Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20197B385 + (20:12:59, 10 December 2024)
- ML20197B382 + (20:13:00, 10 December 2024)
- ML20197B383 + (20:13:00, 10 December 2024)
- PY-CEI-NRR-2239, Responds to NRC Re Violations Noted in Insp Rept 50-440/97-12.Corrective Actions:Svi Was Reviewed & Transferred Data & Time Chart Increments Were Found to Be Incorrect Errors Were Corrected & Results Met Svi Criteria + (20:13:01, 10 December 2024)
- ML20197B376 + (20:13:02, 10 December 2024)
- ML20197B377 + (20:13:02, 10 December 2024)
- ML20197B370 + (20:13:03, 10 December 2024)
- ML20197B372 + (20:13:03, 10 December 2024)
- ML20197B369 + (20:13:04, 10 December 2024)
- IR 05000275/1997021 + (20:13:07, 10 December 2024)
- 05000312/LER-1985-022, :on 851120,pressurized Sampling Valve HV-21516 Found in Open Position W/Breaker Racked Out.Caused by Lack of Administrative Control.Process Sampling Procedures & Operator Training Upgraded + (20:13:10, 10 December 2024)
- ML20197B365 + (20:13:11, 10 December 2024)
- A97181, Requests That Listed Changes Be Made to Document Svc List for Info Re Pbaps,Units 2 & 3 + (20:13:12, 10 December 2024)
- ML20197B363 + (20:13:13, 10 December 2024)
- ML20197B362 + (20:13:13, 10 December 2024)
- ML20197B361 + (20:13:14, 10 December 2024)
- ML20197B360 + (20:13:15, 10 December 2024)
- ML20197B358 + (20:13:16, 10 December 2024)
- ML20197B359 + (20:13:16, 10 December 2024)
- NSD-NRC-97-5490, Forwards W Responses to FSER Open Items on AP600.Summary of Encl Responses Is Provided in Table 1,which Includes FSER Open Item Number,Associated Oits Number & Status to Be Designated in W Status Column of Oits + (20:13:17, 10 December 2024)
- 05000338/LER-1997-009-01, :on 971118,incomplete Surveillance on Solid State Protection Circuits Was Noted.Caused by Inadequate Design by Vendor.Controlling Tps Were Revised to Include Instructions to Test Affected Logic Circuits + (20:13:23, 10 December 2024)
- TXX-6049, Interim Deficiency Rept CP-85-42 Re Adverse Effects of Substituting Sections of Thermolags on Conduit Supports. Initially Reported on 850920.Analysis of Conduits,Supports & Appurtenances Continuing.Next Rept Expected by 861215 + (20:13:24, 10 December 2024)
- NSD-NRC-97-5489, Forwards W Responses to RAIs 640.69 & 640.164 Related to Comments Received from Staff on Rev 3 of AP600 Certified Design Matl Including ITAAC as Requested in Ltrs from Staff & 1106.Encl Closes Open Items 5728 & 6192 + (20:13:24, 10 December 2024)
- ML20197B347 + (20:13:25, 10 December 2024)
- TXX-6036, Interim Deficiency Rept CP-86-48 Re Adequacy of Nonconformance Dispositions.Initially Reported on 860616. Review of Nonconformance Rept Samples Conducted to Determine Safety Significance.Next Rept Will Be Submitted by 870715 + (20:13:25, 10 December 2024)
- TXX-6044, Interim Deficiency Rept CP-86-36 Re Large Bore Piping Supports.Initially Reported on 860609.Scope Revised to Delete Small Bore ASME Class 2 & 3 Piping to Provide More Accurate Results.Next Rept Will Be Submitted by 861201 + (20:13:26, 10 December 2024)
- 05000338/LER-1978-106-03, /03L-0:on 781010,power-range Instrumentation Channel N-41 Taken Out of Svc to Facilitate Replacement of Faulty Gain Pot.Caused by Dirt in Potentiometer,Resulting in Erratic Gain + (20:13:29, 10 December 2024)
