Vogtle Electric Generating Plant, Units 1 and 2 - Inservice Inspection Plan for Class 1, 2, and 3 Components for Vogtle-1 Third Inspection Interval Volume 2, Version 3.0
ML093370310
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/12/2009
From: Agold J M
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
NL-09-1510
Download: ML093370310 (397)


Text

Vogtle Electric Generating Plant Units 1 and 2 Inservice Inspection Plan for Class 1, 2, and 3 Components for Vogtle-1 Third Inspection Interval Volume 2 Volume 2 Contents: Introduction; ISl Examination Tables Other Examination Tables Version Date Description 1.0 May 29, 2007 Initial issue -2001 Edition of Section Xl with Addenda through 2003 2.0 March 13, 2008 Update of the Introduction plus the detailed examination tables 3.0 April 9, 2009 Update of the Bases, added piping exams, revised examination tables Prepared by Material and Inspection Services Preparer:

kLe 07,~~//f~Jf~

22 ae Reviewer:

M .L-eD / Ago-- , Date: 4--9A- -9 Print Q Signature Approval:

QW4,45 W/d...Eq /L L Date: 04-09-59 Print Signature Site Approval ISI Engineer Review: ,3c. k. -_,_j_ _ __ /-__Date:

1_- -zoo_Pont // Signature Programs Group Supervisor:

/ 1-k/lk I14 6 , I /', Date: __/___7'echn,-cJ

'= C 9-"o-o'j Print .Signkfture

..1SRiA ~upport )-Manager Approval: ,m.".e.- ,'f'.- ___________Date:

/LL .Print nature Authorized Nuclear Inservice Inspector Review ANII Review: G-a- Date: rG-G.&,-/ýý

ý -,Date: Print `Sigrfitre MATERIALS AND INSPECTION SERVICES 10 CFR 50.55a EVALUATION Part I Title/Rev:

Updated Vogtle-1 ISI Plan {Volume 2), Version 3.0 Date: April 9, 2009 Requested By: J. John Churchwell, ISI Engineer, Vogtle Engineering Support Activity/Plant:

The ISI Plan has been updated to incorporate the latest ISI information for Vogtle-1 as described in the Summary of Changes for the document.Part II 1. Does the activity require the preparation of (or technical revision to) El Yes a request for an afternative to the existing Code [ No requirements as allowed by 1 OCFR 50.55a(a)(3)?

2. Is the activity a voluntary adoption of a new ISI Code edition or E2 Yes Addenda per 1OCFR 50.55a(g)(4)(iv)?

Z No 3. Is the activity a voluntary adoption of a new IST Code edition or El Yes Addenda per 10CFR 50.55a(f)(4)(iv)? (E No If the answer to any question above is "yes" then a change to the ISI or IST program is required, submittal to the NRC is required, and approval from the NRC is required prior to implementation.

Provide a basis for the determination and the summary of the changes to the ISI/IST program below.Basis and Summary of Required Changes: This update to the ISI Plan does not require any new submittals to the NRC.

Southern Nuclear Operating Company Work ES-MIS-145 COMUT AN Procedure 50.55a Evaluations Version 2.0 C,,,,,o,, ,rocedur,,-Page 2 of 4 MATERIALS AND INSPECTION SERVICES 10 CFR 50.55a EVALUATION Part III 1. Does the activity require the preparation of (or technical revision to) a Relief Request per 1 OCFR 50.55a(g)(5) where it has been determined that conformance with Code is impractical?

,2. Does the activity require the preparation of (or technical revision to) a Relief Request per 10CFR 50.55a(f)(5) where a pump or valve test requirement has been determined to be impractical?

El Yes[ No[ Yes[ No If the answer to any question above is "yes", then the activity is a change to the ISI or IST Program and NRC approval is required within 12 months after the end of the 10-year interval.

Provide a basis for the determination and the summary of the changes to the ISI/IST program below.Basis and Summary of Required Changes: This update to the ISI Plan does not require any new submittals to the NRC.Part IV Is the activity an exception to the requirements of 1 OCFR 50.55a that are not addressed in Parts II or III?EJ Yes 0No If the answer is "yes", then the activity may be an exemption to the rules of 10CFR50.55a and Licensing support should be obtained.

A change to the ISI or IST Program and NRC approval is required prior to implementing.

Provide a basis for the determination and the summary of the changes to the ISIM/ST program below.Basis and Summary of Required Changes: This update to the ISI Plan is not an exception to the requirements of 1 OCFR50.55a.

Southern Nuclear Operating Company SWork ES-MIS-145 sOUmrNY Podr50.55a Evaluations Version 2.0 COMPAWM Procedure....%- .... W- Page 3 of 4 MATERIALS AND INSPECTION SERVICES 10 CFR 50.55a EVALUATION Part V 1. Is any other change required to a program developed or updated by M&IS, as a result of this activity (not identified in Parts II, III, or IV)?2. If the answer to Question 1 is "Yes", is NRC approval required prior to implementation?

E Yes[No El Yes 0 No Provide a basis for the determination and the summary of the changes to the ISUI/ST program below.Basis and Summary of Required Changes: This update to the ISI Plan does not require any other changes related to ISI.Part VI 001 PREPARER: REVIEWER: 6 AMESM. AGOLD 6 DATE: 04-09-2009 DATE: 04-09-2009 MIKE BELFORD APPROVER: DATE: 04-09-2009 DENNIS M. SWANN Southern Nuclear Operating Company Work ES-MIS-145 C A Procedure 50.55a Evaluations Version 2.0 E-.S,.,, .. .... -II Page 4 of 4 MATERIALS AND INSPECTION SERVICES 10 CFR 50.55a EVALUATION Part VII (Supplemental Information for M&IS Use)Does the activity require a change to an inspection Plan ? E Yes[No Does the activity require a change to a testing Plan? El Yes[ No Summary of Required Changes: The ISI Plan is being updated in this process; no other changes are required.

Vogtle-1 ISI Plan, Version 3.0 Summary of Changes Version 3.0 incorporates the results of the 1R14 outage. The tables for the Class 1, 2, and 3 examination tables as well as the component supports have been updated to show the results.Corporate and site personnel previously decided to implement the new risk-informed/safety-based (RISB) ISI methodology for Vogtle- 1 Class 1 and 2 piping. A submittal was made to the NRC in April 2009 to request approval to implement the new approach during the third ISI interval at both Vogtle-1 and -2; however, until the NRC approves this submittal, Vogtle will need to meet the conventional ISI requirements for piping. The associated tables have been re-worked to show conventional ISI Code requirements (i.e., the use of Categories B-F, B-J, C-F-l, and C-F-2). The selection of Class 1 and 2 piping welds in the first ISI period of the third ISI interval have taken the (RISB) approach into account and many of these examinations can be credited under this new program.The Introduction has been changed to address the latest information for Class 1 and 2 piping welds related to risk-informing these examinations.

The basis for the augmented examinations for Vogtle- 1 has been updated to address the latest information.

The examination tables associated with this basis have been updated as well.The Class 2 basis has been updated to implement the use of ASME Code Case N-624. This Code Case allows Vogtle to implement the decision to focus the Class 2 steam generator examinations during the third ISI interval on steam generator 2 as compared to performing examinations on all four generators during previous ISI intervals.

The use of this Code Case has also resulted in changes in the tables for ASME Categories C-B and C-C.The Class 1, 2, and 3 component support tables and basis have been revised to combine similar supports (e.g., linear restraint, rigid struts) by ASME Class to more closely match the ASME Code criteria.Small diameter Class 2 Auxiliary Feedwater system piping welds, component supports, and integrally-welded attachments have been incorporated into Version 3.0 of the ISI Plan. Version 2.0 included most of the component support listing but not the other welds. ISI sketches have been prepared for this piping and have been incorporated into Volume 7 of the ISI Plan.The component support tables were updated to incorporate the latest changes based on reviews of the design drawings.The augmented examination portion of the ISI Plan has been updated to document the 2008 NRC rulemaking related to ASME Code Cases N-722 and N-729-1. Version 2.0 of this document discussed this possibility; however, now that the NRC has issued their rulemaking, the text and tables were revised to address this issue.

VOGTLE UNIT 1 THIRD INTERVAL EXAMINATION PLAN VOLUME 2 CLASS, 1, 2, AND 3 COMPONENTS DISTRIBUTION Manual Holder Document Control QA Record Manual Number 1 VI1VOL2_DIST.doc I oflI Ver. 2.0 Vogtle Unit 1 Third Interval Examination Plan List of Effective Pages Volume 2 Subjct ...~ .-Pa~e .ersion Distribution 1 2.0 List of Effective Pages 1-2 3.0 Table of Contents 1-2 3.0 Introduction 1-2 3.0 Class 1 Examination Schedule Bases 1-9 3.0 Category B-A Code Compliance Sheets 1 3.0 Category B-A Examination Tables 1-4 3.0 Category B-B Code Compliance Sheets 1 3.0 Category B-B Examination Tables 1 3.0 Category B-D Code Compliance Sheets 1 3.0 Category B-D Examination Tables 1-5 3.0 Category B-G-1 Code Compliance Sheets 1 3.0 Category B-G- I Examination Tables 1-2 3.0 Category B-G-2 Code Compliance Sheets 1 3.0 Category B-G-2 Examination Tables 1-7 3.0 Category B-K Code Compliance Sheets 1 3.0 Category B-K Examination Tables 1-2 3.0 Category B-L-2 Code Compliance Sheets 1 3.0 Category B-L-2 Examination Tables 1 3.0 Category B-M-2 Code Compliance Sheets 1 3.0 Category B-M-2 Examination Tables 1-4 3.0 Category B-N-i Code Compliance Sheets 1 3.0 Category B-N-1 Examination Tables 1 3.0 Category B-N-2 Code Compliance Sheets 1 3.0 Category B-N-2 Examination Tables 1 3.0 Category B-N-3 Code Compliance Sheets 1 3.0 Category B-N-3 Examination Tables 1 3.0 Category B-O Code Compliance Sheets 1 3.0 Category B-O Examination Tables 1-2 3.0 Category B-Q Code Compliance Sheets 1 3.0 Category B-Q Examination Tables 1 3.0 Class 2 Examination Schedule Bases 1-3 3.0 Category C-A Code Compliance Sheets 1 3.0 Category C-A Examination Tables 1-3 3.0 Category C-B Code Compliance Sheets 1 3.0 Category C-B Examination Tables 1-3 3.0 Category C-C Code Compliance Sheets 1 3.0 Category C-C Examination Tables 1-24 3.0 V 1 VOL2 Effective Pages I of 2 Ver. 3.0 Vogtle Unit 1 Third Interval Examination Plan List of Effective Pages'jSubject Pa~sVersion Class 2 Examination Schedule (Cont'd.)Category C-D Code Compliance Sheets 1 3.0 Category C-D Examination Tables 1 3.0 Class 3 Exam Schedule Bases 1-2 2.0 Category D-A Code Compliance Sheets 1 3.0 Category D-A Examination Tables 1-44 3.0 Supports Exam Schedule Bases 1-10 3.0 Category F-A Code Compliance Sheets 1 3.0 Class 1 Supports and Snubbers Exam Tables 1-37 3.0 Class 2 Supports and Snubbers Exam Tables 1-100 3.0 Class 3 Supports and Snubbers Exam Tables 1-124 3.0 Class 1, 2, and 3 Equipment Supports Exam Tables 1-26 3.0 Piping Exam Schedule Bases 1-9 3.0 Category B-F Code Compliance Sheets 1 3.0 Category B-F Examination Tables 1-2 3.0 Category B-J Code Compliance Sheets 1 3.0 Category B-J Examination Tables 1-92 3.0 Category C-F-1 Code Compliance Sheets 1 3.0 Category C-F- I Examination Tables 1-151 3.0 Category C-F-2 Code Compliance Sheets 1 3.0 Category C-F-2 Examination Tables 1-67 3.0 Augmented Examinations Bases 1-22 3.0 N-722 Examination Tables 1-2 3.0 N-729 Examination Tables 1 3.0 OE Examination Tables 1 3.0 FW/MS High Energy Line Break Examination Tables 1-6 3.0 Flywheel 1 3.0 Q-4300 Examination Tables 1 3.0 VI VOL2 Effective Pages 2 of 2 Ver. 3.0 VOGTLE-1 THIRD INTERVAL EXAMINATION PLAN VOLUME 2 CLASS 1, 2, AND 3 COMPONENTS TABLE OF CONTENTS VOLUME 2 -Vessel and Piping Weld Information Distribution List of Effective Pages Introduction ASME Class 1 Exam Schedule Bases Code Compliance Sheet Category B-A Code Compliance Sheet Category B-B Code Compliance Sheet Category B-D Code Compliance Sheet Category B-F Category B-G-1 Code Compliance Sheet Category B-G-2 Code Compliance Sheet Category B-J Category B-K Code Compliance Sheet Category B-L-2 Code Compliance Sheet Category B-M-2 Code Compliance Sheet Category B-N- I Code Compliance Sheet Category B-N-2 Code Compliance Sheet Category B-N-3 Code Compliance Sheet Category B-0 Code Compliance Sheet Category B-Q ASME Class 2 Exam Schedule Bases Code Compliance Sheet Category C-A Code Compliance Sheet Category C-B RPV Welds RPV Welds Vessel Welds (non-RPV)Vessel Welds (non-RPV)Class 1 Vessel Nozzle Examinations Class 1 Vessel Nozzle Examinations Pressure Retaining Bolting > 2" Diameter (See Piping Section)Pressure Retaining Bolting > 2" Diameter Pressure Retaining Bolting < 2" Diameter Pressure Retaining Bolting < 2" Diameter Welded Attachments (See Piping Section)Welded Attachments Pump Casings Pump Casings Valve Bodies Valve Bodies Interior of RPV Interior of RPV Interior Attachments to RPV Interior Attachments to RPV Removable Core Support Structure Removable Core Support Structure Control Rod Housing Welds Control Rod Housing Welds Steam Generator Tubing Steam Generator Tubing Pressure Vessel Welds Pressure Vessel Welds Pressure Vessel Nozzle Welds Pressure Vessel Nozzle Welds I V1 VOL2-T OF C.doc I of 2 Ver. 3.0 VOGTLE-1 THIRD INTERVAL EXAMINATION PLAN VOLUME 2 CLASS 1, 2, AND 3 COMPONENTS Code Compliance Sheet Category C-C Code Compliance Sheet Category C-D Category C-F-1 Category C-F-2 ASME Class 3 Exam Schedule Bases Code Compliance Sheets Category D-A Welded Attachments Welded Attachments Pressure Retaining Bolting > 2" Diameter Pressure Retaining Bolting > 2" Diameter (See Piping Section)(See Piping Section)Welded Attachments Welded Attachments Component Support Exams Bases Category F-A Examination Tables Category F-A, Item Fl.10B through Fl.1OH -Class 1 Component Supports Category F-A, Item FI.10S -Class I Snubbers Category F-A, Item F1.20A through F1.20H -Class 2 Component Supports Category F-A, Item F1.20S -Class 2 Snubbers Category F-A, Item F1.30A through F1.30H -Class 3 Component Supports Category F-A, Item F1.30S -Class 3 Snubbers Category F-A, Item F1.40, Class 1, 2, and 3 Equipment Supports Class I and 2 Piping ISI Examinations Bases Code Compliance Sheet Class 1 Dissimilar Metal Welds Category B-F Class 1 Dissimilar Metal Welds Code Compliance Sheet Class 1 Piping Welds Category B-J Class 1 Piping Welds Code Compliance Sheet Austenitic Class 2 Piping Welds Category C-F-1 Austenitic Class 2 Piping Welds Code Compliance Sheet Ferritic Class 2 Piping Welds Category C-F-2 Ferritic Class 2 Piping Welds Augmented Examinations Bases N-722 Examinations N-729 Examinations OE Examinations MS High Energy Line Break Examinations FW High Energy Line Break Examinations Q-4300 Examinations VI VOL2-T OF C.doc 2 of 2 Ver. 3.0 Vogtle Electric Generating Plant -- Unit 1 Third 10-Year Interval Inservice Inspection Plan VOLUME 2 INTRODUCTION Description of the Inservice Inspection Plan This volume contains the details for Vogtle-1 pertaining to ISI requirements for IWB, IWC, IWD, and TWF except for pressure testing. Pressure testing for Vogtle- 1 is covered in Volume 3 of the ISI Plan. This document provides a systematic plan for the performance of ISI-related examinations and tests at Vogtle Electric Generating Plant (VEGP) as required by l0CFR 50.55a and the ASME Boiler and Pressure Vessel Code Section X1.Code of Record Except as modified by the NRC caveats in 10CFR 50.55a (see Enclosure 1 of Volume 1), the 2001 Edition of Section XI with Addenda through 2003 is the Code of Record for Vogtle for the ISI interval starting on May 31, 2007 and ending on May 30, 2017.ISI Periods and Outages As noted above, the third 10-year ISI interval starts on May 31, 2007. The three ISI periods and the outages where ISI will be conducted are as follows: Period 1 05-31-2007 through 05-30-2010 1R14 Spring 2008 IR15 Fall 2009 Period 2 05-31-2010 through 05-30-2014 1R16 Spring 2011 1R17 Fall 2012 1R18 Spring 2014 vli31tpintro.doc 1 of 2 Ver. 3.0 Period 3 05-31-2014 through 05-30-2017 1R19 Fall 2015 1R20 Spring 2017 Format A change has been made in the presentation of the ISI Plan tables as compared to the second ISI interval.

The detailed examination tables are shown for each applicable Section X.I ASME Category with a Code Compliance sheet for each ASME Category.

In addition, an Augmented Section is enclosed after the ISI requirements to address Augmented and Owner-Elected examinations.

Successive Examinations No successive examinations from the second ISI interval are carried over to the third ISI interval.Some Class 1 and 3 examinations were deferred from the second ISI interval and are addressed in the ISI Basis as well as the detailed examination tables.Implementation of Risk-Informed ISI of Class 1 and 2 Piping Vogtle implemented the Westinghouse methodology for risk-informed ISI (RI-ISI) of piping welds during the second ISI interval for Vogtle -1. At the start of the third ISI interval, Vogtle -1 did not have approval to implement RI-ISI. Based on other nuclear sites getting approval for the streamlined EPRI approach using Code Case N-716, SNC made the decision to implement this methodology at Vogtle during the third ISI interval.

Prior to the NRC approving this approach for Vogtle, Vogtle will implement the normal ISI requirements for piping welds. The Vogtle -1 ISI Plan (Volume 2) has been prepared based on this approach.Detailed Schedules for the Third ISI Interval A detailed schedule for the ISI and associated examinations for the third ISI interval at Vogtle-1 is included.

In addition, the ISI Basis for these examinations is included.vli31tpintro.doc 2 of 2 Ver. 3.0 VOGTLE-1 THIRD INTERVAL ISI PLAN ISI BASIS DOCUMENT CLASS 1 COMPONENTS Category B-A -RPV Item B1.11 and B1.12 Shell Welds The Vogtle- 1 Reactor Pressure Vessel (RPV) has three Item B. 11 circumferential welds and nine Item B 1.12 welds. Volumetric examination of the twelve welds is required.

It is permissible to defer these examinations until the end of the interval; therefore, the requirements of Table IWB-2412-1 are not applicable.

All 2 Interval examinations were completed at the end of the interval during the 3rd period; therefore, 3rd Interval examinations are scheduled for the 3 rd period.Category B-A -RPV Item B1.21 and B1.22 Head Welds The Vogtle-1 closure head has one circumferential weld and four meridional welds. The Vogtle-1 bottom head has two circumferential welds and four meridional welds. Volumetric examination of these eleven head welds is required.

It is permissible to defer these examinations until the end of the interval; therefore, the requirements of Table IWB-2412-1 are not applicable.

The examination of the circumferential weld on the closure head is scheduled for the first ISI period based on the examination performed during the 2 nd ISI interval.

The remaining 2"d Interval examinations were completed at the end of the interval during the 3 rd period; therefore, 3 rd Interval examinations are scheduled for the 3 rd period.Category B-A -RPV Item BI.30 and B1.40 RPV Flange Welds The Vogtle- 1 RPV has one Item B 1.30 shell-to-flange weld and one Item B 1.40 head-to-flange weld.Volumetric examination of the shell-to flange and the head-to-flange welds is required.

In addition, a surface examination of the head-to-flange weld is required.

Note 5 of Table IWB-2500-1, Examination Category B-A allows deferral of these examinations provided that: " no welded repair/replacement activities have been performed either on the shell-to-flange weld or head-to-flange weld; and" neither the shell-to-flange weld nor the head-to-flange weld contains identified flaws or relevant conditions that require successive inspections in accordance with IWB-2420(b).

No welded repair/replacement activities have been performed and there are no identified flaws or relevant conditions that require successive inspections in accordance with IWB-2420(b);

therefore, deferral is permissible.

The RPV shell-to-flange weld was examined during the 1 st period of the 2 nd Interval and subsequently re-examined during the 3 Yd period of the 2 nd Interval to align the examinations with the other automated examinations performed at the end of the interval.

These 3 rd period examinations were performed automated, using Performance Demonstration Initiative procedures, and included 100% of the length. Examinations were Vogtle-I Basis Document I of 9 Ver. 3.0 VOGTLE-l THIRD INTERVAL ISI PLAN ISI BASIS DOCUMENT also performed from the top of the flange surface because of limitations with the automated examinations.

Therefore, 3 rd Interval examinations are scheduled for the 3 rd period and the requirements of Table IWB-2412-1 are not applicable.

The examination of the Vogtle- 1 RPV head-to-flange weld on the closure head is scheduled for the first ISI period based on the examination performed during the 2 nd ISI interval;therefore, 3 d Interval examinations are scheduled for the 1't period.Category B-B -Item B2.11 and B2.12 Pressurizer Welds There are two B2.11 shell-to-head welds. Volumetric examination of both welds is required.Deferral to the end of the interval is not permitted.

Additionally, examination of 1 foot of the longitudinal weld (B2.12) from the intersection of each head circumferential weld is required.Category B-B -Item B2.40 Steam Generator Welds There are four steam generators at Vogtle-1.

There is one B2.40 tubesheet-to head weld on each of the four steam generators.

For inservice examinations, Note 1 of Table IWB-2500-1, Examination Category B-B allows examination of only one of the welds. Volumetric examination of the weld is required.

Deferral to the end of the interval is not permitted.

Category B-D -Item B3.90 and B3.100 RPV Full-Penetration Welded Nozzles The Vogtle-1 Reactor Vessel has four inlet nozzles and four outlet nozzles. During the 1st Interval, a portion of the examinations were performed during the 1 st period and the balance was scheduled for the 3Yd period. However, all of the nozzles were examined during the 3 rd period (some were re-examined).

Subsequently, during the 2nd Interval, Code Case N-521 was used to allow deferral of the required examinations to the end of the Interval.

For the 3 rd Interval, Note 5 of Table IWB-2500-1, Examination Category B-D states, "For PWRs in the second and successive inspection intervals, these examinations may be deferred to the end of the interval, provided no repair/replacement activities have been performed on the examination item, and no flaws or relevant conditions requiring successive inspections in accordance with IWB-2420(b) are contained in the examination item." These conditions have been met;therefore, it is permissible to continue to defer the examinations until the end of the interval and the requirements of Table IWB-2412-1 are not applicable.

Volumetric examination of the B3.90 nozzle-to-vessel welds is required in the 3 rd Interval.However, Code Case N-648-1 (with NRC caveats) is used to perform an enhanced visual examination for the B3.100 inner radius examinations in lieu of the Code-required volumetric examinations.

Vogtle-1 Basis Document 2 of 9 Ver. 3.0 VOGTLE-1 THIRD INTERVAL ISI PLAN ISI BASIS DOCUMENT Category B-D -Item B3.110 and B3.120 Pressurizer Full-Penetration Welded Nozzles There are six pressurizer nozzles. Volumetric examination each weld and inner radius is required.Augmented surface examinations are being performed on the Item No. B3.1 10 welds to support the required ultrasonic examinations.

Vogtle will submit a limitation relief request later.Although the nozzle inside radius section examination for pressurizer nozzles is not required in the 2001 Edition of ASME Section XI, 1OCFR50.55a mandates this examination.

Deferral to the end of the interval is not permitted.

Examination is limited and a relief request is needed.Category B-D -Item B3.140 Steam Generator Primary Side Full-Penetration Welded Nozzles The eight steam generator primary side nozzles are integrally cast into the channel heads;therefore, there are no nozzle to vessel welds. Although the nozzle inside radius section examination for steam generator nozzles is not required in the 2001 Edition of ASME Section XI, 10CFR50.55a mandates this examination.

In the 2 nd ISI interval, a visual examination was performed per RR-32. Based on recent work at EPRI for the ultrasonic examination of nozzle inner radii, Vogtle will perform ultrasonic examination from the OD for steam generator nozzle inner radii. Deferral to the end of the interval is not permitted.

Category B-E -This is not a Code Category in the 2003 Addenda _Category B-F -See Class 1 and 2 Piping Examinations.

Category B-G-1 -Item B6.10, B6.20, B6.40, and B6.50 RPV Bolting Greater than 2" For the 3 rd Interval, it is permissible to defer each of these inspections to the end of the interval.For Vogtle-1, each of these examinations has been deferred to the end of the 3rd interval.

This deferral is possible because all components were examined at the end of the 2 d Interval (some were re-examined) such that there will only be about ten years between the 2 nd Interval and 3 rd Interval examinations.

For the I" and 2 nd Intervals, each stud, nut, washer, and flange ligament had an individual number assigned to it. For the 3 rd Interval, a combined number was used in ScheduleWorks (e.g., BO1 thru B054).Category B-G-1 -Item B6.60, B6.70, and B6.80 Pressurizer Bolting Greater than 2" The pressurizer does not have pressure retaining bolting greater than 2" in diameter.Category B-G-1 -Item B6.90, B6.100, and B6.110 Steam Generator Bolting Greater than 2" The steam generators do not have pressure retaining bolting greater than 2" in diameter.Vogtle-1 Basis Document 3 of 9 Ver. 3.0 VOGTLE-1 THIRD INTERVAL ISI PLAN ISI BASIS DOCUMENT Category B-G-1 -Item B6.120, B6.130, and B6.140 Heat Exchanger Bolting Greater than 2" The heat exchangers do not have pressure retaining bolting greater than 2" in diameter.Category B-G-1 -Item B6.150, B6.160, and B6.170 Piping Bolting Greater than 2" The piping does not have pressure retaining bolting greater than 2" in diameter.Category B-G-1 -Item B6.180 and B6.190 Pump Bolting Greater than 2" There is pressure retaining bolting greater than 2" in diameter on the four Reactor Coolant pumps. However, they are studs without nuts, bushings, and washers so Item B6.200 is not applicable.

Per Note 4 of Table IWB-2500-1, Examination Category B-G-1, a VT-1 of the pump flange surface is required only when a pump is disassembled and a Category B-L-2 examination is performed.

If a pump is not disassembled during the 3 rd Interval this examination is not required.

Because the examination is performed only when the component is disassembled, the requirements of Table IWB-2412-1 are not applicable.

In those cases where an examination is only required when a component or a bolted connection is disassembled, the examination tables show "t" for every outage in the ISI interval.

This is used as a reminder to ISI and Vogtle site personnel to perform the required examinations when disassembled.

Per Note 3 of Table IWB-2500-1, Examination Category B-G-1, the volumetric examination of the studs may be limited to one of the four pumps.Category B-G-2 -Item B7.20, B7.30, B7.50, B7.60 and B7.70 Pressure Retaining Bolting Less Than or Equal to 2" in Diameter Note: There is not any RPV or heat exchanger pressure retaining bolting _< 2"; therefore, Items B7.10 and B7.40 are not applicable.

Per Notes 1, 2, and 3 of Table IWB-2500-1, Examination Category B-G-2 the following examinations are required.For the pressurizer(Item B7.20), examination of the B-G-2 bolting is required if it is disassembled during the 3 rd Interval.

Examination is required only once during the interval.Because the examination is performed only when the component is disassembled, the requirements of Table IWB-2412-1 are not applicable.

Vogtle- I Basis Document 4 of 9 Ver. 3.0 VOGTLE-1 THIRD INTERVAL ISI PLAN ISI BASIS DOCUMENT For the steam generators (Item B7.30) only one generator has been selected for examination per Category B-B. Examination of the bolting is required only if the bolting on the steam generator selected for the Category B-B examinations is disassembled during the 3 rd Interval.

Examination is required only once during the interval.

Because the examination is performed only when the component is disassembled, the requirements of Table IWB-2412-1 are not applicable.

For piping flange bolting (Item B7.50) the examinations may be limited to one bolted connection among a group of bolted connections that are similar in design, size, function, and service. Examination is required only when a flange is disassembled.

Examination is required only once during the interval.

Because the examination is performed only when the component is disassembled, the requirements of Table IWB-2412-1 are not applicable.

Group A Component Description 11201-056 FB 6" Flange bolt Assembly for 1201-PSV-8010C 11201-057 FB 6" Flange bolt Assembly for 1201-PSV-8010B 11201-058 FB 6" Flange bolt Assembly for 1201-PSV-8010A Component Description 11204-076-42 FB 1.5" Flange Bolt Assembly for FE-0924 11204-077-10 FB 1.5" Flange Bolt Assembly for FE-0927 11204-078-8 FB 1.5" Flange Bolt Assembly for FE-0925 11204-079-12 FB 1.5" Flange Bolt Assembly for FE-0926 Grouv C______________________

___Component Description 11208-024-5 FB 1.5" Flange Bolt Assembly for RC Pump 001 11208-043-5 FB 1.5" Flange Bolt Assembly for RC Pump 002 11208-045-14 FB 1.5" Flange Bolt Assembly for RC Pump 003 11208-047-14 FB 1.5" Flange Bolt Assembly for RC Pump 004.For the reactor coolant pumps (Item B7.60), examination of the bolting is required only if a pump is disassembled and examined per Examination Category B-L-2. Examination is required only once during the interval.

Because the examination is performed only when the component is disassembled, the requirements of Table IWB-2412-1 are not applicable.

For the valves (Item B7.70), examination of the bolting is required only if a valve is disassembled and examined per Examination Category B-M-2. Examination is required only once during the interval.

Because the examination is performed only when the component is disassembled, the requirements of Table IWB-2412-1 are not applicable.

In those cases where an examination is only required when a component or a bolted connection is disassembled, the examination tables show "t" for every outage in the ISI interval.

This is used as a reminder to ISI and Vogtle site personnel to perform the required examinations when disassembled.

Vogtle- 1 Basis Document 5 of 9 Ver. 3.0 VOGTLE-1 THIRD INTERVAL ISI PLAN ISI BASIS DOCUMENT Category B-J -See Class 1 and 2 Piping Examinations.

Category B-K -Item B10.10 Class 1 Welded Attachments for Vessels Note: There are no piping, pumps or valve welded attachments; therefore, Items B 10.20, B 10.30 and B10.40 are not applicable.

Item B10.10 Pressurizer Skirt Weld -Per Note 7 of Table IWB-2500-1, Examination Category B-K, for the configurations shown in Figs. IWB-2500-13 and IWB-2500-14, a surface examination from an accessible side of the skirt will be performed.

In addition, Vogtle will use Code Case N-700; therefore, the remaining pressurizer welded attachments do not require examination.

Item B 10.10 RPV Head Welded Attachments

-There are three integral attachments on the Vogtle- 1 RPV closure head. Per Code Case N-700, only one of the three lug is required to be examined.Category B-L-1 -Pressure Retaining Welds in Pump Casings -This Code Category is not applicable because there are no Reactor Coolant Pump casing welds.Category B-M-1 -Pressure Retaining Welds in Valve Bodies -This Code Category is not applicable because there are no valve body welds.Category B-L-2 -Pump Casings There are four Reactor Coolant Pumps in this Code Category.

Per Notes 1 and 2 of Table fWB-2500-1, Examination Category B-L-2, examination are limited to one Reactor Coolant Pump. Additionally, examination is required only when a pump is disassembled for maintenance, repair, or volumetric examination.

Examination of the internal pressure boundary shall include the internal pressure retaining surfaces made accessible for examination by disassembly.

If a partial examination is performed and a subsequent disassembly of the pump allows a more extensive examination, an examination shall be performed during the subsequent disassembly.

A complete examination is required only once during the interval.

Because the examination is performed only when the component is disassembled, the requirements of Table IWB-2412-1 are not applicable.

In those cases where an examination is only required when a component or a bolted connection is disassembled, the examination tables show "t" for every outage in the ISI interval.

This is used as a reminder to ISI and Vogtle site personnel to perform the required examinations when disassembled.

Vogtle-I Basis Document 6 of 9 Ver. 3.0 VOGTLE-1 THIRD INTERVAL ISI PLAN ISI BASIS DOCUMENT Category B-M-2 -Valve Bodies for valves Exceeding 4" NPS Per Notes 2 and 3 of Table IWB-2500-1, Examination Category B-M-2, examination is required only when a valve is disassembled for maintenance, repair, or volumetric examination.

Examination of the internal pressure boundary shall include the internal pressure retaining surfaces made accessible for examination by disassembly.

If a partial examination is performed and a subsequent disassembly of that valve allows a more extensive examination, an examination shall be performed during the subsequent disassembly.

A complete examination is required only once during the interval.

Examinations are limited to one valve within each group of valves that are of the same size, constructural design (such as globe, gate, or check valves), and manufacturing method that perform similar functions in the system (such as containment isolation and system overpressure protection).

