Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-III-83-103, on 831021,empty Sf Cast Arrived at West Valley,Ny from Point Beach Nuclear Plant,W/Three Small Areas of Contamination in Excess of Us DOT Limit of 22,000 Disintegrations Per Minute Per 100 Square Centimeters + (14:26:14, 10 December 2024)
- ML20198Q365 + (14:26:15, 10 December 2024)
- PNO-III-83-100, on 831020,ultrasonic Testing Identified One Crack & Ten Crack Indications in Unit 2 Primary Sys Piping, Including Seven Indications in Reactor Water Recirculation Sys.Licensee Intends to Issue News Announcement + (14:26:15, 10 December 2024)
- ML20198Q359 + (14:26:16, 10 December 2024)
- ML20198Q362 + (14:26:16, 10 December 2024)
- B16843, Forwards LER 97-S001-00,documenting 971003 Event at Unit 3. Licensee Commitments in Response to Event Encl + (14:26:17, 10 December 2024)
- ML20198Q358 + (14:26:17, 10 December 2024)
- ML20198Q354 + (14:26:18, 10 December 2024)
- PNO-III-83-098A, on 831116 Licensee Informed That eddy-current Exam of All Tubes in Both SG Using New High Sensitivity Probe W/Continued Identification of Crack Indications Essentially Completed + (14:26:19, 10 December 2024)
- ML20198Q350 + (14:26:19, 10 December 2024)
- ML20198Q349 + (14:26:20, 10 December 2024)
- ML20198Q345 + (14:26:21, 10 December 2024)
- ML20198Q346 + (14:26:21, 10 December 2024)
- ML20198Q343 + (14:26:22, 10 December 2024)
- ML20198Q344 + (14:26:22, 10 December 2024)
- ML20198Q338 + (14:26:23, 10 December 2024)
- ML20198Q342 + (14:26:23, 10 December 2024)
- ML20198Q337 + (14:26:24, 10 December 2024)
- ML20198Q334 + (14:26:25, 10 December 2024)
- ML20198Q336 + (14:26:25, 10 December 2024)
- ML20198Q331 + (14:26:26, 10 December 2024)
- ML20198Q333 + (14:26:26, 10 December 2024)
- 05000282/LER-1997-011-01, :on 971003,failure to Test Low Pressure auto- Start Function of 121 motor-driven Cooling Water Pump.Caused by Oversight During Surveillance Development.Low Header Pressure auto-start of 121 Mdclp Tested Per TS A.4.5.A 5.a + (14:26:28, 10 December 2024)
- ML20198Q328 + (14:26:29, 10 December 2024)
- ML20198Q327 + (14:26:30, 10 December 2024)
- ML20198Q326 + (14:26:30, 10 December 2024)
- ML20198Q324 + (14:26:31, 10 December 2024)
- ML20198Q323 + (14:26:31, 10 December 2024)
- ML20198Q321 + (14:26:32, 10 December 2024)
- ML20198Q318 + (14:26:34, 10 December 2024)
- ML20198Q316 + (14:26:34, 10 December 2024)
- ML20198Q315 + (14:26:35, 10 December 2024)
- 05000282/LER-1997-011, Forwards LER 97-011-00 Re Failure to Test Low Pressure auto- Start Function of 121 Motor Driven Cooling Water Pump & Inadequate Separation Between Trains a & B Low Pressure auto-start Switches.Two New Commitments Made + (14:26:36, 10 December 2024)
- ML20198Q313 + (14:26:36, 10 December 2024)
- 05000366/LER-1986-010-01, :on 860424,relay Actuated,Tripping Main Turbine Which Resulted in Reactor Scram.Caused by Steam Leak.All Moisture in Exciter Equipment Removed,Failed Pipe Sections Replaced & Expanded Investigations Initiated + (14:26:38, 10 December 2024)
- ML20198Q308 + (14:26:39, 10 December 2024)
- ML20198Q307 + (14:26:39, 10 December 2024)
- ML20198Q306 + (14:26:40, 10 December 2024)
- ML20198Q304 + (14:26:41, 10 December 2024)
- ML20198Q302 + (14:26:41, 10 December 2024)
- ML20198Q299 + (14:26:42, 10 December 2024)
- ML20198Q301 + (14:26:42, 10 December 2024)
- ML20198Q298 + (14:26:43, 10 December 2024)
- ML20198Q293 + (14:26:47, 10 December 2024)
- ML20198Q294 + (14:26:47, 10 December 2024)
- ML20198Q288 + (14:26:48, 10 December 2024)
- ML20198Q291 + (14:26:48, 10 December 2024)
- 05000259/LER-1985-057, :on 851009,determined That wide-range Torus Water Level Transmitters Not Qualified.Cause Unstated. Replacement of Existing wide-range Monitors Planned for Current Unit Outages + (14:26:50, 10 December 2024)
- ML20198Q286 + (14:26:51, 10 December 2024)
- BSEP-97-0397, Application for Amends to Licenses DPR-71 & DPR-62,revising Proposed Terms in TSs 4.0.1 & 4.0.3 to Reflect Existing TS Terminology,Per GL 87-09 + (14:26:52, 10 December 2024)
- ML20198Q285 + (14:26:52, 10 December 2024)
- ML20198Q283 + (14:26:53, 10 December 2024)