Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-97-000, Forwards Proprietary & non-proprietary Versions of Revs to EPIPs Including Rev 41 to Index,Rev 39 to Form Index & Rev 3 to EPIP-4.4a, Alternate Emergency Operations Facility Activation Checklist. Proprietary Portion Withheld + (January 3, 1997)
- ML20133L860 + (January 3, 1997)
- ML20133E367 + (January 3, 1997)
- ML20265E011 + (January 3, 1997)
- ML20266A629 + (January 3, 1997)
- ML20202C831 + (January 3, 1997)
- 05000482/LER-1996-019, :on 961206,historical Failure to Comply W/ Radiological Effluent TS Requirement Identified.Caused by Technical Error in Interpretation of TS Provisions.Forms Apf 02-007-06,07 & 08 Have Been Changed + (January 3, 1997)
- 05000266/LER-1996-012, :on 961205,failed to Perform EDG Fuel Oil Tests.Caused by non-conservative Interpretation of Tss. Successfully Tested Fuel Oil & Revised TS Tests TS-81,TS-82, TS-83 & TS-84 + (January 3, 1997)
- 05000271/LER-1996-029, :on 961207,failed to Analyze EDG Fuel Oil within Time Allotted by Ts.Caused by Process & Communication Inadequacies.Performed Analysis & Will Upgrade Sample Handling Process to Eliminate Inadequacies + (January 3, 1997)
- ML20133C646 + (January 3, 1997)
- ML20133D234 + (January 3, 1997)
- ML20133D037 + (January 3, 1997)
- ML20134C211 + (January 3, 1997)
- ML20136A791 + (January 3, 1997)
- PY-CEI-NRR-2126, Forwards Emergency Public Info Calendars Distributed Through Local Counties to General Public within PNPP 10 Mile Emergency Planning Zone,Per Request by NRC Administrative Ltr 94-07 + (January 3, 1997)
- ML20007E278 + (January 3, 1997)
- ML20133C871 + (January 3, 1997)
- ML20133D044 + (January 3, 1997)
- IR 05000255/1996016 + (January 3, 1997)
- ML18066A810 + (January 3, 1997)
- ML17059B391 + (January 3, 1997)
- PNO-IV-97-002, on 970103,licensee Ability to Evacuate Site Personnel Was Prohibited Due to Mudslide Which Blocked Access to & from Plant Site.State of California Has Been Informed + (January 3, 1997)
- ML20136C123 + (January 3, 1997)
- ML20147F101 + (January 3, 1997)
- ML20133G965 + (January 3, 1997)
- ML20136A818 + (January 3, 1997)
- 05000423/LER-1996-048, :on 961202,failed to Complete TS Required Testing of Chs Pump While Shutdown.Caused by Lack of Verbatim Compliance W/Ts.Performed Load Shed Surveillances + (January 3, 1997)
- ML20136A726 + (January 4, 1997)
- ML20134E531 + (January 4, 1997)
- ML20133E843 + (January 4, 1997)
- ML20136A776 + (January 4, 1997)
- ML20133N051 + (January 5, 1997)
- ML20236X423 + (January 5, 1997)
- ML18038B796 + (January 6, 1997)
- ML18102A748 + (January 6, 1997)
- ML18102A739 + (January 6, 1997)
- ML18066A821 + (January 6, 1997)
- ML18066A814 + (January 6, 1997)
- ML20135B349 + (November 22, 1996)
- ML20135B433 + (January 6, 1997)
- ML20138L911 + (January 6, 1997)
- ML20138L848 + (December 30, 1996)
- ML20138L869 + (January 6, 1997)
- ML20138E446 + (June 10, 1994)
- ML20138H962 + (January 6, 1997)
- ML20138H674 + (January 6, 1997)
- ML20134D129 + (January 6, 1997)
- ML20134C732 + (January 6, 1997)
- ML20134D118 + (January 6, 1997)
- ML20134B938 + (January 6, 1997)
- ML20134A941 + (January 6, 1997)
- ML20134A897 + (January 6, 1997)
- ML20134A644 + (January 6, 1997)
- ML20133P807 + (January 6, 1997)