electric & Gas Company ATTN: Mr. C. A. McNeill, Jr.

Senior Vice President - Nuclear Post Office Box 236 Hancocks Bridge, New Jersey 08038 Gentlemen:

Subject:

10 CFR 50.49 EQUIPMENT QUALIFICATION INSPECTION, HOPE CREEK NUCLEAR POWER PLANT (50-354/88-03)

This letter confirms the dates of January 25 - 29, 1988 for the NRC 10 CFR 50.49 equipment qualification (EQ) inspection of Hope Creek.

These dates were established during a conference call on January 13, 1988 between Mr. R. Donges of your organization and Mr. R. Paolino of the NRC Region I office. The inspection will take place at the Hope Creek site in Hancocks Bridge, New Jersey.

A nanagement entrance meeting is scheduled for 11:00 a.m. on January 25, 1988.

The management exit meeting is tentatively scheduled for 1:00 p.m. on January 29, 1988.

The inspection will include the following:

1.

Review of your implementation of 10 CFR 50.49 EQ program, including preservation of qualified status of equipment.

2.

Review of your implementation of Technical Evaluation Report / Safety Evaluation Report E0 corrective action commitments.

3.

Review of EQ documentation files.

4.

Physical inspection of equipment from the Master List.

One week prior to the inspection we will require one copy of each document identified in attachment I with a plus (+) mark.

l A duplicate copy is to be sent to:

Uldis Potapovs, Chief Equipment Qualification Inspection Section EW/S 312A U. S. Nuclear Regulatory Commission Washington, DC 20555 f

8802040233 390121 PDR ADOCF. 05000354 o

PCs

/ g i

0FFICIAL RECORD COPY PAOLIN010/21/87 - 0001.0.0 01/14/88

Public Service Electric and Gas 2

Your cooperation with us during this inspection will be appreciated. Should you have any questions regarding this inspection, you can contact Mr. R. Paolino at (215) 337-5285 or Mr. C. Anderson at (215) 337-5376.

Sincerely, g t,..._ -

.. ' * *: 1 William V. Johnston Acting Director Division of Reactor Safety y

I cc:

S. LaBruna, General Manager, Hope Creek Operations W. H. Hirst, Manager, Joint Generation Projects Department, Atlantic Electric Company L. A. Reiter, General Manager - Licensing and Reliability Rebecca A. Green, Bureau of Radiation Protection Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of New Jersey bec:

Region I Docket Room (with concurrences)

Management Assistant, DRPA (w/o encl)

DRP Section Chief Robert J. Bores, DRSS U. Potapovs, NRR k

c G Q

RI:DRS RI:DR RUURS Paolino/c 1 Anderyon Eppen y ll,yl%

if/f//Y

'p46 0FFICIAL RECORD COPY PADLIN010/21/87 - 0002.0.0 01/14/88

ATTACHMENT 1 REFERENCES 1.

+ Licensee's overall EQ Program 2.

+NRC Safety Evaluation Reports concerning environmental qualification of safety-related electrical equipment.

3

+ Master List, version in effect at time of inspection.

4.

+a.

Generic Letter 84-24, D.G. Eisenhut to Licensee's and Applications, dated December 27, 1984,

Subject:

Certification of Compliance to 10 CFR 50.49.

+b.

Licensee's response to Generic Letter 84-24.

5.

+ Licensee's current System Component Evaluation Worksheets (SCEW sheets) or equivalent (earlier SCEW sheets may have been included in previous licensee submittals).

6.

+ Licensee's procedures applicable to equipment qualification (EQ) program, procurement of qualified equipment, maintenance of qualified equipment, EQ documentation, modifications to EQ equipment, EQ personnel training (site and corporate personnel), QA/EQ interface including corporate QA, Site QA/QC audits, EQ spare parts procurement and licensee program for EQ related NRC Information Notices / Bulletins, 7.

  • Licensee's qualification documentation and/or EQ files.

+'These documents must be available for the inspectors use throughout the inspection.

+These documents are requested for review before the inspection.