MONTHYEARML20155C1351998-10-26026 October 1998 Rev B to Entergy QA Program Manual ML20217M8951998-04-30030 April 1998 QA Program Manual ML20116B8891996-04-0303 April 1996 Rev 8 to River Bend Station Operations QA Manual ML20116B0501992-10-26026 October 1992 Proposed Changes to QAP Re Operations QA Manual (Oqam) ML20205A7141985-04-16016 April 1985 Corrected Rev 2 to Const QA Program,Consisting of Pages 17.1-57 & 17.1-61 Re Quality Documentary Evidence,Cast & Forged Components & NDT ML20078D7591983-03-31031 March 1983 Const QA Program for River Bend Station 1998-04-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARRBG-45144, Monthly Operating Rept for Sept 1999 for River Bend Station. with1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for River Bend Station. with ML20216G1201999-09-0909 September 1999 Rev 3 to Rbs,Cycle 9 Colr RBG-45110, Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With RBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection1999-08-0606 August 1999 Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection ML20210K4721999-08-0303 August 1999 SER Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With ML20210C6391999-07-0202 July 1999 Rev 2 to River Bend Station,Cycle 9 Colr RBG-45055, Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With ML20196J8031999-06-24024 June 1999 Rev 1 to Rbs,Cycle 9 Colr RBG-45028, Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With RBG-45016, Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With ML20206A2111999-04-21021 April 1999 Safety Evaluation Authorizing Pump Relief Request PRR-001 & Valve Relief Request VRR-001 & Denying Valve Relief Request VRR-002 RBG-44969, Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With ML20205S0601999-03-31031 March 1999 Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 ML20205D5481999-03-26026 March 1999 SER Accepting Util Proposed Alternative to Exam Weld AA with Weld Volume Coverage of 62 Percent for First 10-year Insp Interval Pursuant to 10CFR50.55a(a)(3)(ii) & 10CFR50.55a(g)(6)(ii)(A)(5) RBG-44930, Monthly Operating Rept for Feb 1999 for River Bend Station, Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for River Bend Station, Unit 1.With RBG-44826, Monthly Operating Rept for Dec 1998 for River Bend Station Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for River Bend Station Unit 1.With ML20198K2701998-12-22022 December 1998 Rev 1 to RBS Cycle 8 Colr RBG-44773, Monthly Operating Rept for Nov 1998 for River Bend Station, Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for River Bend Station, Unit 1.With RBG-44727, LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With1998-11-17017 November 1998 LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program ML20155H3491998-11-0303 November 1998 Safety Evaluation Granting Requests for Relief RR2-0001, RR2-0002 & RR2-0003 RBG-44719, Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With ML20155C1351998-10-26026 October 1998 Rev B to Entergy QA Program Manual RBG-44677, Monthly Operating Rept for Sept 1998 for River Bend Station, Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for River Bend Station, Unit 1.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods ML20151S5421998-09-0303 September 1998 Safety Evaluation Opposing Licensee Thermal Model as Currently Implemented.Evaluation Recommended to Be Used in Any follow-up Site Insp RBG-44629, Monthly Operating Rept for Aug 1998 for River Bend Station, Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for River Bend Station, Unit 1.With ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed RBG-44600, Monthly Operating Rept for July 1998 for River Bend Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for River Bend Station RBG-44564, Monthly Operating Rept for June 1998 for River Bend Station, Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for River Bend Station, Unit 1 ML20249A6431998-06-12012 June 1998 SER Accepting 980427 Request for Change to River Bend QA Manual Program Description,Per 10CFR50.54(a)(3) RBG-44539, Monthly Operating Rept for May 1998 for River Bend Station, Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for River Bend Station, Unit 1 RBG-44501, Monthly Operating Rept for Apr 1998 for River Bend Station, Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for River Bend Station, Unit 1 ML20217M8951998-04-30030 April 1998 QA Program Manual ML20217P8281998-04-0707 April 1998 Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) RBG-44458, Monthly Operating Rept for Mar 1998 for River Bend Station, Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for River Bend Station, Unit 1 RBG-44423, Monthly Operating Rept for Feb 1998 for River Bend Station Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for River Bend Station Unit 1 ML20203L6631998-02-11011 February 1998 Rev 0 to River Bend Station,1998 Emergency Preparedness Exercise RBG-44385, Monthly Operating Rept for Jan 1998 for River Bend Station, Unit 11998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for River Bend Station, Unit 1 RBG-44353, Monthly Operating Rept for Dec 1997 for River Bend Station, Unit 11997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for River Bend Station, Unit 1 RBG-44460, Forwards Annual Radiological Environmental Operating Rept, for Period Jan-Dec 19971997-12-31031 December 1997 Forwards Annual