Forwards Emergency Plan Implementation Appraisal Insp Rept 50-443/86-18 on 860324-28.No Violations Noted.Items Requiring Corrective Actions Prior to Fuel Load Described in Rept
ML20198E463
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/15/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrison R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20198E468 List:
References
NUDOCS 8605280021
Download: ML20198E463 (2)


See also: IR 05000443/1986018

Text

. _ . _ __

.

. MAY 151986

Docket Nos. 50-443

Public Service of New Hampshire

ATTN: Mr. Robert J. Harrison

President and Chief Executive Officer

P. O. Box 330

.

Manchester, New Hampshire 03105

Gentlemen:

Subject: Inspection Report No. 50-443/86-18

This report forwards the findings of the Emergency Plan Implementation

Appraisal, which was conducted March 24-28, 1986, by Mr. W. Lazarus and others

of this office at Seabrook Nuclear Power Station, Seabrook, New Hampshire.

Areas examined during this inspection are described in the NRC Region I

Inspection Report enclosed with this letter. This appraisal consisted of

selective examinations of procedures, representative records, facilities and

equipment, interviews with personnel, and observations of the inspectors.

Within the scope of this inspection, no violations were identified and no

response to this letter is necessary. Items requiring corrective actions are

categorized in detail 6 of this report, as to whether they must be completed

prior to fuel load or full power license.

,

Your cooperation with us in this matter is appreciated.

Sincerely,

i

'

5Enis"5l5

-

T' . . Win, [' rector

,

Division of Radiation Safety an

Safeguards

Enclosure: NRC Region I Inspection Report No. 50-443/86-18

l

l

8605280021 860515 3

DR ADOCK 0500

0FFICIAL RECORD COPY IR SEA 1 86-18 - 0001.0.0 g

05/14/86 -o

, iu

[hh

!.

r

.

Public Service of New Hampshire 2

cc w/ encl:

John DeVincentis, Director, Engineering and Licensing i

William B. Derrickson, Senior Vice President

Warren Hall, Operational Services Supervisor

Donald E. Moody, Station Manager - Seabrook Station

Gerald F. Mcdonald, Construction QA Manager

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

bcc w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

FEMA RI

RI:DRSS RI:DRSS SD N

Lazarus / p/gcb

5//f/86

Thomas V

5//s786

Qp

P

OFFICIAL RECORD COPY IR SEA 1 86-18 - 0001.1.0

05/14/86