Because the examination is performed only when the component is disassembled, the requirements of Table JWB-2412-1 are not applicable.

In those cases where an examination is only required when a component or a bolted connection is disassembled, the examination tables show "t" for every outage in the ISI interval.

This is used as a reminder to ISI and Vogtle site personnel to perform the required examinations when disassembled.

The table below groups the valves and can be used to ensure that only one valve of a group of valves needs to be examined.Valve Group Function:

Pressurizer Safety Relief Valves VALVES LINE NPS VENDOR LOG NO.IPSV8010A 058 06.0 1X6AA06-649 1PSV8010B 057 06.0 1X6AA06-649 1PSV8010C 056 06.0 1X6AA06-649 Valve Group Function:

RHR Suction Isolation Valves from Hot Leg VALVES LINE NPS VENDOR LOG NO.IHV8701A 036 12.0 1X6AA06-659 IHV8701B 036 12.0 1X6AA06-657 1-HV8702A 049 12.0 IX6AA06-657 1HV8702B 049 12.0 1X6AA06-659 Valve Group Function:

Accumulator Discharge Isolation Valves (MOV)VALVES LINE NPS VENDOR LOG NO.IHV8808A 124 10.0 1X6AA06-6 1HV8808B 125 10.0 1X6AA06-6 IHV808C 126 10.0 IX6AA06-6 1HV8808D 127 10.0 IX6AA06-6 Valve Group Function:

Accumulator Discharge Second Primary Isolation Check Valves VALVES LINE NPS VENDOR LOG NO.11204U6079 124 10.0 1X6AA06-3 1 1204U6080 125 10.0 IX6AA06-3 11204U6081 126 10.0 1X6AA06-3 11204U6082 127 10.0 1X6AA06-3 Vogtle- I Basis Document 7 of 9 Vet. 3.0 VOGTLE-1 THIRD INTERVAL ISI PLAN ISI BASIS DOCUMENT Valve Group Function:

Cold Leg Safety Injection First Primary Isolation Check Valves VALVES LINE NPS VENDOR LOG NO.11204U6083 124 10.0 IX6AA06-3 11204U6084 125 10.0 IX6AA06-3 11204U6085 126 10.0 1X6AA06-3 11204U6086 127 10.0 1X6AA06-3 Valve Group Function:

RHR Cold Leg Injection Second Primary Isolation Check Valves VALVES LINE NPS VENDOR LOG NO.S11204U6147 042 06.0 1X6AA06-3 11204U6148 043 06.0 1X6AA06-3 11204U6149 044 06.0 1X6AA06-3 11204U6150 045 06.0 1X6AA06-3 Valve Group Function:

RHR Hot Leg Injection Second Primary Isolation Check Valves VALVES LINE NPS VENDOR LOG NO.11204U6128 023 08.0 IX6AA06-3 11204U6129 021 08.0 1X6AA06-3 Valve Group Function:

Hot Leg Safety Injection First Primary Isolation Check Valves VALVES LINE NPS VENDOR LOG NO.11204U6124 024 06.0 1X6AA06-3 11204U6125 021 06.0 1X6AA06-3 11204U6126 023 06.0 1X6AA06-3 11204U6127 025 06.0 1X6AA06-3 Category B-N-1 -RPV Interior Item B 13.10 -The interior of the RPV is required to be VT-3 examined each inspection period (approximately every 3 years). ASME Code credit is shown for the first ISI period. The tables also show the RPV Closure Head examination per the FSAR 5.3.3.7 requirement although no ASME Code credit is taken for this examination.

Category B-N-2 -Interior Attachments to the RPV Item B 13.50 -There are no interior attachments in the beltline region; therefore, Item B13.50 is not applicable.

Item B 13.60 -The accessible interior attachment welds (outside of the beltline region) must be VT-3 examined once per interval.

It is permissible to defer these examinations until the end of the interval.

Based on EPRI MRP work, Vogtle will perform a VT-1 examination of these six attachment welds.Category B-N-3 -Removable Core Support Structures The core support structure shall be removed from the RPV for VT-3 examination once per interval.

It is permissible to defer these examinations until the end of the interval.Vogtle- I Basis Document 8 of 9 Ver. 3.0 VOGTLE-I THIRD INTERVAL ISI PLAN ISI BASIS DOCUMENT Category B-O -CRD Housing Pressure Retaining Welds Vogtle-1 has 20 peripheral CRD housing welds. A 10% sample is required over the 3 rd ISI interval.

It is permissible to defer these examinations until the end of the interval; therefore, the requirements of Table IWB-2412-1 are not applicable.

Category B-P -Pressure Testing Pressure testing for Vogtle-1 is addressed in Volume 3 of this plan.Category B-Q -Steam Generator Tubing The extent and frequency of the examinations are governed by the Technical Specifications.

As requested by Vogtle site personnel, the outages where eddy current testing is performed by steam generator are included in the summary tables.Vogtle-I Basis Document 9 of 9 Vet. 3.0 Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISl -Code Edition -2001 Edition with 2003 Addenda Period 1 Period 2 Period 3 Percent Actual Round Total Cat. Itern No. Code Case Population Required Required Up Exams Actual Round Actual Round I Actual Round Count Period Up Count Period Up Count Period Up B-A B1.11 B-A B1.12 B-A B1.21 B-A B1.22 B-A B1.30 B-A 81.40 Total: 3 9 2 8 24 100%100%100%100%100%100%3 9 2 8 24 3 3 9 9 2 2 8 8 1 1 1 1 24 24 0 0%. 0%0 0% 0%1 W0.00% 50%4 50.00% 50%0 0% 0%1 100.00% 100%6 25% 25%0 0.00% 0%0 0.00% 0%0 50.00% 50%0 50.00% 50%0 0.00% 0%0 100.00% 100%0 25% 25%3 100.00% 100%9 100.00% 100%1 100.00% 100%4 100.00% 100%1 100.00% 100%0 100.00% 100%18 100% 100%12/10/2008 Version 3.0 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 IS PLAN, VERSION 3 Category.item No., Class DwgASO No.Comp. Desc.Code Case Period I Period 2 Period 3 CO r. C 01 0 Suamnary NoComptlD/System Scope I Method I Procedure B-A V1 11201-V6-001-W04 ISI/UTNENDOR-UT ISI-11201-V6-001 ISI ..-. ...-.-.----

s ...UPPER SHELL TO INTERMEDIATE B1.11 11201-V6-001-W04 SHELL WELD AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............B-A V1 11201-V6-001-W05 ISI/UTNENDOR-UT ISI-11201-V6-001 ISi -- -- -...-s ---INTERMEDIATE SHELL TO LOWER B1.11 11201-V6-001-W05 SHELL WELD AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............B-A V1 11201-V6-001-W06 ISI/UTNENDOR-UT ISI-11201-V6-001 ISI ----- -s ---LOWER SHELL TO BOTTOM HEAD B1.11 11201-V6-001-W06 TORUS WELD AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ...... ..... ...B-A V1 11201-V6-001-W12 ISI/UTNENDOR-UT ISI-11201-V6-001 SI..........

s. ..UPPER SHELL LONGITUDINAL WELD AT B1,12 11201-V6-001-W12 42 DEGREES AUG ...... ..... ...1 1201 OW N ..... .........PRE ...... ..... ...B-A V1 11201-V6-001-W13 ISI/UTNENDOR-UT ISI-11201-V6-001 ISI ..-. ...-.-.----

s UPPER SHELL LONGITUDINAL WELD AT 81,12 11201-V6-001-W13 162 DEGREES AUG -. ..... ..... ...1 1201 OW N ..... ..... ....PRE ..............B-A V1 11201-V" -001-W14 ISI/UTNENDOR-UT ISI-11201-V6-001 ISI ..-. ...-.-.----

s ---UPPER SHELL LONGITUDINAL WELD AT 81,12 11201-V6-001-W14 282 DEGREES AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE --------8-A V1 11201-V6-001-W15 ISI/UTNENDOR-UT ISI-11201-V6-001 ISI- ...... ...s --INTERMEDIATE SHELL LONGITUDINAL 81,12 11201-V6-001-W15 WELD AT 0 DEGREES AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............B1,12 I 11201-V6-001-W16 1201 II-U IIYC U I INTERMEDIATE SHELL LONGITUDINAL WELD AT 120 DEGREE ISI AUG OWN S -4/3/2009 ScheduleWorks V. 8.1 Page I -4 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1ýe M Period 2.> >-c Period 3 Summary NoJComplD/System Scope/ Method I Procedure PRE B-A Vi 11201-V6-001-W17 ISI/UTNENDOR-UT ISI-11201-V6-001 ISi ..........

--INTERMEDIATE SHELL LONGITUDINAL B1.12 11201-V6-001-W17 WELD AT 240 DEGREE AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............B-A V1 11201-V6-001-W1B ISIAUTNENDOR-UT ISI-11201-V6-001 ISI -..............

s ---LOW ER SHELL LONGITUDINAL WELD B1.12 11201-V6-001-W18 AT 60 DEGREES AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ----B-A V1 11201-V6-001-W19 ISI/UTNENDOR-UT ISI-11201-V6-001 ISI .... .........LOWER SHELL LONGITUDINAL WELD B1.12 11201-VS-001-W19 AT 180 DEGREES AUG ...... ..... ...1 1201 OWN -----....PRE ..............B-A V1 11201-V6-001-W20 ISI/UTNENDOR-UT ISI-11201-V6-001 ISI .........

s LOW ER SHELL LONGITUDINAL WELD B1.12 11201-V6-001-W20 AT 300 DEGREES AUG ...... ..... ...1 1201 OW N ...... .... ....PRE B-A VI 11201-V6-001-W01 ISI/UT/NMP-ES-024-516 ISI-11201-V6-001 ISI s .... ..... ...CLOSURE HEAD DOME TO TORUS 61.21 11201-V6-001-W0t WELD AUG -..........1 1201 OW N ..... ...... ...PRE ..............B-A V1 11201-V6-001-W07 ISI/UTNENDOR-UT ISI-11201-V6-001 SI -................

s --BOTTOM HEAD TORUS TO BOTTOM 61.21 11201-V6-001-W07 HEAD DOME WELD AUG ...... ..... ...1 1201 OW N ...... .... ....PRE ...... .......B-A V1 11201-V6-001-W08 ISIUT/NMP-ES-024-503 ISI-11201-V6-001 ISI s .... ..... ...CLOSURE HEAD TORUS MERIDIONAL B1.22 11201-V6-001-W08 WELD AT 45 DEGREES AUG ..........

1 1201 OW N ..... ..... ....PR E ..............Rt..if ",11' ."J2-S'flfltA P.l !IS l'T I'" i01.1 (111J B1.22 11201-V6-001-W09CLOSURE HEAD TORUS MERIDIONAL WELD AT 135 DEGREES AUG S 4/3/2009 ScheduleWorks V. 8.1 Page 2 -4 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Category, Item No., Class 1 DwgAISO No.Comp. Desc.Code Case Period 1 Period 2 r l 0 .Period 3 Summary NoJComplDISystem 1201 Scope I Method / Procedure OWN PRE B-A V1 11201.V6-001-W 10 ISI/UT/NMP-ES-024-503 SIS-11201-V6-001 SIS -s ......CLOSURE HEAD TORUS MERIDIONAL B 1 .2 2 1 1 2 0 1 -V 6 -0 0 1 -W 1 0 W E L D A T 2 2 5 D E G R E E S A U G ..............1 1201 OW N ..... ..... ....PR E -. -.- -.-. .-.- ..-. ..B-A V1 112014V6-001-W 11 ISIAJT/NM P-ES-024-503 ISI-11201-V6-001 SI s s ...........CLOSURE HEAD TORUS MERIDIONAL 8 1 .2 2 1 1 2 0 1 -V 6 -O0 1 -W l l W E L D A T 3 1 5 D E G R E E S A U G ..............1 1201 OW N ..... ..... ....PRE ..............B-A V1 11201-V6-001-W21 ISI/UTNENDOR-UT ISI-11201-V6-001 ISI .-.-.- ----- s -BOTTOM HEAD TORUS MERIDIONAL 8 1 .2 2 1 1 2 0 1 -V 6 -0 0 1 -W 2 1 W E L D A T 0 D E G R E E S A U G ..............1 1201 OW N ..... ..... ....PR E ..............B-A V1 11201-V6-001-W22 ISIAJTNENDOR-UT ISI-11201-V6-001 IS. -.............

s --BOTTOM HEAD TORUS MERIDIONAL B 1 .2 2 1 1 2 0 1 -V 6 -0 0 1 -W 2 2 W E L D A T 9 0 D E G R E E S A U G ..............1 1201 OW N ..... ..... ....PRE .............."B-A Vi 11201-V6-001-W23 ISI/UTNENDOR-UT ISI- 11201o'V6-001 ISI................s

--BOTTOM HEAD TORUS MERIDIONAL Bi.22 11201-V6.001-W23 WELD AT 160 DEGREES AUG 1 1201 OW N ..... ..... ....PRE ..............B-A V1 11201-V6-001-W24 ISI/UTNENDOR-UT ISI-11201-V6-001 SI- -..-. .-- .-.-- s-- ---.BOTTOM HEAD TORUS MERIDIONAL 81.22 11201-V6-001-W24 WELD AT 270 DEGREES AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............B-A V1 11201-V6-001-W03 ISV/UTNENDOR-UT ISI-11201-V6-001 ISI .... ......... s -..B1.30 11201-V6-001-W03 VESSEL SHELL TO FLANGE WELD AUG ...... ..... ...1 1201 OW N .......... ....PRE-~ ~ ~ ~ ~ ~ ~ ~ ~ II121V-0 ! -... --~ -.1 -Ill~ -C~ -rKLD~~lag, -C~ o1~Cnl 1-A B1.40 11201-V6-001.W02 CLOSURE HEAD TORUS TO FLANGE W ELD AUG ISI/MT/NMP-ES-024-401 4/3/2009 ScheduleWorks V. 8.1 Page 3 -4 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Dwg/ISO No.Comp. Desc.Scope / Method / Procedure Code Case Category, Item No., Class 1 Summary NolComplD/System 1201 Period 1 Period 2 Period 3 2> > > 2>OWN --------PRE ------------4/3/2009 ScheduleWorks V. 8.1 Page 4 -4 Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISI -Code Edition -2001 Edition with 2003 Addenda Period I Period 2 Period 3 Percent Actual Required Required Round Total Up Exams Actual RoundI Actual Round Actual Round Count Period Up Count Period Up Count Period Up Cat. Item No. Code Case Population

...i B-B B2.11 B-B B2.12 B-B B2.40 Total: 2 2 4 8 100% 2 100% 2 25% 1 5 2 2 5 2 2 1 5 0 2 50.00% 50%50.00% 50%0% 0%40% 40%0 50.00% 50%0 50.00% 50%1 100.00% 100%1 60% 60%1 100.00% 100%1 100.00% 100%0 100.00% 100%2 100% 100%12/10/2008 Version 3.0 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period A Period 2 Period 3>> I > >> > >Summary NoJComolD(Svstem Scope I Method I Procedure B-B V1 11201-V6-002-WO1 ISI/UT/ ISI-11201-V6-002 ISI -s .... ..... ..B2.11 11201-V6-002-WO1 UPPER HEAD TO UPPER SHELL WELD AUG ... ... ..... ..1 1201 OW N ..... ..... ....PRE ..............B-B V1 11201-V6-002-WOS ISI1UT/ SI-11201-V6-002 ISI -.................

--B2.11 11201 -V6-002-W05 LOWER SHELL TO LOWER HEAD WELD AUG ...... ..... ...1 1201 OW N ..... .........PR E -. -.- -.-. .-.- ..-. ..B-8 V1 11201-V6-002-W06 ISI/UT/ ISI-11201-V6-002 ISI -s .... ..... ...52.12 11201-V6-002-W06 UPPER SHELL LONGITUDINAL WELD AUG ...... ..... ...1 1201 OWN ......PRE ......B-B V1 11201oV6-002-W09 ISI/UT/ ISI-11201"V6-002 ISI ....... ......S --B2.12 11201-VB-002-W09 LOWER SHELL LONGITUDINAL WELD AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............

B-B V1 11201-B6-001-WO8 ISI/UT/ ISI-11201-B6-001 SI --..- s -..B2.40 11201-B6-001-WO8 TUBE PLATE TO CHANNEL HEAD AUG ... ... ..... ..1 1201 OW N ..... ..... ....PRE .....-. ...- ..- ..B-B V1 11201-B6-002-W08 ISI-11201-B6-002 ISI -.... -..... ...82.40 11201 -B6-002-W08 TUBE PLATE TO CHANNEL HEAD AUG ...... ..... ...1 1201 OWN .... ...PRE .............B-B V1 11201-B6-003-W08 ISI-11201-B6-003 ISI B2.40 11201-B6-003-W08 TUBE PLATE TO CHANNEL HEAD AUG ... ... ..... ..1 1201 OWN --....PRE ...... ..... ...Bs-B V1 I 12UI-B6}-UU4*WO B2.40 11201-B-004-WOB 1 1201 TUBE P11A1T -BO6 EH4 TUBE PLATE TO CHANNEL'HEAD Is5 AUG OWN PRE 12/10/2008 1chp.h iijP.Wnrkc

\1 R 1 Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISI -Code Edition -2001 Edition with 2003 Addenda Period 1 Period 2 Period 3 Percent Actual Round Total Cat. Item No. Code Case Population Required Required Up Exams Actual Round i Actual Round I Actual Round Count Period Up Count Period Up Count Period Up B-D B3.100 B-D B3.110 B-D B3.120 B-D 83.140 B-D B3.90 Total: 8 100% 9 6 100% 6 6 100% 6 8 100% 8 8 100% 6 36 36 8 8 6 6 6 6 8 8 8 8 36 36 0 0% 0%2 33.33% 34%2 33.33% 34%2 25.00% 25%0 0% 0%6 16.60% 17%0 0.00% 0%2 66.67% 67%2 66.67% 67%2 50.00% 50%0 0.00% 0%6 33.30% 34%8 100.00%/ 100%2 100.00% 100%2 100.00% 100%4 100.00% 100%8 100.00% 100%24 100% 100%Item Numbers B3.90 and 13.100 can be deferred to the end of the third ISI interval.Item Numbers B3.110, B3.120 and B3.140 must meat the requirements of Table I W B-24.12. For these AS ME Item Numbers, a total of 14 examinations are required and the AS ME Code-mandated percentages are satisfied.

3/13/2009 Version 3.01 0 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period I 0 Period 2 Period 3 I>> >Summary No./ComplD/System Scope / Method / Procedure B-D V1 11201-V6-001-IR01 ISINTNENDOR ENHANCED VT ISI-11201-V6-001 SIS ...- ..... s .OUTLET NOZZLE N1 INNER RADIUS AT B3.100 11201-V6-001-1R01 22 DEGREES AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............B-D V1 11201-V6-001-1R02 ISINTNENDOR ENHANCED VT ISI-11201-V6-001 ISI -................

s ---INLET NOZZLE N2 INNER RADIUS AT 67 131100 11201-V6-001-1R02 DEGREES AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............B-D V1 11201-V6-001-1R03 ISI/VTNENDOR ENHANCED VT ISI-11201-V6-001 ISI ----------------

s ---INLET NOZZLE N3 INNER RADIUS AT B3.100 11201-V6-001-1R03 113 DEGREES AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............B-D V1 11201-V6-001-1R04 ISI/VTVENDOR ENHANCED VT ISI-11201-V6-001 ISI ...... .........

S ---OUTLET NOZZLE N4 INNER RADIUS AT B3.100 11201-V6-001-IR04 158 DEGREES AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE B-D V1 11201-V6-001-IR05 ISI'TNENDOR ENHANCED VT ISI-11201-V6-001 ISI ---- ---s OUTLET NOZZLE N5 INNER RADIUS AT 83.100 11201-V6-001-IR05 202 DEGREES AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............B-D V1 11201-V6-001-IR06 ISINTNENDOR ENHANCED VT IS1-11201-V6-001 ISI .......--------

s ---INLET NOZZLE N6 INNER RADIUS AT B3.100 11201-V6-001-IR06 247 DEGREES AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE -.- ......B-D V1 11201-V6-001-1R07 ISI/VTNENDORENHANCEDVT ISI-11201-V6-001 ISI s.........s

-INLET NOZZLE N7 INNER RADIUS AT B3.1 00 11201-V6-001

-1R07 293 DEGREES AUG .............

1 1201 OW N ..... ..... ....PRE B3.100 I 11201-V6-001-IR08 1201 OUTLET NOZZLE N8 INNER RADIUS AT 338 DEGREES ISI AUG OWN PRE S ---9/10/2009 ScheduleWorks V. 8.1 Page 1 -5 Southern Nucleartperating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Deac.Code Case Period 1 Period 2 Period 3 V k eý:V 1ýSummary NoJ/CorrpID/System Scope/ Method / Procedure B-D V1 11201-V6-002-W1O ISI/UT/NMP-ES-024-516 ISI-11201-V6-002 ISI s .... ..... ...UPPER HEAD TO 6" SAFETY NOZZLE B3.110 11201-V6-002-W1O AUG/MT/NMP-ES-024-401 WELD AUG s ............

1 1201 OW N ..... ..... ....PRE ... ..........B-D V1 11201-V6-002-W11 ISI/UT/NMP-ES-024-516 ISI-11201-V6-002 ISI s .... ..... ...UPPER HEAD TO 6" SAFETY NOZZLE 13.110 11201-V6-002-W1 I AUG/MT/NMP-ES-024-401 WELD AUG s ............

1 1201 OW N ..... ..... ....PRE ..............B-D VI 11201-V6-002-W12 ISI/UT/ ISI-11201-V6-002 Si ---s ..... ...UPPER HEAD TO 6' SAFETY NOZZLE B3110 11201-V6-002-W12 AUG/MT/ WELD AUG ---s 1 1201 OW N ..... ..... ....PRE ..............B-0 V1 11201-V6-002-W13 ISI/UT/ ISI-11201-V6-002 ISI ----s ..... .UPPER HEAD TO 6" RELIEF NOZZLE B3.110 11201-V6-002-W13 AUG/MT/ WELD AUG ----s 1 1201 OW N ..... ..... ....PRE ... ..........B-D V1 11201-V6-002-W14 ISI/UT/ ISI-11201-V6-002 ISI ...... .........

s -UPPER HEAD TO 4" SPRAY NOZZLE B3.110 11201-V6-002-W14 AUG/MT/ WELD AUG -.............

1 1201 OW N ..... ..... ....PRE ..............B-D V1 11201-V6-002-W16 AUG/MT/ ISI-11201-V6-002 ISI .................

s --14" SURGE NOZZLE WELD TO LOWER B3.110 11201-V6-002-W16 ISI/UT/ HEAD AUG ..................

s -1 1201 OW N ..... ..... ....PRE ..............B-D V1 11201-V6-002-IR-01 ISI/UTINMP-ES-024-513 ISI-11201-V6-002 ISI s .... ..... ...6" SAFETY NOZZLE INNER RADIUS B3.120 11201-V6-002-IR-01 (W ll) AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............B-D B3.120 1 Vi 11201-V6-002-IH-UZ 11201-V6-002-IR-02 1201 ISI/UT/IS1-11201-V6-002 6' SAFETY NOZZLE INNER RADIUS (W12)ISI AUG OWN PRE S --9/10/2009 ScheduleWorks V. 8.1 Page 2 -5 Southern Nucleartperating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 0 Category, Item No., Class DwgfISO No.Comp. Deac.Code Case Period 1 IE Period 2 Period 3 cO1> ~Summary NoJCompID/System Scope I Method / Procedure 6-D V1 11201-V6-002-IR-03 ISI/UT/ IS1-11201-V6-002 ISI ....s ..... ..6" SAFETY NOZZLE INNER RADIUS B3.120 11201-V6-002-IR-03 (W13) AUG ...... ..... ...1 1201 OW N ..... ...... ...PRE ..............B-D V1 11201-V6-002-IR-04 ISI/UT/NMP-ES-024-513 IS1-11201-V6-002 ISI -s .... ..... ..B3.120 11201-V6-002-IR-04 6" RELIEF NOZZLE INNER RADIUS (W10) AUG ..............

1 1201 OW N .......... ...PRE -......B-D VI 11201-V6-002-IR-05 ISI/UT/ ISI-11201-V6-002 ISI .................

s --B3.120 11201-V6-002-IR-05 4" SPRAY NOZZLE INNER RADIUS AUG ..............

1 1201 OW N ..... ..... ....PRE ... ..........8-0 V1 11201 -V6-002-IR-06 ISI/UT/ ISI-11201-V6-002 ISI-- ------- s ..B3.120 11201-V6-002-IR-06 14" SURGE NOZZLE INNER RADIUS AUG ..............

1 1201 OW N ..... ..... ....PRE ..............B-D V1 11201-86-001-IR-01 ISI/UT/ ISI-11201-B6-001 ISI --- -- ---- ---- -- -s ---B3.140 11201-B6-001-IR-01 INLET NOZZLE INNER RADIUS AUG ...... ..... ...1 1201 OWN ... ..........PRE ... ..........B-D V1 11201 -B6-001-IR-02 ISI/UT/ ISI-11201-B6-001 ISI[ -....... ............

s B3.140 11201 -B6-001-IR-02 OUTLET NOZZLE INNER RADIUS AUG ..............

1 1201 OWN ... ..........PRE ..............B-D V1 11201-66-002-IR-01 ISI/UT/NMP-ES-024-513 ISI-11201-B6-002 ISI c ..... ..... ...B3.140 11201-B6-002-IR-01 ISI/UT/NMP-ES-024-513 INLET NOZZLE INNER RADIUS AUG ..............

1 1201 ISI/UT/NMP-ES-024-513 OWN ...... ..... ...ISI/UTINMP-ES-024-513 PRE ...... ..... ...B-D V1 11201-B6-002-IR-02 ISl/UT/NMP-ES-024-53 ISI-11201-B6-002 SI C ..... ..... ...B3.140 11201-B6-002-IR-02 ISI/UT/NMP-ES-024-513 OUTLET NOZZLE INNER RADIUS AUG ..............

1 1201 ISI/UT/NMP-ES-024-513 OWN ...... ..... ...PRE B-D V1 11201-66-003-IR-01 ISI/UT/ ISI-11201-B6-003 ISI -s --. -B3.140 11201-B6-003-IR-01 INLET NOZZLE INNER RADIUS AUG ..............

1 1201 OWN ... ..........PRE I .-.-.I. ...B-D VI 11201-B6-003-IR-02 B3.140 1 1201-B6-003-IR-02 ISI/UT/IS1-11201-86-003 OUTLET NOZZLE INNER RADIUS ISI AUG S -9/10/2009 ScheduleWorks V. 8.1 Page 3 -5 Southern Nuclear perating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 r Period 1 Pdrlod 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Deac.Code Case t2 n 0 r-u .0 0!I 2> 2>Summary NoJCompID/System Scope / Method / Procedure 1 1201 OWN PRE B-0 Vi 11201-06-004-IR-01 ISI/UT/ ISI-11201-86-004 is[ -...............

S ---B3.140 11201-B6-004-IR-01 INLET NOZZLE INNER RADIUS AUG ...... ..... ...1 1201 OW N ..... ...... ...PRE ..............B-D V1 11201-66-004-IR-02 ISI/UT/ ISI-11201-B6-004 ISI .-. .-.--.-.-- -S B3140 11201-B6-004-IR-02 OUTLET NOZZLE INNER RADIUS AUG ..............

1 1201 OW N ..... ..... ....PRE ..............B-D Vi 11201-V6-001-W25 ISI/UT/VENDOR-UT IS1-112011-V6-001 ISI .--------


S ---VESSEL TO OUTLET NOZZLE N1 WELD B3.90 11201 -V6-001 -W25 AT 22 DEGREES AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ... ..........B-D V1 11201-V6-001-W26 ISI/UT/VENDOR-UT ISI-11201-V6-001 ISI .-.-- .-.- ---VESSEL TO INLET NOZZLE N2 WELD AT B3.90 11201-V6-001-W26 67 DEGREES AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............B-D V1 11201-V6-001-W27 ISI/UT/VENDOR-UT IS1-11201-V6-001 ISI -------- s VESSEL TO INLET NOZZLE N3 WELD AT B3.90 11201-V6-001 -W27 113 DEGREES AUG ...... ..... ...1 1201 OW N ...... .... ....PRE -......B-D V1 11201-V6-001-W28 ISI/UT/VENDOR-UT ISI-11201-V6-001 SI- --- ----S ---VESSEL TO OUTLET NOZZLE N4 WELD B3.90 11201-V6-001-W28 AT 158 DEGREES AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............B-D Vi 11201-V6-001-W29 ISI/UT/VENDOR-UT ISI-11201-V6-001 ISI .-.-- .-.- ---VESSEL TO OUTLET NOZZLE N5 WELD B3.90 11201-V6-001-W29 AT 202 DEGREES AUG ........1 1201 OW N ..... ..... ....PRE ..............B3.90 11201-V6-001-W30 1 1201 IOI/U I I v E.IMUUrl-U I VESSEL TO INLET NOZZLE N6 WELD AT 247 DEGREES ISI AUG OWN PRE Page 4 -5 9/10/2009 ScheduleWorks V. 8.1 0 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/lSO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary NoJCompilDSystem Scope I Method / Procedure B-0 V1 11201-V6-001-W31 ISI/UTNENDOR-UT ISI-11201-V6-001 ISI s ---VESSEL TO INLET NOZZLE N7 WELD AT 83.90 11201-V6-001-W31 293 DEGREES AUG -.--..........

1 1201 OWN -.E -----. ..PR E -. -.- -.-. .-.- ..-. ..B-U B3.90 I V1 112ui-V6-001-W32j 11201-V6-001-W32 1201I IVENOruu-u I IS1-1 1 201-V6-Or01 VESSEL TO OUTLET NOZZLE N8 WELD AT 338 DEGREES ISI AUG OWN PRE S -9/10/2009 ScheduleWorks V. 8.1 Page 5 -5 Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISI -Code Edition -2001 Edition with 2003 Addenda Period I Period 2 Period 3 Percent Actual Round Total Cat. Item No. Code Case Population Required Required Up Exams Actual Round -Actual Round Actual Round Count Period Up6 Count Period Up Count Period Up B-G-1 B6.10 B-G-1 56.180 B-G-1 B6.190 B-G-1 B6.20 B-G-1 B6.40 B-G-1 B6.50 Tohtw 1 4 12 1 1 1 20 100%25%0%100%100%100%0 5 0 5 0 5 0 0 0 0 0 0 0 0% 0%0% 0%0% 0%0% 0%0% 0%0% 0%0M 0%0 0.00% 0%0 0.00% 0%0 0% 0%0 0.00% 0%0 0.00% 0%0 0.00% 0%0 0% 0%1 100.00% 100%1 100.00% 100%0 0% 0%1 100/006 100%1 100.00% 100%1 100.00% 100%5 100% 100%4/2009 Version 3.0 Page 1 -1 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Category, Item No., Class DwgflSO No.Comp. Desc.Code Case Period 1 Ix Period 2 wo -- m o Period 3 Summary NoJCompIDiSystem Scope I Method I Procedure B-I-1 VI 11201-V6-001-NO1 THRU N054 ISI/VT/ ISI-11201-V6-001 ISI -..................

s ..B6.10 11201-V6-001-N01 THRU N054 CLOSURE HEAD NUTS AUG -" ---1 1201 OW N ..... ...... ...PRE ..............B-" -1 V1 11201-P6-001-Bo1 THRU B24 ISI-11201-P6-001 ISI -..... ..... ..B6.180 11201.P6-001-B01 THRU B24 MAIN FLANGE BOLTS AUG ..............

1 1201 OW N ..... ..... ....PRE ..............B-G-1 V1 11201-P6-002-B01 THRU B24 ISI/UT/ ISI-11201-P6-002 ISi ..-. ...-.-.----

s B6.180 11201.P6-002-B01 THRU B24 MAIN FLANGE BOLTS AUG ..............

1 1201 OW N ..... ..... ....PRE ..............B-G-I Vl 11201-P6'003-B01 THRU B24 ISI-11201-P6-003 ISI ...... ..... ...B6.180 11201-P6-003-B01 THRU B24 MAIN FLANGE BOLTS AUG ..............

1 1201 OW N ..... ..... ....PRE ... ..........B-G-I V1 11201-P6-004-BO1 THRU B24 ISI-11201-P6-004 ISI ...... ..... ...B0.180 11201-P6-004-B01 THRU B24 MAIN FLANGE BOLTS AUG .............

1 1201 OW N ..... ..... ....PR E ..............8-G-1 V1 11201-P6-001-CO1 THRU C24 ISI/VT/NMP-ES-024-201 ISI-11201-P6-001 ISI .t t t I I t I t --86.190 11201-P6-001-CO1 THARU C24 PUMP CASING BOLT HOLES AUG ..............

1 1201 OW N ..... ..... ....PRE ..............B-G-1 V1 11201-P6-001-MO1 THRU M24 ISINT/NMP-ES-024-201 ISI-11201-P6-001 ISI -t -t t t t t B6.190 11201-P6-001-Mo1 THRU M24 MOTOR STAND FLANGE AUG ..............

