Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196G692 + (21:20:56, 10 December 2024)
- 05000382/LER-1997-011-01, Forwards LER 97-011-01,revising Previous Submittal Re Water Level Maintained in Containment Spray Risers That May Have Been Less than Required by Ts.Commitments Discussed + (21:20:59, 10 December 2024)
- ML20196G690 + (21:21:00, 10 December 2024)
- ML20196G689 + (21:21:00, 10 December 2024)
- ML20196G687 + (21:21:01, 10 December 2024)
- PNO-IV-99-029, on 990625,female Licensee Employee Was Discovered Contaminated in Facial Area.Licensee Convened Incident Investigation Team to Assess Event.Worker Received Total Effective Dose Equivalent of Approx 7 Mrem + (21:21:02, 10 December 2024)
- 05000254/LER-1987-013-08, :on 870629,control Room HVAC Sys Isolation Occurred.Caused by Defective Functional Test Procedure or Probe Corrosion.Chlorine in Probe Vicinity Removed & Corroded Probe Replaced + (21:21:04, 10 December 2024)
- ML20196G684 + (21:21:05, 10 December 2024)
- ML20196G681 + (21:21:06, 10 December 2024)
- ML20196G680 + (21:21:06, 10 December 2024)
- ML20196G679 + (21:21:07, 10 December 2024)
- ML20196G678 + (21:21:08, 10 December 2024)
- ML20196G676 + (21:21:09, 10 December 2024)
- ML20196G677 + (21:21:09, 10 December 2024)
- ML20196G673 + (21:21:13, 10 December 2024)
- ML20196G671 + (21:21:14, 10 December 2024)
- 05000254/LER-1987-014-08, :on 870729,control Room Ventilation Isolation Occurred.Caused by Chlorine Analyzer Sys Spike Resulting from Power Fluctuation During Electrical Storm.Control Room Ventilation Sys Returned to Normal + (21:21:18, 10 December 2024)
- ML20196G664 + (21:21:19, 10 December 2024)
- ML20196G661 + (21:21:20, 10 December 2024)
- ML20196G659 + (21:21:21, 10 December 2024)
- ML20196G655 + (21:21:24, 10 December 2024)
- ML20196G654 + (21:21:25, 10 December 2024)
- 05000254/LER-1987-020-06, :on 871006,refuel Floor Radiation Monitor Sys ESF Actuation Occurred.Caused by Installation Deficiency. Event Discussed W/Electrical Maint Personnel & Relay in Panels 901(2)-40 & 41 Replaced + (21:21:27, 10 December 2024)
- ML20196G651 + (21:21:28, 10 December 2024)
- ML20196G648 + (21:21:31, 10 December 2024)
- 05000254/LER-1987-017-08, :on 870805,HPCI Sys Inoperable Due to Invalid Sys Isolation.Caused by HPCI Steamline Differential Pressure Transmitter Failure.Transmitter Failure Under Investigation. Rosemount Model 1153DB5PA Switch Replaced + (21:21:36, 10 December 2024)
- ML20196G643 + (21:21:40, 10 December 2024)
- ML20196G640 + (21:21:41, 10 December 2024)
- ML20196G637 + (21:21:42, 10 December 2024)
- ML20196G636 + (21:21:43, 10 December 2024)
- 05000254/LER-1987-021-05, :on 871110,diesel Fire Pump 1/2A Inoperable & on 871111 7-day out-of-svc Reporting Criteria Exceeded. Caused by Pump Intake Bay Being Empty for Circulating Water Pump Maint.Intake Bay Refilled on 871117 + (21:21:45, 10 December 2024)
- ML20196G632 + (21:21:46, 10 December 2024)
- ML20196G631 + (21:21:46, 10 December 2024)
- 05000254/LER-1987-024-03, :on 871120,primary Containment Structural Steel Connections Outside FSAR Design Criteria Discovered.Caused by Const Error.Engineering Change Notices QC-87S-24 & 27 Issued & Repairs Made + (21:21:55, 10 December 2024)
- ML20196G627 + (21:21:55, 10 December 2024)
- JAFP-87-0737, Responds to NRC IE Bulletin 87-001, Thinning of Pipe Walls in Nuclear Power Plants. Description of Efforts to Develop Piping Insp Program to Detect Erosion/Corrosion of Susceptible Sys,Sketches & Typical Data Sheet Encl + (21:21:56, 10 December 2024)
- ML20196G624 + (21:21:57, 10 December 2024)
- 05000254/LER-1987-028-03, :on 871202,open Penetrations Found Through Fire Barriers.Caused by Personnel Errors.Identified Deficiencies Repaired & Station Maint Work Request Procedure QAP 1500-2 & Checklist QAP 1500-S1 Revised + (21:21:59, 10 December 2024)
- ML20196G619 + (21:22:00, 10 December 2024)
- ML20196G621 + (21:22:00, 10 December 2024)
- 05000254/LER-1987-029-03, :on 871207,Bus 13-1 Degraded Voltage 5 Minute Time Delay Relay Found Out of Tolerance.Caused by Setpoint Drift.Time Delay Relay Recalibrated & Tested + (21:22:02, 10 December 2024)
- ML20196G616 + (21:22:03, 10 December 2024)
- ML20196G612 + (21:22:04, 10 December 2024)
- ML20196G610 + (21:22:06, 10 December 2024)
- ML20196G609 + (21:22:07, 10 December 2024)
- ML20196G608 + (21:22:07, 10 December 2024)
- ML20196G606 + (21:22:08, 10 December 2024)
- ML20196G605 + (21:22:09, 10 December 2024)
- 05000254/LER-1987-030-03, :on 871219,ATWS Instrument Sensing Lines Inadequately Supported & Did Not Meet FSAR Design Criteria. Caused by Cognitive Personnel Error & Inadequate Design. Temporary Supports Installed + (21:22:10, 10 December 2024)
- ML20196G601 + (21:22:11, 10 December 2024)
- IR 05000445/1987032 + (21:22:12, 10 December 2024)