Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000336/LER-1994-017-01, :on 940601,EBFAS & Control Room Filter Fan Actuation Occurred.Caused by Fused Contact W/Holder Which Reenergized Circuit.Procedure 2384 Will Be Evaluated.W/ + (July 1, 1994)
- 05000334/LER-1994-005-01, :on 940601,transformer Fault Initiated Voltage Disturbance on Electrical Grid Which Caused Relay Actuation Due to single-phase Insulating Bushing Failure.Completed Outage Repairs & Testing Activities + (July 1, 1994)
- 05000412/LER-1994-006, :on 940603,steam Driven AFW Pump Started Due to Low Level in C SG & Operator Error.Individual Involved Was Counseled & Incident Will Be reviewed.W/9407021 Ltr + (July 1, 1994)
- IR 05000280/1994009 + (July 1, 1994)
- IR 05000272/1994013 + (July 1, 1994)
- ML18100B192 + (July 1, 1994)
- IR 05000260/1994014 + (July 1, 1994)
- ML18037A971 + (July 1, 1994)
- HNP-94-052, Advises That Util Scheduled Emergency Preparedness Exercise for Shnpp for 940913.Proposed 940913 Exercise Objectives Encl + (July 1, 1994)
- 05000316/LER-1994-003-01, :on 940421,continuous Radiation Monitor SRA 2905 Declared Inoperable Due to Condensation Buildup in Sample Process Lines.Sample Plugs Reinstalled Prior to Pulling Subsequent Samples + (July 1, 1994)
- IR 05000528/1994018 + (July 1, 1994)
- 05000397/LER-1994-002, :on 940215,seals Conservatively Declared Inoperable,Following Completion of Preliminary Analysis of Seal Program.Caused by Original Const Inadequate in Some Initial Seal.Fire Watch Established + (July 1, 1994)
- L-94-169, Forwards Response to Request for Addl Info Re GL 92-01, Rev 1,including Schedule for Addl Data Requested on belt-line Weld 2-203 Which Should Be Available by 950801 + (July 1, 1994)
- ML16342C616 + (July 1, 1994)
- ML17180A857 + (July 1, 1994)
- TAC:M89315 + (July 1, 1994)
- ML18037A973 + (July 1, 1994)
- ML17180A859 + (July 1, 1994)
- ML17310B422 + (July 1, 1994)
- ML17059A348 + (July 1, 1994)
- ML20024J059 + (July 1, 1994)
- ML17332A240 + (July 2, 1994)
- ML20265F712 + (July 2, 1994)
- ML20265F660 + (July 2, 1994)
- ML20072T145 + (July 3, 1994)
- ML20202E682 + (July 4, 1994)
- ML17332A202 + (July 5, 1994)
- ML17310B426 + (July 5, 1994)
- ML18153A992 + (July 5, 1994)
- ML20070D976 + (July 5, 1994)
- ML20070D960 + (July 5, 1994)
- ML20070D949 + (July 5, 1994)
- ML20070D863 + (July 5, 1994)
- ML20070D798 + (July 5, 1994)
- ML20070D749 + (July 5, 1994)
- ML20073S810 + (July 5, 1994)
- ML20071G920 + (July 5, 1994)
- ML20071G907 + (July 5, 1994)
- ML20071G903 + (July 5, 1994)
- ML20071G403 + (July 5, 1994)
- ML20071G180 + (July 5, 1994)
- ML20071F804 + (July 5, 1994)
- ML20071F768 + (July 5, 1994)
- ML20247G180 + (July 5, 1994)
- ML20210N558 + (July 5, 1994)
- RBG-40695, Provides Details Re Statement Contained in Insp Rept 50-458/94-03 Which Describes Some MOV Actions Planned for Refueling Outage (Rf) 5,as Discussed W/Nrc on 940324 (Before Commencement of RF5) + (July 5, 1994)
- HL-4627, Informs NRC That Licensee Considers Eop/Fsar Conflicts Closed & Plans No Further Action + (July 5, 1994)
- ML20262D584 + (July 5, 1994)
- ML20202E745 + (July 5, 1994)
- 05000458/LER-1994-013, :on 940602,normal Power Supply Breaker to HPCS 4,160 Volt Bus Tripped,Leading to Automatic Start & Load of Div II Dg.Caused by Personnel error.Multi-discipline Team Formed to Evaluate Maint Practices + (July 5, 1994)
- 05000458/LER-1994-014, :on 940602,Div I BOP Containment Isolation Signal Generated During Replacment of Base of Relay Due to Inattention to Detail by Electrical Discipline Technical Specialist.Specialist Counseled + (July 5, 1994)