Forwards Supplemental Safety Evaluation Re NUREG-0737,item II.F.2 Instrumentation for Detection of Inadequate Core Cooling, & RG 1.97,Rev 2 Re Core Exit Thermocouples
ML20198Q349
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/12/1998
From: Mcdonald D
NRC (Affiliation Not Assigned)
To: Bowling M, Loftus P
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20198Q353 List:
References
RTR-NUREG-0737, RTR-NUREG-737, RTR-REGGD-01.097, RTR-REGGD-1.097 TAC-M99613, NUDOCS 9801230001
Download: ML20198Q349 (4)


Text

- _ _ _ - _ _ _ _ _ - _ _ _

Mr. Martin L. Bowling '

T Recovery Officer - Millstone Unit No. 2 Northeasi Nuclear Energy Company clo Ms. Patricia A. Loftus Director-Regulatory Affairs P.O. Box 128 Waterford, CT 06385

SUBJECT:

CONFORMANCE TO NUREG-0737, ITEM ll.F.2, " INSTRUMENTATION FOR DETECTION OF INADEQUATE CORE COOLING," AND REGULATORY GUIDE 1.97, REVISION 2, REGARDING CORE EXIT THERMOCOUPLES - MILLSTONE NUCLEAR POWER STATION, UNIT 2 ('l AC NO. M99613)

Dear Mr. Bowling:

By letter dated September 3,1997, Northeast Nuclear Energy Company (NNECO) requested a deviation from NUREG-0737, item II.F.2, " Instrumentation for Detection c' Inadequate Core Cocling," and Regulatory Guide (RG) 1.97, Revision 2, n they relate to the design and qualification criteria for pressurize'J water reactor core exit thern;ocouples (CETs).

The NRC staff has reviewed the proposed deviations and has determined that they are acceptable as detailed in the enclosed Supplemental Safety Evaluation.

NNECO r,oted in its September 3 letter that it had determined that it would be prudent to improve the current CET design to bring it into conformance with NUREG-0737 and RO 1.97 and committed to implement the change no later than Refueling Outage 13. The staff agrees with NNECO and requests that l4NECO notify the Commission of any change to this commitment and its projected schedule for implementation.

This completes all NRC staff actions related to the referenced TAC Number.

Sincerely, Original Signed L/ 6 Daniel G. Mcdonald, Jr., Sr. Project Manager Special Projects Office - Lic. ming Office of Nuclear Reactor.

'on

{

Dockei No. 50-336 t

Encisoure: As stated

._I j.

cc w/ encl: See next page DJSTRIBUTION:

Mbgn -

I h j @ $29%rg y m

tDocket Fliel' WTravers PUBLIC PMcKee SPO-L Reac'ing OGC SPO Raading ACRS LBerry JDurr, RI DOCUMENT NAME: G:\\ MCDONALD \\M99613.DEV To receive a copy of this documsnt, Indicate in the bor "C" = Copy without attachment / enclosure "E" =

Copy with attachment / enclosure "N" = No copy OcFICE SPO-L:PM A O SPO-L: Ldh SP7/M l

l NAME OMcDonal6 ob LBerry - M PMlRee' DATE 01bT/98 MJ 01 (/98 ' T 01/P/98 OECM 9801230001 980112 PDR ADOCK 05000336 P

PDR

.wm i.i;;i.i[i.j jijigjjy

nce:g I

y" t

UNITED STATES

'j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.c. atm66-0001

%...../

January 12, 1998 Mr. Martir L. Bowling Recovery Officer - Millstone Unit No. 2 Northeast Nuclear Energy Company clo Ms. Patricia A. Loftus Director-Regulatory Affairs P.O. Box 128 Waterford, C7 06385

SUBJECT:

CONFORMANCE TO NUREG-0737, ITEM ll.F.2, " INSTRUMENTATION FOR DETECTION OF INADEQUATE CORE COOLING," AND REGULATORY GUIDE 1.97, REVISION 2, REGARDING CORE EXIT THERMOCOUPLES - MILLSTONE NUCLEAR POWER STATION, UNIT 2 (TAC NO. M99613)

Dear Mr. Bowling:

By letter dated September 3,1997, Northeast Nuclear Energy Company (NNECO) requested a deviation from NUREG-0737, item II.F.2, " Instrumentation for Detection of inadequate Core Cooling," and Regulatory Guide (RG) 1.97, Revision 2, as they relate to the design and qualification criteria for pressurized water reactor core exit thermocouples (CETs).

