Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18017A200 +
- ML17157B934 +
- ML18036A794 +
- ML18153D081 +
- ML20099G246 +
- ML20099D952 +
- ML20099D946 +
- ML20115C119 +
- ML20114A026 +
- ML20113J177 +
- ML20113J172 +
- ML20113J093 +
- ML20113H903 +
- ML20113H899 +
- ML20113H882 +
- ML20113H878 +
- ML20113H875 +
- ML20148G975 +
- ML20148H025 +
- ML20141M331 +
- ML20141M329 +
- ML20141M287 +
- ML20141M269 +
- ML20128C561 +
- ML20127M067 +
- ML20127M097 +
- ML20127D080 +
- ML20127C446 +
- ML20126E677 +
- IA-92-287, Final Response to FOIA Request for Documents Re Releases of Radiation Into Air or Water,Both Inside & Outside Facilities During Time Period of 910101-1231.App a & B Documents Available in PDR +
- 0CAN089201, Responds to Violations Noted in Edsfi Repts 50-313/92-16 & 50-364/92-16 on 920518-0605.Correcitve Actions:Procedure 1412.018 Re Protective Relay Test & Insp in Circuit Breakers Westinghouse/Ge Model Relays Will Be Revised +
- RBG-37303, Suppl to 920701 Special Rept:On 920522,control Panel 1ERSNBI102 Could Not Be Adjusted to within Tolerances Specified.Caused by Internal Component Failure.Component Replaced & Seismic Instrumentation Restored +
- ELV-03931, Forwards Vogtle Unit 2,Cycle 3 Startup Test Rept. Rept Includes Core Loading Map & Summaries of CRD Time Measurement,Initial Criticality,Control & Shutdown Bank Worth Measurement & RCS Flow Measurement +
- ELV-03939, Submits Clarification to Re Rev to Biennial Review of Plant Procedures,Per NRC 920721 Request.Revised, Proposed FSAR Markups,Including Description of How EOPs & Abnormal Procedures Will Be Maintained,Encl +
- U-602021, Responds to Open Item in Insp Rept 50-461/92-03 Re post-accident Sampling Sys.Corrective actions:post-accident Sampling Sys Evaluation Rept Will Be Revised to Comply W/ NUREG-0737,Item II.B.3 +
- RBG-37295, Informs That Util Will Revise Vendor Interface Program to Reflect Contact w/safety-related Vendors on Once Per Cy Basis,Per 900928 Response to Generic Ltr 90-03, Vendor Interface for Safety-Related Components +
- PY-CEI-NRR-1533, Responds to Violations Noted in Insp Rept 50-440/92-11 on 920527-0615.Corrective Actions:Fill & Vent Summary Sheet, Containing Instruments from All Three RHR Loops,Will Be Eliminated & Operations Personnel Will Be Trained +
- TXX-9236, Forwards Rev to Data Point Library,Initially Submitted Via ,As Part of Erds.Rev Contains Info to Reverify Contents &/Or Changes to Library Resulting from Installation & Testing of Computer,Per Generic Ltr 89-15 +
- 05000285/LER-1992-022, :on 920702,discovered That Cables Supplying Power to Three Heater Drain Pump Motors Were Inadequately Sized.Caused by Error in Original Plant Design.Fire Watch Established & Cables Will Be Upgraded +
- 05000285/LER-1992-023, :on 920703,RPS Automatically Tripped & Power Momentarily Lost to Instrument Bus That Supplies Power to Turbine Electrohydraulic Control Sys.Caused by Failure to Isolate Inverters.Mod to Inverters Underway +
- 05000413/LER-1992-007-01, :on 920703,discovered That Previous 72 H Leak Rate Test Had Not Been Performed on Air Lock Per Ts.Caused by Lack of Communication.Operations Support Group Trained Re Communications of Turnover Responsibility +
- 05000423/LER-1992-016-01, :on 920704,both Trains of Auxiliary Bldg Filters Declared Inoperable After Discovering Access Door on Common Intake Plenum for Abfs Open.Caused by Improper Design.Door Has Been Locked Wired Shut +
- ML20127D555 +
- ML20035E130 +
- ML20034D459 +
- ML20092C531 +
- ML20092C544 +
- ML20092C574 +
- ML20127H580 +
- ML17289A787 +