ML20196G655

From kanterella
Jump to navigation Jump to search
Forwards Rev to Improved Tech Spec (ITS) Section 3.1,based on Discussions with NRC Staff.Revs Are Provided in Same ten- Section Format as Initial ITS Submittal
ML20196G655
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 11/30/1998
From: Tulon T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20196G660 List:
References
RTR-NUREG-1431 NUDOCS 9812080052
Download: ML20196G655 (2)


Text

Q mmonwealth Ihon Orrapany Ilraidwood Generating Mation Route *I, Ikix 84 liraceville,11.GHO7%I9 Tel 815-4M2801 November 30,1998 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington D. C. 20555 - 0001

Subject:

Revision S to the improved Technical Specifications (ITS) Submittal Byron Nuclear Power Station, Units 1 and 2 Facility Operating Licenses NPF-37 and NPF-66 NRC Docket Numbers: 50-454 cnd 50-455 Braidwood Nuclear Power Station, Units I and 2 g

Facility Operating Licenses NPF-72 and NPF-77 Q

NRC Docket Numbers 50-456 and 50-457

References:

(1) G. Stanley and K. Graesser (Commonwealth Edison) letter to NRC Document Control Desk, " Conversion to the improved Standard Technical Specifications," dated December 13,1996

)

(2) R. Assa (NRC) letter to O. Kingsley (Commonwealth Edison), " Byron and Braidwood Stations, Units 1 and 2 - Draft Safety Evaluation of Proposed Amendment on improved Technical Specifications (TAC NOS.

M97546, M97547. M97548 and M97549)," dated November 5,1998 The purpose of this letter is to provide Revision S to the referenced ITS submittal. ITS Revision S (Enclosure 1) contains changes to ITS Section 3.1 based on discussions with the NRC staff. As a result of adopting provisions of NUREG-1431 LCO 3.1.8," Rod Position Indication," and Current Technical Specification 3.1.3.2, " Position Indication Systems - Operating," the Beyond Scope discussion in Section III.G.1 of Reference 2 will j

be eliminated.

r _)

9812o8oo52 est130 t

(

ADOCK0500g44{

PDR l

1 P

~

A I!nicum Gimpany

i November 30,1998 U. S. Nuclear Regulatory Commission Page 2 These Revisions are being provided in the same ten-section format as the initial ITS submittal:

1. Byron ITS
2. Braidwood (Brwd) ITS
3. Byron CTS Markups
4. Brwd CTS Markups
5. CTS Discussion of Changes (DOCS)
6. LCO Markups
7. LCO Justification for Differences (JFDs)
8. Bases Markups
9. Bases JFDs 10 No Significant Hazards Consideration (NSHC)

Please address any comments or questions regarding this matter to our Nuclear Licensing Department.

Sincerely, T., othy J. Tulon iie Vice President

'Braidwood Nuclear Power Station TTl 6 20ih : ITS Revision S cc:

NRC Regional Administrator - Region Ill Senior Resident inspector - Braidwood Senior Resident inspector - Byron Oflice of Nuclear Facility Safety - IDNS i

)

v

[

i

>