ML14191A984

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/88-20 on 880801-03.No Violations or Deviations Noted
ML14191A984
Person / Time
Site: Robinson 
Issue date: 09/02/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML14191A986 List:
References
NUDOCS 8809130159
Download: ML14191A984 (3)


See also: IR 05000261/1988020

Text

ACCELERATED

DISTRIBUTION

DEMONSTRATION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8809130159

DOC.DATE: 88/09/02

NOTARIZED: NO

DOCKET #

FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261

AUTH.NAME

AUTHOR AFFILIATION

COLLINS,D.M.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEY,E.E.

Carolina Power & Light Co.

SUBJECT: Forwards Insp Rept 50-261/88-20 on 880801-03.No violations

noted.

DISTRIBUTION CODE: IE01D

COPIES RECEIVED:LTR

ENCL L SIZE:2.9

J

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

COPIES

RECIPIENT

COPIES

S

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

PD2-1 PD

1

1

LO,R

2

2

INTERNAL:

AEOD

1

1

DEDRO

1

1

A

NRR MORISSEAU,D

1

1

NRR/DLPQ/PEB 11

1

1

NRR/DLPQ/QAB 10

1

1

NRR/DOEA DIR 11

1

1

D

NRR/DREP/EPB 10

1

1

NRR/DREP/RPB 10

2

2

NRR/DRIS DIR 9A

1

1

NRR/PMAS/ILRBl2

1

1

NUDOCS-ABSTRACT

1

1

ERANJ

1

1

OGC/HDS1

1

1

(REG

02

1

1

S

RES/DSIR DEPY

1

1

7

01

1

1

1

NAL: LPDR

1

1

NRC PDR

1

1

NSIC

1

1

R

D

S

A

D

D

S

TOTAL NUMBER OF COPIES REQUIRED: LTTR

23

ENCL

23

SEP 0 2 1988

Docket No. 50-261

License No. DPR-23

Carolina Power and Light Company

ATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-261/88-20

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. M. Sartor, Jr. on August 1-3, 1988. The inspection included a review of

activities authorized for your H. B. Robinson facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel,

and observation of

activities in progress.

Within the scope of the inspection,

no violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original Stgneu L,

D. M. Collins

Douglas M. Collins, Chief

Emergency Preparedness and

Radiological Protection Branch

Division of Radiation Safety

and Safeguards

Enclosure:

(See page 2)

o8309 130 159 8 0 90 2

PDR

ADOCK 05000261

F'PDC:

1

Carolina Power and Light Company

2

Enclosure:

Inspection Report

cc w/encl:

.G. P. Beatty, Jr., Vice President

Robinson Nuclear Project Department

R. E. Morgan, Plant General Manager

bcc w/encl:

NRC Resident Inspector

DRS, Technical Assistant

Document Control Desk

State of South Carolina J. C. Heard, FEMA RIV

W. D. Travers, NRR

RIh

R1 I

Rh /

WSartor

TD

er

PFredrickson

8/.99/88

8/9 188

8/31 /88