Radiological Environmental Operating Rept, for Period Jan-Dec 1997 ML20203H9891997-12-12012 December 1997 Part 21 Rept Re Potential Manufacturing Defect of Enterprise DSR-4 & DSRV-4 Edgs.Cooper Energy Svcs Supplied 1A-7840 Adjusting Screw to Affected Utils & Sites.River Bend Station Replaced W/Acceptable Assemblies ML20202E9941997-12-0101 December 1997 ISI Plan Second Ten-Yr Interval (Dec 1,1997-Nov 30,2007) ML20199K9741997-11-30030 November 1997 Brief Aerial Photography Analysis of RBS at St Francisville,LA:1996-1997 RBG-44337, Monthly Operating Rept for Nov 1997 for River Bend Station, Unit 11997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for River Bend Station, Unit 1 ML20202F0191997-11-28028 November 1997 Safety Evaluation Approving Transfer of License NPF-47 for River Bend Station,Unit 1 ML20199H3711997-11-19019 November 1997 SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50 RBG-44295, Monthly Operating Rept for Oct 1997 for River Bend Station Unit 11997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for River Bend Station Unit 1 RBG-44243, LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee1997-10-13013 October 1997 LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee 1999-09-09
[Table view] |
Text
.-_. _ - _ _ _ - _ _ _ - -_-__-
1OF3 4
ATTACIIMENT 2 PROPOSED CIIANGE TO RBS OPERATIONS QUALITY ASSURANCE MANUAL FOR
. REMOVAL OF COMMITMENT FOR BIENNIAL REVIEW PER ANSI N18,7
+
9211020031 921026 PDR ADOCK 05000459 p PDR
1 t,TTACHMENT 2, (cont.) Page 2 of 3 J
Title Quality Assurance Directive QAD 6
- DOCUMENT CONTROL ' Revision: 9
_ Page 4 of 8 4.6 Approval of documents and subsequent revisions shall be-documented to provide evidence of compliance with this directive.
4.7 Controlled document status lists (e.g., indexes) or equivaler.t shall be established, maintained and controlled to identify the current revision of documents. These lists shall be available to responsible personnel to preclude the us, of obsolete documents.
- 4.6 Documents re';uired to perform activities affecting safety related structures, systems and components shall be available at the controlling station or work location prior to beginning the activity.
4.9 4 Changes to documents shall be reviewed and approved as described in administrative procedures. Revision to documents shall be identified. Temporary changes to procedures shall be controlled ir, accordance with applicable station procedures and the -
Technical Specifications.
4.10 edures shall be reviewed and approved prior to inicia The ncy of subsequent reviews shall be speci vary depen . . d may n the type and complexity of activity d
I; involved. All pr res shall be rev .by an individual
! pf/l know19dgeable in the ar fee least every two yects to determine if changes are
{hIUb- 6d\ I procedure may cons e a periodic or desirable. A revision of a J ow. Procedure reviews shall be doc ed and conducted in acco dL4[ a with applicable l
f admin ive procedures and Reference 2.4 (Tec al fications, Section 6).
4.11 Applicable procedures shall be reviewed following reportable incidents including but not limited to accidents, unexpected transients, significant operator errors or equipment-i malfunctinns. Such reviews shall be documented.
4.12 Prior to returning to service systems that have been modified, 4
applicable procedures shall be reviewed and revised as necessary.
4 This review shall be documented.
i 5.0 ATTAC10ENTS -
5.1 Attachment 1 (Quality-Related Document Control Responsibility)
J 5
1 4
i
, - ,. .- , . ~ . . - - . . . , . vn,, . , .~ , -
4
- 30F3 ATTACIIMENT 2 (cont.)
l QAD-6 1
l- IXSERT I
- 4.10 Procedures shall be reviewed and approved prior to initial use. Safety-related procedures will be reviewed / revised as required by the programmatic control stimuil such as
- licensee commitments, industry events, vendor technical input, corrective action programs, user feedback, plant modification program, plant trending program, station events or training experiences, and 3 Quality Assurance /ISEG input. The reviews of frequently used procedures are accomplished durir., the r ision/ update process as a result of the atorementioned stimuli. During routine audits, tim QA organization will verify the revision / update mechanisms to prove the continuing function, infrequently used procedures are to be reviewed prior to use to determine their adequacy. (Infrequently is defined as a procedure of a routine nature that has not been used in the previous two year period). Iliennially, the QA organization shall review a representative sample of routine plant procedures. The QA review will verify that the procedure review d
program is being implemented effectively. A sampling plan which provides a 95% confidence factor with no more than 5 % nonconformance in the popola' ion shall be used. The sampling plan will be based upon the AQL.
i l
t i.
r
ATTACl#ENT 3 Page 1 of 2 RBS USAR TABLE 1.8-1 (Cont).
Retulatory Guide 1.33, Rev. 2 { February 1978)
Quality Assurance Program Requirements (Operation)
Project Position - Comply through the implementation of t,he folicwing clarifications to the regula tory guide and alternates to ANSI N18.7 - 1976, which is referenced by the regulatory guide.
- 1. Paragraph C.S.e - The requirements are implemented subject to the same clarif1:ations made for ANSI N45.2.2 in USAR Section 1.9, Regulatory Guide 1.38.