1 1201 OW N ..... ..... ....PRE ..............B-G-1 V1 11201-P6-001-RO1 THRU A24 ISINT/NMP-ES-024-201 ISI-11201-P6-001 ISI -I -t t I t t t I -B6.190 11201-P6-001-Rol THRU 824 BOLTING RINGS AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............B-G-1 V1 11201-P6-002-CO1 THRU C24 ISI/VTNMP-ES-024-201 ISI-11201-P6-002 SI t I t I t t I I 56.190 11201-P6-002-CO1 THRU C24 PUMP CASING BOLT HOLES AUG ..............

1 1201 OW N ..... ..... ....PRE ..............Vl 11201-1-6-002z-M01U THRIIU M24~B6.190 11201-P6-002-MOi THRU M24 1 1201 iSVlV I/lNMt"-t S-U0 4-2 1 MOTOR STAND FLANGE ISI AUG OWN PRE t tIt t I t Page 1 -2 4/9/2009 ScheduleWorks V. 8.1 Southern Nuclear Operating CompanyV 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Period I Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case:! 14 Period 2 Period 3 Summary NoJCompll/System Scope / Method / Procedure B-G-I Vi 11201-P6-002-ROt THRU R24 ISI/VT/NMP-ES-024-201 ISI-11201-P6-002 ISI -t -t t t -t t --B6.190 11201-P6-002-R01 THRU R24 BOLTING RINGS AUG ..............

1 1201 OW N ..... ....PRE ..............&-G-1 V1 11201-P6-003-C01 THRU C24 ISINTiNMP-ES-024-201 ISI-1 1201-P6-003 Si I I t --tt t B6.190 11201-P6-003-C01 THRU C24 PUMP CASING BOLT HOLES AUG ..............

1 1201 OW N ..... ..... ....PRE ... ......B-G-1 V1 11201-P6-003-M01 THRU M24 ISI/VT/NMP-ES-024-201 ISl-11201-P6-003 ISI -t --t t 1 t I --B6.190 1i201-P6-003-M01 THRU M24 MOTOR STAND FLANGE AUG ..............

1 1201 OW N ..... ..... ....PRE ..............B-G-1 V1 11201-P6-003-R01 THRU R24 ISI/VTiNMP-ES-024-201 ISI-11201-P6-003 SI t" -I I -t B6.190 11201-P6-003-R01 THRU R24 BOLTING RINGS AUG .............

1 1201 OW N ..... ..... ....PRE ..............B-0-1 Vi 11201-P6-004-C01 TH RU C24 ISINT/NMP-ES-024-201 ISI-11201-P6-004 ISI t --t t -t I -B6.190 11201-P6-004-COi THRU C24 PUMP CASING BOLT HOLES AUG ..............

1 1201 OW N ..... ..... ....PRE ..............B-G-1 V1 11201-P6-004-M01 THRU M24 ISINT/NMP-ES-024-201 ISI-11201-P6-004 ISI --I I t -I t --B6.190 11201-P6-004-MO1 THRU M24 MOTOR STAND FLANGE AUG ..............

1 1201 OW N ..... .........PRE ...... ..... ...B-G-1 V1 11201-P6-004-RO1 THRU R24 ISIVT/NMP-ES-024-201 ISI-11201-P6-004 ISI -t --t t I -t t --B6.190 11201-P6-004-Ro1 THRU 824 BOLTING RINGS AUG ..............

1 1201 OW N ..... ..... ....PRE ... ..........B-G-1 V1 11201-V6-001-B01 THRU 054 ISI/UT/ ISI-1 1201-V6-001 ISI ...........

..........

s B6.20 1i201-V6-001-BO1 THRU 054 CLOSURE HEAD STUDS AUG ..............

1 1201 OW N ..... ..... ....PRE ..............B-G-1 V1 11201-V6-001-LO0 THRU 054 ISI(UTNENDOR-UT ISI-11201-V6-001 SI- -..-.-.-..

..- s ---86.40 11201-V6-001-LO1 THRU 054 THREADS IN FLANGE AUG ..............

1 1201 OW N ..... .........PR E ..............B6.50 11201-V6-001-So0 THRU S054 1 1201 CLOSURE WASHERS AUG OWN PRE s Page 2 2 4/9/2009 ScheduleWorks V. 8.1 Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISI -Code Edition -2001 Edition with 2003 Addenda Period 1 Period 2 Period 3 Percent Actual Round Total Cat. Item No. Code Case Population Required Required Up Exams Actual Round Count Period Up Actual Count Period B-G-2 57.20 B-G-2 B7.30 B-G-2 B7.50 B-G-2 B7.60 1-G-2 B7.70 Total: 1 4 11 33 57 0%0%0%01%0%0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0% 0%0 0%/ 0%0 0% 0%0 0% 0%0 0% 0%0 0% 0%0 0% 0%0 0% 01/0 0 0% 0%0 0% 0%0 0% 0%0 0% 0%0 0% 0%0 0% 0%0 0% 0%0 0% 0%0 0% 0%0 0% 0%413/2009 Version 3.0 Page 1 -1 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Category, Item No., Class Dwg/ASO No.Comp. Desc.Code Case Period I Period 2 Period 3>> >>> >>Summary No./ComplD/System Scope / Method I Procedure B-G-2 V1 11201-V6-002-B01 THRU B16 ISINT/NMP-ES-024-201 ISI-11201-V6-002 ISI -t t I -t B7.20 11201-V6-002-BO1 THRU B16 MANWAY BOLTING AUG ..............

1 1201 OW N ..... ..... ....PRE .............B-G-2 VI 11201-86-001-B01 THRU B32 ISI/VT/NMP-ES-024-201 ISI-11201-B6-001 IS1 -I -t t t -t t --B7.30 11201-B6-001-B01 THRU B32 PRIMARY MANWAY BOLTING AUG .............

1 1201 OW N ..... ..... ....PRE ..............B-G-2 V1 11201-B6-002-BO1 THRU B32 ISI/NMP-ES-024-201 ISI-11201-B6-002 ISI -I I I I -t t B7.30 11201-86-002-B01 THRU B32 PRIMARY MANWAY BOLTING AUG ..............

1 1201 OW N ..... ...... ...PRE ..............B-G-2 V1 11201-86-003-B01 THRU B32 ISI/VT/NMP-ES-024-201 ISI-11201-B6-003 ISI -t I t I -t I -B7.30 11201-86-003-B01 THRU B32 PRIMARY MANWAY BOLTING AUG .............

1 1201 OW N ..... ..... ....PRE ..............B-G-2 Vi 11201-B6-004-B01 THRU 832 ISI/Vr/NMP-ES-024-201 ISI-11201-B6-004 SI -I t I I -I It B7.30 11201-86-004-801 THRU B32 PRIMARY MANWAY BOLTING AUG ..............

1 1201 OWN ----....PR E ..............B-G-2 Vi 11201-056-6 FB ISI/VT/NMP-ES-024-201 ISI-11201-056 SI I t t -I It 6" FLANGE BOLT ASSEMBLY FOR 1201-B7.50 11201-056-6 FB PSV-8010C AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE .......... ..B-G-2 V1 11201-057-8 FB ISI/VT/NMP-ES-024-201 ISI-11201-057 ISI t I I I -t t 6" FLANGE BOLT ASSEMBLY FOR 1201-B7.50 11201-057-8 FB PSV-8010B AUG .........1 1201 OW N ..... ...... ...PRE ....B-G-2 V1 11201-058-7 FB ISI/VT/NMP-ES-024-201 ISI-11201-058 SI I t I t t t 6* FLANGE BOLT ASSEMBLY FOR 1201-B7.50 11201-058-7 FB PSV-8010A AUG ----....1 1201 OW N ..... ..... ....PRE ..............B-7-2 B7.50 1 V1 112U4-u0b6-4 FB 11204-076-42 FB 1204 IIl/V I/NMP-E--024-201 ISl-112 4076 1.5' FLANGE BOLT ASSEMBLY FOR FE-0924 ISI AUG OWN-I I t t I I 4/3/2009 ScheduleWorks V. 8.1 Page 1 -7 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISl PLAN, VERSION 3 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case fa Summary No.IComplDSystem Scope / Method I Procedure r.-'0 C.PRE B-G-2 V1 11204-077-10 FB IS[IVT/NMP-ES-024-201 ISI-11204-077 SI -t t t t -t 1.5' FLANGE BOLT ASSEMBLY FOR FE-B7.50 11204-077-10 FB 0927 AUG ...... ..... ...1 1204 OWN ...... ..... ...PRE ..............B-G-2 V1 11204-078-8 FB ISINTINMP-ES-024-201 ISI-11204-078 ISI -t I t t t -I 1.5" FLANGE BOLT ASSEMBLY FOR FE-0 7 .5 0 1 1 2 0 4 -0 7 8 -8 F B 0 9 2 5 A U G ---..........1 1204 OW N ..... ..... ....PRE ...... ..... ...B-G-2 V1 11204-079-12 FB ISIIVT/NMP-ES-024-201 ISI-11204-079 SI -t t t t -I I 1.5' FLANGE BOLT ASSEMBLY FOR FE-B7.50 11204-079-12 FB 0926 AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..........B-G-2 Vl 11208-024-5 FB ISINT/NMP-ES-024-201 ISI-11208-024 ISI -t t t t t I t 1.5' FLANGE BOLT ASSEMBLY FOR RC B7.50 11208-024-5 FB PUMP 001 AUG ...... ..... ...1 1208 OWN ...... ..... ...PRE ..........8-G-2 V1 11208-043-5 FB ISINT/NMP-ES-024-201 ISI-11208-043 SI I I I -t I 1.5" FLANGE BOLT ASSEMBLY FOR RC B7.50 11208-043-5 FB PUMP 002 AUG ...... ..... ...1 1208 OWN ...... ..... ...PRE ..............B-G-2 V1 11208-045-14 FB ISV'/NMP-ES-024-201 IS -11208-045 ISI -t I I -m I t 1.5' FLANGE BOLT ASSEMBLY FOR RC B7.50 11208-045-14 FB PUMP 003 AUG ...... ..... ...1 1208 OW N ..... ..... ....PRE ..............B-G-2 V1 11208-047-14 FB ISI/VT/NMP-ES-024-201 ISI-1 1208-047 IS t 1 t t t 1.5' FLANGE BOLT ASSEMBLY FOR RC B7.50 11208-047-14 FB PUMP 004 AUG ...... ..... ...1 1208 OW N ............PRE B7.60 11201-P6-001 -B25 THRU B32 1 1201 IlIV I/rfMrI-Et-u04-cIJ I 1.5* DIA. SEALWATER HOUSING CAP SCREWS'SI AUG OWN t --t t I Page 2 7 4/3/2L Schedule..

rks V. 8.1 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Period 1 Period 2 Period 3 Category, Item No., Class DwgfSO No.Comp. Desc.Code Case 0 N 0~00 Summary No./CompID/System Scope / Method I Procedure PRE B-G-2 Vi 11201-P6-001-B33 THRU B48 ISI/q/NTMP-ES-024-201 ISI-11201-P6-001 ISI 1 I t t t 2" DIAMETER SEAL- WATER HOUSING 87.60 11201-P6-001 -B33 THRU B48 BOLTS AUG ..............

1 1201 OWN ...... ...PRE ..............B-G-2 Vt 11201-P6-002-B25THRU B32 ISINT/NMP-ES-024-201 ISI-11201-P6-002 ISI -I I I I t I t 1.5" DIA. SEALWATER HOUSING CAP B7.60 11201-P6-002-B25 THRU B32 SCREWS AUG ..............

1 1201 OW N .......... ....PRE ..............B-G-2 V1 11201-P6-002-B33 THRU 848 ISI/VT/NMP-ES-024-201 ISl-1 1201 -P6-002 SI I -t t I -t 2' DIAMETER SEAL- WATER HOUSING B7.60 11201-P6-002-B33 THRU B48 BOLTS AUG .............

1 1201 OW N ..... ..... ....PRE ..............B-G-2 V1 11201-P6-003-B25 THRU B32 ISINT/NMP-ES-024-201 ISI-11201-P6-003 ISI I I t I -I t 1.5" DIA. SEALWATER HOUSING CAP 87.60 11201-P6-003-B25 THRU B32 SCREWS AUG ..............

1 1201 OW N ...... .... ....PR E ..............B-G-2 V1 11201-P6-003-B33 THRU 848 ISINT/NMP-ES-024-201 ISI-11201-P6-003 ISI -I I I I -t 2" DIAMETER SEAL- WATER HOUSING B7.60 11201-P6-003-B33 THRU B48 BOLTS AUG ..............

1 1201 OW N ..... ..... ....PRE ..............B-G-2 V1 11201-P6-004-B25 THRU B32 ISI/VT/NMP-ES-024-201 ISI-11201-P6-004 ISI -I t I t I t 1.5" DIA. SEALWATER HOUSING CAP B7.60 11201 -P6-004-B25 THRU B32 SCREWS AUG ..............

1 1201 OW N ..... ..... ....PRE ........B-G-2 Vi 11201-P6-004-B33 THRU B48 ISI/VT/NMP-ES-024-201 ISI-11201-P6-004 SI s] I I t I 2 DIAMETER SEAL- WATER HOUSING B7.60 11201-P6-004-B33 THRU B48 BOLTS AUG ..............

1 1201 OW N ..... ...... ...PR E ..............B-G-2 V 1120I1iV800Avu B7.70 11201HV8000A 1 1201 ISI/V I/NMP-" ES -0U4"Z2 1 VlV-11201-059 VALVE BOLTING (IS1-1 1201-059 )ISI AUG OWN PRE 1 t t Page 3 7 4/3/2009 ScheduleWorks V. 8.1 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Category, Item No., Class DwgflSO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 0 w D t. 0: 1 0CO cc a c c Sumimary No./ComolfliSvetem Scooe / Method / Procedure B-G-2 VI 11201HV8000B ISIN/TNMP-ES-024-201 ISI-11201-060 SI t I t I -I t B7.70 11201HV8000B VALVE BOLTING (ISI-11201-060)

AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............B-G-2 V1 11201HVB701A IS/INTINMP-ES-024-201 ISI,11201-036 IS$ ---I t t -I I --B7.70 11201HV8701A VALVE BOLTING (ISI-1 1201-036)

AUG ...... ..... ...1 1201 OWN -..........PRE ..............B-G-2 V- 11201HV8701B ISI/VTI/NMP-ES-024-201 IS1-11201-036 ISI -i t t t I -t t B7.70 11201HV8701B VALVE BOLTING (ISI-1 1201-036)

AUG ..............

1 1201 OW N ..... ..... ....PRE ..............B-G-2 Vi 11201HV8702A ISINT/NMP-ES-024-201 ISI-11201-049 ISI -I --I I t -t t B7.70 11201HV8702A VALVE BOLTING (IS1-i 1201-049)

AUG ..............

1 1201 OW N ..... ..... ....PRE ..............B.G-2 VI 11201HV8702B ISI/VT/NM P-ES-024-201 IS1-11201-049 SI -t t I I I t B7.70 11201HV8702B VALVE BOLTING (ISI1'1201-049)

AUG -............

1 1201 OW N ..... ..... ....PRE ..............B-G-2 V1 11201PSV8010A ISIN'T/NMP-ES-024-201 ISI-11201-058 ISI -I --I I I -I I --B7.70 11201PSV801OA VALVE BOLTING (ISI-1 1201-058)

AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............B-G-2 VI 11201PSV8010B ISINT/NMP-ES-024-201 IS1-11201-057 Is] -I --t I t -I I -B7.70 11201PSV8010B VALVE BOLTING (ISI-11201-057)

AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............B-G-2 V1 11201PSV8010C ISINT/NMP-ES-024-201 IS1-11201-056 ISI t t t t -t- -B7.70 11201PSV8010C VALVE BOLTING (ISI-1 1201-056)

AUG ..............

1 1201 OW N ..... ..... ....PRE ..............B-G-2 V1 11201PV0455A ISI/VT/NMP-ES-024-201 ISI-11201-059 ISI -t --t t t -t -t --87.70 11201PV0455A VALVE BOLTING (ISI-11201-059)

AUG ...... ..... ...1 1201 OW N .......... ....PRE B-6-2 V1 1l1U10VL45bbA 87.70 11201PV0456A 1 1201 ISI/V V LI-11201-060 VALVE BOLTING (ISI-11201-060

)ISI AUG OWN PRE t t t t t 4/3/2(,.Scheduleý..,rks V. 8.1 Page 4 -7 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Category, Item No., Dwg/ISO No.Comp. Oesc.Code Case Period I-e !2 Period 2 0 r- aV Period 3 M a Slummary No./ComorlDSvatem SCOne/IMethod I Procedure B-G-2 Vi 11204HV8808A ISI'TI/NMP.ES-024-201 ISI-11204-124 Isi -t t t t -t t B7.70 11204HV8808A VALVE BOLTING (ISI-1 1204-124)

AUG .........1 1204 OW N ...... .......PRE .............B-G-2 V1 11204HV8808B ISI/VT/NMP-ES-024-201 ISI-11204-125 ISI -I --t t t t B 7 .7 0 1 12 04 H V 8 808 B V A L V E B O LT IN G (IS1 -112 0 4 .125 ) A U G ..............1 1204 OW N ..... ...... ...PRE ..............B-G-2 V1 11204HV8808C ISINT/NMP-ES-024-201 ISI-11204-126 SI t -I t I I I B 7 .7 0 1 t2 0 4 H V 8 8 0 8 C V A L V E B O L T IN G ( IS -1 1 2 0 4 -1 2 6 ) A U G ..............1 1204 OW N ..... ..... ....PRE ..............B-G-2 V1 11204HV8808D ISINT/NMP-ES-024-201 IS1-11204-127 ISI tI --I I I t I B7.70 1 i 204HV8808D VALVE BOLTING (ISI-1 1204-127)

AUG -............

1 1204 OWN ..... ..... ....PRE -............B-G-2 VI 11204U6079 ISIN/T/NMP-ES-024-201 1I1-11204-124 ISI tt -t It I t 8 7.70 11204U 6079 V A LV E B O LT IN G (IS I-11204-124 ) A U G -............1 1204 OWN ... ..........PRE ..............,-G-2 V1 11204U6080 ISI/VT/NMP-ES-024-201 ISI-11204-125 ISI I t I t I t B7.70 11204U6080 VALVE BOLTING (ISI-11204-125)

AUG .......1 1204 OWN ..... ...... ...PRE ..............8-G-2 V1 11204U6081 ISI/VT/NMP-ES-024-201 ISI-11204-126 IS -I t t t t t t B7.70 11204U6081 VALVE BOLTING (ISI-11204-126)

AUG ...... ..... ...1 1204 OWN ............PRE ..............a-G-2 VI 11204U6082 ISINT/NMP-ES-024-201 ISI-11204-127 ISI t t t I t I B7.70 11204U6082 VALVE BOLTING (ISI-11204-127)

AUG .......1 1204 OW N ...... .... ....PRE -............B-G-2 VI 11204U6083 ISI/VT/NMP-ES-024-201 ISI-11204-124 ISI t I t I I I t B 7 .7 0 1 12 0 4 U 6 0 8 3 V A L V E B O L T IN G (IS l-1 1 2 0 4 -1 2 4 ) A U G ..............1 1204 OW N -.... ..... ...PRE -............_ "I 1 l204 IU6015A IClATIN n 01_ lfrl.1Oc ..B7.70 11204U6084 1 1204 VALVE BOLTING (IS-1-1204-125)

AUG OWN PRE[t I t Page 5 7 4/3/2009 ScheduleWorks V. 8.1 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISl PLAN, VERSION 3 Category, Item No., Class DwgfISO No.Comp. Desc.Code Case Period 1 Period 2 cc I>M I.>Period 3 Summary NoJCompID/System Scope I Method / Procedure"-G-2 V1 11204U6085 ISINT/NMP-ES-024-201 ISI-11204-126 -SI t -t t t B7170 11204U6085 VALVE BOLTING (ISI-1 1204-126)

AUG ...... ; ......1 1204 OW N ..... ...... ...PRE ..............B-G-2 V1 11204U6086 ISI/VT/NMP-ES-024-201 IS1-11204-127 ISI -t --t t t -t I --B7370 11204U6086 VALVE BOLTING (ISI-11204.127)

AUG ...... ..... ...1 1204 OWN ..............

PRE ...... ..... ...B-G-2 V1 11204U6124 ISI/VT/NMP-ES-024-201 ISI-11204-024 ISI -t t It t B7.70 11204U6124 VALVE BOLTING (B1S-11204-024)

AUG ..........- " ---1 1204 OW N ..... ..... ....PRE ..............B-G-2 V1 11204U6125 ISIVT/NMP-ES-024-201 ISI-11204-021 ISI -I -I I I t- I t B7.70 11204U6125 VALVE BOLTING (ISI-1i1204-021 ) AUG ...... ..... ...1 1204 OW N ...... ..... ...PRE B-G-2 V1 11204U6126 ISI/VT/NMP-ES-024-201 ISI-11204-023 ISI t t I I t I B7,70 11204U6126 VALVE BOLTING (IB1-i 1204-023)

AUG ..............

1 1204 OWN ..............

PRE ..............B0--2 V1 11204U6127 ISI/VT/NMP-ES-024-201 ISI-11204-025 ISI t t t " t t 87.70 11204U6127 VALVE BOLTING (ISI-11204-025)

AUG ..............

1 1204 OW N ..... ..... ....PRE ..............8-G-2 VI 11204U6128 ISI/VT/NMP-ES-024-201 ISI-11204-023 ISI -I t I t t I I B7.70 11204U6128 VALVE BOLTING (ISI-11204-023)

AUG ..............

1 1204 OW N ..... ..... ....PRE ..............B-G-2 V1 11204U6129 ISI/VT/NMP-ES-024-201 ISI-11204-021 ISI -t I t t t I B7.70 11204U6129 VALVE BOLTING (ISI-11204-021 ) AUG ...... ..... ...1 1204 OWN ...... ..... ...PRE ......... ....B-G-2 VI 11204U6147 ISI/VT/NMP-ES-024-201 ISI-1 1204-042 ISI -I t t I I B7.70 11204U6147 VALVE BOLTING (ISI-11204-042)

AUG ..............

1 1204 OWN ..............

B-.-2 V1, I D 6 PRE~ lain r Ir...t.-.-...

.'.PRE B7.70 11204U6148 1 1204 VALVE BOLTING (ISI-11204-043)

II AUG OWN PRE-I t t Page 6 7 4/3/20, Schedule, .. KS V. 8.1 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISl PLAN, VERSION 3 Category, Item No., Class DwgflSO No.Comp. Desc.Code Case Period 1 Period 2 0 N Period 3 Summary NoJComplD/System Scope I Method I Procedure B-G-Z VI 11204U6149 ISINT/NMP-ES-024-201 IS1-11204-044 ISt I t t t t t B7.70 11204U6149 VALVE BOLTING (IS1-1 1204-044)

AUG -.- --........

1 1204 OWN ----... .P R E -. -.- -.-. .-.- ..-. ..B-G-2 Vi 11204U6150 B7.70 11204U6150 1 1204 ISI/VT/NMP-ES-024-201 ISI-11204-045 VALVE BOLTING (IS1-1 1204-045)ISI AUG OWN PRE t..t t t..4/3/2009 ScheduleWorks V. 8.1 Page 7 -7 Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISI -Code Edition -2001 Edition with 2003 Addenda Period 1 Period 2 Period 3 Percent Actual Round Total Actual Round Actual Round I Actual Round Required Required Up Exams Count Period Up Count Period Up Count Period Up Cat. Item No. Code Case Population B-K B10.10 3 B-K B10.10P 13 Total: 16 33.33% 1 7.69% 1 2 2 1 1 1 o00%oo 100% 0 100.00% .100% 0 00.00 100%1 0 0% 0% 0 0.00% 0% 1 100.00% 100%2 1 50% 50% 0 50% 50% 1 100% 100%12/10/2008 Southern Nuclear Operating Company 3rd Interval, VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class DwgASO No.Comp. Desc.Code Case Period 1 (o Period 2 Period 3 cc a; : Ic Summary No.lCompIDISystem Scope / Method / Procedure B-K V1 11201-V6-001-W204 ISI-11201-V6-001 ISi ...... ..... ...310.10 11201-V6-001-W204 LIFTING LUG 0 DEG. AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ----..........13-K V1 11201-V6-001-W205 ISI-11201-V6-001 ISI ...... ..... ...,10.10 1 1201-V6-001-W205 LIFTING LUG 120 DEG. AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE .......... ....13-K VI 11201-V6-001-W206 ISI/MT/NMP-ES-024-401 ISI-11201-V6-001 ISI -s .... .... ...0,10.10 11201-V6-001-W206 LIFTING LUG 240 DEG. AUG ..... ..... ..1 1201 OW N ..... ..... ....PRE ..............13-K VI 11201-V6-002-W23 ISI-11201-V6-002 ISI ...... ..... ...SUPPORT BRACKET ATTACHMENT t310.1OP 11201-V6-002-W23 WELD AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ...... ..... ...1 3 -K V l 1 1 2 0 1 -V 6 -0 0 2 -W 2 4 IS I- 1 1 2 0 1 -V 6 -0 0 2 S I ..............SUPPORT BRACKET ATTACHMENT 010.1 OP 11201-V6-002-W24 WELD AUG ...... ..... ...1 1201 OW N --... ..... ....PRE -.- ......9-K VI 11201-V6-002-W25 ISI-11201-V6-002 SI ...... ..... ...SUPPORT BRACKET ATTACHMENT B10.10P 11201-V6-002-W25 WELD AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ...............1-K V1 11201-V6-002-W26 IS1-1 1201-V6-002 ISI .......... ...SUPPORT BRACKET ATTACHMENT i10.1OP 11201-V6-002-W26 WELD AUG ....1 1201 OWN PR E ..............910.10P 1 Vi 112U1-V6-U02-W27 11201-V6-002-W27 1201 1i1-11201-V6-002 SUPPORT BRACKET ATTACHMENT WELD ISI AUG OWN PRE 5/1/2009 ScheduleWorks V. 8.1 Page 1 -2 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/lSO No.Comp. Desc.Code Case Period 1 cc Period 2 Period 3> >Summary No./ComplD/System Scope / Method / Procedure O-K V1 11201-V6-002-W28 ISI-11201-V6-002 SI ----....SUPPORT BRACKET ATTACHMENT EI10.1OP 11201-V6-002-W28 WELD AUG ...... ..... ...1 1201 OWN ..... ...... ...PRE ..............S-K V1 11201-V6-002-W29 ISI-11201-V6-002 ISI ...... ..... ...SUPPORT BRACKET ATTACHMENT E10.1OP 11201-V6-002-W29 WELD AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............B-K Vi 11201i-VE-002-W30 ISI-11201-VE-002 ISI .......SUPPORT BRACKET ATTACHMENT E 1IO.OP 11201-V6-002-W30 WELD AUG 1 1201 OW N ..... ..... ....PRE ..............B-K V1 11201-V6-002-W31 ISI-11201-V6-002 ISI ...... ..... ...EI30.10P 11201-V6-002-W31 SUPPORT LUG ATTACHMENT WELD AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............B-K Vi 11201-V6-002-W32 ISI-11201-V6-002 SI ...... ..... ...Et10.1oP 11201-V6-002-W32 SUPPORT LUG ATTACHMENT WELD AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............B-K Vi 11201-V6-002-W33 ISI-11201-V6-002 SI ...... ..... ...EiO.1oP 11201-V6-002-W33 SUPPORT LUG ATTACHMENT WELD AUG 1 1201 OW N ..... ..... ....PR E ..............B-K V1 11201-V6-002-W34 ISI-11201-V6-002 SI ...... ..... ...EiO.1oP 11201-V6-002-W34 SUPPORT LUG ATTACHMENT WELD AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............B-K Vi 11201-V6-002-W35 B10.10P 11201-V6-002-W35 1 1201 ISI/MT/ISI-11201-V6-002 SUPPORT SKIRT WELD ISI AUG OWN PRE s 5/1/2009 ScheduleWorks V. 8.1 Page 2 -2 Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISl -Code Edition -2001 Edition with 2003 Addenda Period 1 Period 2 Percent Actual Round Total f Actual Round Actual Cat. Item No. Code Case Population Required Required Up Exams Count Period Up Count Period B-L.2 B12.20 4 0% 0 0 0 0 0% 0% 0 0%Total: 4 0 0 0 0 0% 0% 0 0%0% 0 0% 0%0% 0 0% 0%4/3/2009 Version 3.0 Page 1 -1 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Category, Item No., Class Dwg/ISO No.Comp. tese.Code Case Period 1 Period 2 Period 3ý 0 2 L:: 1ýQ w m cmm c Summary NoJComplD/System Scope/ Method I Procedure B-L-2 V1 11201-P6-001-101 ISINT/NMP-ES-024-203 ISI-11201-P6-001 SI -t I I t -I I B12.20 11201-P6-001-101 PUMP CASING INTERNAL SURFACE AUG ..............

1 1201 OW N ..... ..... ....PRE ... ..........B-L-2 VI 11201-P6-002-101 ISI/VT/NMP-ES-024-203 ISI-11201-P6-002 ISI -I t t t -I I -t B12.20 11201-P6-002-101 PUMP CASING INTERNAL SURFACES AUG ..............

1 1201 OW N ..... ..... ....PRE ...... ..... ...B.-L-2 V1 11201-P6-003-101 ISIV'rNMP-ES-024-203 ISI-11201-P6-003 ISI t I --I I I -I I -612.20 11201-P6-003-101 PUMP CASING INTERNAL SURFACE AUG ..............

1 1201 OW N ..... ..... ....PRE ..............B-L-2 V1 11201-iP6-004-I10 B12.20 11201-P6-004-101 1 1.01 ISIIV I /NM'P--U4-203 PUMP CASING INTERNAL SURFACE ISI AUG OWN PRE t t t I -t t 4/3/2009 ScheduleWorks V. 8.1 Page I -I Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISI -Code Edition -2001 Edition with 2003 Addenda Cat. Item No. Code Case B-M-2 B1250 Total: 29 29 0% 0 0 0 0 0% 0% 0 0% 0% 0 0 0 0 0 0% 0% 0 0% 0% 1 0 0% 0%0% 0%4/3/2009 Version 3.0 Page 1 -1 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISl PLAN, VERSION 3 Period I Period 2 Period 3 Category, Item No., Class DwgflSO No.Comp. Desc.Code Case 0o r- 0>e Summary NoJComplO/System Scope / Method / Procedure B-M-2 VI 11201HV8701A

-IS ISIMIV/NMP-ES-024-203 ISI-11201-036 ISI t t t t t VALVE INTERNAL SURFACES (ISI-11201-B12.50 11201HV8701A

-IS 036) AUG .............

