ML20097D848

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Sequoyah Nuclear Plant Unit 2 Cycle 6 Core Operating Limits Rept
ML20097D848
Person / Time
Site: Sequoyah 
Issue date: 06/04/1992
From: Joshua Wilson
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20097D851 List:
References
NUDOCS 9206110162
Download: ML20097D848 (1)


Text

.

HA 3 em.- we w,

, it

,, s

, r Jack L Wen

'sce Prt s acM x:) o,e 4 !

7 I' a '

n 1

June 4, 1992 U.S. Nuclear Regulatory Commission ATTNs Document Control Desk Washington,-D.C. 20555 Gentiam' it

-In the e.atter of

)

Docket No. 50-328 Tennessee Valley Authority

)

SEQUOYAll NUCLEAR PLANT (SQN)

UNIT 2 CORE OPERATING LIMITS REPORT (COLR)

In accordance with the SQN Unit 2 Technical Specification 6.9.1.14.c, enclosed is the Unit 2 Cycle 6 COLR.

There are no commitments contained in 'his submittal. Please direct

.ations concerning this issue to W. C. Ludwig at (615) 843-7460.

'ncerely, JW 1

j L. Wilson l

l Enc?osure l

cc (Enclosure):

L Mr. D. E. LaBarge, Project Manager Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission One White Flint, North Region II l

11555 Rockville Pike 101 Marietta Street, NW l

Rockville,-Maryland 20852 Suite 2900 Atlanta, Ceorgia 30323 NRC Resident Inspector l

Sequoyah Nuclear Plant i

2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 9206110162 920604 DR ADOCK 05000328 MO/

p PDR

<//

.