Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AECM-84-0326, Describes Design Change Problems & Provides Commitment Dates for Resolution of Tech Spec Problem Sheets,Per Review + (July 3, 1984)
- SNRC-1065, Submits Technical Guidance & Methodology Used in Reducing Emergency Diesel Generator Loads.Revised FSAR Tables Encl. Review of Load Reduction Requested + (July 3, 1984)
- W3P84-1815, Forwards Final Prospectus for Pollution Control Bonds & Preliminary Prospectus for 2 Million Shares of Louisiana Power & Light Preferred Stock,Updating Util + (July 3, 1984)
- ML20092P243 + (July 3, 1984)
- ML20261K949 + (July 3, 1984)
- ML20261L984 + (July 3, 1984)
- ML20261D410 + (July 3, 1984)
- ML20261D398 + (July 3, 1984)
- ML20261C969 + (July 3, 1984)
- ML20261B583 + (July 3, 1984)
- ML20261D404 + (July 3, 1984)
- ML20260A227 + (July 3, 1984)
- ML20211J196 + (July 3, 1984)
- ML20211F053 + (July 3, 1984)
- ML20209D139 + (July 3, 1984)
- 05000263/LER-1984-021, :on 840604,advertent Trip of Offsite Source Supply to Plant Caused Fast Start of Diesel Generator & Initiation of Standby Gas Treatment Sys.Caused by Personnel Error.Procedures Will Be Revised + (July 3, 1984)
- 05000259/LER-1984-025-01, :on 840615,review of Bldg Heat Sys During IE Bulletin 79-14 Insp Determined That Isolation Between Turbine & Reactor Bldg Heat Sys Lines Inadequate.Caused by Failure to Follow Design Criteria + (July 3, 1984)
- 05000316/LER-1984-016, :on 840603,fire Seals 7091 & 7500 Discovered Inoperable W/O Firewatch Present.Apparent Cause Was Slight Movement of Fire Pipe During Installation.Continuous Firewatch Maintained & Seals Repaired + (July 3, 1984)
- 05000321/LER-1984-007, :on 840604,following Turbine Load Reduction, Turbine Stop Valve Fast Closure Reactor Scram Received. Caused by Disc Pump Not Completely Seating on Main Turbine 2.Instrumentation Recalibr + (July 3, 1984)
- 05000346/LER-1984-008, :on 840605,shift Supervisor Notified of Documentation Problem W/Seismic Qualification of Transformer Installed in Two Motor Control Ctrs.Caused by Breakdown in Westinghouse Qa.Also Reported Per Part 21 + (July 3, 1984)
- 05000317/LER-1984-005, :on 840502,through-wall Hole Occurred During Removal of Graphite Layer on Component Cooling HX 22.Second Hole Created on 840503.All Units 1 & 2 Saltwater Pumps Inoperable on 840514.Cause Unknown + (July 3, 1984)
- 05000289/LER-1984-002-02, :on 840603,partial Engineered Safeguards Actuation Sys Actuation Occurred.Caused by Engineered Safeguards Actuation Sys Relay Failures in Conjunction W/ Maint Testing.Maint Procedure Will Be Updated + (July 3, 1984)
- ML20094C816 + (July 3, 1984)
- ML20117L639 + (July 3, 1984)
- ML20094C798 + (July 3, 1984)
- ML20199F713 + (July 3, 1984)
- ML18092A235 + (July 3, 1984)
- ML20093K293 + (July 4, 1984)
- ML20092P632 + (July 4, 1984)
- ML20105D071 + (July 4, 1984)
- ML20261D990 + (July 4, 1984)
- ML20261D651 + (July 4, 1984)
- ML18018B707 + (July 5, 1984)
- ML18092A241 + (July 5, 1984)
- ML20099L120 + (July 5, 1984)
- ML20095E009 + (July 5, 1984)
- ML20095D221 + (July 5, 1984)
- ML20094B445 + (July 5, 1984)
- ML20093P073 + (July 5, 1984)
- ML20093N816 + (July 5, 1984)
- ML20093J000 + (July 5, 1984)
- ML20093G555 + (July 5, 1984)
- ML20093E532 + (July 5, 1984)
- ML20093E259 + (July 5, 1984)
- ML20093E243 + (July 5, 1984)
- ML20093E145 + (July 5, 1984)
- ML20093C778 + (July 5, 1984)
- ML20093A551 + (July 5, 1984)
- ML20093A523 + (July 5, 1984)
- ML20093A512 + (July 5, 1984)
- ML20093A394 + (July 5, 1984)
- ML20093A328 + (July 5, 1984)
- ML20093A247 + (July 5, 1984)
- ML20093A235 + (July 5, 1984)
- ML20092P777 + (July 5, 1984)