1 1201 OW N ..... ..... ....PRE ..............B-M-2 V1 11201HV8701B-IS ISIIVT/NMP-ES-024-203 ISI-11201-036 ISI t I' t I t t tI t VALVE INTERNAL SURFACES (ISI-11201-812.50 11201HV8701B

-IS 036) AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ...... ..... ...B-M-2 V1 11201HV8702A

-IS ISI/VT/NMP-ES-024-203 ISI-11201-049 1- 1 -t tI I -I t VALVE INTERNAL SURFACES (IS-151201-B12.50 11201HV8702A

-IS 049) AUG ...... ..... ...1 1201 OWN ............PRE ..............B-M-2 V1 11201 HV8702B -IS ISUVTINMP-ES-024-203 ISI-11201-049 ISI 1 -I t t t t VALVE INTERNAL SURFACES (ISI- 1201-B12.50 11201HV8702B

-IS 049) AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ... ......B-M-2 V1 11201PSVS010A

-IS ISI/Vr/NMP-ES-024-203 ISI-11201-058 ISI t I t t t t VALVE INTERNAL SURFACES (ISI-11201-B12.50 11201PSV801OA

-IS 058) AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............B-M-2 V1 11201PSV8010B

-IS ISI/VT/NMP-ES-024-203 ISI-11201-057 ISI t I t t I I VALVE INTERNAL SURFACES (ISI-11201-B12.50 11201PSV801OB

-IS 057) AUG -..... ..... ..1 1201 OW N ..... ..... ....PRE ...... ..... ...B-M-2 V1 11201PSV8010C-IS ISI/VT/NMP-ES-024-203 ISI-11201-056 ISI I I t t t t VALVE INTERNAL SURFACES (ISI-11201-B12.50 11201PSV8010C

-IS 056) AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............8-M-2 B 12.50 1 VI 11I204HV8808A

-IS 11 204HV8808A

-IS 1204 ISI/V I/IMP"-tE.S-U04-2U3 ISf VALVE INTERNAL SURFACES (ISI-11204-124) AUG OWN PRE t t 1 4/3/2009 ScheduleWorks V. 8.1 Page 1 -4 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 IS1 PLAN, VERSION 3 Period I Period 2 Period 3 Category, Item No., Class DwgiSO No.Comp. Desc.Code Case E E>* ý w a~ C-N Summary NoJComolD/Svstem Scone/IMethod

/ Procedure B-M-2 V1 11204HV8808B

-IS ISINT/NMP-ES-024-203 ISI-11204-125 ISI I t t t -I t VALVE INTERNAL SURFACES (IS1-11204-B12.50 11204HV8808B

-IS 125) AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ... ..........B-M-2 VI 11204HV8808C

-IS ISINTINMP-ES-024-203 ISI-11204-126 ISI I I I I -t t VALVE INTERNAL SURFACES (ISI-i 1204-B12.50 11204HV8808C

-IS 126) AUG ...... ..... ..--1 1204 OW N ..... ..... ....PRE ..............B-M-2 V1 11204HV8608D

-IS ISI/N"/NMP-ES-024-203 ISI-11204-127 ISI -t I I I -I I VALVE INTERNAL SURFACES (ISI-1 1204-B12.50 11204HV8808D

-IS 127) AUG ...... ..... ...1 1204 OWN ..... ...... ...P RE ..............B-M-2 VI 11204U6079-IS ISI/VT/NMP-ES-024-203 ISI-11204-124 ISI tI t I t -I I VALVE INTERNAL SURFACES (ISI-11204-B12.50 11204U6079

-IS 124) AUG ...... ..... ...1 1204 OWN ... ..........PRE ..............B-M-2 VI 11204U6080

-IS ISIVT/NMP-ES-024-203 ISO-11204-125 ISI -t t tI I It VALVE INTERNAL SURFACES (IS-1 1204-812.50 11204U6080-IS 125) AUG ...... ..... ...1 1204 OW N ..... ...... ...PRE ..............B-M-2 V1 11204U6081

-IS ISIIVT/NMP-ES-024-203 ISI-11204-126 ISI t I I I I t VALVE INTERNAL SURFACES (ISI-11204-812,50 11204U6081

-IS 126) AUG 1 1204 OWN ........PRE ..............D-M-2 Vl 11204U6082

-IS ISINT/NMP-ES-024-203 ISI-11204-127 SI -t t I -I t VALVE INTERNAL SURFACES (ISI-11204-B12.50 11204U6082-IS 127) AUG --...... ...1 1204 OW N ...... ..... ...PRE ..............B-M-2 B12.50 1 V1 11204U6083-IS 11204U6083-IS 1204 ISI/VT/NMP-ES-024-203 IS1-11204-124 VALVE INTERNAL SURFACES (ISI-11204-124)iSI AUG OWN PRE I --I t .!I --4/3/2(,, _Schedulev,orks V. 8.1 Paqe 2 -4 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Category, Item No., Class DwgAISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3!e W: T I C) 0 cc w ~Summary NoJCompID/System Scope / Method I Procedure B-M-2 V1 11204U6084-IS ISlVT/NMP-ES-024-203 ISI-11204-125 ISI 1 -t I I 1 7 VALVE INTERNAL SURFACES (ISI-11204-B12.50 11204U6084-IS 125) AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............B-M-2 V1 11204U6085-IS ISI/VTINMP-ES-024-203 ISI-11204-126 ISI t t I I t I VALVE INTERNAL SURFACES (ISI-1 1204-B12.50 11204U6085

-IS 126) AUG ... ..........1 1204 OW N ..... ..... ....PRE -......B-M-2 Vi 11204U6086-IS ISINT/NMP-ES-024-203 ISI- 1204-127 ISl t t I t t t VALVE INTERNAL SURFACES (IS1-i 1204-B12.50 11204U6086 -IS 127) AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............B-M-2 V1 11204U6124

-IS ISIIVT/NMP-ES-024-203 IS1-11204-024 ISI t -t t VALVE INTERNAL SURFACES (ISI-1 1204-B12.50 11204U6124-IS 024 AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............B-M-2 V1 11204U6125-IS ISINT/NMP-ES-024-203 ISI-11204-021 ISI t I t -I t VALVE INTERNAL SURFACES (SI-I 1204-B12.50 11204U6125-IS 021) AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ...... ..... ...B-M-2 V1 i1204U6126

-IS ISINT/NMP-ES-024-203 ISI-I1204-023 ISI -t I I I t VALVE INTERNAL SURFACES (ISI-11204-B12.50 11204U6126 -IS 023) AUG ...... ..... ...1 1204 OW N ...... ..... ...PRE ... ..........B-M-2 VI 11204U6127

-IS ISIIMT/NMP-ES-024-203 ISI-11204-025 ISI t t t t t VALVE INTERNAL SURFACES (ISI-11204-B12.50 11204U6127-IS 025) AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............B-M-2 Vl 11204U6128-IS B12.50 11204U6128-IS 1 1204 1S1/VTI/ NMP-E"- I02b '4" 2 U ISI-1 1204-U23 VALVE INTERNAL SURFACES (ISI-11204-023)IsI AUG OWN PRE 1 It t tI --4/3/2009 ScheduleWorks V. 8.1 Page 3 -4 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Period 1 Period 2 Period 3 Category, Item No., Class DwgfSO No.Comp. Desc.Code Case t! ý: 14-N E ~Summary NoJComplD/System Scope I Method I Procedure B-M-2 VI 11204U6129

-IS ISI/VT/NMP-ES-024-203 ISI-11204-021 ISI t t I t t t VALVE INTERNAL SURFACES (ISI-11204-812.50 11204U6129-IS 021) AUG -..........1 1204 OWN ... ..........PRE ..........B-M-2 VI 11204U6147 -IS ISI/V'/NMP-ES-024-203 ISI-11204-042 IS1 t t -t T I I t VALVE INTERNAL SURFACES (ISI-11204-B12.50 11204U6147-IS 042) AUG ...... ..... ...1 1204 OWN -......PRE ..............B-M-2 V1 11204U6148-IS ISI/VT/NMP-ES-024-203 ISI-11204-043 ISI t I t t t VALVE INTERNAL SURFACES (ISI-1 1204-812.50 1`1204U6148-IS 043) AUG ...... ..... ...1 1204 OW N ...... .... ....PRE ..............B-M-2 VI 11204U6149-IS ISINT/NMP-ES-024-203 IS1-11204-044 ISI t I t tI t t VALVE INTERNAL SURFACES (ISI-1 1204-B12.50 11204U6149-IS 044) AUG ...... ..... ...1 1204 OW N ...... .... ....PRE ...... ..... ...B12.50 11204U6150-IS 1 1204 151-MM-ES-024-203 IS1-1 1204-045 ISI VALVE INTERNAL SURFACES (151-11204-045) AUG OWN PRE-t It I tI.t 4/3/2(, Scheduleý.

.'ks V. 8.1 Page 4 -4 Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISI -Code Edition -2001 Edition with 2003 Addenda Cat. Item No. Code Case Population B-N-1 B13.10 1 B-N-1 B13.CH 1 Total: 2 Percent Required 100%100%Actual Required 2 Round Up 2 Period 1 Period 2 Total Actual Round Actual Round Exams I Count Period Up Count Period Up 1 100.00% 100% 0 100.00% 100%1 1 100.00% 100% 0 100.00% 100%2 2 100% 100% 0 100% 100%Period 3 0 100.00% 100%0 100.00% 100%0 100% 100%12/1012008 Version 3.0 0- 4 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Category, Item No., Class DwgilSO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 iO t- m Iei C~ ~* ---r I~ N I>>> I>>* -I '.- --I -Summary NoJComplD/System Scope / Method J Procedure B-N-1 Vi 11201-V6-001-101 ISINTNENDOR-VT ISI-11201-V6-001 ISI T S --b -b -B13.10 11201-V6-001-101 ISINTNENDOR-VT VESSEL INTERIOR AUG .......... ..1 1201 ISV1NENDOR-VT OWN ---.........

PRE -............B-N-1 B13.CH I VI 11201-V6-001-102 11201-V6-001-102 1201 ISINVT/NMP-ES-024-203 IS]/vT/ISINVT1 isl "i ZU1-VGd "Oui VESSEL CLOSURE HEAD INTERIOR (FSAR 5.3.37)1I'AUG OWN PRE c b b b-Ilb b -I I 1 Z/1 012008 ScheduleWorks V. 8.1 Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISI -Code Edition -2001 Edition with 2003 Addenda Period I Period 2 Period 3 Percent Actual Round Total Actual Round Actual Round Actual Round Cat. Item No. Code Case Population Required Required Up Exams j Count Period Up Count Period Up Count Period Up B-N-2 613.60 6 100% 6 6 6 0 0% 0% 0 0.00% 0% 6 100.00% 100%Total: 6 6 6 6 0 0% 0% 0 0% 0% 6 100% 100%12/10/2008 Version A" 03 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Category, Item No., Class DwgflSO No.Comp. Desc.Code Case PeTiod ~ Petiod 2 Period 3~ 0 0--I~I>).> I>~-I.- -I --Summary NoJComplD/System Scope I Method I Procedure B-N-2 V1 11201-V6-001-W41 ISIN/VrENDOR-VT ISI-11201-V6-001 ISI .-.-.- ...- -. .. s ---B13.60 11201-V6-001-W41 CORE SUPPORT LUG AT 0 DEGREES AUG ..............

1 1201 OWN ... ..........PRE ..............B-N-2 V1 11201-V6-O01-W42 ISI/VT/VENDOR-VT ISI-11201-V6-001

.SI. ..............

s ---B13.60 11201-V6-001-W42 CORE SUPPORT LUG AT 60 DEGREES AUG ..............

1 1201 OW N ..... ..... ....PRE ..............B-N-2 V1 11201-V6-001-W43 tSI/VTNENDOR-VT IS1-11201-V6-001 ISI ........ .........S -813.60 11201-V6-001-W43 CORE SUPPORT LUG AT 120 DEGREES AUG ..............

1 1201 OW N ..... ........PRE ...... ........B-N-2 V1 11201-V6-001-W44 ISIIVT/VENDOR-VT IS1-11201.V6-001 ISI ........ .........s --B13.60 11201-V6-001-W44 CORE SUPPORT LUG AT 180 DEGREES AUG ..............

1 1201 OW N ..... ..... ....PRE ..............B-N-2 V1 11201-V6-001-W45 ISI/VTNENDOR-V' ISI-11201.V6-001 IS. ..........

-B1360 11201-V6-001-W45 CORE SUPPORT LUG AT 240 DEGREES AUG ..............

1 1201 OW N ..... ..... ....PRE ..............B-N-2 I I IM-I-VO-4U-V6 B13.60 11201-V6-001-W46 1 1201v I ,.1-11201U

-V6-001 CORE SUPPORT LUG AT 300 DEGREES AUG OWN PRE S 12/10/2008 ScheduleWorks V. 8.1 P.- I Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISI -Code Edition -2001 Edition with 2003 Addenda Percent Actual Cat. Item No. Code Case Population Required Required Round Total Up Exams I Count Period i Actual Period B-N-3 B13170 Total: 1 1 100% 1 1 1 1 0 1 0 0%0%12/10/2008 Version .I f)

Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Category, Item No., Class B-N-3 B13.70 I Summary NoJCompID/System V 11201-V6-001-CSS-01 11201-V6-001-CSS-01 1201 Scope I Method I Procedure ISI/VTNENDOR-VT DwgfSO No.Comp. Desc.Code Case ISI-11201-V6-001 CORE SUPPORT STRUCTURE AUG OWN PRE Period 1 3.Period 2 Period 3 El N* .20 1211012008 Schph.dllAWnrkt

\k/ R 1 Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISl -Code Edition -2001 Edition with 2003 Addenda Percent Cat. Item No. Code Case Population Required B-0 B14.10 20 10%Total: 20 Actual Required 2 2 Round Up 2 2 Period I Total r Actual Exams Count Period 2 0 0%2 0 0%Period 3 0% 0 0.00% 0% 1 -2 100.00% 100%0% 0 0% 0% 2 100% 100%1211012008 Version 3.0 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Period 1 Period 2 Period 3 Category, Item No., Class DwgflSO No.Comp. Desc.Code CaseýE t2 lz Icýt 0 IF ir Summary NoJComplO/System Scope I Method I Procedure B-0 V1 11201-V6-001-W184 ISI/PT/ ISI-11201-V6-001 ISI .-.-.- ..-.-.-.-.

I- s -.B14.10 11201-V6-001-W184 CRD HOUSING WELD AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ............... -B-0 V1 11201-V6-001-W185 ISI-11201-V6-001 ISI ...........B14.10 11201-VS-001-W185 CRD HOUSING WELD AUG ...... .... ..1 1201 OW N ...... ..... ...PRE ..... ...... ...B-0 VI 11201-V6-001-W186 ISI-11201-V6-001 ISI ...... ..... ...B14.10 11201-V6-001-W186 CRD HOUSING WELD AUG ...... ..... ...1 1201 OW N ......... ....PRE ----....B-0 Vl 11201-V6-00l-W187 ISI-11201-V6-001 ISI ...... ..... ...B14.10 11201-V6-001-W187 CRD HOUSING WELD AUG ...... ..... ...1 1201 OW N ...... .... ....PRE ..........B-0 VI 11201-V6-001-W118 ISI/PT/ ISI-11201-V6-001 ISI ...... ......... S -B14.10 11201-V6-001-W188 CRD HOUSING WELD AUG ...... ..... ...1 1201 OW N ...... .... ....PRE ....I ... .....B-O VI 11201-VS-001-W189 ISI-11201-V6-001 ISI ... ..........W1410 11201-V6-001 -W189 CRD HOUSING WELD AUG ... ... ..... ..1 1201 OWN ...... .... ....PRE ...... ..... ...B-0 VI 11201-V6-001-W190 ISI-11201-V6-001 ISI .......B14.10 11201-VS-001-W190 CRD HOUSING WELD AUG 1 1201 OWN ...... .......PRE ----....B-0 VI 11201-V6-001-W191 1S1-11201-V6-001 SI B14.10 11201-VS-001-W191 CRD HOUSING WELD AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............8-0 Vi 11201-V6-001-W192 ISI-11201-V6-001 I SI .............814.10 11201-V6-001-W192 CRD HOUSING W ELD AUG ----....1 1201 OW N ..... ..... ....PRE ........... ...-' Vl i 12U1-V6-UU1-VVI9,3 B14.10 11201-V6-001-W193 1 1201 ORD HOUSING WELD 1SI AUG OWN PRE 12/10/2008 ScheduleWorks V. 8.1 Page I -2 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Period I Period 2 Period 3 Category, Item No., Class Dwg/tSO No.Comp. Desc.Code Case rr n" (0 NW 00>~> >~Summary No.jComplD/System Scope I Method I Procedure 8-0 V1 11201-V6-001-W194 ISI-11201-VB-001 SIl 'B14.10 11201-V6-001.W194 CRD HOUSING WELD AUG ...... ...1 1201 OW N .......... ...PRE ... ..........8-0 VI 11201-V6-001-W195 ISI-11201-V6-001 ISI ...... ..814.10 11201-V6-001-W195 CR0 HOUSING WELD AUG -...... ..1 1201 OWN -..... .-...PRE .......B-0 V1 11201-V6-001-W196 ISI-11201-V6-001 ISI --B14.10 11201-V6-001-W196 CRD HOUSING WELD AUG -..... ..... ..1 1201 OWN ...PRE I B-0 Vl 11201-VB-001-W197 ISI-11201-V6-001 ISI -..B14.10 11201-V6-0O1-W197 CRD HOUSING WELD AUG ... ... ..... ..1 1201 OWN ...... ..... ...PRE -...-...--. ...--B-. V1 11201-V6-001-W198 ISI-112014V6-001 ISI --..... ..... ...814.10 11201-V6-001-W198 CRD HOUSING WELD AUG ... ... ..... ..1 1201 OW N ...... ..... ...PRE .......... ....B-C VI 11201-46-001-W199 ISI-11201-V6.001 ISI 814.10 11201-V6-001-W199 CR0 HOUSING WELD AUG -..........1 1201 OW N ..... ...... ...PRE .........I -.. ...B-0 V1 11201-V6-001-W200 ISI-11201-V6-001 1SI ........ ... ...814.10 11201-V6-001-W200 CRD HOUSING WELD AUG .1 1201 OWN ...... ..... ...PRE ........B-0 Vi 11201-V6-001-W201 ISI-11201-V6'001 IS .814.10 11201-V6-001-W201 CRD HOUSING WELD AUG ...... ..... ...1 1201 OW N ..... ........PRE ..........8-0 VI 11201-V6-00l-W202 ISI-11201-6-001 ISI ...... ..... ...814.10 11201-V6-001-W202 CRD HOUSING WELD AUG 1 1201 OWN ------------fl-f V1 I I2nI-V6.nn,.i-flff P88 B14.10 11201-V6-001-W203 1 1201 CRD HOUSING WELD ISI AUG OWN PRE S2/11012008 S/ 2duleWorks V. 8.1 p" 2. .2 Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISI -Code Edition -2001 Edition with 2003 Addenda Percent Cat. Item No. Code Case Population Required B-0 B16.20 4 100%Total: 4 Actual Required Round Up 4 4 4 4 Total Exams Count 4 4 4 4 100.00%100%Period 1 Actual Period Round o Up Count 100% / 0 100% 0 100.00%100%Period 2 Actual Period Period 3 Round Actual Round Up Count Period Up 100% 0 100.00% 100%100% 0 100% 100%12/10/2008 Version 3.0 Southern Nuclear Operating Companyý3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwgIISO No.Comp. Desc.Code Case Period 1 Period 2-* wO (0 NW a: cc c c [Period 3 cm Summary NoJComplD/System Scope / Method / Procedure B-0 V1 11201-B6-O01-T01 ISI/ETNENDOR-ET ISI-11201-B6-001 ISI c b b b b -b b TUBING -ENTIRE LENGTH OF B16.20 11201-B6-001-TO1 ISI/ SELECTED TUBES AUG ...... ..... ...1 1201 ISIl/ OW N ..... ..... ....ISll PRE ..............B-0 V1 11201-B6-002-TO0 ISI/ETNENDOR-ET ISI-11201-B6-002 ISi c b b b b -b b TUBING -ENTIRE LENGTH OF B16.20 11201-16-002-T01 ISI// SELECTED TUBES AUG ...... ..... ...1 1201 ISI / OW N ..... ..... ....ISI/I PRE ..............B-0 V1 11201-B6-003-TO1 ISI/ETNENDOR-ET ISI-11201-B6-003 ISI c b b b b -b b TUBING -ENTIRE LENGTH OF B16.20 11201-B6-003-TO1 ISI1/ SELECTED TUBES AUG 1 1201 ISI/I OW N ..... ..... ....ISI/I PRE B-0 B16.20 1 V1 112U1-OB-UU4-1U1 11201-B6-004-TO1 1201 l~iSUT IVENUUOi-E ISI/ETNENDOR-ET IS I/I IS III IS1-112U1

-1=36-004 TUBING -ENTIRE LENGTH OF SELECTED TUBES ISI AUG OWN PRE c b --b b b-b b -8/4/2009 ScheduleWorks V. 8.1 Page 1 -1 VOGTLE-1 THIRD INTERVAL ISI PLAN ISI BASIS DOCUMENT CLASS 2 COMPONENTS Per IWC-1220, except for high pressure safety injection systems in a pressurized water reactor plant, pressure vessels and their connections in piping having a cumulative inlet and a cumulative outlet pipe cross-sectional area, neither of which exceeds NPS 4", are exempted from volumetric and surface examination requirements.

This exemption applies to the: Excess Letdown Heat Exchanger Letdown Heat Exchanger Letdown Reheat Heat Exchanger Reactor Coolant Filter Seal Injection Filters Seal Water Return Filter Seal Water Heat Exchanger Vl-1208-E6-002 Vi-1208-E6-003 VI-1208-E6-007 Vl-1208-F4-001 V I -1208-F4-004

& -005 VI-1208-F4-002 VI-1208-E6-004 Per IWC- 1220, for systems (or portions of systems) other than RHR, Emergency Core Cooling, or Containment Heat Removal, vessels that oPerate at a pressure equal to or less than 275 psig and at a temperature equal to or less than 200 F may be exempted from volumetric and surface examination requirements.

This exemption applies to the: Volume Control Tank Vl-1208-T6-001 (operates at about 15 to 35 psig and up to 140 0 F)Per IWC- 1220, for systems (or portions of systems) within RHR, Emergency Core Cooling, or Containment Heat Removal, vessels of any size in statically pressurized, passive safety injection systems of pressurized water reactor plants may be exempted from volumetric and surface examination requirements.

This exemption applies to the:.Accumulator Tanks V1-1204-V6-001 through -004 Per Code Case N-706, a VT-2 performed during the system leakage test will be used in lieu of I the volumetric examination requirements for the: " Regenerative Heat Exchanger" RHR Heat Exchangers VI-1208-E6-001 Vl-1205-E6-001

& -002 Since only pressure testing will be performed on the components listed above, these components will not show up in the Code Compliance Summary.Vogtle-I Class 2 Basis Document I of 3 Ver. 3.0 VOGTLE-1 THIRD INTERVAL ISI PLAN ISI BASIS DOCUMENT After applying the exemptions and Code Case N-706, the four Steam Generators and the Boron Injection Tank are the only pressure vessels subject to volumetric and/or surface examinations, per ASME Categories C-A and C-B. Since N-706 did not apply to integrally welded attachments, ASME Category C-C applies to the steam generators, the Boron Injection Tank, the RHR Heat Exchangers, and the Regenerative Heat Exchanger.

Category C-A -Item CL.IO, C1.20 and C1.30 Pressure Retaining Welds in Pressure Vessels Item Cl. 10 applies to shell circumferential welds at gross structural discontinuities.

Each Steam Generator has three welds that meet this criterion:

W03, W04, and W05. Per Note 3 of Table IWC-2500-1, Examination Category C-A, the required examinations may be limited to one steam generator; therefore, welds W03, W04 and W05 on steam generator 2 were scheduled for examination.

This scheduling is a change from the previous strategy which was to distribute the welds among the vessels. Limiting the examinations to one vessel reduces the various support requirements associated with steam generator examinations and the scheduling of the shell welds during one outage should result in a significant reduction in radiation dose and craft support. The basis for the change is ASME Code Case N-624. Using the Code Case, the ISI scope between the second and third ISI intervals is almost identical, but the selection of actual welds has been changed to support the optimization of scaffolding, radiological issues, and insulation removal. It should be pointed out that this results in the selection of some welds that have not previously been examined or were examined more than 10 years ago, but this is considered acceptable since the number of examinations is the same. In addition, selected examinations may be performed without ASME Code credit being taken to ensure ASME Code compliance.

Additionally none of these welds being deleted were being re-examined to address flaws.There is one C1.20 head circumferential weld and one C1.30 tubesheet-to-shell weld on each of the four Steam Generators.

Per Note 3 of Table IWC-2500-1, Examination Category C-A, the required examinations may be limited to one steam generator; therefore, only one C. 120 weld and one C. 130 weld require examination for the steam generators.

In addition, the Boron Injection tank has two C 1.20 head circumferential welds which will require examination in the third ISI interval.

It should be noted that Boron Injection Tank weld 1 1204-V6-001-W03 was last examined during 1R7 which was in the first period of the 2 nd Interval.

For the 3 rd Interval weld W03 was scheduled for second period which is a change in the sequence of component examinations as described in IWB-2420(a).

The basis for this change is ASME Code Case N-624 which allows the sequence of examinations to be modified to optimize scaffolding, radiation exposure, and insulation removal.Category C-B -Item C2.21 and C2.22 Pressure Retaining Nozzle Welds in Pressure Vessels Each Steam Generator has a Feedwater Inlet Nozzle, an Auxiliary Feedwater Inlet nozzle, and a Steam Outlet Nozzle.Vogtle-1 Class 2 Basis Document 2 of 3 Ver. 3.0 VOGTLE-1 THIRD INTERVAL ISI PLAN ISI BASIS DOCUMENT The Steam Outlet nozzle is on the head and it does not have a true inner radius because it was fabricated from a solid piece with multiple holes drilled through it. Relief was requested per RR-14 during the 2 nd Interval to not perform inner radius examinations.

A similar relief will be submitted for the 3 rd Interval.

Both the Feedwater and the Auxiliary Feedwater Inlet nozzles have a nozzle to shell weld. Per Figure IWC-2500-4(b), the inner radius examination for the Auxiliary Feedwater Inlet nozzle is not required per ASME.There are three C2.21 nozzle-to-shell welds and one C2.22 nozzle inner radius on each of the Steam Generators.

Per Note 4 of Table IWC-2500-1, Examination Category C-B the required examinations may be limited to one steam generator; therefore, two C2.21 welds and one C2.22 inner radius require examination which will be performed on steam generator 2 using the same basis as discussed for Item C 1.10. Vogtle will continue to examine the Main Steam nozzle to head weld on steam generator

1. In addition, selected examinations may be performed without ASME Code credit being taken to ensure ASME Code compliance.

Category C-C -Item C3.10, C3.20, and C3.30 Welded Attachments Item C3. 10 -Each of the Steam Generator has four trunnions.

Per Note 4 of Table IWC-2500-1, Category C-C only one of the trunnions on one of the Steam Generators require examination.

Item C3.20 -Per Note 5 of Table IWC-2500-1, Examination Category C-C, 10% of the piping welded attachments (associated with component supports) shall be examined.

Item C3.30 -Per Note 5 of Table IWC-2500-1, Examination Category C-C, 10% of the pump welded attachments (associated with component supports) shall be examined.Category C-D- Pressure Retaining Bolting Greater Than 2" in Diameter Item C4.30 -There are 2 sets of pump casing studs. Per Table IWC-2500-1, Category C-D, 100% of the studs on one of the pumps is required to be examined.Category C-F-1 -See Class 1 and 2 Piping Examinations Category C-F-2 -See Class 1 and 2 Piping Examinations Category C-G -Pressure Retaining Welds in Pumps and Valves There are no welds in Class 2 pumps and valves; therefore, this category is not applicable.

Category C-H -Pressure Testing Pressure testing is addressed in Volume 3 of the Vogtle-1 ISI Plan.Vogtle-1 Class 2 Basis Document 3 of 3 Ver. 3.0 Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISI -Code Edition -2001 Edition with 2003 Addenda Percent Actual Required Required Cat. Item No. Code Case Population C-A C1.10 C-A C1.20 C-A C1.30 Total 12 6 4 22 25%50%25%3 3 1 7 Period 1 Period 2 Period 3 Round Total Actual Round r Actual Round Actual Round Up Exams Count Period UpI Count Period Up Count Period Up 3 3 1 1 33.33% 34%9/ 0 33.33% 34% 2 100.00% 100%/6 3 3 1 33.33% 34% 1 66.67% 67% 1 100.00% 100%1 1 0 0% 0% 1 100.00% 100% 0 100.00% 100%7 7 2 28.50% 29%0 2 57.101/ 58% 3 100% 100%12/10/2008 Version 3.0 P... 11 -I Southrn Nuc~lear Operating, COmpany 3rd Interval VOGTLE-1 1SI PLAN, VERSION 3.0 Period I Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case cc 0 ý: ý2 x cc M o c Summary No./ComplD/System Scope / Method / Procedure C-A V1 11201-B6-001-W03 ISI-1 1201-66-001 ISIs[ .......... .UPPER SHELL BARREL 'C' TO Cl.10 11201-B6-O01-W03 TRANSITION CONE WELD (98-V005)

AUG ...... ..... ...2 1201 OW N ..... ..... ....PRE ..............C-A V1 11201-B6-001-W04 ISI-11201-B6-001 SI ...... ..... ...TRANSITION CONE TO LOWER CONE C1.10 11201-86-001-W04 END STUB BARREL WELD AUG ...... ..... ...2 1201 OW N ..... ..... ....PRE ....---....C-A V1 11201-B6-001-W05 ISI-11201-B6-001 ISI ...... ..... ...LOWER CONE END STUB BARREL TO C1.10 112011-B6-001-W05 LOWER SHELL BARREL B AUG ...... ..... ...2 1201 OW N ..... ..... ....PR E ..............C-A V1 11201-B6-002-W03 ISI/UT/NMP-ES-024-516 ISI-11201-B6-002 ISI s .... ..... ...UPPER SHELL BARREL 'C' TO C1.10 11201-B6-002-W03 TRANSITION CONE WELD (98-V005)

AUG -------....2 1201 OW N ...... .... ....PRE ..............C-A V1 11201-B6-002-W04 ISI/UT/ ISI-11201-B6-002 IS1 -. -S ---TRANSITION CONE TO LOWER CONE C1.10 11201-B6-002-W04 END STUB BARREL WELD AUG ...... ..... ...2 1201 OW N ..... ..... ....PRE ..............C-A V1 11201-B6-002-W05 IS]/UT/ ISI-11201-B6-002 ISI -- ---- -------- -s ---LOWER CONE END STUB BARREL TO C1.10 11201-B6-002-WO5 LOWER SHELL BARREL' AUG ...... ..... ...2 1201 OW N ..... ..... ....PRE -......C-A V1 11201 -B6-003-W03 ISI-11201-B6-003 ISI -..... ..... ...UPPER SHELL BARREL 'C' TO C1.10 11201-B6-003-W03 TRANSITION CONE WELD (98-V005)

AUG ...... ..... ...2 1201 OW N ..... ..... ....PRE -----....C-A Vi 11201-B6-UU3-WU4 C1.10 11201-B6-003-W04 2 1201 ISI-11201-B6-003 ISI TRANSITION CONE TO LOWER CONE END STUB BARREL WELD AUG OWN PRE 7/24/2009 ScheduleWorks V. 8.1 Page 1 -3 Southern NUIce OperaNtiN Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1= U Period 2 cc r M 'a Io Period 3 Summary No./ComplD/System Scope / Method / Procedure C-A V1 11201-B6-003-W05 ISM-11201-B6-003 SI-- -- --- ---..-.-. ---.LOWER CONE END STUB BARREL TO C1.10 11201-B6-003-W05 LOWER SHELL BARREL"B AUG -------------------

---2 1201 OWN PRE ..............C-A V 112011-B6-004-W03 ISI-11201-B6-004 ISI ...... ..... ...UPPER SHELL BAERELN 'U TO C1.10 11201-B6-004-W03 TRANSITION CONE WELD (98 005) AUG ...... ..... ...2 1201 OW N ..... ..... ....PRE ...... ..... ...C-A V1 11201-B6-004-WO4 ISI-11201-B6-004 ISI ...... ..... ...TRANSITION CONE TO LOWER CONE C1.10 11201-B6-004-W04 END STUB BARREL WELD AUG ...... ..... ...2 1201 OW N -. -. ... ..... ....---OW PR E ..............C-A V1 11201-B6-004-WO5 ISI-11201-B6-004 ISI ...... ..... ...LOWER CONE END STUB BARREL TO C1.10 11201-B6-004-W05 LOWER SHELL BARREL B AUG ..............

