ML17298B892

From kanterella
Jump to navigation Jump to search
Submits Cost Analysis of Prof Hours Expended on OL Review Through 840623.Ofc of Resource Mgt Will Transmit Bill
ML17298B892
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/08/1985
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 8502150274
Download: ML17298B892 (4)


Text

FEe 8

198S Docket No.

STN 50-528 STN 50-529 STN 50-530 Arizona Public Service Company ATTN:

Hr. E. E.

Van Brunt, Jr.

Vice President, Nuclear Projects P.O.

Box 21666 Phoenix, Arizona 85036 Gentlemen:

As you are aware, 10 CFR 170 of the Commission's regulations for license and inspection fees was revised effective June 20, 1984.

Section 170.12(b) of the revised rule provides that for applica-tions for permits, licenses, facility reference design approvals,

-and special projects which have been on file with the Commission for review for six months or longer, the first bill for accumulated review costs would be sent to the applicant at the time the rule becomes effective and thereafter at six-month intervals or when the review is completed, whichever is earlier.

The first bill for the operating license (OL) review will include applicable professional staff review time expended through June 23, 1984, and contractual support services expended to Nay 31, 1984.

Subsequent bills covering sfx-month reviews will be issued approximately ninety days after the end of each six-month period which closes in December and June of each year.

Consistent with the requirements of 10 CFR 170.12(b).

we have completed the cost analysis for the Palo Verde 1, palo Verde 2 and palo Verde 3 OL application reviews for the period specified above.

The cost through that period is

$2,550,294 for Palo Verde l. $433,415 for Palo Verde 2 and

$408,352 for Palo Verde 3.

The Office of Resource Management has been notified to bill your Company for this amount.

Hhen making payment, please make reference to the bill number.

On December 31, 1984, your Company was issued an operating license (5X power) for Palo Verde 1.

The maximum fee that can be assessed for an operating license (100K power) under the current regulations'is

$3,077,400.

Footnote 1 of 10 CFR 170.21 provides for the assessment of the operatfng license fee through issuance of the 1005 license.

Since onnca~

SURNAMC1R DATE~

p~Wpi50274 800208 PR ADOCK pppppppp PDR NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY

I I

Arizona Public Service Company FEB 8 1985 the costs being billed for Palo Verde 1 are less than the maximum fee and since the review for the 100K license is not yet complete, your Company will continue to receive billings every six months for the review effort until the issuance of the 1005 power license or until the maximum fee of $3,077,400 is reached.

Enclosed is a copy of the revision to Part 170 as sent to all applicants and licensees on May 24, 1984.

Sincerely, Orj inaj Sjg0~y~p

~%al 0, Zjjj~

William 0. Miller, Chief License Fee Management Branch Office of Administration

Enclosure:

Revision to Part 170 w/Notice of 5/24/84 DISTRIBUTION:

PDR LPDR LFMB Actual Manpower File'MDi

ggs, LFMB CJHol1oway, LFMB Reg Docket File DWei ss, LFMB LFMB Reactor File LSolander, NRR
MKaltman, NRR MLicitra, NRR
JLee, NRR OFFiCEP SURNAME OATEN LFMB.ADM C

way:.j.

/85 LF DM~

,,gg.1,QQS....,

2/'f/85 LFMB:ADM

.QOPli.l.l.er.

2/

/85

~

~

~

~

~

~

~

~

~

~

~

~

NRC FORM 318 t10 80) NRCM 0240 OFFICIAL R ECOR D COPY

4

~

~

A W

P

/

~

4

~

1 I

I C

I V