Partially Withheld Minutes of Ofc of Special Projects Comanche Peak Allegation Review Committee 870625 Meeting at Const Site.Ci Grimes 870615 Memo Re Mgt of Allegations & Meeting Agenda Encl
ML20196B261
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/08/1987
From: Gower G
NRC OFFICE OF SPECIAL PROJECTS
To:
NRC
Shared Package
ML20196B221 List:
References
FOIA-87-558, FOIA-87-A-97 NUDOCS 8802110131
Download: ML20196B261 (5)


Text

_ _

s-

  • o . . .
  • / ..s% UMTED STATES i

l j

[

c NUCLEAR REGULATORY COMMISSION WASWeGT004, D. C. 20666 k j[

s,.....

M 04 M7 )

l MEMORANDUM FOR: Allegation Review Committee Members i

i FRON: George C. Gower, Allegation  ;

Coordinator (PAC)

Comanche Peak Project Division Office of Special Projects

SUBJECT:

MINUTES OF OSP C0HANCHE PEAK ALLEGATION REVIEW COMITTEE (ARC) MEETING The first meeting of the OSP Comanche Peak ARC was held at the Comanche Peak construction site on June 25, 1987. ARC membership is discussed in enclosure 1.

Enclosure 2 is a copy of the meeting agenda.

The meeting was attended by the following:

P. McKee, ARC Chairman J. Lyons, ARC member R. Warnick, ARC member G. Gower, OSP/ PAC B. Zaleman, OSP/0AC I. 84rnes, OSP-CPRT C. Hale,OSP-CPRT(parttime)

8. Griffin, RIV/0!

The first part of the meeting was devoted to a discussion about the method of doing business which covered the three items on the agenda plus several other items, such as 0$P/01 interface / assistance, case development prior to ,

referral, general practices for obtaining specifics of allegations, and pre- ,

paration of correspondence to allegers and the licensee.

During part 2 of the ager.da, the following cases were discussed:

0$P47 A-0021 Al7I.yW and assist in letter to alleger confirmining technical issues.

OSP-87-0038 Oew/ve.4 PAC will set up conference call with allemr to obtain specific details on allegation. For next ARC meet < ag, Warnick will present proposed followup plan.

. g21,1g1 e7070s DAUMAN87-A-97 PDR

~

Allegation Review Cormittee Members M 0 8 281 OSPM0039 w ,M pdsd$ 4 Asp l

Letter 1 to licensee to be prepared, if appropriate, to reso ve coactrn.

Contact with alleger pending above actions.

c. lor,d OSPMA-0040 It was agreed that the concern raised should be brought to the licensee's attention and that owu s not nec PAC will follow up on best method to c ate concern to icensee.

OSP $ A-0054 W 6 /4 This issue will be pursued by Warnic s sta and w probably the subject of a special I inspection. Followup plan to be developed for next ARC meeting.

OSP-fM-A 0055 #ala OSP s te s a w nc u.e ~ cer.n in fcilowup of other MCR followup action noted above.

OSP-87-A-0056 Su u e Warnick's staff will interview a leger to o n ona ac s. For next ARC meeting, a plan

will be p of technical concerns; if details of alleged a request for referral to 01 will be t

prepa .

POST TRT Allegations Enclosure 3 was (15 cussed by I. Barnes. Gower will work with Barnes and Mark Emerson, RIV, to ensure the files reflect closure of those noted as complete on the list. Additional review is needed to more clearly understand the allegations noted as "open" and those where followup is not planned.

l TRT Vintage Allegations l

! Several TRT allegations were briefly discussed. Additional file review work is planned during July to clarify the status of these concerns, especially the O! referrals or lack thereof.

l

~

JIM. 0 8 lh Allegation Review Connittee Members The next ARC meeting has been tentatively set for July 15, 1987 at the site.

Those receiving copies of these minutes should contact George Gower if questions arise or corrections are needed.

George wer Project Allegation Coordinator Comanche Peak Project Office of Special Projects

Enclosures:

1. Memo to CPPD staff fm C.1. Grimes dtd. 6/15/87
2. ARC meeting agenda
3. Memo to P. F. McKee fm R. F. Warnick otd. 6/25/87 cc: C. Grimes P. McKee J. Lyons R. Marnick B. Zaleman B. Griffin, RIV/01
11. Schierling l

l l

l 1

l 1

h. /$m: 4

[een %, UNITED STATES

" ~

! o NUCLEAR REGULATORY COMMISSION 1 1 wAsemeoToN. o. c. rosso S

\ ..... June 15, 1987

! MEMORANDUM FOR: Comanche Peak Project Division Staff FROM: Christopher I. Grimes, Director Comanche Peak Project Division Office of Special Projects

SUBJECT:

MANAGEMENT OF ALLEGATIONS One of the essential tasks to be accomplished by the Comanche Peak Project staff is the proper management of allegations. At the present time the agency is in the final stages of preparation and issuance of an NRC Manual Chapter and Appendix 0517, Management of Allegations, that defines tha policy and procedures for the proper receipt, processing, control and disposition of allegations. To 1:nplement the requirements of 0517. an internal office procedure (OSP-OP-SM) has been drafted and will be circulated for connent. It is currently being used on an interim basis by the OSP staff. Barry Zalcman, Office Allegation Coordinator, is the OSP staff contact on MC 0517 and also has the lead on development and issuance of OSP-0P-0170. OSP will conduct staff training for those involved in the actual management of allegations and those likely to be in 4 oosition to receive them.