2 1201 OWN PRE -.- ..... .C-A V1 11201-B6-001-WO1 ISI/UT/NMP-ES-024-516 ISI-11201-B6-001 ISI c ..... ..... ...UPPER HEAD TO UPPER SHELL C1.20 11201-B6-001-W01 ISI/UT/NMP-ES-024-516 BARREL'D'WELD AUG ...... ..... ...2 1201 ISI/UT/NMP-ES-024-516 OWN -. ..... ..... ...- -ISI/UT/NMP-ES-024-516 PRE -. ..... ..... ...- -C-A V1 11201-136-002-W01 SIS-11201-B36-002 ISI -. ..... ..... ...- -UPPER HEAD TO UPPER SHELL C1.20 11201-B6-002-W01 BARREL 'D'WELD AUG -. ..... ..... ...- -2 1201 OW N ..... ..... ....P R E ..............C-A V1 11201-B1 6-003-W01 IS1-11201-B6-003 IS] ...... ..... ..UPPER HEAD TO UPPER SHELL C1.20 11201-B6-003-W01 BARREL 'D' WELD AUG -. ..... ..... ...- -2 1201 OW N -. -.- -.-. .-.- ..-. ..P R E -. -.- -.-. .-.- ..-. ..C1.20 2 V1 11201-B6-004-WU1 112011-B6-004-W01 1201 ISI11201 UPPER HEAD TO UPPER SHELL BARREL'D'WELD ISI AUG OWN PRE 7/24/2009 ScheduleWorks V. 8.1 Page 2 -3 Southern Nulea OperatingRI Co.n 3rd Interval pn VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 IT M 1ý e: 02 1>3 ~ ~ c M 3 Summary No./CompiD/System Scope / Method / Procedure C-A VI 11204-V6-001-W02 ISI/UT/ ISI-11204-V6-001 IS- .-.-.-- -- -- -s ---C1.20 11204-V6-001-W02 VESSEL HEAD TO VESSEL SHELL AUG ...... ..... ...2 1204 OWN ...... ..... ...PRE ..............C-A V1 11204-V6-001-W03 ISI/UT/ ISI-11204-V6-001 SI-- ---------

s -. ... ...01.20 11204-V6-001-W03 VESSEL SHELL TO VESSEL HEAD AUG ...... ..... ...2 1204 OW N ..... ..... ....P R E .............C-A Vi 11201-B6-001-W07 ISI-11201-B6-001 ISI ...... ..... ...LOWER SHELL BARREL 'A' TO TUBE 01.30 11201-BE-001-iW07 PLATE WELD AUG ...... ..... ...2 1201 OW N -........ ....PRE ..............C-A V1 11201-B6-002-W07 ISI-11201-BS-002 ISI ...... ..... ...LOWER SHELL BARREL A' TO TUBE C1.30 11201-B6-002-W07 PLATE WELD AUG ...... ..... ...2 1201 OW N ......... ....PR E ..............C-A Vi 11201-B6-003-W07 IS1-1 1201-B6-003 ISI ...... ..... ...LOWER SHELL BARREL 'A' TO TUBE C1.30 11201-B6-003-W07 PLATE WELD AUG .2 1201 OW N ..... ..... ....PRE -...-.-. ...C1.30 2 11201-B6-004-W07 1201 LOWER SHELL BARREL "A"TO TUBE PLATE WELD AUG OWN PRE s --7/24/2009 ScheduleWorks V. 8.1 Page 3 -3 Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISI -Code Edition -2001 Edition with 2003 Addenda C-B C2.21 14 35.70% 5 5 5 C-B C222 8 12.50% 1 1 1 Total: 22 6 6 6 2 40.00% 40%1 100.00% 100%3 50% 50%1 60.00% 60%0 100.00% 100%1 66.60% 67%2 100.00% 100%0 100.00% 100%2 100% 100%12/10/2008 Version 3.0 Southern Nuclear Operatig Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case cc cc tO N tO~> > >M cc Summary No./ComplD/System Scope / Method / Procedure C-B V1 11201-B6-001-W18 ISIIUT/NMP-ES-024-516 ISI-11201-B6-001 SI B ------- ---32" STEAM OUTLET NOZZLE TO UPPER C2.21 11201-B6-001-W18 ISI/MT/NMP-ES-024-401 HEAD WELD AUG ...... ..... ...2 1201 ISI/I OW N ..... ..... ....PR E ..............C-B V1 11201-B6-001-W19 ISI-11201-B6-001 SI ----....16' MAIN FEEDWATER NOZZLE TO C2.21 11201-[6-001-W19 SHELL WELD AUG ...... ..... ...2 1201 OW N ..... ..... ....PR E -............C-B V1 11201-B6-001-W26 IS1-11201-B6-001 SI ...... ..... ...6" AUX. FEEDWATER NOZZLE TO C2.21 112011-B6-001-W26 SHELL WELD AUG ...... ..... ...2 1201 OW N ..... ..... ....P R E ..............C-B V1 11201-B6-002-W18 ISI-11201-B6-002 ISI ...... ..... ...32' STEAM OUTLET NOZZLE TO UPPER C2.21 11201-B6-002-Wi8 HEAD WELD AUG 2 1201 OWN PR E ..............C-B V1 11201-B6-002-W19 ISI/MT/NMP-ES-024-401 ISI-11201-B6-002 ISI -s .... ..... ...16" MAIN FEEDWATER NOZZLE TO C2.21 11201-B6-002-W19 ISI/UT/NMP-ES-024-516 SHELL WELD AUG ...... ..... ...2 1201 OW N ..... ..... ....PRE ..............C-B V1 11201-B6-002-W26 ISI/MT/NMP-ES-024-401 IS1-11201-B6-002

[SI s --6" AUX. FEEDWATER NOZZLE TO C2.21 11201-B6-002-W26 ISI/UT/NMP-ES-024-516 SHELL WELD AUG .......... ...2 1201 OW N ..... ........PRE ..............C-B V1 11201-B6-003-W18 ISI-11201-B6-003 SI ...... ..... ...32" STEAM OUTLET NOZZLE TO UPPER C2.21 11201-B6-003-WI8 HEAD WELD AUG ...... .......2 1201 OW N ..... ..... ....PR E ..............L-B V! 11201-B6-UU3-W19 C2.21 11201-B6-003-W19 2 1201 16" MAIN FEEDWATER NOZZLE TO SHELL WELD ISI AUG OWN PRE t Page 1 -3 7/24/2009 ScheduleWorks V. 8.1 Southern Nuclear Opera ting Comipany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2! Uo Period 3 0 Summarv No./ComDID/Svstem Scooe / Method / Procedure C-B V1 11201-B6-003-W26 ISI-11201-B6-003 ISI ...... ..... ...6" AUX. FEEDWATER NOZZLE TO C2.21 11201 -B6-003-W26 SHELL WELD AUG ...... ..... ...2 1201 OW N ..... ..... ....PRE ..............C-B V1 11201-B6-004-W18 ISI-1 1201-B6-004 SI ...... ..... ...32" STEAM OUTLET NOZZLE TO UPPER C2.21 11201-B6-004-W18 HEAD WELD AUG ...... .......2 1201 OW N ..... ..... ....PRE .. ............C-B V1 11201-B6-004-W19 ISI-11201-B6-004 IS ...... ..... ...16" MAIN FEEDWATER NOZZLE TO C2.21 11201-B6-004-W19 SHELL WELD AUG ...... ..... ...2 1201 OWN PR E ..............C-B V1 11201-B6-004-W26 ISI-11201-B6-004 ISI ...... ..... ...6" AUX. FEEDWATER NOZZLE TO C2.21 11201 -B6-004-W26 SHELL WELD AUG 2 1201 OW N ...... .... ....PR E ..............C-B V1 11204-V6-001-WO0 ISI/MT/ ISI-11204-.V6-001 ISI s -C2.21 11204-V6-001-W01 ISI/UT/ INLET NOZZLE TO VESSEL HEAD AUG ..............

2 1204 OW N ...... .... ....P R E ..............C-B VI 11204-V6-001-W04 ISI/MT/ ISI-11204-V6-001 ISI ..................

s .C2.21 11204-V6-001 -W04 ISI/UT/ VESSEL HEAD TO OUTLET NOZZLE AUG 2 1204 OW N ..... ..... ....PRE -.- ......C-B V1 11201-B6-001-1R03 ISI-11201-B6-001 SI ...... ..... ...02.22 11201-B6-001-1R03 STEAM OUTLET NOZZLE INNER RADIUS AUG ..............

2 1201 OW N ..... ..... ....P R E ..............C-B V1 11201-B6-001-1R04 ISI-11201-B6-001 ISI --MAIN FEEDWATER NOZZLE INNER C2.22 11201-B6-001-1R04 RADIUS AUG ...... ..... ...2 1201 OWN PRE ISI 7/24/2009 ScheduleWorks V. 8.1 Page 2 -3

-Souithern Nuclear Operating Company..............

3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Summary No./CompID/System Scope / Method I Procedure Dwg/ISO No.Comp. Desc.Code Case STEAM OUTLET NOZZLE INNER RADIUS AUG OWN PRE Period 1> r Period 2 cc cc r Period 3 on C2.22 11201-86-002-IR03 2 1201 C-B V1 11201-B6-002-1R04 ISI/UT/NMP-ES-024-513 ISI-11201-B6-002 ISI -a -.. ......MAIN FEEDWATER NOZZLE INNER C2.22 11201-B6-002-1R04 RADIUS AUG ...... ..... ...2 1201 OW N ..... ..... ....PR E ..............C-B V1 11201-B6-003-IR03 ISI-11201-B6-003 ISI ...... ..... ...C2.22 11201-B6-003-1R03 STEAM OUTLET NOZZLE INNER RADIUS AUG ..............

2 1201 OW N ..... ..... ....PRE ..............C-B V1 11201-B6-OO3-1R04 IS1-11201-B6-003 ISI .......MAIN FEEDWATER NOZZLE INNER C2.22 11201-56-003-IR04 RADIUS AUG 2 1201 OWN ----....PRE ---w ....C-B V1 11201-B6-004-1R03 ISI-11201-B6-004 ISI ...... ..... ...C2.22 11201-B6-004-1R03 STEAM OUTLET NOZZLE INNER RADIUS AUG ----....2 1201 OWN PRE ..............C2.22 2 V1 110136I-00tU4-"1104 11201-B6-004-"R04 1201 MAIN FEEDWATER NOZZLE INNER RADIUS ISI AUG OWN PRE 7/24/2009 ScheduleWorks V. 8.1 Page 3 -3 Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISl -Code Edition -2001 Edition with 2003 Addenda Period 1 Period 2 Period 3 Percent Actual Round Total Actual Round Actual Round Actual Cat. Item No. Code Case Population Required Required Up Exams Count Period Up Count Period Up Count Period C-C C3.10 26 15.38% 4 4 4 1 25.00% 25% 1 50.00% 50% 2 100.00%C-C C3.20 187 10% 18.7 19 216 5 2,74% 27% 6 58.82% 58% 10 112.30%C-C C3.30 14 10% 1.4 2 2 2 142.86% 100% 0 142.86% 100% 0 142.86%Total: 227 24 25 27 8 33.30% 32% 7 62.50% 60% 12 112.00%100%111%100%108%4/912009 Version 3.0 Page 1 -1 Southern, Nuclea OpItn op~any 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/lSO No.Comp. Desc.Code Case Period 1 Period 2 IM N c Period 3 cc C Summary No./ComplD/System Scope / Method / Procedure C-C V1 11201-B6-001-W22 ISI-11201-B6-001 ISI ...... ..... ...C3.10 11201-B6-001-W22 TRUNNION TO SHELL WELD AUG ...... ..... ...2 1201 OW N ..... ..... ....P R E ..............C-C V1 11201-B6-001-W23 ISI-11201-86-001 ISI ...... ..... ...C3.10 11201-66-001-W23 TRUNNION TO SHELL WELD AUG 2 1201 OW N .. .... ..... ....PR E ..............C-C V1 11201-B6-001-W24 ISI-11201-B6-001 ISI C3.10 11201-86-001-W24 TRUNNION TO SHELL WELD AUG ...... ..... ...2 1201 OW N ..... ..... ....PR E ..............C-C V1 11201-B6-001-W25 ISI-11201-96-001

'ISI ...... ..... ...C3.10 11201-96-001-W25 TRUNNION TO SHELL WELD AUG ...... ..... ...2 1201 OW N ..... ..... ....PR E ..............C-C V1 11201-B6-002-W22 ISI-11201-B6-002 iS] ...... ..... ...C3.10 11201-B6-002-W22 TRUNNION TO SHELL WELD AUG ...... ..... ...2 1201 OWN PR E ..............C-C V1 11201-B6-002-W23 ISI-11201-B6-002 ISI ...... ..... ...C3.10 11201-86-002-W23 TRUNNION TO SHELL WELD AUG 2 1201 OW N ..... ..... ....PRE ..............C-C V1 11201-B"-002-W24 ISI-11201-136-002 ISi --... ...C3.10 11201 002-W24 TRUNNION TO SHELL WELD AUG ...... ..... ...2 1201 OW N ..... ..... ....PRE C-C V1 11201-16-002-W25 ISI/MT/ ISI-11201-B6-002 IS- -.-- -- -- ---- -- -- s ---C3.10 11201-B6-002-W25 TRUNNION TO SHELL WELD AUG ...... ..... ...2 1201 OW N ..... ..... ....PRE ..............C-C Vi 11201-B6-003-W22 ISI-11201-E6-003 ISI ...... ..... ...C3.10 11201-B6-003-W22 TRUNNION TO SHELL WELD AUG ...... ..... ...2 1201 OW N ..... ...... ...PR E ..............C3.10 11201 -B6-003-W23 2 1201 TRUNNION TO SHELL WELD IS1 AUG OWN PRE 7/24/2009 ScheduleWorks V. 8.1 Page I1 24 Southern Nuclear OpErating 3.C0i"a 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwgfISO No.Comp. Desc.Code Case Period 1 Period 2 cc M. to Period 3 Summary No./CompID/Svstem Scope / Method / Procedure C-C V1 11201-B6-003-W24 ISI-11201-86-003 ISI ...... ..... ...C3.10 11201-B6-003-W24 TRUNNION TO SHELL WELD AUG ...... ..... ...2 1201 OW N ..... ..... ....PR E ..............C-C V1 11201-B6-003-W25 ISI-11201-B6-003 ISI ......C3.10 112011-B6-003-W25 TRUNNION TO SHELL WELD AUG ...... ..... ...2 1201 OW N ..... ..... ....PR E ..............C-C V1 11201-B6-004-W22 ISI-11201-B6-004 ISI ...... ..... ...C3.10 112011-B6-004-W22 TRUNNION TO SHELL WELD AUG ...... ..... ...2 1201 OW N ..... ..... ....PRE ...... ..... ...C-C V1 11201-86-004-W23 ISI-11201-B6-004 ISI C3.10 11201-B6-004-W23 TRUNNION TO SHELL WELD AUG ...... ..... ...2 1201 OW N ..... ..... ....PRE ..............C-C V1 11201-B6-004-W24 ISI-11201-B6-004 ISI ...... ..... ...C3.10 11201-B6-004-W24 TRUNNION TO SHELL WELD AUG ...... ..... ...2 1201 OW N ..... ..... ....PR E ..............C-C V1 11201-B6-004-W25 ISI-11201-B6-004 ISl ...... ..... ...C3.10 11201-B6-004-W25 TRUNNION TO SHELL WELD AUG ...... ..... ...2 1201 OW N ..... ..... ....P R E ..............C-C V1 11204-V6-001-W05 ISI/PT/ ISI-11204-V6-001 ISI --.s ..... ..VESSEL SUPPORT PAD WELDED C3.10 11204-V6-O01-W05 ATTACHMENT AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............C-C V1 11204-V6-001-WO6 IS[-11204-V6-001 ISI ...... ..... ...VESSEL SUPPORT PAD WELDED C3.10 11204-V6-001-WO6 ATTACHMENT AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ...... ..... ...C-C Vi 11204-V6-001-W07 ISI-11204-V6-001 ISI ... ..........VESSEL SUPPORT PAD WELDED C3.10 11204-V6-001-W07 ATTACHMENT AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ...... ..... ...C-C V1 11204-V6-001-W08 ISI-11204-V6-001 IS1 7/24/2009 ScheduleWorks V. 8.1 Page 2 -24 0-6 : SoutherNuclear rOpe7atingCmpany 3rdl nterVal VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item .No., Class C3.10 2 Summary No./CompID/System 11204-V6-001-W08 1204 Scope I Method / Procedure Dwg/ISO No.Comp. Desc.Code Case VESSEL SUPPORT PAD WELDED ATTACHMENT Period 1 M Period 2 M r- M Period 3 0)AUG OWN PRE C-C V 11205-E6-001-W03 ISI-11205-E6-001 Is[ ...... ..... ...C3.10 11205-E6-001-W03 HEAD TO SUPPORT SKIRT WELD AUG ...... ..... ...2 1205 OW N ..... ...... ...PRE C-C V1 11205-E6-002-W03 ISI/PT/NMP-ES-024-301 IS1-1 1205-E6-002 ISI -s .... ..... .C3.10 11205-E6-002-W03 HEAD TO SUPPORT SKIRT WELD AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............C-C V1 11208-E6-001-W13 ISI/PT/ ISI-11208-E6-001 SI- ---- ------ ---- s ---C3.10 11208-E6-001-W13 SUPPORT TO SHELL WELD AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............C-C V1 11208-E6-001-W14 ISI-11208-E6-001 ISI ...... ..... ...C3.10 11208-E6-001-W14 SUPPORT TO SHELL WELD AUG ...... ..... ...2 1208 OWN ..... ...... ...PR E ..............C-C V1 11208-E6-001-W15 ISI-11208-E6-001 ISI ...... ..... ...C3.10 11208-E6-001-W15 SUPPORT TO SHELL WELD AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............C-C V1 11208-E6-001-W16 ISI-11208-E6-001 tSI ...... ..... ...C3.10 11208-E6-001-W16 SUPPORT TO SHELL WELD AUG ...... ..... ...2 1208 OW N ..... ..... ....P R E ..............C-C V1 11204-001-6 ISI-11204-001 ISI ...... ..... ...C3.20 11204-001-6 SUPPORT H004 AUG ...... ..... ...2 1204 OWN ...... ..... ...PRE -...-.-. ...C-C VI 11204-006-23 ISI-11204-006 ISI ...... ..... ...C3.20 11204-006-23 SUPPORT H032 AUG ...... ..... ...2 1204 OWN ---...... ...PRE ...... ..... ...C-C V1 11204-006-31 C3.20 11204-006-31 2 1204 1I1-11204-006 SUPPORT H034 ISl AUG OWN PRE 7/24/2009 ScheduleWorks V. 8.1 Page 3 -24 Southern Nuclear Operating Company.3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwgIISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 M I Io M- n Summary No.jComplD/Svstem Scope I Method / Procedure C-C V1 11204-006-40 ISI-11204-006 ISI ... ....03.20 11204-006-40 SUPPORT H038 AUG ...... ..... ...2 1204 OWN ......... ....PR E ..............C-C V1 11204-006-41 A ISI-11204-006 SI ...... ..... ...C3.20 11204-006-41 A SUPPORT H001 AUG ...... ..... ...2 1204 OW N ..... ..... ....P R E ..............C-C V1 11204-006-45 A ISI-11204-006 ISI ...... ..... ...C3.20 11204-006-45 A SUPPORT H005 AUG -..........2 1204 OW N ..... ..... ....PRE ..............C-C V1 11204-006-51 ISI/PT/NMP-ES-024-301 IS1-11204-006 ISI C ..... ..... ...C3.20 11204-006-51 SUPPORT H006 AUG ...... ..... ...2 1204 OWN .. ..... ..... ...PR E ..............C-C V1 11204-006-54 SI-11204-006 ISI ...... ..... ...C3.20 11204-006-54 SUPPORT H007 AUG ...... ..... ...2 1204 OWN ...... ..... ...PRE ..............C-C V1 11204-006-57 ISI-11204-006 ISI ...... ..... ...C3.20 11204-006-57 SUPPORT H023 AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............C-C V1 11204-006-60 ISI-11204-006 ISI ...... ..... ...C3.20 11204-006-60 SUPPORT H008 AUG ...... ..... ...2 1204 OWN ...... ..... ...PR E ..............C-C V1 11204-006-69 ISI-11204-006 ISI ...... ..... ...C3.20 11204-006-69 SUPPORT H009 AUG ...... ..... ...2 1204 OW N ...... .... ....PR E ..............C-C V1 11204-006-7 ISI-11204-006 ISI ...... ..... ...C3.20 11204-006-7 SUPPORT H013 AUG ...... ..... ...2 1204 OWN ..... ..... ....PRE ..............,-C V1i 1120U4-006-9 03.20 11204-006-9 2 1204 ISU-1O 124-006 SUPPORT H602 ISI AUG OWN PRE 7/24/2009 ScheduleWorks V. 8.1 Page 4 -24 Southern NUtlear Operatin Coman 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case> >aý 0 Summary No./CompID/System Scope / Method / Procedure C-C VI 11204-007-14 ISI-11204-007 IS1 .. ..... ..... ...C3.20 11204-007-14 SUPPORT H008 AUG -..... ..... ..2 1204 OW N ...... .... ....PRE -...-.-. ...C-C V1 11204-007-5 ISi/PT/NMP-ES-024-301 ISI-11204-007 SI C ..... ..... ...C3.20 11204-007-5 SUPPORT H003 AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE .. ............C-C V1 11204-008-4 ISI-11204-008 ISI ...... .......C3.20 11204-008-4 SUPPORT H009 AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............C-C V1 11204-012-20 ISI-11204-012 SI ...... ..... ...C3.20 11204-012-20 SUPPORT H019 AUG ...... ..... ...2 1204 OWN ---... ..... ...PR E ..............C-C V1 11204-012-25 ISI-11204-012 ISI ...... ..... ...C3.20 11204-012-25 SUPPORT H022 AUG 2 1204 OW N ..... ..... ....P R E ..............C-C V1 11204-012-30 ISI-11204-012 ISI ...... ..... ...C3.20 11204-012-30 SUPPORT H023 AUG ...... ..... ...2 1204 OWN ....PR E ..............C-C V1 11204-012-35 ISI/PTI IS1-11204-012 ISI .-.-- .-.- ---C3:20 11204-012-35 SUPPORT H002 AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............C-C V1 11204-012-6 ISI-11204-012 ISI ........ ... ..C3.20 11204-012-6 SUPPORT H014 AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ..............C-C V1 11204-012-9 ISI-11204-012 ISI ...... ..... ...C3.20 11204-012-9 SUPPORT H016 AUG ...... ..... ...2 1204 OWN ...... ..... ...PRE .......C-C Vi 11204-020-13 A C3.20 11204-020-13 A 2 1204 1S1-11204-020 SUPPORT H007 is]AUG OWN PRE 7/2412009 ScheduleWorks V. 8.1 Page 5 -24 Southerhn N uclear Operating Colm~pany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwoIISo No.Comp. Desc.Code Case Period 1 cc Li, Period 2> > >=Period 3 Summary No./CompID/System Scope / Method / Procedure C-C V1 11204-039-27 ISI-11204-039 ISI ...... ..... ...C3.20 11204-039-27 SUPPORT H031 AUG ...... ..... ...2 1204 OW N ..... ...... ...PR E ..............C-C V1 11204-039-53 ISI-11204-039 SI ...... ..... ...C3.20 11204-039-53 SUPPORT H020 AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............C-C V1 11204-041-34 ISJ-11204-041 ISt ...... ..... ...C3.20 11204-041-34 SUPPORT H021 AUG ...... ..... ...2 1204 OW N ...... ..... ...PR E ..............C-C V1 11204-041-50 ISI/PT/ ISI-11204-041 iSI- ---- -------- ---- s ---C3.20 11204-041-50 SUPPORT H027 AUG ...... ..... ...2 1204 OWN ...... ..... ...PRE ..............C-C V1 11204-057-17 ISI-11204-057 SI ...... ..... ...C3.20 11204-057-17 SUPPORT H008 AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE C-C V1 11204-057-34 IS1-1 1204-057 SI ...... ..... ...C3.20 11204-057-34 SUPPORT H013 AUG .......... ...2 1204 OWN ..... ..... ....PRE ..............C-C V1 11204-057-50 IS1-11204-057 ISI ...... ..... ...C3.20 11204-057-50 SUPPORT H018 AUG ...... ..... ...2 1204 OWN ...... ..... ...PRE ..............C-C Vi 11204-057-68 IS1-11204-057 SI- --. .--- ------ -- -----C3.20 11204-057-68 SUPPORT H026 AUG -.-.-- ----- ---- -----2 1204 OWN -.-- ----- ------ -----PRE -.----- -- ---- ----C-C V1 11204-057-92 IS1-11204-057 ISI ...... ..... ...C3.20 11204-057-92 SUPPORT H032 AUG .......... ...2 1204 OW N ..... ..... ....PR E ..............C-C Vi 11204-063-17 03.20 11204-063-17 2 1204 ISI-11204-063 SUPPORT H010 ISI AUG OWN PRE 7/24/2009 ScheduleWorks V. 8.1 Page 6 -24 Southern Nuclear Operating Company 3rd Interval : VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2>w> N i ra Period 3 Summary No./ComplD/System Scope / Method I Procedure C-C V1 11204-063-24 ISI/PT/ ISI-11204-063 ISI- ---- ----------

-- s ---C3.20 11204-063-24 SUPPORT H006 AUG ...... ..... ...2 1204 OW N ...... ..... ...PRE C-C V1 11204-201-16 IS1-11204-201 is[ ...... ..... ...C3120 11204-201-16 SUPPORT H009 AUG ...... ..... ...2 1204 OW N ...... ..... ...PRE ..............C-C V1 11205-003-10 ISi-1 1205-003 SI -......C3.20 11205-003-10 SUPPORT H044 AUG ...... ..... ...2 1205 OWN ...... .... ....PR E ..............C-C V1 11205-003-14 ISI-11205-003 IS[ ...... ..... ...C3.20 11205-003-14 SUPPORT H042 AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............C-C Vi 11205-003-17 ISI-11205-003 SI ...... ..... ...C3.20 11205-003-17 SUPPORT H041 AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE -.- ......C-C V1 11205-003-38 ISI-11205-003 ISI ...... ..... ...C3.20 11205-003-38 SUPPORT H021 AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............C-C V1 11205-003-41 ISI/PT/NMP-ES-024-301 ISI-11205-003 ISI c ..... ..... ...C3.20 11205-003-41 SUPPORT H019 AUG ...... ..... ...2 1205 OWN ..... ..... ....PRE ..............C-C V1 11205-003-45 ISi-1 1205-003 1S1 ...... ..... ...C3.20 11205-003-45 REMOVED SUPPORT AUG ...... ..... ...2 1205 OW N ..... ..... ....P R E ..............C-C V1 11205-003-48 ISI-11205-003 Is] ...... ..... ...C3.20 11205-003-48 REMOVED SUPPORT (H006) AUG ...... ..... ...2 1205 OWN .......... ...PRE ..............C-C V1 11205-003-55 C3.20 11205-003-55 2 1205 Is/11P TI I;I-1 1205-003 SUPPORT H012 ISI AUG OWN PRE-S 7/24/2009 ScheduleWorks V. 8.1 Page 7 -24 ouLter-n INu lear Operting Co.pany 3rd Intearval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class DwgfISO No.Comp. Desc.Code Case Period 1 M cc Period 2 Period 3 N co ccc Summary No./CompID/Svstem Scope / Method / Procedure C-C V1 11205-004-11 ISI-1 1205-004 SI .C3.20 11205-004-11 SUPPORT HOI7 AUG ...... ..... ...2 1205 OW N ...... .... ....PR E ..............C-C V1 11205-004-18 ISI-11205-004 SI ...... ..... ...C3.20 11205-004-18 SUPPORT H020 AUG ...... ..... ...2 1205 OW N ...... .......PRE -.- ......C-C V1 11205-004-28 ISI-11205-004 SI ...... ..... ...C3.20 11205-004-28 SUPPORT H01 1 AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE C-C V1 11205-004-29 ISI-11205-004 ISI ...... ..... ...C3.20 11205-004-29 SUPPORT H025 AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............C-C V1 11205-004-33 ISI-1 1205-004 ISI ...... ..... ...C3.20 11205-004-33 SUPPORT H010 AUG .......... ...2 1205 OWN .......... ...PRE -......C-C V1 11205-004-45 ISI-11205-004 SI --..... ----C3.20 11205-004-45 SUPPORT H007 AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............C-C VI 11205-004-6 ISI-11205-004 IS) ...... ..... ...C3.20 11205-004-6 SUPPORT H015 AUG ...... ..... ...2 1205 OWN PRE ...... ..... ...C-C V1 11205-005-13 ISI-11205-005 ISI ...... ..... ...C3.20 11205-005-13 SUPPORT H002 AUG ...... ..... ...2 1205 OW N ..... ..... ....P R E ..............C-C V1 11205-005-22 ISI-11205-005 SI ...... ..... ...C3.20 11205-005-22 REMOVED SUPPORT (H007) AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............C-C Vi 11205-005-40 A C3.20 11205-005-40 A 2 1205 ISI-11205-005 REMOVED SUPPORT (H017)ISI AUG OWN PRE 7/24/2009 ScheduleWorks V. 8.1 Page 8 -24 VSOGuthn N1uclear t!ng Com pany mERSI VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/lSO No.Comp. Desc.Code Case Period 1 cc>Period 2 w ca U cc cc 0>Period 3 Summary No./ComplD/System Scope / Method / Procedure C-C Vi 11205-005-43 ISI/PT/ ISI-11205-005 ISI ---.s ..... ...03.20 11205-005-43 SUPPORT H018 AUG 2 1205 OW N ..... ..... ....PRE -...-.-. ...C-C VI 11205-005-44 ISI-11205-005 ISI ...... ..... ...C3.20 11205-005-44 REMOVED SUPPORT (1-1020) AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............C-C V1 11205-006-10 ISI-11205-005 iSI ...... ..... ...C3.20 11205-006-10 SUPPORT H021 AUG ...... ..... ...2 1205 OWN ..... ...... ...PRE C-C Vi 11205-006-18 IS1-11205-006 IS ...... ..... ...C3.20 11205-006-18 SUPPORT H016 AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............C-C Vl 11205-006-36 ISI-11205-006 ISI ...... ..... ...C3.20 11205-006-36 SUPPORT H027 AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E -. -.- -.-. .-.- ..-. ..C-C V1 11205-006-37 ISI-11205-006 ISI ...... ..... ...C3.20 11205-006-37 SUPPORT H026 AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE C-C Vi 11205-007-18 A ISI-11205-007 ISI ...... ..... ...C3.20 11205-007-18 A SUPPORT H040 AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............C-C Vi 11205-007-25 IS1-11205-007 ISI ...... ..... ...C3.20 11205-007-25 SUPPORT H034 AUG ...... ..... ...2 1205 OWN ...... ..... ...PRE ..............C-C Vi 11205-007-27 ISI-11205-007 ISI ...... ..... ...C3.20 11205-007-27 REMOVED SUPPORT (H-011) AUG ...... ..... ...2 1205 OWN -..... ..... ..PRE C-C Vi 11205-007-32 C3.20 11205-007-32 2 1205 ISI-11205-007 SUPPORT H012 ISI AUG OWN PRE 7/24/2009 ScheduleWorks V, 8.1 Page 9 -24 Souithern Nuc -lear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case M e~ 0 Summary NoJCompID/System Scope I Method / Procedure C-C V 11205-007-36" ISI-11205-007 IS1 ...... ..... ...C3.20 11205-007-36 SUPPORT H601 AUG 2 1205 OW N ..... ..... ....PRE ----....C-C V1 11205-007-66 ISI-11205-007 SI ...... ..... ...C3.20 11205-007-66 SUPPORT H016 AUG -..... ..... ..2 1205 OW N ...... .... ....PR E ..............C-C Vi 11205-007-70 ISI/PT/NMP-ES-024-301 IS1-11205-007 ISI c ..... ..... ...C3.20 11205-007-70 SUPPORT H032 AUG ...... ..... ...2 1205 OWN ----....PRE C-C V1 11205-007-74 ISI/PT/NMP-ES-024-301 IS1-11205-007 ISI c -....C3.20 11205-007-74 SUPPORT H033 AUG ...... ..... ...2 1205 OW N -..... ..... ..PRE -.- ......C-C V1 11205-008-17 A ISI-11205-008 IS1 ...... ..... ...C3.20 11205-00 -17 A SUPPORT H001 AUG -..... ..... ..2 1205 OW N ..... ..... ....P R E ..............C-C V1 11205-008-24 ISI-11205-008 ISI ...... ..... ...C3.20 11205-008-24 REMOVED SUPPORT (H003) AUG .. .... ..... ...2 1205 OW N ..... ..... ....PRE ..............C-C V1 11205-008-25 ISI-11205-008 ISI -... .... .C3.20 11205-008-25 SUPPORT H017 AUG ...... ..... ...2 1205 OWN ...... .......PRE .........C-C V1 11205-008-26 IS1-11205-008 ISl -......03.20 11205-008-26 SUPPORT H004 AUG -..... ..... ..2 1205 OW N ...... .... ....PR E ..............C-C VI 11205-008-34 ISl/PT/ IS-11205-008 ISI .-.- .- ...-.. .s C3.20 11205-008-34 SUPPORT H030 AUG ....2 1205 OW N ...... .... ....PR E ..............C-C V1 11205-008-46 C3.20 11205-008-46 2 1205 I1i-1 12U5-00U3 SUPPORT H043 ISI AUG OWN PRE 7/24/2009 ScheduleWorks V. 8.1 Page 10 -24 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3-* wn !n r- !? 11 N FE M M M M M Summary No./CompID/System Scope / Method / Procedure C-C Vl 11205-008-55 ISI-11205-008 ISI ----.. ..... ...C3.20 11205-008-55 SUPPORT H053 AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............C-C V1 11205-008-79 IS1-11205-008 ISI ...... ..... ...C3.20 11205-008-79 SUPPORT H034 AUG ...... ..... ...2 1205 OW N ..... ......- .---PRE ..............C-C V1 11205-008-82 IS1-11205-008 ISI C3.20 11205-008-82 SUPPORT H035 AUG ...... ..... ...2 1205 OWN ...... ..... ...PRE ..............C-C V1 11205-009-13 ISI-11205-009 ISI .- -..... ..... ..C3.20 11205-009-13 REMOVED SUPPORT (H003) AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE .......... ....C-C V1 11205-009-14 ISI-11205-009 ISI ----....C3.20 11205-009-14 SUPPORT H004 AUG ...... ..... ...2 1205 OW N ---.. ..... ....PRE ..............C-C V1 11205-009-15 ISI-11205-009 ISI ...... ..... ...C3.20 11205-009-15 SUPPORT HO05 AUG ...... ..... ...2 1205 OWN -.....- --.... ...PRE ---. .C-C V1 11205-009-18