- 2. Section 2.4 -
Those personnel who perform inrpections, examinations, or testing activities at the River Bend Station who are not qualified to ANS 3.1 are qualified in accordance the requirements of ANSI N45.2.6. w4th
- 3. Section 5.2.7 -
Since some emergency situations could arise which might preclude preplanning of all activities, CSU will comply with an alternate to the first sentence in the second paragraph which reads:
"Except in emergency or abnormal operating conditions where immediate actions are required to protect the health and safety of the public, to protect equipment or personnel, or to prevent the deterioration of plant conditions to a possibly unsafe or unstable leval, maintenance or modification of equipment shall be preplanned and performed in accordance with written procedures. Where written procedures would be required and are not used, the activities that were accomplished are documented after-the-fact and receive the same degree of' review as if they had been preplanned."
- 4. Section 5.3.9 - A format for emergency procedures is followed which is symptom based as opposed to
_ event based as stipulated in Section 5.3.9.1.
USAR Sections - 13.4.1, 13.4.3, 13.5.1, 17.2.18 42 of 238 August 1987 Sfetion 5.2.15 - Frequency of safety related procedure reviews will be performed in accordance with the Operations Quality Assurance Manual rather than ever" two years as specified in N38.7-1976.
ATTACHMENT 3 (cont.) pAGE 2 of 2 RBS USAR 41 and subsequent issues. Final approval of Station Support Manual 1+*
procedures will be as specified in USAR Table 17.2-2.
42 Procedures for the Station Support Manual are prepared under the direction of applicable department heads by the depart-ment responsible for the activities described. Review coordination, obtaining approvals, distribution, and control of procedures is the responsibility of the Administrative Support Section (see Section 13.1.1.2.8.2). Administrative and technical aspects are defined in the procedures.
Procedures are classified as safety-related, nonsafety-related or QA Program Applicable and are' reviewed by qualified individuals in the departments requiring input the procedures. to 2+'
. **1 Station Support Manual procedures arc originated, revised, reviewed, approved, and controlled in accordance with procedures contained in the manual.
previously approved procedures will be Reviews of revisions to performed by those individuals or departments performing the initial review, where possible. In all cases, reviews after first revisions will be performed by personnel with similar qualifications to those performing the initial reviews, 1
Procedures in the station support manual periodically will be reviewed as follows to ensure their ongoing accuracy:
- 1. Emergency Implementing Procedures (EIPs) - Once per 12 calendar months at a minimum.
- 2. Plant Security Procedures
- (PSPs) -
Once per 12 1
calendar months at a minimum.
k 3. All other Station Support Manual procadares - once
) per 24 calendar montna at a minimum.
15-
>A revision to a procedure constitutes a review for the pur-4 pose of meeting the periodic review requirement.
13.5.2.2 Procedures Procedures pertaining to responsibilities performed by the following groups are included in the Station-Support Manual:
All other Station Support idanual procedures will be revised as-needed based on use and experience in accordance with the Operations QA Manual.
Revision 2 13.5-17 August 1989
1
.. l l
l 1 OF 1 A1TACIIMENT 4 Glossary of Acronyms and Initialisms l
i GSU -
GULF STATES UTILITIES COMPANY OQAM - OPERATIONS QUALITY ASSURANCE MANUAL ANSI - AMERICAN NATIONAL STANDARDS INSTITUTE ANS -
AMERICAN NUCLEAR SOCIETY
, USAR - UPDATED SAFETY ANALYSIS REPORT NRC - U.S. NUCLEAR REGULATORY COMMISSION RBS -
RIVER BEND STATION TS -
TECHNICAL SPECIFICATIONS CR -
CONDITION REPORT - PRIMARY IMPLEMENTING DOCUMENT PROVIDING FOR IDENTIFICATION / CORRECTIVE
, ACTION FOR DEFICIENCIES & NON-CONFORMANCES OE -
OPERATING EXPERIENCE INPO - INSTITUTE FOR NUCLEAR POWER OPERATIONS SOER- SIGNIFICANT OPERATING EXPERIENCE REPORT
, SER -
SIGMIFICANT EVENT REPORT SIL -
SERVICE INFORMATION LETTER TIL -
TECHNICAL INFORMATION LETTER
, TRAC - COMPUTER DATABASE USED TO HOUSE IDENTIFICATION / HISTORY OF GSU's INTERNAL AND EXTERNAL COMMITMENTS LER -
LICENSEE EVENT REPORTS EPA -
ENVIRONMENTAL PROTECTION AGENCY ISEG - RIVER BEND's INDEPENDENT SAFETY EVALUATION GROUP.
QA -
QUALITY ASSURANCE AQL - ACCEPT ABLE QUALITY LEVEL RDNP - RIVER BEND NUCLEAR PROCEDURE (UPPER TIER PROCEDURE) 10CFR- TITLE 10 OF THE U.S. NRC CODE OF FEDERAL REGULATIONS EIPs -
EMERGENCY IMPLEMENTING PROCEDURES EPPs - EMERGENCY PLANNING PROCEDURES EOPs - EMERGENCY OPERATING PROCEDURES AOPs - ABNORMAL OPERATING PROCEDURES QAD -
QUALITY ASSURANCE DIRECTIVE (UPPER TIER QA PROGRAM PROCEDURES) l l