List of results
- ML17329A646 +
- ML17329A645 +
- ML17329A644 +
- Press Release-92-157, NRC Advisory Committee on Reactor Safeguards to Meet in Bethesda, MD, November 5-7 +
- ML18153D161 +
- ML18152A330 +
- ML18152A329 +
- ML20046C759 +
- ML20116L288 +
- ML20116H098 +
- ML20116F032 +
- ML20116D312 +
- ML20116C679 +
- ML20116C576 +
- ML20116C574 +
- ML20116C384 +
- ML20116C351 +
- ML20116C161 +
- ML20116B619 +
- ML20116B596 +
- ML20116B558 +
- ML20116B544 +
- ML20116B398 +
- ML20116B050 +
- ML20116A723 +
- ML20115J610 +
- ML20115J387 +
- ML20128D172 +
- ML20126C861 +
- PNO-III-92-058, on 921022,licensee Identified 7 Inch Long Crack at Weld Interface Between First 18 Inch Weldlet & 30 Inch Condensate Header for Number 4 Direct Contact Feedwater Heater.Licensee Decided to Commence Plant Shutdown +
- ML20266A082 +
- BECO-92-124, Forwards Corrected TS Bases Section 3.9.Error Discovered During Electrical Distribution Sys Functional Insp (Edsfi) Edsfi Rept 50-293/91-80 Re Emergency Diesel Fuel Tank Level Instrumentation +
- BECO-92-123, Submits Reformatted Tech Spec Page 3a Re Fire Protection,In Response to NRC 911007 Request & Generic Ltrs 86-10 & 88-12 +
- RBG-37640, Forward Proposed Changes to QA Program Re Operations QA Manual (Oqam).Proposed Change Establishes Alternative Method of Maintaining Procedures Per 10CFR50,app B,In Lieu of Reviews Imposed by ANSI N18.7,section 5.2.15 +
- JPN-92-064, Forwards Safe Shutdown Capability Reassessment,10CFR50 App R, in Ref to Util Re Fire Protection Improvement Program & NRC Re Insp Rept 50-333/92-80 on Fire Protection +
- ML20057C992 +
- ML20128D190 +
- 05000456/LER-1992-011-06, :on 921007,inadequate Testing Frequency for Afp Start on RCP Bus Undervoltage.Caused by Procedural Deficiency.Instrument Slave Relay Surveillances Increased from Quarterly to Monthly Per TS 4.3.2.1 +
- 05000321/LER-1992-025, :on 920930,setpoint Drift in Protective Relay Results in Multiple Actuations of Esf.Caused by One RPS Bus Power Supply Overvoltage Relay.Overvoltage Relay Recalibrated & Sys Return to Normal +
- 05000366/LER-1992-018-01, :on 920928,PCIS Valve Automatically Isolated & Tripped Operating RWCU Sys Pump.Cause Unknown.Fuse Replaced & Sys Returned to Service +
- 05000366/LER-1992-019-01, :on 920928,personnel Notified That Test Results for SRV Exhibited Drift in Mechanical Setpoint Due to corrosion-induced Bonding.C/A Includes Installing Sys That Will Provide Electrical Signals to SRV +
- 05000382/LER-1992-011, :on 920924,noted That CCW Sys Grab Sample Per TS Action Requirement Had Not Been Taken within Specified Periodicity,Due to Personnel Error.Processing of Permits Will Be Assigned Only to Plant Technicians +
- 05000301/LER-1992-004-02, :on 920926,reactor Manually Tripped During Hot CR Drop Testing Due to Unexpected CR Buttom Indications. Caused by Lack of Communication.Cr Testing Terminated. Procedure Resp 1.1 Will Be Revised +
- PNO-II-92-072, on 921024,facility Went Critical at 5:15 Am & Returned to Svc (Online) at 1:37 Pm,Following 23-day Shutdown.Facility Will Remain at 50% Power Level Until Repairs on Feedpump Recirculation Pipe Weld Complete +