[St-11205-009 SI ...... ..... ...C3.20 11205-009-18 SUPPORT H012 AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............C-C V1 11205-009-2 ISI/PT/ ISI-11205-009 ISI ----s C3.20 11205-009-2 SUPPORT H009 AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............C-C V1 11205-009-6 ISI-11205-009 ISI ...... ..... ...C3.20 11205-009-6 SUPPORT H011 AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............C-C Vi 11205-010-12 C3.20 11205-010-12 2 1205 161-11205-010 SUPPORT H015 ISI AUG OWN PRE 7/24/2009 ScheduleWorks V. 8.1 Page 11 -24 Sou I thern Nuclear Op ýer"ating Company.3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 3.>Period 2 MO cc U Period 3 R >Summary NoJCompID/System Scope / Method I Procedure C-C V1 11205-010-15 A ISI-11205-010 ISI ...... ..... ...C3.20 11205-010-15 A SUPPORT H017 AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............C-C V1 11205-010-19 A ISI-11205-010 ISI ...... ..... ...C3.20 11205-010-19 A SUPPORT H018 AUG ...... ..... ...2 1205 OWN ...... ..... ...PRE ..............C-C V1 11205-010-2 A ISI-11205-010 ISI ...... ..... ...C3.20 11205-010-2 A REMOVED SUPPORT (H008) AUG ...... ..... ...2 1205 OWN ...... .... ....PRE ..............C-C VI 11205-010-6 A ISI-11205-010 iSi ...... ..... ...C3.20 11205-010-6 A SUPPORT H601 AUG ...... ..... ...2 1205 OW N ...... .... ....PR E ..............C-C VI 11205-010-A ISI-11205-010 iSi ...C3.20 11205-010-A REMOVED SUPPORT (H003) AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE I C-C V1 11205-027-1 A IS1-1 1205-027 IS1 ...... ..... ...C3.20 11205-027-1 A ENCAP VESSEL AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............C-C VI 11205-027-12 ISI-11205-027 IS1 ...... ..... ...C3.20 11205-027-12 SUPPORT H002 AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............C-C V1 11205-027-7 ISI-11205-027 ISt ...... ..... ...C3.20 11205-027-7 SUPPORT H004 AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............C-C V1 11205-028-1 A ISI-11205-028 ISI ...... ..... ...C3.20 11205-028-1 A ENCAP VESSEL AUG ...... ..... ...2 1205 OW N ..... ...... ...PR E ..............C3.20 11206-001-12 2 1206 iSI-1120U-001 SUPPORT H022 ISI AUG OWN PRE 7/24/2009 ScheduleWorks V. 8.1 Page 12 -24 Soýuthern Nulclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwgAlSO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 V Mn i! N: "2 IT C M I> Ix cc cc Summary No.ICompl)D/System Scope / Method / Procedure C-C V1 11206-001-15 ISI-11206-001 ISI ...... ..... ...03.20 11206-001-15 SUPPORT H012 AUG ...... ..... ...2 1206 OW N ..... ..... ....PR E ..............C-C VI 11206-001-16 ISI-11206-001 ISI ...... ..... ...C3.20 11206-001-16 REMOVED SUPPORT (H020) AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............C-C V1 11206-001-18 ISI-11206-001 SI ...... ..... ...C3.20 11206-001-18 SUPPORT H005 AUG 2 1206 OW N ..... ..... ....PR E ..............C-C V1 11206-001-24 ISI-11206-001 ISi ...... ..... ...C3.20 11206-001-24 REMOVED SUPPORT (H003) AUG ...... ..... ...2 1206 OW N ...... ..... ...PRE ..............C-C V1 11206-001-25 ISI-11206-001 ISI ...... ..... ...C3.20 11206-001-25 SUPPORT H026 AUG ...... ..... ...2 1206 OW N ...... .... ....PRE O .............C-C V1 11206-001-26 ISI-11206-001 SI ...... ..... ...C3.20 11206-001-26 SUPPORT H025 AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE O .............C-C V1 11206-001-30 SI-1 1206-001 SI .C3.20 11206-001-30 REMOVED SUPPORT (H019) AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE .O ......... ...C-C V1 11206-001-31 ISI-11206-001 ISI ...... ..... ...C3.20 11206-001-31 SUPPORT H018 AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE O .... ..... ....C-C V1 11206-001-4 A ISI-11206-001 ISI ...... ..... ...C3.20 11206-001-4 A WELDED ATTACHMENT AUG ...... ..... ...2 1206 OWN PRE O .............C-C VI 11206-001-40 C3.20 11206-001-40 2 1206 Sil-11206-001 SUPPORT H009 ISI AUG OWN PRE 7/24/2009 ScheduleWorks V. 8.1 Page 13 -24 Southern Nuclear Operatingi Coman 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class OwgilSO No.Comp. Desc.Code Casetn o! 0 Summary No./ComplD/System Scope / Method / Procedure C-C Vi 11206-002-22 SI-I 1206-002 ISI -..... ..... ...C3.20 11206-002-22 SUPPORT H034 AUG ...... ..... ...2 1206 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..C-C V1 11206-002-26 IS-11206-002 SI ...... ..... ...C3.20 11206-002-26 SUPPORT H030 AUG ...... ..... ...2 1206 OW N ..... ..... ....PR E ..............C-C VI 11206-002-31 IS1-11206-002 ISI -... .C3.20 11206-002-31 REMOVED SUPPORT (H002) AUG ...... ..... ...2 1206 OWN ...... .-... ...PRE I C-C V1 11206-002-34 IS1-11206-002 SI ...... ..... ...C3.20 11206-002-34 SUPPORT H013 AUG ...... ..... ...2 1206 OW N ....... .... ....PR E ..............C-C VI 11206-002-5 ISI-11206-002 ISI ...... ..... ...WELDED ATTACHMENT (ENCAP C3.20 11206-002-5 VESSEL) AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............C-C V1 11206-002-6 ISHl1206-002 ISI ...... ..... ...C3.20 11206-002-6 SUPPORT H007 AUG ...... ..... ...2 1206 OW N ..... ..... ....PR E ..............C-C V1 11206-003-2 ISI/PT/ ISI-11206-003 ISI .......--------

s -C3.20 11206-003-2 SUPPORT H001 AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............C-C V1 11206-004-2 ISI-11206-004 ISI ...... ..... ...C3.20 11206-004-2 SUPPORT H001 AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............C-C VI 11206-004-3 IS1-11206-004 ISI ...... ..... ...C3.20 11206-004-3 SUPPORT H003 AUG ...... ..... ...2 1206 OW N ...... ..... ...PR E ..............C-C V1 11206-005-14 C3.20 11206-005-14 2 1206 ISI/PT/ISI-11206-005 SUPPORT H004 ISI AUG OWN S 7/24/2009 ScheduleWorks V. 8.1 Page 14 -24 Ou-thern Nuclear-Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/1ISO No.Comp. Desc.Code Case Period 1> >Period 2 Period 3 E CC Summary NoJCompIlD/System Scope / Method / Procedure PRE C-C V1 11206-005-17 A ISI-11206-005 ISI ...... ..... ...C3.20 11206-005-17 A SUPPORT H012 AUG ...... ..... ...2 1206 OWN PRE ..............C-C V1 11206-005-22 IS1-11206-005 ISI ...... ..... ...C3.20 11206-005-22 SUPPORT H018 AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............C-C V1 11206-005-38 ISI-11206-005 ISI ...... ..... ...C3.20 11206-005-38 SUPPORT H022 AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............C-C V1 11206-005-42 IS1-11206-005 SI ...... ..... ...C3.20 11206-005-42 REMOVED SUPPORT AUG ...... ..... ...2 1206 OWN -..........PRE ..............C-C V1 11206-005-43 ISI-11206-005 SI ...... ..... ...C3.20 11206-005-43 SUPPORT H008 AUG -..........2 1206 OWN -... .PR E ..............C-C V1 11206-005-6 ISI-11206-005 ISI -..........C3.20 11206-005-6 SUPPORT H007 AUG -..........2 1206 OWN PR E ..............C-C Vi 11206-005-7 ISI-11206-005 ISI ...... ..... ...C3.20 11206-005-7 SUPPORT H006 AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE -...-.-. ...C-C V1 11206-006-18 ISI-11208-006

]SI -..........C3.20 11206-006-18 SUPPORT H005 AUG ......2 1206 OWN -..........PRE -......C-C V1 11206-006-32 ISI-11206-006 ISI ...... ..... ...C3.20 11206-006-32 REMOVED SUPPORT AUG ...... ..... ...2 1206 OWN ...... ..... ...PRE ..............t"J" V,1 11206-W6nR'*.-

06i C3.20 11206-006-34 2 1206 SUPPORT H018 AUG OWN Page 15 24 7/24/2009 ScheduleWorks V. 8.1 S§outhern Nuclear, Operating'"b Cm'pany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 (0 co Ir c Period 3 S0 Summary NoJCompiD/System Scope / Method / Procedure PRE C-C V1 11206-006-40 ISI-11206-006 SI ...... ..... ...C3.20 11206-006-40 SUPPORT H016 AUG ...... ..... ...2 1206 OWN ...... ..... ...PRE -............C-C V1 11206-006-7 ISHl1206-006 ISI ...... ..... ...C3.20 11206-006-7 SUPPORT H002 AUG ...... ..... ...2 1206 OWN ...... ..... ...PRE ..............C-C VI 11206-007-1 A ISI-11206-007 Is[ ...... ..... ...C3.20 11206-007-1 A SUPPORT H021 AUG ...... ..... ...2 1206 OWN ...... ..... ...PRE -...-.-. ...C-C V1 11208-003-13 ISI-11208-003 ISI ...... ..... ...C3.20 11208-003-13 SUPPORT H014 AUG ...... ..... ...2 1208 OWN ...... ..... ...PRE ..............C-C V1 11208-003-19 IS1-11208-003 ISI -......C3.20 11208-003-19 SUPPORT H017 AUG ...... ..... ...2 1208 OWN PRE C-C V1 11208-003-35 ISI-11208-003 SI ...... ..... ...C3.20 11208-003-35 SUPPORT H019 AUG ...... ..... ...2 1208 OW N ...... .... ....PR E ..............C-C Vl 11208-003-39 A ISI-11208-003 SI ...... ..... ...C3.20 11208-003-39 A SUPPORT H067 AUG ...... ..... ...2 1208 OWN ...... ..... ...PRE .............C-C V1 11208-003-5 A ISI-11208-003 ISI .......... ...C3.20 11208-003-5 A SUPPORT H007 AUG ...... ..... ...2 1208 OWN ...... ..... ...PRE .............C-C V1 11208-003-61 ISI-11208-003 ISI ...... ..... ...C3.20 11208-003-61 SUPPORT H055 AUG --..... ----2 1208 OWN ...... ..... ...PRE ..............C-C Vi 11208-003-69 A C3.20 11208-003-69 A 2 1208 ISi-1 1208-003 SUPPORT H059 ISI AUG OWN 7/24/2009 ScheduleWorks V. 8.1 Page 16 -24 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Summary No.ICompID/System Scope / Method / Procedure n-N oM PRE C-C V 11208-003-79 ISI-11208-003 iS[ ...... ..... ...C3.20 11208-003-79 SUPPORT H031 AUG ...... .......2 1208 OW N ..... ..... ....PR E ..............C-C V1 11208-003-91 ISI-11208-003 SI ...... ..... ...C3.20 11208-003-91 SUPPORT H040 AUG ...... ..... ...2 1208 OW N ......... ....PRE ..............C-C V 11208-003-96 ISI-11208-003 ISI ...... ..... ...C3.20 11208-003-96 SUPPORT H041 AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE C-C V1 11208-099-14 IS1-1 1208-099 SI ...... ..... ...C3.20 11208-099-14 SUPPORT H009 AUG ...... ..... ...2 1208 OWN PR E ..............C-C V1 11208-101-15 ISI-11208-101 ISI ...... .... ....C3.20 11208-101-15 SUPPORT H008 AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............C-C Vi 11208-137-25 ISI/PT/ IS1-11208-137 SI-- -------- -------- s ---C3.20 11208-137-25 SUPPORT H006 AUG .......... ...2 1208 OW N ..... ..... ....PRE C-C V1 11208-139-13 ISI-11208-139 IS1 ----....C3.20 11208-139-13 SUPPORT H006 AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE ..............C-C V1 11208-139-2 SH- 1208-139 ISI ...... ..... ...C3.20 11208-139-2 SUPPORT H015 AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............C-C V1 11208-411-33 ISI-11208-411 IS] ...... ..... ...C3.20 11208-411-33 SUPPORT H015 AUG ...... ..... ...2 1208 OWN ..... ..... ....PRE .......C-C Vi 11208-411-46 C3.20 11208-411-46 2 1208 ISI/PT/161-11208-411 SUPPORT H031 IS1 AUG OWN-S 7/24/2009 ScheduleWorks V. 8.1 Page 17 -24 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwglISO No.Comp. Desc.Code Case PRE Period 1 Period 2 ot M Period 3 0Ir Summary No./ComplDISystem Scope / Method / Procedure C-C V1 11301-001-4 ISI/PT/ ISI-11301-001 ISI -- ----------

-- -s ---C3.20 11301-001-4 SUPPORT H003 AUG -..... ..... ..2 1301 OW N ..... ..... ....PR E ..............C-C V1 11301-001-7 ISI-11301-001 ISI ...... ..... ...C3.20 11301-001-7 SUPPORT H001 AUG 2 1301 OW N ..... ..... ....PR E ..............C-C Vl 11301-002-4 ISI-11301-002 SI -......C3.20 11301-002-4 SUPPORT H001 AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE ..............C-C VI 11301-002-7 ISI-11301-002 SI ...... ..... ...C3.20 11301-002-7 SUPPORT H002 AUG 2 1301 OW N ..... ..... ....PR E ..............C-C V1 11301-003-4 ISI-11301-003 ISI ...... ..... ...C3.20 11301-003-4 SUPPORT H001 AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE -.- ......C-C V1 11301-003-7 ISI-11301-003 SI ...... ..... ...C3.20 11301-003-7 SUPPORT H002 AUG ...... ..... ...2 1301 OW N ...... .... ....PR E ..............C-C V1 11301-004-4 ISI/PT/ ISI-11301-004 ISI ----s C3.20 11301-004-4 SUPPORT H003 AUG ...... ..... ...2 1301 OW N ..... ..... ....PR E ..............C-C V1 11301-004-7 ISI/PTI I1S-11301-004 IsI ....-----C3.20 11301-004-7 SUPPORT H002 AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE ..............C-C V1 11301-013-11A ISI-11301-013 ISI ...... ..... ...C3.20 11301-013-11A SUPPORT H004 AUG ...... ..... ...2 1301 OW N ..... ..... ....PR E ..............C-C V1 11301-104-6 C3.20 11301-104-6 2 1301 131-11301-104 SUPPORT H001 isi AUG OWN 7/24/2009 ScheduleWorks V. 8.1 Page 18 -24

-Southern Nclear Operating_

Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class OwqIISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3> > > " Summary No./CompID/System Scope / Method / Procedure PRE C-C V1 11301-105-6 ISI-11301-105 ISt ...... ..... ...C3.20 11301-105-6 SUPPORT H001 AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE ..............C-C V1 11301-106-6 ISI-11301-106 SI ...... ..... ...C3.20 11301-106-6 SUPPORT H001 AUG --------2 1301 OWN PRE .....-. ...- ..-. ..C-C V1 11301-107-6 ISI-11301-107 SI ...... ..... ...C3.20 11301-107-6 SUPPORT H001 AUG ...... ..... ...2 1301 OW N ..... ..... ....P R E -. -.- ..-.- ..- .- ...C-C V1 11302-029-11A ISI-11302-029 IS1 ...... ...C3.20 11302-029-11A SUPPORT H003 AUG ...... ...2 1302 OW N ..... ..... ....PRE .-. ............-C-C V1 11302-029-19A IS1-11302-029 SI ...... ..... ...C3.20 11302-029-19A SUPPORT H004 AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E ..............C-C V1 11302-030-16 ISI-11302-030 SI ...... ..... ...C3.20 11302-030-16 SUPPORT H005 AUG ...... ..... ...2 1302 OW N ...... .... ....P R E -. -.- -.-. .-.- ..-. ..C-C V1 11302-030-3A IS1-11302-030 ISI ...... ..... ...C3.20 11302-030-3A SUPPORT H007 AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E ..............C-C V1 11302-031-3A ISI-11302-031 SI ...... ..... ...03.20 1 1302-031-1A SUPPORT H003 AUG .......C-C Vii 11302-032-3A ISI-11302-032 SI~ .......C3.20 11302-032-3A SUPPORT H003 AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E ..............C3.20 11302-033-3A 2 1302 SUPPORT H001 AUG OWN 7/24/2009 ScheduleWorks V. 8.1 Page 19 -24 Southern Nucle ar Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 DwgIISO No.Comp. Desc.Scope / Method / Procedure Code Case Category, Item No., Class Summary No./ComplD/System Period 1 cc x Period 2 cc cc M, Period 3 cc PRE C-C VI 11302-034-5A ISI-11302-034 SI ...... ..... ...C3.20 11302-034-5A SUPPORT H001 AUG 2 1302 OW N .. .... ..... ....PRE C-C VI 11302-035-1A ISI-11302-035 SI ...... ..... ...C3.20 11302-035-1A SUPPORT H001 AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E ..............C-C VI 11302-036-3A ISH-11302-030 iS) ...... ..... ...03.20 11 302-036-3A SUPPORT H001 AUG ...... ..... ...2 1302 OWN ..... ...... ...PRE ..............C-C V1 11302-036-8A ISI-11302-030 ISI ...... ..... ...C3.20 11302-036-BA SUPPORT H002 AUG ...... ..... ...2 1302 OWN -..........PR E ..............C-C V1 11302-084-8A ISI-11302-084 IS] --. .. .C3.20 11302-084-8A SUPPORT H002 AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE ..............C-C V1 11302-085-5A ISI-11302-085 SI- -.--- ---- -- -----C3.20 11302-085-5A SUPPORT H001 AUG -- -- ----- ------ -----2 1302 OWN ---- ----- ------ -----PRE ...-.-.-.-.

.-..C-C Vi 11302-087-5A ISI-11302-029 SI -..........C3.20 11302-087-5A SUPPORT H001 AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E ..............C-C V1 11302-107-11 A IS1-1 1302-107 SI ...... .......C3.20 11302-107-11 A SUPPORT H001 AUG ----....2 1302 OW N ..... ..... ....PR E ..............C-C V1 11302-107-23'A ISI-11302-107 SI- --.-- -- -------- -----C3.20 11302-107-23 A REMOVED SUPPORT (H020) AUG ----- ------ -----2 1302 OWN --- --- ------ -- --- --- -PR E ...............-l Vi 1132U-1U0-11 A C3.20 11302-109-11 A 2 1302 SI-1 1302-109 SUPPORT H001 IS'AUG OWN----I 7/24/2009 ScheduleWorks V. 8.1 Page 20 -24 Southern Nuclear Operating,ý Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case PRE Period 1 Period 2 I'- m=Period 3 Summary NoJComplD/System Scope/ Method / Procedure C-C V1 11305-058-11 ISI/MT/ ISI-11305-058 ISI ----..C3.20 11305-058-11 SUPPORT H007 AUG ...... ..... ...2 1305 OW N ..... ..... ....PRE ..............C-C V1 11305-058-14 ISI-11305-058 iSi .. ..... ..... ...C3.20 11305-058-14 SUPPORT H002 AUG ...... ..... ...2 1305 OW N ..... ..... ....PRE -...-.-. ...C-C V1 11305-058-3 ISI/MT/ ISI-11305-058 ISI ----s C3.20 11305-058-3 SUPPORT H001 AUG ...... ..... ...2 1305 OW N ..... ..... ....PRE ..............C-C V1 11305-060-11 ISI-11305-060 ISI ...... ..... ...C3.20 11305-060-11 SUPPORT H007 AUG ...... ..... ...2 1305 OW N ...... ..... ...PR E ..............C-C V1 11305-060-14 ISI-11305-060 IS1 ...... ..... ...C3.20 11305-060-14 SUPPORT H002 AUG 2 1305 OW N ..... ..... ....PR E ..............C-C V1 11305-060-3 ISI-11305-060 ISI ...... .......C3.20 11305-060-3 SUPPORT H001 AUG ...... ..... ...2 1305 OW N ..... ...... ...PRE -...-.-. ...C-C V1 11305-062-12 ISI-11305-062 ISI ...... ..... ...C3.20 11305-062-12 SUPPORT H008 AUG ...... ..... ...2 1305 OWN ..... ..... ....PRE ..............C-C V1 11305-062-15 IS1-1 1305-062 IS[ ...... ..... ...C3.20 11305-062-15 SUPPORT H003 AUG ...... ..... ...2 1305 OW N ..... ...... ...PR E ..............C-C Vi 11305-062-3 ISI-11305-062 ISi ...... ..... ...C3.20 11305-062-3 SUPPORT HO01 AUG ...... ..... ...2 1305 OW N ..... ..... ....PR E ..............U-U Vi 11305-062-6 C3.20 11305-062-6 2 1305 S1O1305-ti02 SUPPORT H002 ISI AUG OWN 7/24/2009 ScheduleWorks V. 8.1 Page 21 -24 S§outherni'-N'uclear Operating Copny 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Summary No./ComplD/System Scope I Method / Procedure cc Period 2>=>=Period 3 CC)PRE C-C V1 11305-064-14 ISI-11305-064 ISI C3.20 11305-064-14 SUPPORT H008 AUG ...... ..... ....2 1305 OW N ..... ........PRE ....---....C-C V1 11305-064-17 ISI-1 1305-064 ISI ...... ..... ...C3.20 11305-064-17 SUPPORT H1003 AUG ...... ..... ...2 1305 OW N ...... .... ....PR E ..............C-C V1 11305-064-5 ISI-11305-064 ISI ...... ..... ...C3.20 11305-064-5 SUPPORT H002 AUG ...... ..... ...2 1305 OW N ..... ..... ....PRE ..............C-C V1 11305-064-8 ISI-11305-064 ISI .. ..... ..... ...C3.20 11305-064-8 SUPPORT H001 AUG --..... ----2 1305 OW N ..... ..... ....PR E ..............C-C V1 11205-P6-001-WO1 ISI/PT/NMP-ES-024-301 ISI-11205-P6-001 ISI C ..... .......INTEGRALLY WELDED SUPPORT C3.30 11205-P6-001-WO1 ATTACHMENT AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............C-C V1 11205-P6-001-W02 ISI-11205-P6-001 ISI ...... ..... ...INTEGRALLY WELDED SUPPORT C3.30 11205-P6-001-W02 ATTACHMENT AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ....C-C Vii 1205-P6-001-W03 ISI-11205-P6-001 ISI .......INTEGRALLY WELDED SUPPORT C3.30 11205-P6-001-W03 ATTACHMENT AUG 2 1205 OW N ..... ..... ....PRE ..............C-C V1 11205-P6-002-WOI ISI-11205-P6-002 ISI ...... ..... ...INTEGRALLY WELDED PUMP SUPPORT C3.30 11205-P6-002-W0i BRACKET AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E .............C-C C3.30 V1 11205-P6-002-W02 11205-P6-002-W02 ISI-11205-P6-002 ISI INTEGRALLY WELDED PUMP SUPPORT BRACKET AUG 7/24/2009 ScheduleWorks V. 8.1 Page 22 -24 eS~thr ,ii.'Nublep Oper;atingý, Copany 3rd`:Interval VOGTLE-1 IS[ PLAN, VERSION 3.0 Category, Item No., Class 2 Dwg/1SO No.Comp. Desc.Code Case Summary No.JComplD/System 1205 Scope IMethod I Procedure OWN PRE Period 1 ir Period 2.O ..Period 3 0 l* o .C-C V 11205-P6-002-W03 ISI-11205-P6-002 ISI -.. ........INTEGRALLY WELDED PUMP SUPPORT C3.30 11205-P6-002-W03 BRACKET AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............C-C V1 11208-P6-002-W03 ISI/PT/NMP-ES-024-301 IS1-11208-P6-002 ISI c ..... ..... ...INTEGRALLY WELDED PUMP SUPPORT C3.30 11208-P6-002-W03 BRACKET AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............C-C V 11208-P6-002-W04 ISI-11208-P6-002 ISI ...... ..... ...INTEGRALLY WELDED PUMP SUPPORT C3.30 11208-P6-002-W04 BRACKET AUG ...... ..... ...2 1208 OW N ..... ...... ...PR E ..............C-C V1 11208-P6-002-WO5 IS1-11208-P6-002 ISI ...... ..... ...INTEGRALLY WELDED PUMP SUPPORT C330 11208-P6-002-WO5 BRACKET AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE ..............C-C V1 11208-P6-002-W06 ISI-11208-P6-002 SI ...... ..... ...INTEGRALLY WELDED PUMP SUPPORT C3.30 11208-P6-002-WO6 BRACKET AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............C-C Vi 11208-P6-003-W03 ISI-11208-P6-003 SI ...... ..... ...INTEGRALLY WELDED PUMP SUPPORT C3.30 11208-P6-003-W03 BRACKET AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE ..............C-C V1 11208-P6-003-W04 ISI-11208-P6-003 SI ...... ..... ...INTEGRALLY WELDED PUMP SUPPORT C3.30 11208-P6-003-W04 BRACKET AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE ..............U-u C3.30 V1 1] 2UO-P60-UU-WU2 ii 208-P6-003-WO5 ISI1-1 Is[INTEGRALLY WELDED PUMP SUPPORT BRACKET AUG 7/24/2009 ScheduleWorks V. 8.1 Page 23 -24 Southern Nuclear Operating

'Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Dwg/ISO No.Comp. Desc.Summary NoJComplD/System Scope I Method I Procedure Code Case 1208 Category, Item No., Class 2 Period 1 Period 2 to to Period 3 a0 0 OWN PRE C-C V1 11208-P6-003-W06 C3.30 11208-P6-003-W06 2 1208 ISI-11208-P6-003 INTEGRALLY WELDED PUMP SUPPORT BRACKET IS'AUG OWN PRE 7/24/2009 ScheduleWorks V. 8.1 Page 24 -24 Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISI -Code Edition -2001 Edition with 2003 Addenda Period 1 Period 2 Percent Actual Round Total Actual Round Actual Cat. Item No. Code Case Population Required Required Up Exams Count Period Up Count Period C-D 04.30 2 50% 1 1 1 0 0% 0% 0 0.00%Total: 2 1 1 1 0 0% 0% 0 0%12/10/2008 Version 3.0 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3 Category, Item No., Class DwgASO No.Comp. Desc.Code Case Period 1 Period 2 Period 3> > >Summary No./CompIDiSystem Scope / Method / Procedure C-D Vi 11204-P6-003-BOI THRU 832 ISIAJT/ ISI-11204-P6-003 ISI .-. ... s.C4.30 11204-P6-003-Bo1 THRU 832 PUMP CASING STUDS AUG -.- --...... ..2 1204 OWN ----.......PR E -. -. .-. .-. .-. .-. .-.. .C-D V1 l1204-P6-OO4-B01 THRU B32 C4-30 11204-P6-004-B01 THRU 832 2 1204 1SI-11204-P6-004 PUMP CASING STUDS isi AUG OWN PRE 12/10/J2008 ScheduleWorks V A 1 VOGTLE UNIT 1 THIRD INTERVAL ISI PLAN ISI BASIS DOCUMENT CLASS 3 COMPONENTS Category D-A -Item D1.i0 (Vessel), Di.20 (Piping), and D1.30 (Pump) Welded .Attachments Note: There are no valve welded attachments; therefore, Item D1.40 is not applicable.

The examination requirements apply to the welded attachments on Class 3 pressure-retaining components in support of one or more of the following six functions:

1. reactor shutdown 2. emergency core cooling 3. containment heat removal 4. atmosphere cleanup 5. reactor residual heat removal 6. residual heat removal from spent fuel storage pool Item D 1.10 -Pressure Vessel Welded Attachments.

A pressure vessel is a closed container designed to hold gases or liquids at a pressure different from the ambient pressure; therefore, storage tanks (e.g., CST, etc.) are not pressure vessels. (This position is confirmed by intent inquiry IN 07-01 dated 10/22/07).

The ASME Code allows the use of multiple vessels (see Table IWD-2500-1, Note 3). Vogtle will be using ASME Code Case N-700 for this item number.Component System Comments Period 1 23 11203-E4-001 CCW 4 Total -examine 1 using N-700 I 11203-E4-002 CCW 11203-T4-001 CCW 4 Total -examine 1 using N-700 11203-T4-002 CCW 11205-E6-001 RHR 2 Total -examine 1 using N-700 11205-E6-002 RHR 11208-F6-003 CVCS 1 Total -examine 1 using N-700 1 11213-E6-001 SPFC 2 Total -examine 1 using N-700 1 11213-E6-001 SPFC 11592-T7-001 ESF 4 Total -examine 1 using N-700 11592-T7-002 ESF Total 2 3 Vogtle I Basis Doc -Class 3.doc I of 2 Ver. 2.0 VOGTLE UNIT 1 THIRD INTERVAL ISI PLAN ISI BASIS DOCUMENT Item D 1.20 -Piping Welded Attachments.

Per Note 3 of Table IWD-2500-1, Examination Category D-A, for welded attachments of piping, a 10% sample shall be selected for examination.

This percentage sample will be proportional to the total number of nonexempt welded attachments connected to the piping in each system subject to these examinations.

Item D1 .30 -Pump Welded Attachments.

Per Note 3 of Table IWD-2500-1, Examination Category D-A, for welded attachments of pumps, a 10% sample shall be selected for examination.

This percentage sample will be proportional to the total number of nonexempt welded attachments connected to the pumps in each system subject to these examinations.

The ISI scope of the examinations include: CATEGORY D-A EXAMINATIONS ATTACHMENTS ITEM TOTAL SCHEDULED for NO. ATTACHMENTS EXAMINATION D1.10 17 6 D1.20 333 39 D1.30 89 9 TOTALS 439 54 Nuclear Service Cooling Water system pump supports and their integrally welded attachments were examined for second ISI interval Code credit between the Vogtle 1 R 13 and 1R14 outages. These examinations will be documented in the update to the second ISI interval ISI Plan for Vogtle- 1. The examinations for third ISI interval Code credit will be performed in the third ISI period.In addition, weld V1-1205-E6-002-S02 ATT is scheduled for a VT-i examination during the 1R14 outage to satisfy second ISI interval requirements.

The tables show this examination as a "b" in order to not credit the third ISI interval.

