Southert* Nucleat; Operating Company. Inc.
SOUTHERN October 12, 2009 COMPANY Docket Nos.: 50-424 NL-09-1510 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Third 10-Year Interval ISI Plan Ladies and Gentlemen:
Per the requirements of IWA-1400(c) of the 2001 Edition of ASME Code Section XI with Addenda through 2003, Southern Nuclear Operating Company (SNC) hereby submits the Vogtle Electric Generating Plant (VEGP) Unit 1 and 2 Third 10-Year Interval Inservice Inspection (ISI) Plan. One copy of the ISI Plan is being submitted on a compact disk. This plan will continue to be updated throughout the third ten-year ISI interval and is available for review upon request at VEGP, The VEGP ISI Plan consists of eight separate volumes which implement the Class 1, 2, and 3 ISI requirements including pressure testing as well as IWE and IWL. In SNC letter, dated April 15, 2009, to the NRC, VEGP submitted IS[
alternative VEGP-ISI-ALT-02, related to Risk Informed-ISI. The ISI Plan submittal being made by this letter does not include this ISI alternative, but will be updated to incorporate it at a later date. It should be noted that Volume 6 of the ISI Plan (IWE and IWL Containment Testing) does not require submittal to the NRC per 10 CFR 50.55a.
The Third Interval ISI Plan is a compilation of ISI related activities. Each volume of the collective plan is considered to be a stand-alone document with approval documentation for each volume. The enclosed ISI Plan consists of the following:
Volume 1: General Information Volume 2: Class 1, 2, and 3 ISI Examinations related to Vogtle -1 Volume 7: Class 1, 2, and 3 ISI Figures related to Vogtle -1 Volume 4: Class 1, 2, and 3 ISI Examinations related to Vogtle -2 Volume 8: Class 1, 2, and 3 ISI Figures related to Vogtle -2 Per teleconference on September 2, 2009, SNC will provide Volumes 3 and 5, Class 1, 2, and 3 Pressure Testing for Unit 1 and Unit 2 respectively, in a subsequent submittal
_4)-V 74,/
This letter contains no NRC commitments. If you have any questions, please
- advise, Sincerely, M. J. Ajluni Nuclear Licensing Manager MJA/TAH/lac
Enclosures:
Compact disk (1), containing a copy of the VEGP Third 10-Year Interval ISI Plan (Volumes 1, 2, 4, 7 and 8) cc:
Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. T. E. Tynan, Vice President - Vogtle Ms. P. M. Marino, Vice President - Engineering RType: CVC7000 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Ms. D. N. Wright, NRR Project Manager - Vogtle Mr. M. Cain, Senior Resident Inspector - Vogtle