ML18066A810

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-255/96-16 on 961119-21 & 1216.No Violations Noted
ML18066A810
Person / Time
Site: Palisades 
Issue date: 01/03/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Thomas J. Palmisano
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML18066A811 List:
References
NUDOCS 9701080115
Download: ML18066A810 (3)


See also: IR 05000255/1996016

Text

Mr. T. Palmisano

General Manager

January 3, 1997

Palisades Nuclear Generating Plant

27780 Blue Star Memorial Highway

Covert, MI

49043-9530

SUBJECT:

NRC INSPECTION REPORT NO. 50-255/96016(DRS)

Dear Mr. Palmisano:

This refers to the inspection conducted by Mr. D. Jones of this office on

November 19-21, and December 16, 1996.

The inspection included a review of

authorized activities for your Palisades Nuclear Generating Plant.

The focus

of this inspection was on your inservice inspection efforts.*

The inspector considered the IS1 plan particularly well organized and

documented.

The use of "state of the art" equipment to perform eddy current

examinations for the Inservice Inspection Program demonstrated an important

element of a quality program.

The steam generator eddy current inspection

program was conservative with a positive management oversight.

In addition,

the Engineering Department's planning and implementation of the Alloy 600

project was observed to be positive.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures,

representative records and interviews with personnel.

For the areas

inspected, NRC and ASME Code requirements were met and no violations or

deviations were identified.

At the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed report.

In accordance with

10 CFR 2.790 of the Commission's regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC Public Document Room .

9701080115 970103

PDR

ADOCK 05000255

G

PDR

T. Palmisano

2

January 3, 1997

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original Signed by Melvyn Leach (for)

Docket No. 50-255

Enclosure:

Inspection Report

Geoffrey E. Grant, Director*

Division of Reactor Safety

No. 50-255/96016(DRS)

cc w/encl:

Robert A. Fenech, Vice President,

Nuclear Operations

Thomas C. Bordine, Manager, Licensing

James R. Padgett, Michigan Public

Service Commission

Michigan Department of Public Health.

Department of Attorney General (Ml)

Distribution:

Docket File w/encl

PUBLIC IE-01 w/encl

OC/LFDCB w/encl

Riii PRR w/encl

SRls, Palisades,

BRP w/encl

LPM, NRR w/encl

W. L. Axelson, Riii w/encl

Enf. Coordinator, Riii w/encl

CAAl w/encl

DRP w/encl

  • DRS w/encl

A. B. Beach, Riii w/encl

,_130011

SEE ATTACHED CONCURRENCES

DOCUMENT NAME:

G:\\DRS\\PAL96016.DRS

\\

)

To receive a copy of this document, indicate in the box 'C" = Copy w/o attach/encl "E" = Copy w/attach/encl "N" = No copy

OFFICE

RIII:DRS

I

RIII:DRS

I

Rill :DRP

I

RIII:DRS

1..-v'

NAME

Jones/kjc

Krooo

Mi 11 er

Granto7'""-"-'- ~

DATE

12/

/96

12/

/96

12/

/96

01/o!:i/97

OFFICIAL RECORD COPY

T. Palmisano

2

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Geoffrey E. Grant, Director

Division of Reactor Safety

Docket No. 50-255

Enclosure:

Inspection Report

No. 50-255/96016(DRS)

cc w/encl:

Robert A. Fenech, Vice President,

Nuclear Operations

Thomas C. Bordine, Manager, Licensing

James R. Padgett, Michigan Public

Service Commission

Michigan Department of Public Health

Department of Attorney General (MI)

Distribution:

Docket File w/encl

PUBLIC IE-01 w/encl

OC/LFDCB w/encl

DRP w/encl

DRS .w/encl

RIII PRR w/encl

SRis, Palisades,

BRP w/encl

LPM, NRR w/encl

A. B. Beach, RIII w/encl

DOCUMENT NAME:

G:\\DRS\\PAL96016.DRS

W. L. Axelson, RIII w/encl

Enf. Coordinator, RIII w/encl

CAAl w/encl

To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy w/attach/encl "N" = No copy

OFFICE

~ RIII:DRS

NAME

Grant

DATE

12/

/96