The examination for third ISI interval Code credit will be performed in the third ISI period.ASME Section XI also requires a visual examination whenever component support member deformation, e.g., broken, bent, or pulled out parts, is identified during operation, refueling, maintenance, examination, or testing.Category D-B -Pressure Testing Pressure testing is addressed in Volume 3 of this plan.Vogtle I Basis Doc -Class 3.doc 2 of 2 Ver. 2.0 Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISI -Code Edition -2001 Edition with 2003 Addenda Cat. Item No. Code Case Population D-A D1.10 17 D-A D1,20 333 D-A 01.30 89 Total: 439 Percent Required 35.20%10%10%Actual Required 5.98 33.3 8.9 48 Round Up 6 34 9 49 Period 1 Period 2 Total f Actual Round r Actual Round Exams Count Period Up Count Period Up 6 2 33,44% 34% 3 83.61% 84%39 9 27.03% 27% 14 69.07% 68%9 0 0% 0% 0 0.00% 0%54 11 22.90% 23% 17 58.30% 58%Period 3 1 100.33% 100%16 117.12% 115%9 101.12% 100%26 112.00% 110%12/10/2008 Version 3.0 Paae 1 -1 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary No./CompilD/System Scope I Method / Procedure D-A V1 11203-E4-001-SO1 ATT ISI-11203-E4-001 SI ...... ..... ...D1.10 11203-E4-001-SO1 ATT Lugs AUG 3 1203 OW N ..... ..... ....PRE D-A V1 11203-E4-001-S02 ATT ISI ...... ..... ...D1.10 11203-E4-001-S02 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............D-A V1 11203-E4-002-SO1 ATT ISI-11203-E4-002 ISI D1.10 11203-E4-002-SO1 ATT Lugs AUG 3 1203 OWN ...... .... ....PR E ..............D-A V1 11203-E4-002-S02 ATT ISINT/ ISI ----s ..... ...D1.10 11 203-E4-002-S02 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............D-A V1 11203-T4-001-SO1 ATT ISI-11203-T4-001 SI ...... ..... ...D1.10 11203-T4-001-S01 ATT Lugs AUG ...... ..... ...3 1203 OWN PR E ..............D-A V1 11203-T4-001-SO2ATT ISI-11203-T4-001 ISI D1.10 11203-T4-001-S02 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PRE D-A V1 11203-T4-002-S01 ATU ISI-11203-T4-002 ISI D1.10 11203-T4-002-S01 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PRE D-A V1 11203-T4-002-S02ATT ISINT/ IS1-11203-T4-002 ISI ----s ..... ...D1.10 11203-T4-002-S02 ATT Lugs AUG 3 1203 OW N ..... ..... ....PR E ..............D-A V1 11205-E6-001-SO2ATT ISI-11205-E6-001 S1 -D1.10 11205-E6-001-S02 ATT Lugs AUG ...... ..... ...3 1205 OW N ..... ..... ....P R E ..............D-A Vi 11205-Eb-002-S02 A 1 D1.10 11205-E6-002-S02 ATT 3 1205 i~I/V I NMP-ES-024-201 IBYII ISI-1 1205-E6-002 Lugs ISI AUG OWN PRE B -S 8/31/2009 ScheduleWorks V. 8.1 Page 1 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 r a Period 2 Period 3 Summary No./ComplD/System Scope / Method / Procedure D-A Vi 11208-F6-003-SO1 ATT ISI/VT/NMP-ES-024-201 ISI-11208-F6-003 ISI -s .D1.10 11208-F6-003-S01 ATT Lugs AUG 3 1208 OW N ..... ..... ....PR E ..............D-A V1 11213-E6-001-S01 A'i ISI/VT/NMP-ES-024-201 ISI-11213-E6-001 iSI c ..... ..... ...D1.10 11213-E6-001-SO1 ATT Lugs AUG 3 1213 OWN P R E ..............D-A V1 11213-E6-001-SO2ATT ISM-11213-E6-001 IS1 131.10 11213-E6-001-SO2 ATT Lugs AUG 3 1213 OW N ..... ..... ....PRE D-A V1 11592-T7-001-SO1 ATT ISM-1i592-T7-001 ISI D1.10 11592-T7-OO1-SO1 ATT Lugs AUG ...... ..... ...3 1592 OWN PRE D-A V1 11592-T7-001 -S02 ATT ISI-11592-T7-001 ISI ...... ..... ...D1.10 11592-T7-001-S02 ATT Lugs AUG 3 1592 OWN PRE D-A V1 11592-T7-002-SO1 ATT ISI-11592-T7-001 -SI D1.10 11592-T7-002-SO1 ATT Lugs AUG 3 1592 OW N ..... ..... ....PRE D-A V1 11592-T7-002-SO2ATT ISINT/ ISI-11592-T7-001 SI ----s D1.10 11 592-T7-002-S02 ATT Lugs AUG ....3 1592 OWN P R E ..............D-A V1 11202-001-H006ATT ISI-11202-001 IS1 D1.20 11202-001-H006 ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-002-HO14ATT ISINT/NMP-ES-024-201 ISI c D1.20 11202-002-H014 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-003-HO17ATT 01.20 11202-003-H017 ATT 3 1202 Lugs ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 2 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary No./CompID/System Scope / Method / Procedure D-A V1 11202-004-H021 ATT ISi D1.20 11202-004-H021 ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-004-H025 ATT ISI D1.20 11202-004-H025 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E -...-.-. ...D-A V1 11202-004-H029 ATT ISI/VT/ IS--- --- ----- s-- --D1.20 11202-004-H029 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-004-H030 AU" ISIN'TINMP-ES-024-201 SI c ..... ..... ...D1.20 11 202-004-H030 ATT Lugs AUG -..........3 1202 OWN PR E .............D-A V1 11202-004-HO35AUT ISINT/ ISI- ----------------

s ---D1.20 11202-004-H035 ATT Lugs AUG ...... ..... ...3 1202 OWN PR E ..............D-A Vi 11202-004-H036ATT isi D1.20 11 202-004-H036 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-004-H038 ATT ISI ...... ..... ...D1.20 11202-004-H038 ATU Lugs AUG ...... ..... ...3 1202 OWN PR E ..............D-A V1 11202-004-H039 ATT ISI D1.20 11202-004-H039 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE O .............D-A V1 11202-004-HO44ATT Isi ...... ..... ...D1.20 11 202-004-H044 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE O -..... ....D-A Vi 1 1U2-UU4-HU45 AI D1.20 11202-004-H045 ATT 3 1202 Lugs Is'AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 3 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary No./ComplD/System Scope / Method / Procedure D-A Vi 11202-004-H048ATT ISI .-.-- -- ------ -- -----D1,20 11202-004-H048 ATT Lugs AUG --.-.-----.-

-3 1202 OW N ..... ..... ....PRE D-A V1 11202-004-H050 ATT SI ...... ..... ...D1.20 11202-004-H050 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-004-H052 ATT ISI/VT/NMP-ES-024-201 ISI c ..... ..... ...D1.20 11202-004-H052 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A Vl 11202-004-H053 ATT SIl ...... ..... ...D1.20 11 202-004-H053 ATT Lugs AUG 3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-004-H063 ATT ISIVT/ ISi- ---- -------- ---- s ---D1.20 11202-004-H063 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A Vi 11202-004-H066 ATT ISI ...... ..... ...D1.20 11202-004-H066 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-004-HO67ATT ISI ...... ..... ...D1.20 11 202-004-H067 ATT Lugs AUG 3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-004-H068 AUT ISI ...... ..... ...D1.20 11202M004-H068 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-004-HO69ATT ISI ...... ..... ...D1.20 11202,004-H069 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............D-A Vi 1120U-0U4-HU71 All D1.20 11202,004-H071 ATT 3 1202 Lugs IsI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 4 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No,, Class Dwg/ISO No.Comp. Oesc.Code Case Period 1 Period 2 Period 3 Summary No./ComplD/System Scope I Method I Procedure D-A V1 11202-004-H073 ATT ISI D1.20 11202-004-H073 ATT Lugs AUG 3 1202 OWN PR E ..............D-A V1 11202-004-H075ATT ISI D1.20 11202-004-H075 ATT Lugs AUG .. ..... ..... ...3 1202 OWN PRE D-A V1 11202-004-H081 ArT ISI ...... ..... ...D1.20 11202-004-HO81 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-004-H083 ATT ISi ...... ..... ...01.20 11 202-004-H083 ATT Lugs AUG .. ..... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-004--084 ATT ISi ...... ..... ...D1.20 11202-004-H084 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-005-H004ATT IS -------....D1.20 11202-005-H004 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-005-HO16ATT ISI D1.20 11202-005-HO16 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-005-HO23ATT ISI 01.20 I I202-005-H023 ATT Lugs AUG 3 1202 OWN PR E ..............D-A V1 11202-005-H025 ATT ISI ...... ..... ...D1.20 11202-005-H025 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 112U0-UUb-HUb2AI I D1.20 11202-005-H026 ATT 3 1202 Lugs IS1 AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 5 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 0 Period 2 Period 3>> >>Summary No./CompID/System Scope I Method I Procedure D-A V1 11202-006-HOll ATT ISI ...... ..... ...D1.20 11202-006-HOll ATT Lugs AUG 3 1202 OWN P R E ..............D-A V1 11202-006-HO12ATT SI ...... ..... ...D1.20 11202-006-H012 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-006-HO13ATT iSI 01.20 11202-006-H013 ATT Lugs AUG 3 1202 OW N ..... ..... ....PRE D-A V1 11202-006-HO25ATT SI -....D1.20 11202-006-H025 ATT Lugs AUG 3 1202 OW N ..... ..... ....PRE -......D-A V1 11202-006-HO31 ArT Isi ...... ..... ...D1.20 11202-006-H031 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-006-HO32ATT ISl ...... ..... ...D1.20 11 202-006-H032 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-006-H033 ATT SI ...... ..... ...D1.20 11 202-006-H033 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-006-H034 ATT ISI D1.20 11 202-006-H034 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-006-H035 AUT ISI ...... ..... ...D1.20 11202-006-H035 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE O .............D-A Vi 11202-OUb-HU46Ali D1.20 11202-006-H046 ATT 3 1202 Lugs ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 6 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period I0 Period 2 Period 3 Summary No./ComplD/System Scope / Method / Procedure D-A V 11202-006-H047 ATT ISI D1.20 11202-006-H047 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE ..............D-A V1 11202-006-H049 ATT Isi ...... ..... ...D1.20 11202-006-H049 ATT Lugs AUG 3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-006-H052 ATT ISI ...... ..... ...D1.20 11202-006-H052 ATT Lugs AUG 3 1202 OWN P R E ..............D-A Vi 11202-006-HO54 ATT ISI D1.20 11202-006-H054 ATT Lugs AUG 3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-006-HO55 ATT ISi D1.20 11 202-006-H055 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-006-H056 ATT ISI D1.20 11202-006-H056 ATT Lugs AUG 3 1202 OWN PR E ..............D-A V 11202-006-H057 ATT ISI ...... ..... ...D1.20 11 202-006-H057 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-006-H061 ATT SI -... .... .01.20 11202-006-H061 ATT Lugs AUG ...... ..... ...3 1202 OWN ----....PR E ..............D-A Vi 11202-006-H062 ATU IS1 ...... .......D1.20 11202-006-H062 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE U-A V i 1 I2U0UUO-6UOj Ai i D1.20 11202-006-H063 ATT 3 1202 8/31/2009 Lugs II AUG OWN PRE ScheduleWorks V. 8.1 Page 7 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period I 0 Period 2 Period 3ý wo 0 c.>> > >Summary No./ComplD/System Scope / Method / Procedure D-A V1 11202-007-HO02ATT PSI D1.20 11202-007-H002 ATT Lugs AUG ...... ..... ...3 1202 OWN P R E ..............D-A V1 11202-007-H007 ATT SI ...... ..... ...D1.20 11202-007-H007 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-008-H002 ATT IS ...... ..... ...D1.20 1 1202-008-H002 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V 11202-008-H006 ATT ISI D1.20 1 1202-008-H006 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A VI 11202-009-HO02ATT ISI ...... ..... ...D1.20 11202-009-H002 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-009-H006 ATT SIl ...... ..... ...D1.20 11202-009-H006 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-010-H002 ATT ISI D1.20 11202-010-H002 ATT Lugs AUG 3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-010-HO06ATT ISI D1.20 11202-010-H006 ATT Lugs AUG ...... ..... ...3 1202 OWN --....PRE D-A Vi 11202-011-H006 ATT IS -D1.20 11202-011 -H006 ATT Lugs AUG ...... ..... ...3 1202 OWN PR E ..............D-A Vi 11202-011-H0U9ATT D1.20 11202-011-HO09 ATT 3 1202 Lugs ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 8 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary No./ComplD/System Scope / Method / Procedure D-A V1 11202-012-HO02ATT ISI D1.20 11202-012-H002 ATT Lugs AUG 3 1202 OWN P R E ..............D-A Vi 11202-012-H006 ATT Isr ...... ..... ...D1.20 11202-012-H006 ATT Lugs AUG .. ..... ..... ...3 1202 OWN PR E ..............D-A V1 11202-013-H002 ATT ISI ...... ..... ...D1.20 11202-013-H002 ATT Lugs AUG -... .3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-013-H006 ATT ISI D1.20 11202-013-H006 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-014-H002 ArT ISI ...... ..... ...D1.20 11202-014-H002 ATT Lugs AUG 3 1202 OW N ..... ..... ....PR E ..............D-A Vi 11202-014-H006 ATT ISI D1.20 11202-014-H006 ATT Lugs AUG ...... ..... ...3 1202 OWN P R E ..............D-A V1 11202-029-H002 ATT SI ...... ..... ...D1.20 11202-029-H002 ATT Lugs AUG 3 1202 OW N ..... ..... ....PRE D-A V1 11202-029-HO05ATT ISI D1.20 11202-029-H005 ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-029-HO08 ATT ISI D1.20 11202-029-H008 ATT Lugs AUG 3 1202 OW N ..... ..... ....PR E ..............D-A V1 lZU2-U02-11UU.9 AT D1.20 11202-029-H009 ATT 3 1202 Lugs ISi AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 9 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg1ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary No./ComoID/Svstem Scope I Method I Procedure D-A V1 11202-029-HO14ATT ISi D1.20 11202-029-H014 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-029-H021 ATT Si D1.20 11 202-029-H021 ATT Lugs AUG 3 1202 OWN PRE D-A VI 11202-029-H025 AUT ISI/VT/NMP-ES-024-201 ISI c ..... ..... ...01.20 11202-029-H025 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-030-H002 AUT ISI D1.20 11 202-030-H002 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A Vi 11202-030-H005 ATT isI ...... ..... ...D1.20 11202-030-H005 ATT Lugs AUG 3 1202 OW N ..... ..... ....PRE D-A V1 11202-030-H008 ATT IS -D1.20 11202-030-H008 ATT Lugs AUG 3 1202 OW N ..... ..... ....PRE D-A V1 11202-030-HO16ATT IsI ----....D1.20 11202-030-HO16 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-030-H021 ATT ISP ...... ..... ...D1.20 11202-030-H021 ATT Lugs AUG ...... ..... ...3 1202 OWN ---.. .... ...PRE ---.. .......D-A V1 11202-030-H024 ATT IS1 ...... ..... ...D1.20 11202-030-H024 ATT Lugs AUG ---3 1202 OWN ---PRE --D-A V1 112U0-U3U-HU2b A I I D1.20 11 202-030-H026 ATT 3 1202 Lugs ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 10 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period IPeriod 2 Period 3*>> >>Summary No./ComplD/System Scope / Method / Procedure D-A V1 11202-035-H012 AU- S TIVT/ iSI -.------- s ---D1.20 11202-035-H012 ATT Lugs AUG 3 1202 OWN PRE -.- ......D-A V1 11202-035-H021 A'T IS1 ...... ..... ...D1.20 11202-035-H021 ATT Lugs AUG ...... ..... ...3 1202 OWN P R E ..............D-A V1 11202-035-HO25ATr isi -... .D1.20 11202-035-H025 ATT Lugs AUG ...... ..... ...3 1202 OW N ...... ..... ....PR E ..............D-A V1 11202-036-HOOl ATU ISI ...... ..... ...D1.20 11202-036-HOOl ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-036-H020 ATU ISI ...... ..... ...D1.20 11 202-036-H020 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-036-H025 ATT ISl ...... ..... ...D1.20 11202-036-H025 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A Vi 11202-036-HO30ATT ISl ...... ..... ...D1.20 11202-036-H030 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-036-H038 ATT ISl U -..... ----D1.20 11 202-036-H038 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE 0-A V1 11202-037-H007 ATU ISI(VTI IS- --- -.-.-.----

s D1.20 11202-037-H007 ATT Lugs AUG 3 1202 OW N ..... ..... ....P R E ..............D-A V 11202-037-H023 ATT D1.20 11202-037-H023 ATT 3 1202 Lugs ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 11 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3> >> >>Summary No./ComplD/System Scope / Method / Procedure D-A V1 11202-037-HO25ATT ISINT/ SI- --.-.-- ---- -- -s ---01.20 11202-037-H025 ATT Lugs AUG 3 1202 OWN PR E ..............D-A V1 11202-037-HO29ATT ISI ...... ..... ...D1.20 11202-037-H029 ATT Lugs AUG ...... ..... ...3 1202 OWN PR E ..............D-A V1 11202-038-H002 ATT SI .. ..... ..... ...D1.20 11202-038-H002 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-038-H022 ATT ISI D1.20 1 1202-038-H022 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-038-H025 A'T ISI D1.20 11202-038-H025 ATT Lugs AUG ...... ..... ...3 1202 *OWN ..... ..... ....PR E ..............D-A Vi 11202-038-H027 ATT ISI ...... ..... ...D1.20 11 202-038-H027 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-038-H032 ATT ISi ...... ..... ..- .-D1.20 11 202-038-H032 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............D-A V1 11202-072-H001 ATT ISI ...... ..... ...D1.20 11202-072-HOOl ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-072-H007 AUT ISi D1.20 11202-072-H007 ATT Lugs AUG ...... ..... ....3 1202 OW N ..... ..... ....PR E ..............D-A V1 11ZUZ-U07-HUlO7 Al D1.20 11202-072-HO17 ATT 3 1202 Lugs IsI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 12 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case>t Period 1 Period 2_ o> w>>Period 3 oI Summary No./CompID/System Scope / Method / Procedure D-A V1 11202-072-H020 ATT ISl -... .... .D1.20 11 202-072-H020 ATT Lugs AUG 3 1202 OW N ..... ...... ...PR E ..............D-A V1 11202-072-H022 AUT ISI ...... ..... ...D1.20 11 202-072-H022 ATT Lugs AUG 3 1202 OW N ..... ..... ....PRE O .............D-A V1 11202-072-H024 ATT SI ...... ..... ...D1.20 11 202-072-H024 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-072-HO27 ATT ISI ...... ..... ...D1.20 11202-072-H027 ATT Lugs AUG 3 1202 OW N ..... ..... ....PRE ...... ..... ...D-A V1 11202-084-HOOl ATT ISI D1.20 11202-084-HOOl ATT Lugs AUG ...... ..... ...3 1202 OWN PRE ..............D-A V1 11202-084-HOO5 ATT IS1 ...... ..... ...D1.20 11 202-084-H005 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE O ..... ..... ...D-A V1 11202-085-H003 ATT IS1 -....D1.20 11 202-085-H003 ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-088-H009 ATT ISI ...... ..... ...D1.20 11202-088-H009 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-088-HO1OATT ISI ...... ..... ...D1.20 11202-088-HOlO ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE O .............D-A Vi 11202-0o8-HO16ATT D1.20 11 202-088-HOl16 ATT 3 1202 Lugs IS'AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 13 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period I Period 2 Period 3>>> >>Summary No./CompiD/System Scope / Method / Procedure D-A V1 11202-088-HO17 ATT -SI D1.20 11202-088-H017 ATT Lugs AUG ...... ..... ...3 1202 OWN P R E ...............D-A V1 11202-088-HO18ATT 1si ...... ..... ...D1.20 11202-088-H018 ATT Lugs AUG 3 1202 OWN ...... ..... ...PR E ..............D-A V1 11202-088-HO20 ATT ISI ...... ..... ...D1.20 1 1202-088-H020 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE ---....D-A V1 11202-088-H021 ATT IS1 ...... ..... ...D1.20 11202-088-H021 ATT Lugs AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE D-A Vi 11202-088-H022 ATT ISI ...... ..... ...D1.20 11202-088-H022 ATT Lugs AUG 3 1202 OWN ...... ..... ...P R E ..............D-A V1 11202-088-H024 ATT ISI ...... ..... ...D1.20 11202-088-H024 ATT Lugs AUG ...... ..... ...3 1202 OWN PR E ..............D-A V1 11202-088-H031 ATT ISINT/ ISI ----------------

s ---D1.20 11202-088-H031 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-088-HO32ATT ISI ...... ..... ...D1.20 1 t 202-088-H032 ATT Lugs AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE D-A VI 11202-088-H033 ATT IS ...... ..... ...D1.20 11 202-088-H033 ATT Lugs AUG ...... ..... ...3 1202 OWN ...... ..... ...PR E ..............U-A V1 11ZU-U20-HOU34 Al I D1.20 11202-088-H034 ATT 3 1202 Lugs IS1 AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 14 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary No./CompID/Svstem Scope / Method / Procedure D-A Vi 11202-088-HO37 ATT ISI D1.20 11202-088-H037 ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-088-H039 ATT PSI ...... ..... ...D1.20 11 202-088-H039 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A Vl 11202-088-H040 ATT S -D1.20 11202-088-H040 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-088-H042 AUT IS1 ...... ..... ...D1.20 11 202-088-H042 ATT Lugs AUG 3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-088-H043 ATT ISI D1.20 11 202-088-H043 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-088-H044 ATU ISI ...... ..... ...D1.20 11202-088-H044 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-088-HO51 ATT ISI ...... ..... ...D1.20 11202-088-HO51 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-088-HO56 ATT SI ...... ..... ...D1.20 11202-088-H056 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-088-H058 AUT SI ...... ..... ...D1.20 11 202-088-H058 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A Vi 11202-098-H003 AT D1.20 11202-098-H003 ATT 3 1202 Lugs ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 15 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 S > >> >2.Summary No./ComplD/System Scope / Method / Procedure D-A V1 11202-098-H007 ATT SI ...... ..... ...D1.20 11 202-098-H007 ATT Lugs AUG -..... ..... ...3 1202 OW N ...... ..... ....PR E ..............D-A V1 11202-098-H008 ATT ISI ...... ..... ...D1.20 11202-098-HO0B ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-098-HO16 ATT ISi -... .D1.20 11202-098-H016 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-098-H018ATT isi ...... ..... ...D1.20 11202-098-H018 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-098-HO19 ATT IsI ...... ..... ...D1.20 11202-098-H019 ATT Lugs AUG ...... ..... ...3 1202 OWN -... .PR E ..............D-A V1 11202-098-H020 ATT ISi ...... ..... ...D1.20 11 202-098-H020 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-098-H021 ATT IsI ...... ..... ...D1.20 11202-098-H021 ATT Lugs AUG ...... ..... ...3 1202 OWN PR E ..............D-A V1 11202-098-HO22ATT ISI ...... ..... ...D1.20 11202-098-H022 ATT Lugs AUG ...... ..... ...3 1202 OWN ..... ..... ....PR E ..............D-A V1 11202-098-H023 ATT ISI .......... ...D1.20 11 202-098-H023 ATT Lugs AUG ....3 1202 OW N ..... ..... ....PR E ..............D-A V1 112U0-0MUU-0A IT D1.20 11202-099-H003 ATT 3 1202 Lugs ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 16 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class DwgIlSO No.Comp. Desc.Code Case>>Summary No./ComplDlSystem Scope / Method / Procedure D-A V1 11202-099-H004 ATT ISIN'T/ ISI ----s D1.20 11202-099-H004 ATT Lugs AUG .......... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-099-H005 ATT SI ...... ..... ...D1.20 11202-099-H005 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-099-H007 ATT ISI ...... ..... ...D1.20 11202-099-H007 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-099-H008 AUT ISI ...... ..... ...D1.20 11202-099-H008 ATT Lugs AUG --...... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-099-H013 ATT SI ...... ..... ...D1.20 11202-099-H0 3 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-099-H020 ATT SI ...... ..... ...D1.20 11 202-099-H020 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............D-A V 11202-099-H023 AUT SI ...... ..... ...D1.20 11 202-099-H023 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-104-H1-009 ATT Is] ...... ..... .D1.20 11202-104-H009 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ...... ..... ...D-A V1 11202-104-HO13ATT -SI ...... ..... ...D1.20 11202-104-HOI3 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A Vi 11202-104-HU14All D1.20 11202-104-HO14 ATT 3 1202 8/31/2009 Lugs IsI AUG OWN PRE ScheduleWorks V. 8.1 Page 17 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 aD Period 2 Period 3ý w- S.>> I> >Summary No,/ComplD/System Scope / Method / Procedure D-A V1 11202-104-HO17 ATT ISINT/ IS ...... ..s -D1.20 11202-104-H017 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-104-HO20 ATT ISI ...... ..... ...D1.20 11 202-104-H020 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-104-HO22ATT ISI D1.20 11202-104-H022 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-104-HO26 ATT SI ...... ..... ...D1.20 11202-104-H026 ATT Lugs AUG ...... ..... ...3 1202 OWN PR E ..............D-A V1 11202-104-HO29ATT iSi/VT/ ISI -. .....-- s-- ---------D1.20 11202-104-H029 ATT Lugs AUG 3 1202 OWN ----....P R E ..............D-A V1 11202-104-HO33ATT ISI D1.20 1 1202-104-H033 ATT Lugs AUG 3 1202 OWN PR E ..............D-A V1 11202-104-HO40ATT isI ----....D1.20 11202-104-H040 ATT Lugs AUG 3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-104-HO43 ATT ISINT/ isI] ---- -------- ---- s ---D1.20 11202-104-H043 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-134-HO09ATT Isp ...... ..... ...D1.20 11202-134-H009 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 112UZ-134-HU13AT I D1.20 11202-134-HO13 ATT 3 1202 Lugs ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 18 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case a,> > >M 0 Summary No./CompiD/System Scope / Method / Procedure D-A V1 11202-134-HO14 ArT ISI D1.20 11202-134-HO14 ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-134-HO15ATT SI ...... ..... ...D1.20 11202-134-H015 ATT Lugs AUG ...... ..... ...3 1202 OWN P R E ..............D-A V1 11202-134-H018 ATT SI ...... ..... ...D1.20 11202-134-H018 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-134-HO23 ATT ISI D1.20 11202-134-H023 ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-134-HO27 ATT ISI D1.20 11202-134-H027 ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-134-H031 ATT Isi D1.20 11202-134-H031 ATT Lugs AUG 3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-134-HO35ATT IsI ...... ..... ...D1.20 11202-134-H035 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-134-HO42ATT SI ...... ..... ...D1.20 11202-134-H042 ATT Lugs AUG ...... ..... ...3 1202 OWN --...... ...PRE D-A V1 11202-134-HO49 ATT ISI D1.20 11202-134-H049 ATI Lugs AUG 3 1202 OWN PRE D-A Vl 11202-151-H048ATT D1.20 11202-151-H048 ATT 3 1202 Lugs ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 19 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period I Period 2 Period 3 Category, Item No., Class Dw91gSO No.Comp. Desc.Code Case Summary No./ComplD/System Scope I Method / Procedure D-A V1 11202-174-HOOl ATT Isi --...... ...D1.20 11202-174-HOOl ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-174-H003 ATT 1SI D1.20 1 1202-174-H003 ATT Lugs AUG 3 1202 OW N ..... ..... ....PRE D-A V1 11202-181-HOOl ATT ISIPT/ ISI .-.-.--- s-- --D1.20 11202-181-HOOI ATT Lugs AUG ...... ..... ...3 1202 OWN ----....P R E ..............D-A VI 11202-181-H002 ATT ISI ...... ..... ...D1.20 11202-181-H002 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-181-HO05ATT Isi-------------

D1.20 11202-181--H005 ATT Lugs AUG --------------------

--3 1202 OW N ..... ..... ....PRE D-A VI 11202-181-HOll ATT ISI ...... ..... ...D1.20 11202-181-HOll ATT Lugs AUG ...... ..... ...3 1202 OWN PRE ..............D-A V1 11202-181-HO19 ATT ISI/T/ ISI ---------

s .... .D1.20 11202-181-HO19ATT Lugs AUG ...... ..... ...3 1202 OWN PR E ..............D-A VI 11202-181-HO27ATT Isi ...... ..... ...D1.20 11202-181-H027 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A Vi 11202-181-H030 ATT isi D1.20 11202-181-H030 ATT Lugs AUG 3 1202 OW N ..... ..... ....PR E ..............D-A VI 11202-181-H032 ATl D1.20 11202-181-H032 ATT 3 1202 ISI/VT/Lugs IS'AUG OWN PRE S 8/31/2009 ScheduleWorks V. 8.1 Page 20 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case V w 0 ~- 0 Summary No.ICompID/System Scope / Method / Procedure D-A V1 11202-181-H034 ATT ISI/VT/ S1-----------


s ---D1.20 11202-181-H034 ATT Lugs AUG ...... ..... ...3 1202 OWN P R E ..............D-A V1 11202-181-H039 A-T IS -D1.20 11202-181-HO39 ATT Lugs AUG ....3 1202 OWN PRE D-A V1 11202-181-HO40ATT SI ...... ..... ...D1.20 11202-181-H040 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-181-HO43 ATT ISI ...... ..... ...D1.20 11202-181-H043 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-181-H0 44 ATT ISI ...... ..... ...D1V20 11202-181 -H044 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-181-H050 ATT ISi D1.20 11202-181 -H050 ATT Lugs AUG 3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-181-HO53ATT ISi D1.20 11202-181 -H053 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-181-H056 ATT Isi ...... ..... ...D1.20 11202-181-H056 ATT Lugs AUG 3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-184-H002 AT] ISI -..... ..... ..D1.20 11202-184-H002 ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-184-HO05ATT D1.20 11202-184-H005 ATT 3 1202 Lugs IS'AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 21 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case> >Summary No./CompiDlSystem Scope / Method / Procedure D-A V1 11202-185-H002 ATT SI ...... ..... ...D1.20 11202-185-H002 ATT Lugs AUG 3 1202 OWN PRE ..............D-A V1 11202-185-HO05ATT ISI -----....D1.20 11202-185-H005 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-187-H005 ATT ISINT/NMP-ES-024-201 SI c ..... ..... ...D1.20 11202-187-H005 ATT Lugs AUG 3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-187-H006ATT ISI -----....D1.20 11202-187-H006 ATT Lugs AUG ...... ..... ...3 1202 OWN ..... ..... ....PR E ..............D-A V1 11202-187-Hoo9 ATT ISI ...... ..... ...01.20 11202-187-HOO9 AUT Lugs AUG ...... ..... ...3 1202 OWN PR E ..............D-A V1 11202-204-H002 ATT IS1-11202-204 SI ...... ..... ...D1.20 11202-204-H002 ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-212-HOOl ATT ISI-11202-212 ISI D1.20 11202-212-HOOl ATT Lugs AUG ...... ....... ..3 1202 OW N ..... ..... ....PRE D-A V1 11202-213-H003 ATT ISI ...... ..... ...D1.20 11202-213-HOO3 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE -......D-A V1 11202-213-HO04ATT iSI ...... ..... ...D1.20 11202-213-H004 ATT Lugs AUG 3 1202 OW N ..... ..... ....PRE ...... ..... ...D-A V! 11J2-215-HOU3 ATi D1.20 11202-215-H003 ATT 3 1202 8/31/2009 Lugs IsI AUG OWN PRE ScheduleWorks V. 8.1 Page 22 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period I Period 2 Period 3 Of w0w w) 0 Summary No./CompID/System Scope / Method / Procedure D-A V1 11202-215-HO05ATT iSI ...... ..... ...D1.20 11202-215-H005 ATT Lugs AUG ...... ..... ...3 1202 OWN --PRE D-A V1 11202-218-H031 ATT IS1-11202-218 ISI ...... ..... ...D1.20 11202-218-H031 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-220-HOOl ATT ISI-11202-220 SI -... .01.20 11202-220-H001 ATT Lugs AUG-------------

3 1202 OWN PRE D-A V1 11202-228-H006 ATT IsI -... .... .D1.20 11202-228-H006 ATT Lugs AUG 3 1202 OWN P R E ..............D-A Vi 11202-390-H1002 ATT ISi ...... ..... ..D1.20 11202-390-H002 ATT Lugs AUG ...... ..... ...3 1202 OW N ......... ....PR E -............D-A V1 11202-390-HO03ATT isi D1.20 11202-390-H003 ATT Lugs AUG 3 1202 OW N -.... ..... ...PRE D-A V1 11202-390-H005 ATT ISI -...D1.20 11202-390-H005 ATT Lugs AUG -..... ..... ..3 1202 OWN PRE -......D-A V1 11202-390-H006 ATT ISINT/NMP-ES-024-201 ISl c D1.20 11202-390-HO06 ATT Lugs AUG -..... ..... ..3 1202 OW N ..... ..... ....PRE 0-A Vi 11202-390-HOO8 AUl ISI D1.20 11202-390-H008 ATT Lugs AUG 3 1202 OW N ..... ..... ....PR E -.. ..........D-A V1 112U0-390U-1-UU9 ATl D1.20 11202-390-H009 ATT 3 1202 Lugs IS1 AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 23 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary NoICompID/System Scope / Method / Procedure D-A V1 11202-485-HOOl ATT ISI D1.20 11202-485-HOOl ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-486-HOOl ATT ISI D1.20 11202-486-HOOl ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-512-HO09ATT ISI D1.20 11202-512-H009 ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-512-H012 ATT ISIINTINMP-ES-024-201 ISI c D1.20 11202-512-HO12ATT Lugs AUG ...... ..... ...3 1202 OWN PR E ..............D-A V1 11202-516-HO09ATT ISI D1.20 11202-516-H009 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-516-HO12ATT 1SI ...... ..... ...D1.20 11202-516-H012 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11203-021-H002 ATT ISI D1.20 11203-021-H002 ATT Lugs AUG ...... ..... ...3 1203 OWN P R E ..............D-A V1 11203-021-HO03ATT S- .-.------


