ML20198Q323
| ML20198Q323 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 01/12/1998 |
| From: | Capra R NRC (Affiliation Not Assigned) |
| To: | Kingsley O COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 9801220401 | |
| Download: ML20198Q323 (4) | |
Text
-
..y.
EMW/2W
(
y~y%
y*
UNITED STATES
}
NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. 306 2 0001 "4',
January 12, 1998 Mr. Oliver D. Kingsley, President Nuclear Generation Group Commonwealth Edison Company Executive Towers West lli 1400 Opus Place, Suite 500 Downers Grove,IL 60515
SUBJECT:
QUAD CITIES NUCLEAR POWER STATION DESIGN INSPECTION
Dear Mr. Kingsley:
During the time period of February 16 through March 27,1998, we have scheduled an on site design inspection of your Quad Cities Nuclear Power Station. Your staff has indicated that there are no major conflicts with onsite activities during this period. The two mechanical systems selected are the residual heat removal (RHR) and core spray (CS) including the automatic depressurization system (ADS). In addition, support and interface systems such as the RHR service water and the electrical distribution systems will be reviewed. We will contact your staff to request material needed to support the on site and off site reviews. The team leader and two (L.im members of the inspection team are scheduled to visit the site bet' 1en January 26 and 28,1998, to ensure that all requested documentation has been provided to facilitate the in-office review and on site inspection.
Recent NRC inspections at nuclear power reactor facilities have identified numerous findings where the actual plant cor. figuration or operations were inconsistent with the design basis, licensing basis, or the UFSAR. Thus, the purpose of this inspection is to evaluate the capability of the systems to perform safety functions required by their design and licensing bases and to verify consistency of the as built configuration with the final safety analysis report. Inspection Procedure (IP) 93801, "Sefety System Functional Inspection" will be used to perform the design inspection.
Mr. Morris Branch, Team Leader, NRR, willinterface with you at J your staff regarding all matters related to this inspection. The inspection will be perfomied by a team of five engineers
'[
from Stone and Webster (S&W) Corporation who have been contracted by the NRC for this f
purpose. Mr. Robert Najuch of S&W who is part of the five person team will be the lead
'/)
contractor engineer.
j l
EC M CMdlCOPY 99G ' Wfri 9901I2' POR
%~,0K 05000245 G
PDR 5pp!BM.lill!I
1 Mr. O. Kingsley 2
We will be in contact with your staff regarding additional details for the inspection. Should you have any questions, please contact Mr. Branch at (301) 4151279 rv myself at (301) 4151395.
Sincerely, A
fc.Lb (f.c I
Robert A. Capra, P ect Director Project Directorate 1112 Division of Reactor Projects - lil/IV office of Nuclear Reactor Regulation Docket Nos: 50 246 and 50 265 cc: See next page
g.
sr Mr. O. Kingsley We will be in contact with your steff regarding additional details for the inspection. Should you have any questions, please contact Mr. Branch at (301) 415-1279 or myself at (301) 4151395.
Sincerely, lOrigitaal signed by l Robert A. Capra, Project Director Project Directorate ill 2 Division of Reactor Projects - Ill/IV Office of Nuclear Reactor Regulation Docket Nos: 50-245 and 50-265 cc: See next page plSTRIBUTION-DOCKET FILE (50-254/265)
PUBLIC PECB R/F PD32 R/F GGrant, Rlli EAdenst n JRoe RPulsifer, PM CMoore SRichards MBranch DNorkin NRC Resident inspector WBeach, Rlli JCaldwell, Rill ACRS OGC JGrobe, Rlli DOCUMENT NAME: G:\\MXB2\\ANNOUNCE.QC To receive a copy of this document, Indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy P OFFICE PM:PD32 PECB:DRPM PECB:DRPM PECB:DRPM PD:PDill-2 l
'NAME RPulsifer
- MBranchW DNor 'r&
SRichar%
RCapra v DATE 01D/98 C W /98 01/9/sE 01h/98 01/4/98 OFFICIAL RECORD COPY
j of e
0,IQnguier Quod Cales Nuoiser Power Staton Commonweenh Edson Company Unha 1 and 2 oc:
MoheelI. Muer, Esquire Document Contt01 Desk 4.looneing Sidley and Ausen Commonwealth Edloon Company One F6st Netonal Plaza 1400 Opus Place, Sulle 400 Chicope, Illinois 80003 Downers Grove,lilinois 00515 Commonweehh Edloon Company Mr. Mchael J. Wallace Quod Celes Stegon Manager Nuclear Serv 6ces Senior Vice Proeident 22710 200th Avenue N.
Commonwealth Edison Company Confove,llunois $1242 9740 Emocu#ve Towers West til 1400 Opus Place, Suite 900 U.S. Nuclear Regulatory Conmenion Downers Grove,IL 60515 Quod Caloo Reeldent inspectors Office
- 22712 200th Avenue N.
Mr. Gene H. Stanley Cordove, Illinois 81242 PWR's V6ce President Commonwealth Edison Company Chairman ExecuWve Towers West ill Rock leland County Board 1400 Opus Place, Sulle 900 of Supervisors Downers Grove,IL 60515 1504 3rd Avenue Rockleland County Ofilce Bldg.
Mr. Steve Perry Rockleland,lilmois 61201 BWR's Vee President Commonwealth Edison Company lilinois Department of Nucleer Safety Enocutke Towers West til Ofince of Nuclear Faculty Safety 1400 Opus Place, Suite 900 1035 Outer Park Drive Downers Grove,IL 60515 Sprineteld, Illinois 62704 Mr. Dennis Ferrar Re0 onal Administrator Regulatory Services Manager i
U.S. NRC, Region lli Commonwealth Edison Compen/
801 Warrenville Road.
Executive Towers West lil Lisle,blinois 60532-4351 1400 Opus Place, Suite 500 Downers Grove,IL 60515 Wilhem D. Leech
'fr;+: Nuclear Ms. Irene Jahnson, Licensing Director MdAmerican Energy Company Nuclear Regulatory Services
- 907 Walnut Street Commonwealth Edison Company P.O.Bou457-Execuevo Towers West lll DesMoines, Iowa 50303 1400 Opus Place, Suite 500 Downers Grove,IL 60515 Vlos President-Law and Regulatory Affairs Commonwealth Edison Company MdAmerican Energy Company.
Reg. Assurance Supervisor - Quad Cales One RiverConter Placs 22710 200th Avenue N.
100 E. Second Street Cordove, Illinois 61242-9740
- P,0. Box 4350 -
Devonport,lowe 52808 Commonwealth Edloon Company Site Vlos Preendent-Quad Cities 22710 200th Avenue N.
Cordove,llNnois 61242-9740
-