Email from R. Carrion to M. Franke, Subj: Authorization and RFP for a New ORNL Contract.Email from R. Carrion to M. Franke, Subject: Authorization and RFP for a New ORNL Contract
ML100750467
Person / Time
Site: Crystal River 
Issue date: 10/10/2009
From: Robert Carrion
NRC/RGN-II/DRS/EB3
To: Mark Franke
NRC/RGN-II/DRS/EB3
References
FOIA/PA-2010-0010
Download: ML100750467 (4)


Text

°Franke, Mark From:

Carrion, Robert Sent:

Saturday, October 10, 2009 10:10 PM To:

Franke, Mark

Subject:

RE: AUTHORIZATION AND RFP FOR A NEW ORNL CONTRACT: J-4289, "CRYSTAL RIVER 3 SPECIAL INSPECTION" Thanks, Mark. I will incorporate these items into the Entrance Meeting. I will also call you upon arriving on site prior to the Entrance Meeting in case there are any additional items which should be identified/discussed.

Bob From: Franke, Mark Sent: Saturday, October 10, 2009 12:50 PM To: Carrion, Robert; Lake, Louis

Subject:

RE: AUTHORIZATION AND RFP FOR A NEW ORNL CONTRACT: J-4289, "CRYSTAL RIVER 3 SPECIAL INSPECTION"

-Thanks Bob. This is good.

BC instructions for first week focus:

1) Determine whether any immediate safety concerns exist.
2) Review licensee schedule and develop a recommended SIT inspection plan/schedule, understanding this may need to be paced out over next couple months.
3) Determine whether current licensee action path appears appropriate.

From: Carrion, Robert Sent: Friday, October 09, 2009 10:55 PM To: Franke, Mark

Subject:

RE: AUTHORIZATION AND RFP FOR A NEW ORNL CONTRACT: J-4289, "CRYSTAL RIVER 3 SPECIAL INSPECTION" Thanks for the info, Mark. By the way, I attached my inspection plan. I am not sure that it is required uder these circumstances, but I did one just in case. I plan to speak from it during my entrance. Please review it and add any value you feel is appropriate.

Thanks, Bob From: Franke, Mark Sent: Friday, October 09, 2009 6:23 PM To: Carrion, Robert

Subject:

Fw: AUTHORIZATION AND RFP FOR A NEW ORNL CONTRACT: J-4289, "CRYSTAL RIVER 3 SPECIAL INSPECTION" Fyi This email is being sent from an NRC Blackberry device.

From: Franke, Mark To: Grenier, Bernard Sent: Fri Oct 09 18:10:05 2009

Subject:

Re: AUTHORIZATION AND RFP FOR A NEW ORNL CONTRACT: J-4289, "CRYSTAL RIVER 3 SPECIAL INSPECTION" Bernie, are we to contact him at this point?

We intend to do our entrance Tuesday afternoon. It is not imperative that he attends, though he is welcome if our process and travel makes it reasonable to do so. Otherwise it is ok if he joins after. This will. be a drawn out SIT dependent somewhat on licensee actions and schedule.

During the first week the team will assess and determine the preliminary inspection schedule among other things. We have had inspectors there since last week, though not in SIT mode.

When clear, we need to get his contact info.

Thanks Mark This email is being sent from an NRC Blackberry device.

From: Grenier, Bernard To: Hope, Teresa R <HopeTR@oro.doe.gov>

Cc: Simpson, Julie J. <simpsonjj@ornl.gov>; Thomas, George; nausdj@ornl.gov <nausdj@ornl.gov>; Franke, Mark Sent: Fri Oct 09 17:14:00 2009

Subject:

AUTHORIZATION AND RFP FOR A NEW ORNL CONTRACT: J-4289, "CRYSTAL RIVER 3 SPECIAL INSPECTION"

Teresa, Forwarded for your expedited processing is a new ORNL contract that we need in place immediately, as explained, in part, in the BACKGROUND statement of the Statement of Work. Under the circumstances, we are authorizing work ahead of receiving a proposal. Please have ORNL provided me with a draft proposal as soon as possible.

Thank you in advance for your attention to this matter.

Bernie 2

1 ENGINEERING BRANCH 3 INSPECTION PLAN Site:

Inspection Dates:

Inspection Report No.:

Inspectors:

Type of Inspection:

Direct Inspection Hours:

Crystal River Unit 3 October 13 - Open 05000302/2009007 Louis Lake, Senior Reactor Inspector (lead)

Robert Carrion, Senior Reactor Inspector George Thomas, Anthony Masters, Senior Construction Inspector Contractor, TBD Inspection Procedure 93812, "Special Inspection" 200? Hours Inspection Objectives:

The objective of this inspection is to assess the condition of the containment and its causes.

-Inspection Scope:

This inspection will perform data gathering and fact-finding in order to:

1.

Develop a complete description of the problems and circumstances surrounding the gap in the containment building.

2.

Verify that the licensee has appropriately evaluated Operability and Reportability of the containment building.

3.

Review structural integrity testing data of the containment.

4.

Assess the adequacy of the licensee's maintenance and inspection programs related to this event.

5.

Assess the licensee's activities related to the problem investigation (e.g., root cause analysis, extent of condition, etc).

6.

Collect data necessary to develop and assess the safety significance of any findings in accordance with IMC 0609, "Significance Determination Process."

7.

Determine' potential generic issues or any design and construction inadequacies and make recommendations for appropriate follow-up actions (e.g., Information Notices, Generic Letters, and Bulletins).

Branch Chief/Senior Resident Perspective:

A 2

Outstanding items to be reviewed:

Lodging/Telephone No. During Inspection:

Robert Carrion.: Quality Inn - Crystal River, FL (352) 563-1500 Licensee Contact / Telephone No.: Dennis Herrin, Licensing (352) 563-4633 Entrance Meeting: Tuesday, October 13, 2009 at 1400 In charge of exit interview: Lou Lake Branch Chief Instructions:

1.

2.

Approving Branch Chief:

Mark Franke, Chief, EB3 Provide Copies to:

Project Branch Chief: Marvin Sykes Project Engineer: Son Ninh Sr. Resident Inspector: Tom Morrisey Original to Branch Files:

Date:

10/13/2009 S:\\DRS\\Eng Branch 3\\PLANS\\Plans 2009\\CR3 Special Inspection 2009007 Plan - RPC.doc