Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000328/LER-1984-013, :on 840820,rupture of Pressurizer Relief Tank Rupture Disc Occurred.Caused by Leaking Pressurizer Safety Valve.Rupture Discs & Leaking Safety Valve Replaced + (February 8, 1985)
- 2CAN028503, Forwards Summary Rept on Exam,Testing & Evaluation of Irradiated Pressure Vessel Surveillance Specimens from Arkansas Nuclear One,Unit 2. No Tech Spec Changes Submitted Due to Conservative Pressure Temp Limits + (February 8, 1985)
- 05000316/LER-1985-001-01, :on 850111,automatic ESF Actuation Occurred, Providing Start Signal to Motor Driven Auxiliary Feedwater Pumps.Caused by Personnel Error in Manual Control of Feedwater Regulator Valves + (February 8, 1985)
- 05000316/LER-1985-002, :on 850112,automatic ESF Actuation Occurred, Resulting in Reactor Trip.Caused by lo-lo Level in Steam Generator 22 Due to Unexpected Increase in Steam Flow.Event Discussed W/Shift Personnel & Operating Memo Written + (February 8, 1985)
- 05000413/LER-1985-002, :on 841231,unit Entered Hot Shutdown W/Ice Condenser Lower Inlet Doors Blocked Closed.Incident Discovered on 850109.Caused by Personnel Error.Blocking Devices Removed & Training Sessions Held + (February 8, 1985)
- 05000327/LER-1985-001, :on 850109,Surveillance Instruction 143, Control Bldg Emergency Air Cleanup Sys Filter Train Test, Not Performed within Tech Spec Time Limits.Surveillance Instruction Completed Satisfactorily on 850109 + (February 8, 1985)
- 05000413/LER-1985-003, :on 850109,during Monthly Testing of Solid State Protection Sys,Reactor Trip Breaker Opened on High Flux Source Range Reactor Trip Signal.Caused by Procedural Deficiency.Procedure Revised + (February 8, 1985)
- ML20128G818 + (February 8, 1985)
- ML20133B778 + (February 8, 1985)
- ML20127E610 + (February 8, 1985)
- ML20033D876 + (February 8, 1985)
- ML20134G612 + (February 8, 1985)
- ML17139C972 + (February 8, 1985)
- ML17139C975 + (February 8, 1985)
- ML17139C893 + (February 8, 1985)
- ML13316A794 + (February 8, 1985)
- ML17298B892 + (February 8, 1985)
- ML13324A555 + (February 8, 1985)
- ML17054B397 + (February 8, 1985)
- ML17277B610 + (February 8, 1985)
- ML16288A662 + (February 8, 1985)
- ML14192A602 + (February 8, 1985)
- ML13316A791 + (February 8, 1985)
- TAC:56875 + (February 8, 1985)
- ML18331A281 + (February 8, 1985)
- ML13316A797 + (February 8, 1985)
- ML20107B039 + (February 8, 1985)
- ML20106J794 + (February 9, 1985)
- ML20106J759 + (February 9, 1985)
- ML20106J739 + (February 9, 1985)
- ML20106H769 + (February 9, 1985)
- ML20127D777 + (February 9, 1985)
- ML20106J868 + (February 10, 1985)
- ML20262G717 + (February 10, 1985)
- ML20260B348 + (February 10, 1985)
- Information Notice 1985-11, Licensee Programs for Inspection of Electrical Raceway and Cable Installations + (February 11, 1985)
- Information Notice 1985-12, Recent Fuel Handling Events + (February 11, 1985)
- ML18040A770 + (February 11, 1985)
- ML18040A764 + (February 11, 1985)
- ML18040A767 + (February 11, 1985)
- PLA-2407, Forwards Applications for Proposed Amends 63 & 17 to Licenses NPF-14 & NPF-22,respectively,revising Membership of Util Review Committee.Fee Paid + (February 11, 1985)
- ML18018B895 + (February 11, 1985)
- ML18018B894 + (February 11, 1985)
- ML18018B893 + (February 11, 1985)
- ML18094B192 + (February 11, 1985)
- ML18094B191 + (February 11, 1985)
- ML20100G363 + (February 11, 1985)
- ML20090J395 + (February 11, 1985)
- ML20107J093 + (February 11, 1985)
- ML20107E192 + (February 11, 1985)
- ML20107C750 + (February 11, 1985)
- ML20107C061 + (February 11, 1985)
- ML20107B045 + (February 11, 1985)
- ML20107B029 + (February 11, 1985)
- ML20107A143 + (February 11, 1985)