Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BW090095, Submittal of Analytical Evaluation in Accordance with IWC-3125(b) + (October 9, 2009)
- HNP-09-094, Third Response to Request for Additional Information License Amendment Request to Adopt National Fire Protection Association Standard 805, Performance-Based Standard for Fire Protection for Light Water Reactor.. + (October 9, 2009)
- 05000277/LER-2009-002, Pneumatic Supply Degraded for Containment Isolation Valves Due to Mis-Positioned Valve + (October 9, 2009)
- ML092800062 + (October 9, 2009)
- ML093221017 + (October 9, 2009)
- ML092820224 + (October 9, 2009)
- ML092650717 + (October 9, 2009)
- ML092790317 + (October 9, 2009)
- ML102040280 + (October 10, 2009)
- ML101970461 + (October 10, 2009)
- FOIA/PA-2010-0010 + (October 5, 2009)
- ML100750467 + (October 10, 2009)
- ML092850025 + (October 10, 2009)
- ML092850024 + (October 10, 2009)
- ML092850023 + (October 10, 2009)
- ML092850020 + (October 10, 2009)
- ML092850011 + (October 10, 2009)
- ML092850010 + (October 10, 2009)
- ML092850009 + (October 10, 2009)
- ML092850008 + (October 10, 2009)
- ML092850007 + (October 10, 2009)
- ML092850005 + (October 10, 2009)
- ML092850004 + (October 10, 2009)
- ET 09-0019, Proposed Revision to Technical Specifications for Use of Beacon Power Distribution Monitoring System + (October 10, 2009)
- ML16230A226 + (October 10, 2009)
- ML102180347 + (October 11, 2009)
- ML092870215 + (October 12, 2009)
- ML093290297 + (October 12, 2009)
- ML102280558 + (October 12, 2009)
- ML102420141 + (October 12, 2009)
- FOIA/PA-2010-0010 + (October 5, 2009)
- ML100750426 + (October 12, 2009)
- NL-09-1510, Inservice Inspection Plan for Class 1, 2 and 3 Figures for Vogtle-1 Third Inspection Interval Volume 7 + (October 12, 2009)
- NL-09-1510, Vogtle Electric Generating Plant, Units 1 and 2 - Inservice Inspection Plan for Class 1, 2 and 3 Figures for Vogtle-2 Volume 8 + (October 12, 2009)
- ML093380123 + (October 12, 2009)
- NL-09-1510, Vogtle Electric Generation Plant, Unit 2 - 3rd Interval VOGTLE-2 ISI Plan, Version 3.0 + (October 12, 2009)
- ML093370313 + (October 12, 2009)
- NL-09-1510, Vogtle Electric Generating Plant, Unit 2 - Submittal of ISI Plan for Class 1, 2 and 3 Components for Third Inspection Interval, Volume 1, Version 3.0 + (October 12, 2009)
- ML093370312 + (October 12, 2009)
- NL-09-1510, Vogtle Electric Generation Plant, Unit 1 - Third 10-Year Interval ISI Plan, Version 3.0 + (October 12, 2009)
- ML093370311 + (October 12, 2009)
- NL-09-1510, Vogtle Electric Generating Plant, Units 1 and 2 - Inservice Inspection Plan for Class 1, 2, and 3 Components for Vogtle-1 Third Inspection Interval Volume 2, Version 3.0 + (October 12, 2009)
- ML093370310 + (October 12, 2009)
- NL-09-1510, Vogtle Electric Generating Plant, Units 1 and 2 - Inservice Inspection Plan Third Inspection Interval Volume 1, Version 3.0 + (October 12, 2009)
- ML093370309 + (October 12, 2009)
- NL-09-1510, Vogtle Electric Generating Plant, Units 1 and 2 - Third 10-Year Interval ISI Plan + (October 12, 2009)
- ML093370308 + (October 12, 2009)
- L-MT-09-096, Required 30-Day Offsite Dose Calculation Manual Report for the Monticello Nuclear Generating Plant + (October 12, 2009)
- SBK-L-09220, Response to RIS 2009-11, Preparation and Scheduling of Operator Licensing Examinations + (October 12, 2009)
- TMI-09-115, Issuance of the Core Operating Limits Report for Cycle 17, Revision 6 + (October 12, 2009)
- ML18127B614 + (October 12, 2009)