Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ELV-02853, Requests Change to QA Program,Described in Encl FSAR Sections,Providing for Biennial QA Audits of Plant Procedural Development & Maint Program Utilizing Representative Sampling Process + (April 3, 1992)
- BECO-92-043, Requests Permission for 3 Gallons Per Min of Scrubber Effluent from Gas Generator Scrubber to Be Dicharged Through PNPS Discharge Canal Storm Drain + (April 3, 1992)
- U-601949, Forwards Info to Resolve Issues Re NRC Review of Util Inservice Testing Program for Initial 120-month Insp Interval & Relief Requests + (April 3, 1992)
- ELV-03618, Comment Supporting Proposed Rule 10CFR2 Re Policy & Procedure for Enforcement Actions + (April 3, 1992)
- PY-CEI-NRR-1467, Provides Update on Action Plan Re Suppression Pool Stainless Steel Cladding Sensitization Issue Outlined in 801006 Deviation Analysis Rept.Electrochemical Monitoring of Heat Affected Zones of Pool Welds Completed + (April 3, 1992)
- ML20198D060 + (April 3, 1992)
- 05000282/LER-1992-004-01, :on 920306,discovered Failure to Perform Full Flow Test of turbine-driven Auxiliary Feedwater Pumps.Caused by Personnel Error.Comprehensive Review of Testing Requirements Being Conducted + (April 3, 1992)
- 05000339/LER-1992-004-01, On 920313,determined That D CRD Mechanism Cooling Fan Timer Drifted Outside Setpoint Limit.Caused by Setpoint Drift.Timer Was Reset & Tested + (April 3, 1992)
- 05000370/LER-1992-002-06, :on 920305,train B Experienced Inadvertent Esfa.Caused by Defective Procedure & Inappropriate Actions. Personnel Counselled & Governing Procedure to Be Revised + (April 3, 1992)
- ML20095G742 + (April 3, 1992)
- ML20100R440 + (April 3, 1992)
- ML20134H359 + (April 3, 1992)
- ML20095G752 + (April 3, 1992)
- ML20126K507 + (April 3, 1992)
- 05000255/LER-1992-018, :on 920305,determined That Containment Electrical Penetration Connectors Were Not Qualified W/ 10CFR50.49.Caused by Lack of Adequate Technical Guidance. Subj Connectors Replaced + (April 3, 1992)
- ML18036A680 + (April 3, 1992)
- ML17306A653 + (April 3, 1992)
- GO2-92-080, Provides Corrections to Annual Reporting Requirements Re Level of Property & Liability Insurance Coverage in Force at Facility,Initially Submitted Via Util + (April 3, 1992)
- IR 05000237/1992006 + (April 3, 1992)
- IR 05000387/1992007 + (April 3, 1992)
- ML17177A352 + (April 3, 1992)
- ML17177A353 + (April 3, 1992)
- IR 05000220/1992009 + (April 3, 1992)
- ML16148B131 + (April 3, 1992)
- TAC:M51112 + (April 3, 1992)
- ML17306A651 + (April 3, 1992)
- ML17306A640 + (April 4, 1992)
- ML20114B982 + (April 4, 1992)
- ML20266C473 + (April 4, 1992)
- ML20091D770 + (April 5, 1992)
- BVY-92-055, Advises That Util Performed Rv Head Insp During Outage to Address Concerns Raised in GE SIL 539 & Discovered Possible Cracking in Cladding of RPV Head.No Evidence That Structural Integrity of RPV or Vessel Head Compromised.Evaluation Encl + (April 5, 1992)
- ML17309A479 + (April 6, 1992)
- ML17262A812 + (February 1, 1990)
- ML18164A046 + (April 6, 1992)
- ML18157A019 + (April 6, 1992)
- ML18036A654 + (April 6, 1992)
- ML18036A652 + (April 6, 1992)
- ML18036A651 + (April 6, 1992)
- ML20079Q870 + (April 6, 1992)
- ML20101A151 + (April 6, 1992)
- ML20099H052 + (April 6, 1992)
- ML20097A828 + (April 6, 1992)
- ML20094S437 + (April 6, 1992)
- ML20094P367 + (April 6, 1992)
- ML20094P351 + (April 6, 1992)
- ML20091E610 + (April 6, 1992)
- ML20091E467 + (April 6, 1992)
- ML20091E256 + (April 6, 1992)
- ML20091D976 + (April 6, 1992)
- ML20091D666 + (April 6, 1992)
- ML20091D656 + (April 6, 1992)
- ML20091D637 + (April 6, 1992)
- ML20091D582 + (April 6, 1992)