Georgia Power Co Motion to Establish Date for Intervenor Response to Georgia Power Co Second Request for Admissions.* W/Certificate of Svc & Svc List
ML20071G920
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/05/1994
From: Doris Lewis
GEORGIA POWER CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
To:
Atomic Safety and Licensing Board Panel
References
CON-#394-15332 93-671-01-OLA-3, 93-671-1-OLA-3, OLA-3, NUDOCS 9407130155
Download: ML20071G920 (5)


Text

_

/35332-t DOCKETE1 July 5, 1994'S"RC UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 3M ll -6 P3 :48 Before the At_omic Safety and Licensing Boa /d gppg q 00CXEir ivn7

!!i%

)

In the Matter of

)

Docket Nos. 50-424-OLA-3 i

)

50-425-OLA-3 GEORGIA POWER COMPANY,

)

et al.

)

Re: License Amendment

)

(Transfer to Southern (Vogtle Electric Generating

)

Nuclear)

Plant, Units 1 and 2)

)

I

)

ASLBP No. 93-671-01-OLA-3 GEORGIA POWER COMPANY'S MOTION TO ESTABLISH DATE FOR INTERVENOR'S RESPONSE TO i

GEORGIA POWER COMPANY'S SECOND REQUEST FOR ADMISSIONS Georgia Power Company (GPC) moves the Board to establish a date by which Intervenor is required to respond to GPC's Second Request for Admissions and Fourth Request for Production of Docu-ments to Intervenor (June 22, 1994).

GPC's Request asked that Intervenor respond to admissions by July 15, 1994,1# and that Intervenor produce all documents responsive to the request within 30 days of service.

The schedule for Intervenor's response was not discussed at the June 23 prehearing conference, because Intervenor's counsel wished more opportunity to review the request.

GPC subsequently asked Intervonor's counsel whether the response date is satisfac-tory.

At a meeting on July 1, Intervenor's counsel informed GPC A/

The July 8, 1994 date corresponded to 14 days after service which is longer-thcn the minimum 10-day period for response established in the NRC Rules.

See 10 C.F.R. 5 2.742(b).

9407130155 940700 PDR ADUCK 05000424.

2)SA C

PDR s

~ -~m

't i

that Intervenor would not commit to respond by any date and may not respond until after the close of discovery, on the same day, Intervenor served GPC with Intervenor's Second Request f or Admis -

s$ons, relating to the same subject matter (the accuracy of the coordinating Group Analysis) and asking for a response in four-teen days.

t to comm'.t to any date for In light of 3 nterJe..ne's ref usu 7

responso, GPC ret) ests that the Board, pursu.nt to 10 C.F.R. 5 2.742(b), establish July 15 ac the date by w 'ich Intervenor is Admissions.

With required to respond to GPC's Second Request f(

this due date, representing an additional vee-Irtervanor will

'"V have had three weeks to respond s Regs - - t.

Respectfully submitted, r,-,

(

-]

(

i Ernest L. B.EE Y,~~Ja Davia d. Levit SHAW PtTTMAN POTTS TROWBRIDGE 2300 N Street, N.We Washing ton,- D.C.

20037 (202) 663 8000 John Lamberski

-TROUTMAN SANDEf<S 600 Peachtrer-Street, NE Suite 5200 Atlanta, di. 308-2316 (404) 885 336i Counsel fer Georgia Power e ipany Dated:

July 5,1994 h

1 r

,-m

+

v w

.,e r--

,e-_.

F

,,wem

-.,.-,,ey

,,y,,m--mm

.g-e vr ~ ~

--wwe-

-wy-

, '-+--

=

i DOCKfTED UNITED STATES OF AMERICA U S 'g q ('

NUCLEAR REGULATORY COMMISSION Bef ore the Atomic Saf ety and I:icensing Boa r'94 J1 -fa P3:/.8

)

OfflCE N LireE1/my 0

50 fMdilh3

!P*i!

In the Matter of

)

Docket Nos.

)

50- 4 2 5-Ollk '3d GEORGIA POWUR COMPANY,

)

et al.

)

Re License Amendment

)

(Transfer to Southern (Vogtle Electric Generating

)

Nuclear)

Plant, Units 1 and 2)

)

)

ASLBP No. 93-671-01-OLA-3 f

CERTIFICATE OF SERVICE I hereby certify that copies of " Georgia Power Company's Motion to Establish Date for Intervenor's Response to Georgia Power Company's Second Request for Admissions," dated July 5, 1994, were served by deposit in the U.S. Mail, first class, post-age prepaid, or where indicated by an asterisk by hand delivery, upon the persons listed on the attached service list, this fifth day of July, 1994.

V J )c c' d David Lewis Dated: July 5, 1994

-l UNITED STATES OF AMERICA NUCLEAP REGULATORY COMMISSION Before the Atomic Gafety and Licensina Board

)

In the Matter of

)

Docket Nos. 50-424-OLA-3

)

50-425-OLA-3 GEORGIA POWER COMPANY,

)

et al.

)

Re: License Amendment

)

(Transfer to Southern (Vogtle Electric Generating

)

Nuclear)

Plant, Units 1 and 2)

)

)

ASLBP No. 93-671-01-OLA-3 SERVICE LIST

\\

  • Ac.ministrative Judge Office of the Secretary Pett-B. Bloch, Chairman U.S. Nuclear Regulhtory Commission Atomic Safety & Licensing Board Washington, D.C.

20555 U.S. Nuclear Regulatory Commission ATTN: Docketing and Services Branch Washington, D.C.

20555

  • Mitzi A. Young, Esq.

Administrative Judge

' Charles Barth, Esq.

James H. Carpenter Office of General Counsel Atomic Safety & Licensing Board One White Flint North t

933 Green Point Drive Stop 15B18 Oyster Point U.S. Nuclear Regulatory Commission Sunset Beach, N.C. 28468 Washington, D.C.

20555

  • Administratire Judge
Director, Thomas D. Murphy Environmental Protection Division Atomic Safety & Licensing Board Department of_ Natural Resources U.S. Nuclear Regulatory Commission 205 Butler Street, S.E.

Washington, D.C.

20555 Suite 1252 Atlanta, Georgia 30334

  • Michael D. Kc hn, Esq.

Kohn, Kohn & Colapinto, P.C.

Office of Commission Appellate 517 Florida Avenue, N.P.

Adjudication Washington, D.C.

20001-U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Stewart D. Ebneter Regional. Administrator Adjudicatory File USNRC, Region II Atomic Safety and Licensing Board

-101 Marietta Street, NW U.S. Nuclear Regulatory Commission Suite 2900 Washington, D.C. 20555 Atlanta, Georgia 30301

.---f---..,_

.-. -~ ~,.- -

.~..-._.

-...- - ~ -....... -.~-- -..- - - - -. -.- -,. -....

M:/01;)/077DRL.)4 b

P 1

+

en

.c+y g.

,,wg i.=

+

w

-,e

~

=

c c.w co -m e -