Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20198E461 + (16:28:15, 10 December 2024)
- ML20198E459 + (16:28:15, 10 December 2024)
- ML20198E458 + (16:28:16, 10 December 2024)
- ML20198E457 + (16:28:17, 10 December 2024)
- NPL-98-1041, Equipment Qualification Engineering Evaluation + (16:28:18, 10 December 2024)
- ML20198E454 + (16:28:20, 10 December 2024)
- ML20198E453 + (16:28:21, 10 December 2024)
- ML20198E452 + (16:28:21, 10 December 2024)
- TXX-4805, Interim Deficiency Rept CP-85-34 Re Adequacy of Conduit Supports to Perform Intended Design Functions.Initially Reported on 850906.All Electrical Raceway Items Consolidated.Next Rept by 861021 + (16:28:22, 10 December 2024)
- RBG-23672, Special Rept:On 860418,invalid Failure Involving Receipt of Trip Indications Experienced on Div I Diesel Generator During Surveillance Testing.Caused by Stuck Relays in Diesel Generator Pneumatic Control Logic + (16:28:23, 10 December 2024)
- ML20198E449 + (16:28:23, 10 December 2024)
- ML20198E446 + (16:28:24, 10 December 2024)
- ML20198E447 + (16:28:24, 10 December 2024)
- ML20198E445 + (16:28:25, 10 December 2024)
- ML20198E444 + (16:28:25, 10 December 2024)
- ML20198E443 + (16:28:26, 10 December 2024)
- IR 05000443/1986009 + (16:28:28, 10 December 2024)
- ML20198E437 + (16:28:29, 10 December 2024)
- ML20198E436 + (16:28:29, 10 December 2024)
- LIC-98-0167, Informs That Implementation of Severe Accident Mgt Guidelines at FCS Was Completed on 981210 & Includes Listed Items + (16:28:30, 10 December 2024)
- ML20198E435 + (16:28:30, 10 December 2024)
- ML20198E433 + (16:28:31, 10 December 2024)
- ML20198E431 + (16:28:31, 10 December 2024)
- ML20198E430 + (16:28:32, 10 December 2024)
- TXX-4807, Interim Deficiency Rept CP-86-13 Re Computer Entry Error Which Could Invalidate Portions of Jet Impingement Load Review for high-energy Piping.Initially Reported on 860305. Next Rept by 860613 + (16:28:33, 10 December 2024)
- ML20198E426 + (16:28:34, 10 December 2024)
- ML20198E424 + (16:28:35, 10 December 2024)
- ML20198E422 + (16:28:35, 10 December 2024)
- ML20198E421 + (16:28:36, 10 December 2024)
- 05000298/LER-1998-010, :on 981118,inadvertent Reactor Protection Sys Half Trip Was Noted.Caused by Defective Electrical Protection Assembly Logic Card.Defective Logic Card Was Replaced with Refurbished Card.With + (16:28:37, 10 December 2024)
- 3F0586-22, Confirms 860519 Telcon Re Emergency Response Data Sys.Nrc Visit to Obtain Info During Wk of 860623 Suggested. Knowledgeable Personnel Will Be Available to Discuss Recall Sys.Agenda & List of Attendees Requested + (16:28:38, 10 December 2024)
- ML20198E418 + (16:28:39, 10 December 2024)
- ML20198E411 + (16:28:40, 10 December 2024)
- ML20198E409 + (16:28:41, 10 December 2024)
- ML20198E402 + (16:28:42, 10 December 2024)
- IR 05000245/1986008 + (16:28:45, 10 December 2024)
- VPN-080-98, Forwards Updated ISFSI Emergency Plan,Per 981123 & Discussion in Meeting with NRC on 981119.Description of Changes Encl + (16:28:45, 10 December 2024)
- ML20198E396 + (16:28:50, 10 December 2024)
- ML20198E395 + (16:28:51, 10 December 2024)
- ML20198E393 + (16:28:52, 10 December 2024)
- ML20198E388 + (16:28:53, 10 December 2024)
- ML20198E387 + (16:28:54, 10 December 2024)
- ML20198E385 + (16:28:54, 10 December 2024)
- ML20198E384 + (16:28:55, 10 December 2024)
- ML20198E380 + (16:28:56, 10 December 2024)
- ML20198E382 + (16:28:56, 10 December 2024)
- ML20198E379 + (16:28:57, 10 December 2024)
- ML20198E378 + (16:28:58, 10 December 2024)
- ML20198E375 + (16:28:59, 10 December 2024)
- ML20198E376 + (16:28:59, 10 December 2024)
- ML20198E372 + (16:29:00, 10 December 2024)
- ML20198E373 + (16:29:00, 10 December 2024)