Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101K929 +
- ML20101K821 +
- ML20101G634 +
- ML20101D220 +
- ML20101D154 +
- ML20101C429 +
- ML20101C063 +
- ML20101B859 +
- ML20097F702 +
- ML20097F678 +
- ML20097E731 +
- ML20097E100 +
- ML20097E051 +
- ML20097E043 +
- ML20097E036 +
- ML20097D848 +
- ML20097D740 +
- ML20097D514 +
- ML20097D261 +
- ML20117Q172 +
- ML20127C374 +
- ML20239A433 +
- ML20239A427 +
- ML20261K476 +
- IR 05000334/1992011 +
- GO2-92-136, Comment Supporting Proposed Rules 10CFR19 & 20 Re Extension of Implementation Date Concerning 10CFR20 +
- HL-2232, Certifies That All Elements of Reg Guide 5.66 Implemented to Satisfy Requirements of 10CFR73.56.Administrative Changes Relative to Compliance W/Requirements of Reg Guide 5.66 Encl.Encl Withheld (Ref 10CFR73.21) +
- 3F0692-04, Forwards Relief Request 92-010 to Permit Use of Guidelines for Selection of Sample Populations Provided in ASME Operation & Maint of Nuclear Plants,Part 4 (OM-4),1987 as Alternative for Snubbers That Fail Inservice Tests +
- 3F0692-07, Provides Response to NRC Ltr Re Reactor Bldg Equipment Relocation & Environ Qualification +
- 3F0692-06, Forwards Addl Info Re 920213 Tech Spec Change Request 196 to Allow Replacement of Defective Fuel Rods W/Stainless Steel Filler Rods in B&W Fuel Co Designed Mark B Fuel Assembly,In Ref to B&Wog Topical Rept BAW-2149,dtd Dec 1991 +
- ML20071M650 +
- BECO-LTR-92-060, Responds to NRC Re Violations Noted in Insp Rept 50-293/92-80.Corrective Actions:Insp Performed for 4 Valves & M01001-43C Tagged Closed & Remains Tagged +
- 05000265/LER-1988-006-02, Errata to LER 88-006-02:on 880404,station Notified That Eleven Flued Head Anchors Did Not Meet Design Requirements. Caused by Misinterpretation of Scope & Design Structures.Mod Initiated to Revise Structure +
- 05000265/LER-1992-010, :on 901015,reactor Scram Occurred Due to Turbine Stop Valve Closure.Modification of DG Autostart Logic Will Be Installed to Preclude Similar Starts of Dg +
- 05000333/LER-1992-023, :on 920505,auxiliary Operator Failed to Restart Sample Pump a Before Deenergizing Redundant Sample Pump. Caused by Personnel Error.Operator Counseled & Will Be Disciplined & Scheduling Database Revised +
- 05000338/LER-1992-009, :on 920402,surveillance on Containment Purge & Exhaust Isolation Sys Missed & PORV Alarm Actuated Due to Personnel Error During Procedure Development.Addl Review of Other Complex Instrumentation Being Performed +
- 05000440/LER-1992-012-01, :on 920505,RHR Sys a Pump Tripped Due to Inappropiately Adjusted Valve Limit Switch.Caused by Program Weakness.Appropriate Switch Adjusted +
- 05000425/LER-1992-010-01, :on 920514,discovered Reactor Trip.Caused by Inadvertent Grounding & Personnel Error.Signs Have Been Placed on Doors of Regulator Cubical +
- 05000265/LER-1990-010-03, :on 901015,reactor Scram Occurred Due to Turbine Trip from Moisture Separator High Level.Caused by Partially Blocked Drain Line on 2C Moisture Separator Level Switch.Level Switches Cleaned +
- 05000289/LER-1992-001, :on 920122,inadvertent Emergency Feedwater Initiation Occurred During Planned Maint.Caused by Installation Error.Wire Errors Affecting Sys Operation Corrected +
- 05000440/LER-1992-012, :on 920505,RHR Sys a Pump Tripped Due to Inappropriately Adjusted Valve Limit Switch.Caused by Program Weakness.Limit Switch Reset & Appropriate Design Drawings Being Revised +
- 05000445/LER-1992-009, :on 920508,reactor Tripped.Caused by Personnel Error During Testing.Appropriate Level of Positive Discipline Program Implemented for Individuals Involved & Cabinet Locking Scheme Modified +
- 05000412/LER-1992-007, :on 920505,auxiliary Feedwater Pump Started After Main Feedwater Pump Tripped.Caused by Inadequate Pump Procedure.Event & Issue of Procedure Compliance Discussed +
- 05000425/LER-1991-009-01, :on 910813,discovered That Safety Injection Pump Start During Surveillance Testing Due to Failure of Reset Switch S-921 Which Will Be Replaced During Fall 1993 Refueling Outage.Shift Briefings Held +
- ML20044E132 +
- ML20097D758 +
- ML20097G501 +
- ML20101D066 +
- ML20044E312 +
- ML20044D849 +