Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18152B198 + (September 2, 1988)
- ML18152B200 + (September 2, 1988)
- ML18152B197 + (September 2, 1988)
- L-88-384, Responds to Violations Noted in Insp Repts 50-250/88-11 & 50-251/88-11.Corrective Actions:Chemistry Dept Training Program Revised to Include Addl Instruction on Procedure Usage + (September 2, 1988)
- ML17345A360 + (September 2, 1988)
- 05000315/LER-1988-006-01, :on 880803,isolation of CO2 Fire Protection Sys,W/O Compensatory Action Occurred.Caused by Personnel Error.Appropriate Administrative Action Taken W/Individuals Involved + (September 2, 1988)
- ML17345A366 + (September 2, 1988)
- 05000397/LER-1988-019, :on 880527,determined That Control Room Emergency Filtration Sys Actuation Occurred on 880520.Caused by Technician Failure to Reset Trip Logic During Response Time Test Due to Inadequate Procedure + (September 2, 1988)
- 05000397/LER-1988-006, :on 880213,series of Reactor Pressure Vessel Level Transients Resulted in Low Reactor Protective Sys Actuation Following Manual Scram.Caused by Procedural Inadequacy.Procedures Modified + (September 2, 1988)
- ML17156A762 + (September 2, 1988)
- ML14191A984 + (September 2, 1988)
- 05000206/LER-1988-013-01, :on 880806,east Main Feedwater Pump Safety Injection Recirculation Valve CV-875A Observed Leaking Feedwater to Refueling Water Storage Tank.Caused by Valve Not Seating Properly in Closed Position + (September 2, 1988)
- ML13330B373 + (September 2, 1988)
- ML17345A364 + (September 2, 1988)
- PNO-II-88-052A, on 880831,augmented Insp Team Dispatched to Investigate Partial Loss of Water from Refueling Cavity. Licensee Submits Justification for Continued Operation.Nrc Plans to Meet W/Licensee to Discuss Actions + (September 2, 1988)
- PNO-V-88-056, on 880830,Unit 1 Experienced Reactor Trip from 99% Power Due to Main Feed Pump Trip.Also,On 880901,Unit 2 Experienced Reactor Trip from 100% Power Due to Seismic Trip Signal.Incidents Under Investigation + (September 2, 1988)
- ML13336A107 + (September 2, 1988)
- ML13308B078 + (September 2, 1988)
- ML17345A362 + (September 2, 1988)
- ML20154E116 + (September 2, 1988)
- ML20154E121 + (September 2, 1988)
- ML20154L793 + (September 2, 1988)
- ML20155B841 + (September 2, 1988)
- IR 05000206/1988017 + (September 2, 1988)
- IR 05000192/1988002 + (September 2, 1988)
- ML20153H168 + (September 2, 1988)
- ML20155A659 + (September 3, 1988)
- NRC-88-0230, Forwards Action Plan on Recirculation Pump B Discharge Valve,Per Rc Knop Request on Progress of Investigation Into Recirculation Pump Discharge Valve Failure to Close + (September 3, 1988)
- ML20154J668 + (September 3, 1988)
- ML20154A898 + (September 5, 1988)
- ML20207N651 + (September 5, 1988)
- ML20207N551 + (September 5, 1988)
- ML20207N543 + (September 5, 1988)
- ML20207N539 + (September 5, 1988)
- ML20207N520 + (September 5, 1988)
- ML20207N497 + (September 5, 1988)
- ML20207N491 + (September 5, 1988)
- ML20207N480 + (September 5, 1988)
- ML20207N453 + (September 5, 1988)
- ML20207N398 + (September 5, 1988)
- ML20207N367 + (September 5, 1988)
- ML20207N146 + (September 5, 1988)
- ML20246E710 + (September 5, 1988)
- ML20245D617 + (September 5, 1988)
- ML20207N466 + (September 5, 1988)
- ML20207N676 + (September 5, 1988)
- ML20207N556 + (September 5, 1988)
- ML20207N509 + (September 5, 1988)
- ML20207N148 + (September 5, 1988)
- ML20205C570 + (September 5, 1988)
- ML20207N418 + (September 5, 1988)
- ML20207L013 + (September 5, 1988)
- ML16341E796 + (September 5, 1988)