- 05000529/LER-1986-049-01, :on 860923,automatic Reactor Protection Sys Actuation Initiated Reactor Trip Due to Low Level in Steam Generator 1.Caused by Inadequate Operating Procedure. Operating Procedures Revised + (20:13:32, 10 December 2024)
- ML20197B340 + (20:13:33, 10 December 2024)
- TXX-6030, Interim Deficiency Rept CP-85-31 Re Electrical Raceway Support Sys.Initially Reported on 850827.Conduit Raceways Affected by Installation of Radiant Energy Shield Matl Identified.Next Rept Will Be Submitted by 861205 + (20:13:34, 10 December 2024)
- ML20197B335 + (20:13:34, 10 December 2024)
- TXX-6045, Interim Deficiency Rept CP-84-12 Re Impact of High Energy Line Break Temp on Qualified Equipment Outside Containment. Initially Reported on 840604.Comparison of Cable Temp to Existing Qualified Temps Unresolved.Next Rept by 861219 + (20:13:35, 10 December 2024)
- NSD-NRC-97-5488, Forwards W Revised Response to RAI 480.1079 Related to 15 Comments Received from Staff Concerning 0RWST & Recirculation Screens During AP600 ITAAC Task Group Meeting on 971204.Encl Closes Open Item 5740 + (20:13:36, 10 December 2024)
- ML20197B331 + (20:13:36, 10 December 2024)
- ML20197B330 + (20:13:37, 10 December 2024)
- 05000334/LER-1997-036, :on 971113,inadequate Channel Check for Meteorological Monitoring Instrumentation Was Noted.Caused by Inadequate Change Mgt.Hp Was Requested to Perform Channel Checks & Rept Results to CR + (20:13:38, 10 December 2024)
- 05000338/LER-1978-105-03, /03L-0:on 781010,axial Flux Difference Deviated Greater than 5%.Caused by Rapid Load Reduction Necessitated by Problems W/Condenser Circulating Water Valve + (20:13:40, 10 December 2024)
- ML20197B326 + (20:13:41, 10 December 2024)
- B16917, Informs That Util Will Provide Next Update on Approximately 980123 Rather than 971219 + (20:13:42, 10 December 2024)
- ML20197B325 + (20:13:42, 10 December 2024)
- ML20197B323 + (20:13:43, 10 December 2024)
- 05000338/LER-1978-104-03, /03L-0:on 781009,during Mode 1,leak Detected in Steam Valve 1-MS-120 Valve Leads to Steam Generator Auxiliary Feedwater Pump 1-FW-P-2.Caused by Isolation of Steamline,Causing Pump Inoperability + (20:13:46, 10 December 2024)
- 05000395/LER-1997-006, :on 971113,TS Breaker Alignment Surveillance Was Not Performed.Caused by Personnel Error.Operator Was Dispatched to Do Surveillance Following Identification That Surveillance Had Not Been Performed + (20:13:48, 10 December 2024)
- ML20197B318 + (20:13:50, 10 December 2024)
- ML20197B316 + (20:13:51, 10 December 2024)
- 05000338/LER-1978-093-03, /03L-0:on 781017,multiplier Divider Card Output Drifted So That steam-feedwater Flow Mismatch Would Not Trip Until Actual Value of 1,932,000 Lbs Per Hour Occurred.Caused by Electronic Drift in Card.Card Recalibr + (20:13:52, 10 December 2024)
- 05000282/LER-1986-005-01, :on 860410,reactor Trip Occurred Due to Steam Generator lo-lo Level While in Manual Control at Low Power Level.Cause Not Stated.Mods Planned to Provide Better Feedwater Flow Indication + (20:13:55, 10 December 2024)
- ML20197B307 + (20:13:56, 10 December 2024)
- ML20197B310 + (20:13:56, 10 December 2024)
- AECM-86-0263, Forwards Semiannual Radioactive Effluent Release Rept for Jan-June 1986. Rept Includes Changes in Estimates of Total Errors for Sampling & Measurement of Radioactive Effluents & Methodology for Reporting Noble Gas Doses + (20:13:57, 10 December 2024)
- ML20197B303 + (20:13:58, 10 December 2024)