Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196B337 + (22:28:41, 10 December 2024)
- ML20196B338 + (22:28:41, 10 December 2024)
- ML20196B336 + (22:28:42, 10 December 2024)
- ML20196B335 + (22:28:43, 10 December 2024)
- ML20196B334 + (22:28:43, 10 December 2024)
- ML20196B332 + (22:28:44, 10 December 2024)
- ML20196B330 + (22:28:45, 10 December 2024)
- ML20196B327 + (22:28:46, 10 December 2024)
- ML20196B326 + (22:28:46, 10 December 2024)
- ML20196B324 + (22:28:47, 10 December 2024)
- ML20196B325 + (22:28:47, 10 December 2024)
- ML20196B323 + (22:28:48, 10 December 2024)
- ML20196B315 + (22:28:51, 10 December 2024)
- ML20196B318 + (22:28:51, 10 December 2024)
- 05000325/LER-1988-011, :on 880420,HPCI Pump Suction from Suppression Pool E41-F041 Would Not Open During Instrument Channel Calibr & Functional Test.Probably Caused by Breakdown of motor-winding Insulation + (22:28:57, 10 December 2024)
- ML20196B313 + (22:28:58, 10 December 2024)
- ML20196B312 + (22:28:59, 10 December 2024)
- ML20196B311 + (22:28:59, 10 December 2024)
- ML20196B310 + (22:29:00, 10 December 2024)
- ML20196B308 + (22:29:01, 10 December 2024)
- ML20196B309 + (22:29:01, 10 December 2024)
- ML20196B307 + (22:29:02, 10 December 2024)
- ML20196B305 + (22:29:02, 10 December 2024)
- ML20196B304 + (22:29:03, 10 December 2024)
- ML20196B303 + (22:29:04, 10 December 2024)
- ML20196B300 + (22:29:05, 10 December 2024)
- LIC-98-0160, Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated + (22:29:06, 10 December 2024)
- ML20196B299 + (22:29:06, 10 December 2024)
- ML20196B294 + (22:29:07, 10 December 2024)
- ML20196B292 + (22:29:08, 10 December 2024)
- ML20196B291 + (22:29:08, 10 December 2024)
- 05000278/LER-1998-005-03, :on 981025,inadvertent Unit 3 Electrical Bus E33 Trip (Esfa) During Performance of Unit 2 Electrical Bus E32 Surveillance Test Was Noted.Caused by Personnel Error. Sp S12M-54-E32-XXF4 Was Completed.With + (22:29:10, 10 December 2024)
- LIC-88-1071, Confirms That Response to Safety Sys Outage Mod Insp Rept 50-285/88-200 Extended to 881219,per Telcon Between PD Milano & Jj Fisicaro + (22:29:12, 10 December 2024)
- ML20196B287 + (22:29:12, 10 December 2024)
- ML20196B285 + (22:29:13, 10 December 2024)
- ML20196B281 + (22:29:14, 10 December 2024)
- ML20196B280 + (22:29:14, 10 December 2024)
- ML20196B279 + (22:29:15, 10 December 2024)
- ML20196B277 + (22:29:15, 10 December 2024)
- ML20196B276 + (22:29:16, 10 December 2024)
- ML20196B275 + (22:29:17, 10 December 2024)
- ML20196B273 + (22:29:18, 10 December 2024)
- ML20196B271 + (22:29:22, 10 December 2024)
- NOC-AE-000360, Requests Authorization to Use Alternative to Requirements of 10CFR50.55a(g)(6)(ii)(A) to Perform ISI Nondestructive Exam on Essentially 100% of Weld Length of All RPV Welds + (22:29:22, 10 December 2024)
- ML20196B267 + (22:29:23, 10 December 2024)
- ML20196B266 + (22:29:24, 10 December 2024)
- ML20196B265 + (22:29:24, 10 December 2024)
- RBG-29498, Forwards Supplemental Response to Violations Noted in Insp Rept 50-458/88-18.Corrective Actions:Temporary Change Notice Issued for STP-403-0601 to Reflect Actual Testing Requirements for Standby Gas Treatment Sys.Affidavit Encl + (22:29:25, 10 December 2024)
- 05000395/LER-1999-008, :on 990518,manual RT Initiated Due to Main Turbine High Vibration.Caused by Light Rubbing within New Monoblock Turbine Rotor.Reactor Power Was Reduced.With + (22:29:34, 10 December 2024)
- ML20196B261 + (22:29:35, 10 December 2024)
- ML20196B259 + (22:29:35, 10 December 2024)
- ML20196B258 + (22:29:36, 10 December 2024)