Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- CNL-15-164, Second Annual Update, License Renewal Application + (August 14, 2015)
- ML15226A563 + (August 14, 2015)
- W3F1-2015-0061, Provides Supplement to Revise Control Element Assembly Drop Times Associated with Technical Specification 3.1.3.4 + (August 14, 2015)
- GNRO-2015/00059, Submits Corrected Technical Specification Pages Regarding Maximum Extended Load Line Limit Plus License Amendment Request, Dated 9/25/2013 + (August 14, 2015)
- ML15226A061 + (August 14, 2015)
- TAC:MF6517 + (August 14, 2015)
- ML15225A254 + (August 14, 2015)
- ML15223B250 + (August 14, 2015)
- TAC:MF3905 + (August 14, 2015)
- ML15218A625 + (August 14, 2015)
- TAC:MF6160 + (August 14, 2015)
- ML15203A122 + (August 14, 2015)
- TAC:MF6475 + (August 14, 2015)
- ML15195A468 + (August 14, 2015)
- ML15149A363 + (August 14, 2015)
- ML15146A381 + (August 14, 2015)
- ML15139A104 + (August 14, 2015)
- ML15139A101 + (August 14, 2015)
- ML15128A477 + (August 14, 2015)
- ML15103A585 + (August 14, 2015)
- NG-15-0260, NextEra Energy Duane Arnold Energy Center, LLCs Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. + (August 14, 2015)
- 05000286/LER-2015-005, Regarding Automatic Reactor Trip Due to a Turbine-Generator Trip Caused by the Trip of 345kV Main Generator Output Breaker 3 Due to a Failure of South Ring Bus 345kV Breaker 5 + (August 14, 2015)
- ML15161A442 + (August 14, 2015)
- TAC:MF4633 + (August 14, 2015)
- ML15229A054 + (August 14, 2015)
- ML15244A381 + (August 16, 2015)
- IR 05000315/2015403 + (August 17, 2015)
- IR 05000315/2015408 + (August 17, 2015)
- ML15224A539 + (August 17, 2015)
- ML15211A005 + (August 17, 2015)
- ML16116A158 + (August 17, 2015)
- ML16116A151 + (August 17, 2015)
- ML15231A391 + (August 17, 2015)
- ML15251A199 + (August 17, 2015)
- ML15244A379 + (August 17, 2015)
- ML15238B592 + (August 17, 2015)
- ML15237A095 + (August 17, 2015)
- ML15237A087 + (August 17, 2015)
- ML15233A289 + (August 17, 2015)
- ML15233A288 + (August 17, 2015)
- L-15-263, Response to Request for Additional Information Related to Security Plan Changes + (August 17, 2015)
- ML15232A518 + (August 17, 2015)
- ML15201A529 + (August 17, 2015)
- ML15231A161 + (August 17, 2015)
- ML15231A149 + (August 17, 2015)
- ML15230A071 + (August 17, 2015)
- ML15230A046 + (August 17, 2015)
- ML15229B008 + (August 17, 2015)
- ML15229A405 + (August 17, 2015)
- Press Release-IV-15-024, NRC Names New Resident Inspector at Wolf Creek Nuclear Power Plant + (August 17, 2015)
- Press Release-IV-15-023, NRC Names New Senior Resident Inspector at Wolf Creek Nuclear Power Plant + (August 17, 2015)