By this meno I am establishing an Allegation Review Committee (ARC) charged with reviewing all new allegations (as of March 1,1987) and setting forth the appropriate course of action for evaluation, followup, and final disposition.

The Cosmittee will also establish a process for closing out all previous allegations. Membership is as follows: Phil McKee is designated Comanche Peak ARC Chairman; James E. Lyons and Robert F. Warnick are assigned as ARC members, with Hans Schier11ng as an alternate. George C. Gower is assigned the re-sponsibilities of the Project Allegation Coordinator for CP?D. The specific duties of the ARC and the Project Allegation Coordinator are spelled out in OSP-0P-0170 and will be formalized shortly. In the interim, all allegations related to Comanche Peak are to be brought to the attention of George C. Gower (301-492-4923) orPhi&McKee(301-492-4900) for initial data collection, form preparation, and entry into the NRC Allegation Management System (AMS).

In order to determine the status of allegations on the Comanche Peak Project, the staff is in the process of obtaining a set of files on past and recent allegations related to the Comanche Peak Project. You may be contacted to assist those involved in this effort; please do your best to help make these files as complete and accurate as possible.

A number of allegations related to the Comanche Paak Project have been received since OSP has been operational (March 1,1987). These have been entered into the AMS. Additional infonnation is being gathered on these silegations before n,/ 4 a " (.d., 4 th p- pp

.*. O r%0 h a bi;.rlo assignments are made for followup by the . ARC. The first ARC meeting is planned for later this month (the week of 6/2? Hat the OSP offices at Comanche Peak.

The purpose of this meeting will be to discuss administrative and functional activities of the Cossaittee, to discuss plans for followup and disposition of the recent allegations, and to continue the review of past NRC efforts to deal with past allegation followup and closecut.

If any of you have been contacted by individuals from outside NRC raising con.

cerns verbally or in writing, they should be considered as potential allega-tions. The prescriptive treatJnent of their concerns need to be followed as discussed earlier. Please get in touch with George Gower or any member of the ARC as soon as practical to initiate the process. You may also contact Barry Zaleman, OAC, in their absence.

It is important for the CPPD staff to recognize the coassitment of the agency to deal with allegers and their concerns in an appropriate manner, if you have any questions on the policy or process on this matter please bring them to my attention.

Original signed by Phillip F. McKee Christopher 1. Grimes, Director IOP Comanche Peak Project Director Office of Special Projects cc: J. Keppler

J. Axelrad B. Zaleman DISTRIBUTION

CFFU Reeding i OSP Reading CGrimes PMcKee HSchierling l JLyons GGower' N. Emerson, R ion IV" L. Chandler, C R. Warnick, RIV Docket File -50 445, 446

( Os

. , _ /.

i 0FC :05P:CPPD :CPPD:0 2

CPPD:05P 1 :DD 52  : Cm h s..........:.... .......:.........g .:. .i ....: . . .

..K....{..::............

MAME  : rjcb :JLyo :HSchierli Yg :P e'  : rdus  :

..... . : .. y. ...........:............:..............:..............:.............:............

l DATE :6/f3/ 87 :6/lI/87 :6/lI/87 :6/IS87 :6/13/87  :

l V l

l l

SM.x*v 2 ARC MEETING AGENDA 6/25/87 - 8:30

1. Method of Doing Business a) Meeting Prep, b) Conduct of Meeting (frequency of meeting) c) Documentation of Meeting
2. Discussion of Individual Allegations Received Since Fonnation of OSP a OSP-87-A-0021 - Lyons/McKee b OSP-87-A-0038 , - Gower c OSP-87-A-0039 - Gower d) OSP-87-A-0040 - Gower e) Two allegations - Warnick made onsite
3. Review of Open Allegations Received Prior to Fonnation of OSP a) TRT Vintage Allegations b) Post TRT Allegations
4. Discussion of Issues Pertaining to Allegation Handling (as time permits) l l

l i

l l

ARC MEETING AGENDA 6/25/87 - 8:30

1. Method of Doing Business a) Meeting Prep, b) Conduct of Meeting (frequency of meeting) c) Documentation of Meeting
2. Discussion of Individual Allegations Received Since Fonnation of OSP c) 0SP-87-A-0021 - Lyons/McKee b) 0SP-87-A-0038 - Gower c) OSP-87-A-0039 - Gower d) OSP-87-A-0040 - Gower e) Two allegations -

Warnick made onsite

3. Review of Open Allegations Received Prior to Formation of OSP a) TRT Vintage Allegations b) Post TRT Allegations
4. Discussion of Issues Pertaining to Allegation Handling (as time permits) c}z.

.