The NRC staff has reviewed the proposed deviations and has determined that they are acceptable as detailed in the enclosed Supplemental Safety Evaluation.

NNECO noted in its September 3 letter that it had dotermined that it would be prudent to improve the current CET design to bring it into conformance with NUREG-0737 and RG 1.97 and committed to implement the change no !ater than Refueling Outage 13. The staff agrees with NNECO and requerts that NNECO notify the Commission of any change to this commitment and its projected schedule for implementation.

This completes all NRC staff actions related to the referenced TAC Number.

Sincerely, Q 'L Daniel G. Mcdonald, Jr., Sr. Project Manager Special Projects Office - Licenaing Office of Nuclear Rear tor Regulation Docket No.' 50-336

Enclosure:

As stated cc w/ encl: See next page

~

Northeast Nuclear Energy Company Millstone Nuclear Fewer Station l /

Unit 2 cc:

Mr. F. C. Rothen IJilian M. Cuoco, Esquire Vice President - Work Services Senior Nuclear Counsel Northeast Utilities Service Company Northeast Utilities Service Company P. O. Box 128 P. O. Box 270 Waterford, CT 06385 Hartford, CT 06141-0270 Ernest C. Hadley, Esquire Mr. John Buckingham 1040 B Main Street Department of Public Utility Control P.O. Box 549 Electric Unit West Wareham, MA 02576 10 Liberty Square New Britain, CT 06051 Mr. D. M. Goebel Vice President - Nuclear Oversight Mr. Kevin T. A. McCarthy, Director Northeast Utilities Service Company Monitoring and Radiation Division P. O. Box 128 Department of Environmental Protection Waterford, CT 06385 79 Elm Street Hartford, CT 06106-5127 Mr. David Amerine Vice President - Nuclear Engineering Regional Administrator, Region I and Support U.S. Nuclear Regulatory Commission Northeast Utilities Service Company 475 Allendale Road P. O. Box 128 King of Prussia, PA 19406 Waterford, CT 06385 First Selectmen Mr. Allan Johanson, Assistant Director Town of Waterford Office of Policy and Management Hall of Records Policy Development and Planning 200 Boston Post Road Division Waterford, CT 06385 450 Capitol Avenue - MS# 52ERN P. O. Box 341441 Mr. Wayne D. Lanning Hartford, CT 06134-1441 Deputy Director of Inspictions Special Projects O'fice Mr. N.. H. Brothers 475 Allendale Road Vice President - Operations King of Prussia, PA 19406-1415 Northeast Nuclear Energy Company P.O. Box 128 Charles Brinkman, Manager Waterford, CT 06385 Washington Nuclear Operations ABB Combustion Engineering Mr. J. A. Price 12300 Twinbrook Pkwy, Suite 330 Unit Director - Millstone Unit 2

?

Rockville, MD 20852 Northeast Nuclear Energy Company P.O. Box 128 Senior Resident inspector Waterford, CT 06385 Millstone Nuclear Power Station clo U.S. Nuclear Power Station P.O. Box 513 Niantic, CT 06357 l

l

~

e es...

Northeast Nuclear EnrJsy Company -

Millstone Nuclear Power Station

/

Unit 2 cc:

Mr. B. D. Kenyon Chief Nucler Officer-Millstone Northeast Nuclear Energy Company P.O. Box 128 Waterford, CT 06385 Citizens Regulatory Commission r

ATTN: Ms. Susan Perry Luxton 180 Great Neck Road Waterford, CT 06385 Deborah Katz, President Citizens Awareness Network

' P. O. Box 83

-- Shelburne Fal s, MA 03170 The Honorable Terry Concannon Co-Cha!r Nuclear Energy Advisory Council Room 4035 Legislative Office Building Capitol Avenue Hartford, CT C6106 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simst;uy, CT 06070

' ittle Harbor Consultants, Inc.

Millstone -ITPOP Project Office P. O. Box 0630 Niantic, CT 06357-0630 Mr. Daniel L. Curry Project Director Persons Power Group Inc.

2675 Morgantown Road Reading, PA;19607.

Mr. Don Schopfer '

Verifics. tion Team Manager.

Sargent & Lundy 55 E. Monroe Strast Chicago,IL 60603

o