Responds to NRC Raising Concerns That State 2 ITAAC Submittal Contained Several Inconsistencies Reflected in Lack of Internal Qa.Urges Continuation of face-to-face Staff & Mgt Interactions
ML20101C063
Person / Time
Site: 05200001
Issue date: 06/04/1992
From: Berglund R
GENERAL ELECTRIC CO.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
MFN-124-92, SLK-9275, NUDOCS 9206080103
Download: ML20101C063 (3)


Text

' ' ~ ~

JUN 04 '92 04:0941 P.1 s

V)

GE Nuclear Enemy 6

nobert C Bergkat Aw.md Pes; tar Provems Goret h*ent;e*

Ce*ers'(e.n Ccrwy 173 Cu t?tt A<trw. > nn. CA 95125 r

i C85255HC June 4,1992 MFN 124-92 Docket No. STN 52401 SLK 9275 i

\\{

Mr. Dennis M. Crutchfield, Associate Director for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Crutchfield:

SUBJECT:

ITAAC Stan 2 and Staee 3 Desion Certifiartiens Mainia!

This responds to your letter of May 29,1992 in which you expressed concern that GC's Stage 2.lTAAC submittal containea several inconsistencies that, you believe, reflected a lack ofinternal quality assurance. GE does not agree that the items identified by the staff are in fact inconsinencies that reflect a lack of internal quality assurance. The basis for this conclusion is provided below, In its correspondence with GE, the,Wf ured the term " inconsistent"in difTerent ways. It is necessary, therefore, to at.icess the term in the context in which it was used.

In the enclosure to its memorandum dated May 7,1992 which provided comments on GE's Stage 2 ITAAC submittal, the staff cited inconsistent treatment within indisidual system ITAAC as a specific shortcoming. However, the bulk of examples cited were not, in fact, due to inconsistent treatment within indisidual system ITAAC, but rather were a reflection of the graded approach being taken in the definition and develop-ment ofITAAC. This approach recognizes variations among systems relative to their importance. GE believes that the examples cited by the staff reueet a lack of common understanding of agreements reached on ITAAC scope and content in conjunction with the pilot review.

1 The first example of a perceived inconsi:tency cited by the staffin the memorandum l

dated May 29, ; 992 pertained to a difference between information provided for the Control Habitability HVAC System in the Tier 1 design description and that contained in Chapter 15 of the SSAR. The specifics of this comment related to Chapter 15 defining the HVAC filter efficiency as 95% while the Tier 1 design description l

specified "80% filter efficiencies." The HVAC system contains a bag-type filter with 80% efIiciency. For accident conditions, an additional emergency filter train I

consisting of HEPA filters and a charcoal bed is automatically initiated to raise the filtration efIiciency as described in Chapter 9 of the SSAR.

O RCB:92049hj '

bb I} O' 9206C90103 920604 PDR ADOCK 05200001 A

PDR j

JLti 04 '92 o h 10Pt1 P.2 q

1

\\

Mr. Dennis M. Crutchfield June 4,1992 Page 2 Another inconsistency cited by the staffin the May 29 memorandum dealt with the apparent staff conclusion that, should both air intakes into the control room be isolated at the same time, this is contrary to the SSAR analysis that requires a positive atmos-pheric pressure control system te perform its function. However, as described in the SSAR Chapter 9, the normal Control Room HVAC intake duct and exhaust fans do isolate on high radiation signal. Correspondingly, the emergency recirculation filter train is automatically initiated, which provides a reduced flow of outside air through high efficiency filtration and controls positive pressure of the control room. This apparent lack of cladty is regretted, but GE does not agree that it reflects a shortc.oming in internal quality assurance, s

The staff also noted that it is particularly difficult to assure consistency between Tier 1 and SSAR information because amendments to the SSAR have not been submitted in consonance with changes made to Tier 1 matedal. GE believes that this comment does not reflect the reality of the review process which, in effect, places the resiew of all sections of the SSAR in parallel. This process has resulted in changes to SSAR chapters flowing from the resiew progress on indMdual chapters rather than from progress on renew ofinterfacing sections.

The staff noted that they believed another inconsistency to be that systems proposed for the Tier 1 documer t were not addressed in the SSAR. Examples cited were the Breathing Air system and the Dust Radiation Monitoring System (DRM). In regard to the Breathing Air system, Section 1.2.2.12.19 of the SSAR provides the discussion of that system and, consequently, there is no inconsistency with the Tier 1 document.

In the case of the Dust Radiation Monitoring system, that system is part of the K6/7 project unique ABWR design application but is not part of the standard ABWP design as submitted for Design Certification. In the initial listing of the standard ASWR systems to be addressed by the ITAAC, the DRM system was included but was clearly identified as not being a part of the ABWR for which GE is seeking certification.

Future updates of that list of systems to be addressed by ITAAC will delete identi-fication of the DRM system. When this has been done, neither the Tier I document nor the SSAR will discuss a DRM system.

With regard to the comments made regarding GE's commitment to proside "roadmaps" for a number of key analyses, it is GE's perception tha development of "roadmaps" should follow Stage 2 and Stage 3 submittals and thus would begin after all Tier 1 information has been initially submitted. Now that the Stage 3 ITAAC submittal has been made (June 1,1992), GE will start development of "roadmaps" and will work with the staff to put in place a list of the subjects / chapters to be covered.

With regard to the staff's comment in its May 29 memorandum that GE would not support discussions to address the comments contained in the May 7 memorandum, GE addressed many of them in the Stage 3 submittal. If we had interrupted our Stage 3 RCB:92049/j l

l

jut 4 04 '92 04: 10PM P.3 i

Mr. Dennis M. Crutchfield June 4,1992 PageS preparation activity to discuss the comments, we would not have successfully met our commitment to make the Stage 3 submittal byJune 1,1992.

I,astly, it is GE's intention to assure that the Tier 1 material complies with the apphcable requirements of Part 50, Appendix B. This will entail a verification process that,in GE's opinion,is best completed after completion of the highly.,eracdve review / change process noted above. We would emphasize, however, that we have exercised appropriate checking measures #n preparing the Stage $ submittal.

As discussed in our last mar.agement meeting on May 7, we will need to carry out parallel aedons to meet our mutual objective of a December 1992 Final Design Approval on ABWR. For thi= reasor,, I urge that we condnue our face to face staff and management interacdons and coordinadon on these types of subjects in order to resolve them in a timely way.

Sincerely.

/C0 af

~

R. C. Berglund cc:

N. D. F; etcher D. F. Giessing J. M. Gutierrez P. W. Marriott J. F. Quirk M. A. Rowden l