Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-4808, Interim Deficiency Rept CP-84-12 Re Impact of high-energy Line Break Temps on Qualified Equipment Outside Containment. Initially Reported on 840604.Thermal Analysis Completed & Operability of Equipment Under Review.Next Rept by 860716 + (16:27:05, 10 December 2024)
- RBG-44783, Provides Entergy Operations,Inc Input as Discussed in Call, for Consideration by NRC in Enforcement Process Re Insp Rept 50-458/98-13 + (16:27:06, 10 December 2024)
- PNO-II-98-001, on 980106,licensee Reported to Fl Bureau of Radiological Health That Troxler,Model 3430,moisture Density Gauge Stolen from Licensee pick-up Truck.State Will Require Licensee to Issue Press Release + (16:27:07, 10 December 2024)
- NUREG/CR-5549, Forwards NUREG/CR-5549, Environmental Assessment Renewal of Materials Licenses for Alaron Corp Northeast Regional Service Facility,Wampum,Pa, for Placement Into Nudocs + (16:27:08, 10 December 2024)
- IR 05000423/1986012 + (16:27:18, 10 December 2024)
- TXX-4806, Interim Deficiency Rept CP-85-42 Re Possible Adverse Effects of Substituting Rectangular & Oversized Preformed Sections of Thermolag on Conduit Support Design Installations. Initially Reported on 850920 + (16:27:19, 10 December 2024)
- ML20198E508 + (16:27:23, 10 December 2024)
- 05000309/LER-1986-002, :on 851106 & 860417,automatic Reactor Trip on Loss of Load Occurred Due to Main Turbine Trip on High Steam Generator Level.Caused by Controller Malfunction & Faulty Potentiometer.Controller Replaced + (16:27:28, 10 December 2024)
- U-600288, Emergency Response Facilities Design Rept + (16:27:29, 10 December 2024)
- ML20198E499 + (16:27:30, 10 December 2024)
- ML20198E498 + (16:27:30, 10 December 2024)
- ML20198E496 + (16:27:31, 10 December 2024)
- 05000528/LER-1986-029, :on 860422,surveillance Test of Pressurized Heater Capacity Incorrectly Performed Due to Procedural Deficiency.Caused by Personnel Error & Incorrect Calculation Method Specified in Procedures + (16:27:33, 10 December 2024)
- RBG-44769, Submits Final License Examination Matl for Feb 1999,license Examination for Rbs.Without Attachments + (16:27:34, 10 December 2024)
- ML20198E486 + (16:27:37, 10 December 2024)
- TXX-4804, Interim Deficiency Rept CP-85-19 Re Nonrepresentative Sample Used in Determining Generic Values for Typical Conduit Span Calculations.Initially Reported on 850515.Next Rept by 861021 + (16:27:38, 10 December 2024)
- ML20198E478 + (16:27:39, 10 December 2024)
- ML20198E479 + (16:27:39, 10 December 2024)
- ML20198E475 + (16:28:04, 10 December 2024)
- ML20198E474 + (16:28:05, 10 December 2024)
- IR 05000309/1985029 + (16:28:10, 10 December 2024)
- ML20198E470 + (16:28:11, 10 December 2024)
- ML20198E471 + (16:28:11, 10 December 2024)
- ML20198E469 + (16:28:12, 10 December 2024)
- ML20198E464 + (16:28:14, 10 December 2024)
- ML20198E463 + (16:28:14, 10 December 2024)
- ML20198E461 + (16:28:15, 10 December 2024)
- ML20198E459 + (16:28:15, 10 December 2024)
- ML20198E458 + (16:28:16, 10 December 2024)
- ML20198E457 + (16:28:17, 10 December 2024)
- NPL-98-1041, Equipment Qualification Engineering Evaluation + (16:28:18, 10 December 2024)
- ML20198E454 + (16:28:20, 10 December 2024)
- ML20198E453 + (16:28:21, 10 December 2024)
- ML20198E452 + (16:28:21, 10 December 2024)
- TXX-4805, Interim Deficiency Rept CP-85-34 Re Adequacy of Conduit Supports to Perform Intended Design Functions.Initially Reported on 850906.All Electrical Raceway Items Consolidated.Next Rept by 861021 + (16:28:22, 10 December 2024)
- RBG-23672, Special Rept:On 860418,invalid Failure Involving Receipt of Trip Indications Experienced on Div I Diesel Generator During Surveillance Testing.Caused by Stuck Relays in Diesel Generator Pneumatic Control Logic + (16:28:23, 10 December 2024)
- ML20198E449 + (16:28:23, 10 December 2024)
- ML20198E446 + (16:28:24, 10 December 2024)
- ML20198E447 + (16:28:24, 10 December 2024)
- ML20198E445 + (16:28:25, 10 December 2024)
- ML20198E444 + (16:28:25, 10 December 2024)
- ML20198E443 + (16:28:26, 10 December 2024)
- IR 05000443/1986009 + (16:28:28, 10 December 2024)
- ML20198E437 + (16:28:29, 10 December 2024)
- ML20198E436 + (16:28:29, 10 December 2024)
- LIC-98-0167, Informs That Implementation of Severe Accident Mgt Guidelines at FCS Was Completed on 981210 & Includes Listed Items + (16:28:30, 10 December 2024)
- ML20198E435 + (16:28:30, 10 December 2024)
- ML20198E433 + (16:28:31, 10 December 2024)
- ML20198E431 + (16:28:31, 10 December 2024)
- ML20198E430 + (16:28:32, 10 December 2024)
- TXX-4807, Interim Deficiency Rept CP-86-13 Re Computer Entry Error Which Could Invalidate Portions of Jet Impingement Load Review for high-energy Piping.Initially Reported on 860305. Next Rept by 860613 + (16:28:33, 10 December 2024)
- ML20198E426 + (16:28:34, 10 December 2024)