------ ---D1.20 11203-021-H003 ATT Lugs AUG--------------------

--3 1203 OW N ..... ..... ....PRE D-A V1 11203-021-H006 ATT ISI ...... ..... ...D1.20 11203-021 -H006 ATT Lugs AUG 3 1203 OWN PRE D-A Vi 11U03-UZi-HUU(AI I D1.20 11203-021-H007 ATT 3 1203 Lugs ISI AUG OWN PRE 8/3112009 ScheduleWorks V. 8.1 Page 24 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary No./CompID/System Scope / Method I Procedure D-A V1 11203-021-HO13 ATT SI .. ..... ..... ...D1.20 11203-021 -H1013 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............D-A V1 11203-021-HO20 ATT SI ...... ..... ...D1.20 11203-021 -H020 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PRE ...... ..... ...D-A V1 11203-021-H022 ATT SI ...... ..... ...D1.20 11203-021 -H022 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PROE ..............D-A V1 11203-026-HO02ATT IS1 ...... ..... ...D1.20 11203-026-H002 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............D-A Vi 11203-034-H005 ATT ISl D1.20 11203-034-H005 ATT Lugs AUG ...... ..... ...3 1203 OWN PR E ..............D-A Vi 11203-042-H003 ATT SI ...... ..... ...D1.20 11203-042-H003 ATT Lugs AUG --3 1203 OWN PRE ...... ..... ...D-A V1 11203-042-H004 ATT ISI/VT/ ISI ---s D1.20 11203-042-H004 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....P R E ..............D-A V1 11203-042-HO07ATT ISINT/ ISI ----s .D1.20 11203-042-H007 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PRE -.- ......D-A V1 11203-042-H008 ATU Sl D1.20 11203-042-H008 ATT Lugs AUG ...... ..... ...3 1203 OWN PR E ..............D-A Vi 11203-04Z-HU12ATT D1.20 11203-042-HO12 ATT 3 1203 Lugs IsI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 25 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary No.ICompID/Svstem Scope / Method I Procedure D-A V1 11203-042-HO13ATT ISI . .D1.20 11203-042-HO13 ATT Lugs AUG 3 1203 OW N -.... ..... ....PR E ..............D-A Vi 11203-042-H0lO15 ATT Sl SI. ... ..... ...D1.20 11203-042-H015 ATT Lugs AUG ...... ..... ...3 1203 OWN ...... ...PRE D-A V1 11203-042-H019 ATT ISl D1.20 11203-042-H019 ATT Lugs AUG 3 1203 OWN PR E -...-.-. ...D-A Vi 11203-042-H020 ATT SIl ...... ..... ...D1.20 11 203-042-H020 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............D-A V1 11203-047-1-1003 ATT SI ...... ..... ...D1.20 11203-047-H003 ATT Lugs AUG -----....3 1203 OW N ..... ..... ....P R E ..............D-A V1 11203-047-H006 ATT SIl D1.20 11203-047-H006 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............D-A V 11203-047-H007 ATT ISl ...... ..... ...D1.20 11203-047-H007 ATT Lugs AUG ...... ..... ...3 1203 OWN P R E ..............D-A V 11203-047-H008 AUT ISI D1.20 11203-047-H008 ATT Lugs AUG 3 1203 OWN ----....PR E ..............D-A V1 11203-049-H003 AUT IS -D1.20 11203-049-H003 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PRE D-A Vi 11203-055-HOOI AUT D1.20 11203-055-HOOl ATT 3 1203 ISI/VT/Lugs ISl AUG OWN PRE s 8/31/2009 ScheduleWorks V. 8.1 Page 26 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period I Period 2 Period 3 I> >> > >Summary No./ComplD/System Scope / Method / Procedure D-A V1 11203-055-H004 ATT ISI/VT/NMP-ES-024-201 ISI c D1.20 11 203-055-H004 ATT Lugs AUG ...... ..... ...3 1203 OWN PRE D-A V1 11203-055-H008 ATT ISIVT/ SI- -- ------- s ---D1.20 11203-055-H008 ATT Lugs AUG ...... ..... ...3 1203 OWN PRE ...... ..... ...D-A V1 11203-055-H012ATT ISI ...... ..... ...D1.20 11203-055-H012 ATT Lugs AUG ----....3 1203 OW N ..... ..... ....PR E ..............D-A V1 11203-063-HOOl ATT ISI ----....D1.20 11203-063-HOOl ATT Lugs AUG 3 1203 OWN PR E ..............D-A V1 11203-063-HO12 ATT ISI ...... ..... ...D1.20 11203-063-HO12ATT Lugs AUG 3 1203 OW N ..... ..... ....PRE D-A V1 11203-063-HO13ATT ISI D1.20 11203-063-HO13 ATT Lugs AUG 3 1203 OW N ..... ..... ....PRE ...... ..... ...D-A V1 11203-065-H002 ATT iSI D1.20 11203-065-H002 ATT Lugs AUG ...... ..... ...3 1203 OWN PRE D-A V1 11203-065-H006 ATT SI ...... ..... ...D1.20 11203-065-H006 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PRE D-A V1 11203-091-H004 ATT ISI ...... ..... ...D1.20 11203-091 -H004 ATT Lugs AUG 3 1203 OW N ..... ..... ....PRE U-A V1 112U3-U01--HUU7 All D1.20 11203-091 -H007 ATT 3 1203 Lugs 1I1 AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 27 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case>>> >Summary No./ComplD/System Scope / Method I Procedure D-A V1 11203-091-HO08ATT ISI 01.20 11203-091-H008 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............D-A V1 11203-091-HOlOATT SI ...... ..... ...D1.20 11203-091-HO10 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............D-A V1 11203-093-H009 ATT ISIIVT/ isI ----s ..... ...D1.20 11203-093-H009 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PRE D-A V1 11203-093-Ho01 ATT ISIVT/ Si ----s .D1.20 11203-093-HO10 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PRE ..............D-A V1 11203-093-HO16 ATT iSI ...... ..... ...D1.20 11203-093-H016 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............D-A Vi 11203-093-H018 AUT Si D1.20 11203-093-HOl8 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....P R E ..............D-A Vi 11203-093-HO19 ATT Sl ...... ..... ...D1.20 11 203-093-HOl 9 ATT Lugs AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............D-A V1 11213-001-H11004 ATT ISI ...... ..... .D1.20 11213-001-H004 ATT Lugs AUG ...... ..... ...3 1213 OW N ..... ..... ....PRE -......D-A V1 11213-002-H1-003 ATT SI ...... ..... ..D1.20 11213-002-H003 ATT Lugs AUG ...... ..... ...3 1213 OW N ..... ..... ....PR E ..............D-A V1 0 lAl D1.20 11213-006-H002 ATT 3 1213 Lugs IsI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 28 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case*0I- co Summary No/ComplD/System Scope / Method / Procedure D-A V1 11302-007-HOOl ATT ISINT/ ISI ----------------

s ---D1.20 11302-007-HOOl ATT Lugs AUG 3 1302 OWN P R E ..............D-A V1 11302-008-H002 ATT ISI D1.20 11 302-008-H002 ATT Lugs AUG 3 1302 OW N ..... ..... ....PRE D-A V1 11302-010-H004 ATT SI ...... ..... ...D1.20 11302-010-H004 ATT Lugs AUG 3 1302 OW N ..... ..... ....PR E ..............D-A V1 11302-011-H001 ATT ISI ...... ..... ...D1.20 11302-011-HOOl ATT Lugs AUG ...... ..... ...3 1302 OWN PRE D-A V1 11302-011-HO15ATT ISI D1.20 11302-O11-H015 ATT Lugs AUG 3 1302 OWN PRE D-A V1 11302-011-H026 AT" ISI D1.20 11302-011 -H026 ATT Lugs AUG 3 1302 OW N ..... ..... ....PR E ..............D-A V1 11302-011-HO29ATT ISI D1.20 11302-011-H029 ATT Lugs AUG 3 1302 OWN PRE D-A V1 11302-011-H031ATT ISI ...... ..... ...01.20 11302-011-H031 ATT Lugs AUG ...... ..... ...3 1302 OWN P R E ..............D-A Vi 11302-011-HO36ATT ISINT/NMP-ES-024-201 SI c -- .... ..... ...D1.20 11302-011-HO36ATT Lugs AUG 3 1302 OW N ..... ..... ....PR E ..............D-A Vi 11302-013-HO15ATT D1.20 11302-013-HO15ATT 3 1302 Lugs IS'AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 29 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg1ISO No.Comp. Desc.Code Case to -to Summary No./ComplD/System Scope I Method / Procedure D-A V1 11302-013-HO19ATT ISI D1.20 11302-013-HO19 ATT Lugs AUG 3 1302 OWN P R E ..............D-A V1 11302-013-HO22ATT ISI ...... ..... ...D1.20 1 1302-013-HO22 ATT Lugs AUG 3 1302 OWN PRE D-A V1 11302-015-HOOl ATT ISI D1.20 11302-015-HOOl ATT Lugs AUG 3 1302 OW N ..... ..... ....PRE D-A V1 11302-015-HO03ATT ISI/VT/ ISI .......--------

s --D1.20 11302-015-H003 ATT Lugs AUG 3 1302 OWN PRE D-A V1 11302-016-H004 ATT SI -... .... .D1.20 11302-016-H004 ATT Lugs AUG 3 1302 OWN PRE -.- ......D-A V1 11302-018-H005 ATT ISI D1.20 11302-018-H005 ATT Lugs AUG ...... ..... ...3 1302 OW N ..... ..... ....P R E ..............D-A V1 11302-018-HO15ATT isi D1.20 1J302-018-HO15ATT Lugs AUG 3 1302 OWN -.. ........PR E ..............D-A V1 11302-019-HOOl ATT ISI ...... ..... ...D1.20 11302-019-H001 ATT Lugs AUG ...... ..... ...3 1302 OWN PRE D-A VI 11302-019-H004 ATT IsI D1.20 11302-019-H004 ATT Lugs AUG ...... ..... ...3 1302 OWN PR E ..............U-A V1 11302ou-019 -HO1 Au I D1.20 11302-019-K010 ATT 3 1302 Lugs AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 30 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary No./ComelD/System Scope / Method / Procedure D-A Vi 11302-020-HOOl ATT ISi -... .D1.20 11302-020-HOOl ATT Lugs AUG 3 1302 OWN PRE D-A V1 11302-020-HOl 5 ATT Si D1.20 11302-020-HO15 ATT Lugs AUG 3 1302 OW N ..... ..... ....P R E -...-.-. ...D-A V 11302-020-H023 ATT ISl ...... ..... ...D1 20 11302-020-H023 ATT Lugs AUG -..........3 1302 OW N ..... ..... ....PR E ..............D-A V1 11302-020-H024 ATT ISI D1.20 11 302-020-H024 ATT Lugs AUG 3 1302 OWN PRE D-A V1 11302-020-HO28 ATT SI D1.20 11302-020-H028 ATT Lugs AUG 3 1302 OWN PR E ..............D-A V1 11302-020-HO31 ATT ISI ...... ..... ...D1.20 11302-020-H031 ATT Lugs AUG -----....3 1302 OWN P R E ..............D-A V1 11302-020-H035 ATT S -D1.20 1 I302-020-H035 ATT Lugs AUG ----....3 1302 OWN PRE D-A Vi 11302-022-HO05 AUT si ...... ..... ...D1.20 11302-022-H005 ATT Lugs AUG 3 1302 OW N ..... ..... ....P R E ..............D-A V1 11302-027-HO0 i ATT isi ...... ..... ...D1.20 11302-027-HOOl ATT Lugs AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............D-A Vi 11302-027-H007 ATT D1.20 11 302-027-H007 ATT 3 1302 Lugs IS'AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 31 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Ce IP- Co Period 3 Summary No./ComplD/System Scope I Method / Procedure D-A Vi 11302-028-HO02ATT 1SI D1.20 11 302-028-H002 ATT Lugs AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............D-A V1 11302-045-H002 ATT ISI ...... ..... ...D1.20 11 302-045-H002 ATT Lugs AUG ...... ..... ...3 1302 OW N ..... ..... ....P R E ..............D-A V1 11302-045-H004 ATT IS1 ...... ..... ...D1.20 11302-045-HOO4 ATT Lugs AUG ...... ..... ...3 1302 OWN PR E ...............D-A V1 11302-046-HOOl ATT iSI D1.20 11302-046-HOOl ATT Lugs AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE D-A V1 11302-046-H003 ATT 1SI ...... ..... ...D1.20 11302-046-H003 ATT Lugs AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE D-A V1 11302-048-HOO3 ATT ISINT/ SI- -.-- ---- ---- -- -s ---D1.20 11302-048-H003 ATT Lugs AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............D-A V1 11592-003-HOO4 ATT ISi -... .D1.20 11592-003-H004 ATT Lugs AUG ...... ..... ...3 1592 OW N .. .... ..... ....PR E ...............D-A V1 11592-004-HO03ATT Is] ...... ..... ...D1.20 11592-004-H003 ATT Lugs AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE D-A V1 11592-004-H005 A'T ISI D1.20 11 592-004-HOO5 ATT Lugs AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE D1.20 11 592-007-H003 ATT 3 1592 Lugs Is[AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 32 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case V V ,o r- ~>> >0~ 0 Summary NoI/ComplDISystem Scope / Method / Procedure D-A V1 11592-007-H006 ATT ISI ...... ..... ...D1.20 11592-007-H006 ATT Lugs AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE D-A V1 11592-007-H009 ATT ISI D1.20 11592-007-H009 ATT Lugs AUG 3 1592 OW N ..... ..... ....P R E ..............D-A V1 11592-007-H011 AUT ISI -... .D1.20 11592-007-H011 ATT Lugs AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE D-A V1 11592-008-11003 ATT ISIIVT/ I ----s D1.20 11592-008-H003 ATT Lugs AUG ...... ..... ...3 1592 OW N ..... ..... ....P R E ..............D-A V1 11592-008-HOIOATT IsI ...... ..... ...D1.20 11592-008-H010 ATT Lugs AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE ...... ..... ...D-A V1 11592-008-H016 ATT IS ...... ..... ...D1.20 11592-008-HO16 ATT Lugs AUG ...... ..... ...3 1592 OW N ..... ..... ....PR E ..............D-A V1 11592-020-H048 AUT ISI -D1.20 11 592-020-H048 ATT Lugs AUG 3 1592 OW N ..... ..... ....PRE O .............D-A V1 11592-020-HO75ATT 1SI ...... ..... ...D1.20 11 592-020-H1075 ATT Lugs AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE O .............D-A V1 11592-020-H080 ATT ISI ...... ..... ...D1.20 11592-020-H080 ATT Lugs AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE O .............D-A V1 11592-020-HU85 AII D1.20 11592-020-H085 ATT 3 1592 8/31/2009 Lugs ISl AUG OWN PRE ScheduleWorks V. 8.1 Page 33 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary No./CompID/System Scope / Method / Procedure D-A V1 11592-031 -H054 ATT ISI D1.20 11592-031-H054 ATT Lugs AUG 3 1592 OWN PRE D-A V1 11592-031-H063 ATT SI D1.20 11592-031-HO63 ATT Lugs AUG 3 1592 OWN PRE D-A V1 11592-031-H075 ATT SI ...... ..... ...D1.20 11592-031 -H075 A'T Lugs AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE D-A V1 11592-031-HO80 ATT Isi ...... ..... ...D1.20 11592-031-HO80 ATT Lugs AUG ...... ..... ...3 1592 OWN PRE D-A V1 11592-032-HO16ATT ISI ...... ..... ...D1.20 11592-032-HO16ATT Lugs AUG ...... ..... ...3 1592 OWN PRE D-A V1 11592-032-HO18 ATT ISI D1.20 11592-032-HO18 ATT Lugs AUG 3 1592 OWN PRE D-A V1 11592-044-H041 ATI ISINT/ SI ----s D1.20 11592-044-H041 ATT Lugs AUG ...... ..... ...3 1592 OWN PRE D-A V1 11592-044-HO51 ATT iSI D1.20 11 592-044-HO51 ATT Lugs AUG 3 1592 OWN PRE D-A V1 11592-044-HO63 ATT ISINT/ IS ----s D1.20 11 592-044-H063 ATT Lugs AUG 3 1592 OWN PRE D-A V1 11592-044-H066 AUT D1.20 11 592-044-HO66 ATT 3 1592 Lugs IsI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 34 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3! V> V IT Of> Q: I w w 0 Summary No./ComplD/System Scope / Method I Procedure D-A V1 11592-044-H069 ATT ISI ...... ..... ...D1.20 11 592-044-H069 ATT Lugs AUG ...... ..... ...3 1592 OW N ..... ..... ....PR E ..............D-A V1 11592-044-H082 ATF IS1 D1.20 11 592-044-H082 ATT Lugs AUG ...... ..... ...3 1592 OW N ..... ..... ....PR E ..............D-A V1 11592-054-H005 AT ISINT/ SI ----s D1.20 11592-054-H005 ATT Lugs AUG ...... ..... ...3 1592 OW N .. .... ..... ....PR E ..............D-A V1 11592-054-HO40ATT iSI D1.20 11 592-054-H040 ATT Lugs AUG ...... ..... ...3 1592 OW N ..... ..... ....PR E ..............D-A V1 11592-054-H067 ATT ISI ...... ..... ...D1.20 11 592-054-H067 ATT Lugs AUG ...... ..... ...3 1592 OW N ..... ..... ....P R E ..............D-A V1 11592-054-H073 ATT IS ...... ..... ...D1.20 11 592-054-H073 ATT Lugs AUG ...... ..... ...3 1592 OW N ..... ...... ...PR E ..............D-A Vi 11592-054-H079 ATT ISi ...... ..... ...D1.20 11 592-054-H079 ATT Lugs AUG ...... ..... ...3 1592 OW N ..... ..... ....PR E ..............D-A V1 11592-054-H083 ATT ISINT/ ISI ----s ..... .D1.20 11 592-054-HO83 ATT Lugs AUG ...... ..... ...3 1592 OW N ..... ..... ....PR E ..............D-A V1 11592-054-H086 ATT ISI ...... ..... ...D1.20 11 592-054-H086 ATT Lugs AUG ...... ..... ...3 1592 OW N ..... ..... ....P R E ..............D-A Vi 11592-055-H020 ATT D1.20 11 592-055-H020 ATT 3 1592 ISI/VT/Lugs ISI AUG OWN PRE S 8/31/2009 ScheduleWorks V. 8.1 Page 35 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period I Period 2 Period 3 V , w ,- w 0 Summary No,/CompID/System Scope / Method / Procedure D-A Vl 11202-P4-001-SO2ATT ISINVT/ ISI-11202-P4-001 IS- ---- -------- ---- s ---D1.30 11202-P4-001-S02 ATT Lugs AUG ...... ..... ...3 1202 OWN PR E ..............D-A V1 11202-P4-001-SO3ATT ISI/VT/ ISI-11202-P4-001 ISI -- --. ---D1.30 11202-P4-001-S03 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-P4-001-S04 ATT ISI\T/ ISM- 1202-P4-001 SI- .-.-.-- --s ---D1.30 11202-P4-001-S04 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-P4-001-S05ATT ISINVT/ ISM-11202-P4-001 ISI- ---- -------- ---- s ---D1.30 11202-P4-001-S05 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-P4-001-S06 ATT ISIVT/ IS1-1 1202-P4-001 ISI- ------ ------ ---- s ---D1.30 11202-P4-001-S06 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............D-A V1 11202-P4-001-SO7ATT iSINVT/ IS1-1 1202-P4-001 IS1 .----- ---- -s ---D1.30 11 202-P4-001-S07 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-P4-001-SO8ATT ISI-11202-P4-001 ISI ...... ..... ...D1.30 11202-P4-001-S08 ATT Lugs AUG ...... ..... ...3 1202 OWN -------....P R E ..............D-A V1 11202-P4-001-SO9ATT ISI-11202-P4-001 SI ...... ..... ...D1.30 11202-P4-001-S09 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-P4-001-S1OATT ISI-11202-P4-001 SI ...... ..... ...D1.30 11202-P4-001-$10 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-P4-001-$11 ATT D1.30 11202-P4-001-S11 ATT 3 1202 S1-1 1202-P4-001 Lugs ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 36 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case>>>> ;>Summary No./CompID/System Scope / Method / Procedure D-A Vi 11202-P4-002-S02 ATT ISM-11202-P4-001 ISI D1.30 11202-P4-002-S02 ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-P4-002-S03 ATT ISI-M1202-P4-001 ISl D1.30 11202-P4-002-S03 ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-P4-002-S04ATT ISI-11202-P4-001 ISl D1.30 11202-P4-002-S04 ATT Lugs AUG 3 1202 OWN PRE D-A V 11202-P4-002-S05 AU ISI-11202-P4-001 ISl ...... ..... ...D1.30 11 202-P4-002-SO5 ATT Lugs AUG 3 1202 OW N ..... ..... ....PRE D-A V1 11202-P4-002-S06 ATT ISI-11202-P4-001 Sl ...... ..... ...D1.30 11 202-P4-002-S06 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE -----....D-A V1 11202-P4-002-S07 ATT ISI-1 1202-P4-001 ISl D1.30 11202-P4-002-S07 ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-P4-002-S08 AI- ISI-1i1202-P4-001 ISl D1.30 11202-P4-002-S08 ATT Lugs AUG 3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-P4-002-S09 ATT ISI-11202-P4-001 ISl ...... ..... ...D1.30 11202-P4-002-S09 ATT Lugs AUG 3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-P4-002-S1OATT ISI-11202-P4-001 Sl ...... ..... ...D1.30 11202-P4-002-S1O ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 1122U-P4-UU2-S11 All D1,30 11202-P4-002-Sll ATT 3 1202 LsI-1 I2U2-P4-001 Lugs ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 37 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1Period 2 Period 3 w> w 0 Summary No/ComolDI/Svstem Scope / Method I Procedure D-A V 11202-P4-003-S02 AUT ISM-11202-P4-001 ISI ...... ..... ...D1.30 11202-P4-003-S02 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-P4-003-S03 ATT ISI-11202-P4-001 ISI ...... ..... ...D1.30 11202-P4-003-S03 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-P4-003-S04 AUT ISI-11202-P4-001 SI ...... ..... ...D1.30 11 202-P4-003-S04 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............D-A V1 11202-P4-003-S05 AT ISI-11202-P4-001 ISI ...... ..... ...D1.30 11202-P4-003-S05 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ...... ..... ...D-A V1 11202-P4-003-S06 ATT ISI-11202-P4-001 ISI ...... ..... ...D1.30 11202-P4-003-S06 AUT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-P4-003-SO7 ATT ISI-11202-P4-001 SI ...... ..... ...D1.30 11202-P4-003-S07 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE O .............D-A V1 11202-P4-003-S08 ATT ISI-11202-P4-001 ISI ...... ..... ...D1.30 11 202-P4-003-S08 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-P4-003-S09 AU ISM-11202-P4-001 ISI ...... ..... ...D1.30 11202-P4-003-S09 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-P4-003-S$O AUT ISI-11202-P4-001 SI ...... ..... ...D1.30 11 202-P4-003-S1 0 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ...... ..... ...U-A V1 I I0U-P4-UU3-SI I A11 D1.30 11202-P4-003-Sl1 ATT 3 1202 Lugs IsI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 38 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case e C (o co>>Summary No.ICompID/System Scope I Method I Procedure D-A V1 11202-P4-004-S02 ATT ISI-11202-P4-001 ISI D1.30 11202-P4-004-S02 ATT Lugs AUG ...... ..... ...3 1202 OWN PR E ..............D-A V1i 1202-P4-004-S03 A F ISI-1 1202-P4-001 ISI 01.30 11202-P4-004-S03 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A Vli 1202-P4-004-S04 ATT ISI-11202-P4-001 ISl ...... ..... ...D1.30 11 202-P4-004-S04 ATT Lugs AUG 3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-P4-004-SO5ATT ISI-11202-P4-001 IS1 D1.30 11202-P4-004-S05 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 i 1202-P4-004-S06 ATT IS1-11202-P4-001 ISI ...... ..... ...D1.30 11 202-P4-004-S06 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A Vi 11202-P4-004-S07 ATT ISI-11202-P4-001 ISt ...... ..... ...D1.30 11202-P4-004-S07 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 t 1202-P4-004-S08 AT IS1-1 1202-P4-001 ISI ...... .......D1.30 11202-P4-004-S08 ATT Lugs AUG 3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-P4-004-S09 ATT ISI-11202-P4-001 Si -D1.30 11202-P4-004-S09 ATT Lugs AUG 3 1202 OWN ..... ..... ....PRE D-A V1 11202-P4-004-S10 ATT ISI-11202-P4-001 ISI ...... ..... ...D1.30 11202-P4-004-S10 ATT Lugs AUG ...... ..... ...3 1202 OWN -------....PRE D-A Vi 11202-P4-004-$i1 ATT D1.30 11202-P4-004-S11 ATT 3 1202 I1-1 1202-P4-001 Lugs ISI AUG OWN PRE 8/3112009 ScheduleWorks V. 8.1 Page 39 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary NoIComplD/System Scope / Method I Procedure D-A Vi 11202-P4-005-S02 ATT ISI-11202-P4-001 ISI ...... ..... ...D1.30 11202-P4-005-S02 ArT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............D-A Vi 11202-P4-005-SO3 ATT ISI-11202-P4-001 iSI ...... ..... ...D1.30 11 202-P4-005-S03 ATT Lugs AUG 3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-P4-005-S04 ATT ISI-11202-P4-001 ISI ...... ..... ...D1.30 11 202-P4-005-S04 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-P4-005-S05 ATT ISI-M1202-P4-001 ISl ...... ..... ...D1.30 11202-P4-005-S05 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE ...... ..... ...D-A V 11202-P4-005-S06 ATT ISI-11202-P4-001 ISl ...... ..... ...D1.30 11 202-P4-005-S06 ATT Lugs AUG ....3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-P4-005-S07 ATT ISI-11202-P4-001 ISI 01.30 11202-P4-005-S07 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-P4-005-S08 AUT IS1-11202-P4-001 ISI ...... ..... ...D1.30 11 202-P4-005-S08 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE .........D-A V1 11202-P4-005-S09 ATT ISI-11202-P4-001 ISI ...... ..... ...D1.30 11 202-P4-005-S09 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE -.- ......D-A V1 11202-P4-005-S OATT ISI-11202-P4-001 ISI ...... ..... ...D1.30 11202-P4-005-S10 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-P4-005-Si1 All D1.30 11202-P4-005-S$1 ATT 3 1202 ISI-1 1202-P4-001 Lugs Is'AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 40 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary No./CompID/System Scooe I Method / Procedure D-A V1 11202-P4-006-S02 ATT ISI-11202-P4-001 SIl ...... ..... ...D1.30 1 1202-P4-006-S02 ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-P4-006-S03 All ISI-11202-P4-001 ISI D1.30 11202-P4-006-S03 ATT Lugs AUG ...... ..... ...3 1202 OWN P R E ..............D-A VI 11202-P4-006-S04 ATT ISI-11202-P4-001 SI ...... ..... ...D1 30 11 202-P4-006-S04 ATT Lugs AUG 3 1202 OWN ..............

PRE D-A V1 11202-P4-006-S05 ATT ISI-11202-P4-001 ISI ...... ..... ...D1.30 11202-P4-006-S05 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A VI 11202-P4-006-S06 ATT IS1-11202-P4-001 ISI D1.30 11 202-P4-006-S06 ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-P4-006-S07 ATT ISI-11202-P4-001 -SI D1.30 11202-P4-006-S07 ATT Lugs AUG 3 1202 OWN PRE D-A V1 11202-P4-006-S08 At ISM- 1202-P4-001 Sr ..............

D1.30 11 202-P4-006-S08 ATT Lugs AUG 3 1202 OW N ..... ..... ....PRE D-A V1 11202-P4-006-S09 ATT ISI-11202-P4-001 ISi ...... ..... ...D1.30 11202-P4-006-S09 ATT Lugs AUG ...... ..... ...3 1202 OWN P R E ..............D-A VI 11202-P4-006-S1OAi-r ISI-11202-P4-001 SI D1.30 11202-P4-006-S10 ATT Lugs AUG 3 1202 OWN PR E ..............U-A V1I IIUL-P4-UUO-SIl All D1.30 11202-P4-006-S 11 ATT 3 1202 ISl-I 1202sP4-001 Lugs IsI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 41 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case> >>>Summary NoiComplD/System Scope / Method / Procedure D-A V1 11202-P4-007-SO2ATT ISINT/ ISI-11202-P4-007 ISl .-.---- ---- -- -s ---D1.30 11 202-P4-007-S02 ATT Lugs AUG 3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-P4-007-S03 ATT ISINT/ ISI-11202-P4-007 ISI- --------------

-s ---D1.30 11 202-P4-007-S03 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... .. ...PRE D-A V1 11202-P4-007-SO4ATT ISINT/ ISI-11202-P4-007 ISI- ------ ---- -- -s ---D1.30 11 202-P4-007-S04 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE D-A V1 11202-P4-007-SO5ATT ISI-11202-P4-007 ISI D1.30 11202-P4-007-S05 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-P4-007-S06 AUT IS1-11202-P4-007 Si D1.30 11202-P4-007-S06 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 11202-P4-007-S07 AUT IS1-11202-P4-007 ISI ...... ..... ...D1.30 11202-P4-007-S07 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-P4-007-S08 AT ISI-11202-P4-007 ISI ...... ..... ...D1.30 11 202-P4-007-S08 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-P4-007-S09 AUT ISI-11202-P4-007 Isi ...... ..... ...D1.30 11 202-P4-007-S09 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-P4-007-S1OArT ISI-11202-P4-007 isi D1.30 11202-P4-007-S1O ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A V1 112UZ-P4-UUT-S11 ATT D1.30 11202-P4-007-S$1 ATT 3 1202 I1-1s1202-P4-007 Lugs ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 42 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period I Period 2 tO N- , Period 3 Summary No./ComplD/System Scope I Method I Procedure D-A Vi t 1202-P4-007-S12 ATT ISI-11202-P4-007 ISI ...... ..... ...D1.30 11202-P4-007-S12 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-P4-007-S13ATT ISI-11202-P4-007 ISi D1.30 11202-P4-007-S13 ATT Lugs AUG 3 1202 OWN ..... ..... ....PR E ..............D-A V1 11202-P4-007-S14 ATT IS1-11202-P4-007 ISI D1.30 11202-P4-007-$14 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A Vi 11202-P4-007-S15ATT ISI-11202-P4-007 IS1 ...... ..... ...D1.30 11 202-P4-007-S1 5 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A Vl 11202-P4-008-S02 ATT ISI-11202-P4-007 SI ...... ..... ...D1.30 11202-P4-008-S02 ATT Lugs AUG 3 1202 OWN PRE D-A V 11202-P4-008-S03 AT IS1-1 1202-P4-007 ISI ...... ..... ...D1.30 11 202-P4-008-S03 ATT Lugs AUG ...... ..... ...3 1202 OWN PR E ..............D-A V1 11202-P4-008-S04 ATT ISI-11202-P4-007 ISI ...... ..... ...D1.30 11202-P4-008-S04 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............D-A Vl 11202-P4-008-S05 ATT ISl-11202-P4-007 ISI ...... ..... ...D1.30 11 202-P4-008-S05 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............D-A V1 11202-P4-008-S06 ATT ISI-11202-P4-007 ISI ...... ..... ...D1.30 11202-P4-008-S06 ATT Lugs AUG 3 1202 OW N ..... ..... ....PR E ..............D-A V1 112UZ-Pl4-UU00-8U AlI1 D1.30 11 202-P4-008-S07 ATT 3 1202 1s1-11202-P4-007 Lugs ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 43 -44 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period I Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Summary No./ComplD/System Scope / Method / Procedure D-A V1 11202-P4-008-S08 ATT ISI-11202-P4-007 ISI D1.30 11 202-P4-008-S08 ATT Lugs AUG 3 1202 OW N ..... ..... ....PRE D-A V1 11202-P4-008-S09ATT ISI-11202-P4-007 ISI D1.30 11202-P4-008-S09 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-F4-008-S0 ATT IS1-11202-P4-007 ISI D1.30 11202-P4-008-S10 ATT Lugs AUG 3 1202 OW N ..... ..... ....PRE D-A V1 11202-P4-008-S11 AUT ISM-11202-P4-007 IS -D1.30 11202-P4-008-S11 ATT Lugs AUG ...... ..... ...3 1202 OWN PR E ..............D-A V1 11202-P4-008-S$2ATT ISI-11202-P4-007 ISI D1.30 11202-P4-008-S12 ATT Lugs AUG ...... ..... ...3 1202 OWN PR E ..............D-A V1 11202-P4-008-S$3ATT ISI-11202-P4-007 1SI ...... ..... ...D1.30 11202-P4-008-S13 ATT Lugs AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE D-A V1 11202-P4-008-$14 AU' ISI-11202-P4-007 SI -... .... .D1.30 11202-P4-008-$14 ATT Lugs AUG ...... ..... ...3 1202 OWN PRE O .............D-A V1 11202-P4-008-S15ATT ISI-11202-P4-007 Si D1.30 11202-P4-008-S15 ATT Lugs AUG ...... .......3 1202 OW N ..... ..... ....PRE D-A V1 11302-011-H045 ATl D1.30 11302-011-H045 ATT 3 1302 8/31/2009 Lugs IsI AUG OWN PRE ScheduleWorks V. 8.1 Page 44 -44 VOGTLE UNIT 1 THIRD INTERVAL ISI PLAN COMPONENT SUPPORTS SCOPE For the 3 rd Interval, the determination of the Class 1, 2, and 3 supports to be examined will be performed using Subsection IWF of the 2001 Edition of Section XI through the 2003 Addenda. (The rules in IWF are similar to those used during the 2nd Interval per NRC approved Code Case N-491-1). (Note: IWE supports are not included here).Per the IWA-9000 Glossary a component support is defined as a metal support designed to transmit loads from a component to the load-carrying building or foundation structure.

Component supports include piping supports and encompass those structural elements relied upon to support the weight or provide structural stability to components.

Examinations apply to all component supports that are in the scope of the Class 1, 2, and 3 Boundary Diagrams and are not exempt. These exemptions are: Class 1 Exemptions Per IWF- 1230, Class I supports exempt from examination are those connected to piping and other items exempted from examination by IWB. These include:* Supports located on components less than or equal to 1" in diameter.* Portions of supports that are inaccessible by being encased in concrete, buried underground, or encapsulated by guard pipe.Class 2 Exemptions Per IWF-1230, Class 2 supports exempt from examination are those connected to piping and other items exempted from examination by IWC. These include: " Supports on piping < 4" that is not part of high pressure safety injection (HPSI) or the Auxiliary Feedwater (AFW) system." Supports on vessels, pumps, and valves located in piping < 4" that is not part of HPSI or AFW. In the case of multiple connections to a component, the cumulative cross-sectional area of the inlet must be < 4" and the outlet < 4"." Supports on piping < 1-1/2" that is part of HPSI or AFW." Supports on vessels, pumps, and valves located in piping < 1-1/2" part of HPSI or AFW. In the case of multiple connections to a component, the cumulative cross-sectional area must be used as defined in the Code.Vogtle I Basis Doc -Supports.doc Page I of 10 Ver. 3 VOGTLE UNIT 1 THIRD INTERVAL ISI PLAN COMPONENT SUPPORTS* Supports located on components in systems (or portions of systems) whose function is not required in support of reactor residual heat removal, containment heat removal, and emergency core cooling and that operate at a pressure equal to or less than 275 psig and at a temperature equal to or less than 200 0 F.* Supports located on components of any size beyond the last shutoff valve in open ended portions of systems that do not contain water during normal operation.

  • Portions of supports that are inaccessible by being encased in concrete, buried underground, or encapsulated by guard pipe.Class 3 Exemptions Per IWF-1230, Class 3 supports exempt from examination are those connected to piping and other items exempted from examination by IWD. These include:* Supports located on piping NPS 4 and smaller.* Supports located on vessels, pumps, and valves and their connections in piping NPS 4 and smaller" Supports located on components in systems (or portions of systems) whose function is not required in support of reactor residual heat removal, containment heat removal, and emergency core cooling and that operate at a pressure equal to or less than 275 psig and at a temperature equal to or less than 2000F.* Portions of supports that are inaccessible by being encased in concrete, buried underground, or encapsulated by guard pipe.Examination of Pipin2 supports Piping supports should be selected for examination as follows: 1. Supports should be characterized to identify its support type/function.

For VEGP-1, the support type/functions include the following:

A Anchor B Constant Spring C Linear Rack 1 -D D Linear Rack 2-D E Linear Rack 3-D F Linear Restraint G Rigid Strut H Variable Spring S Snubber Vogtle 1 Basis Doc -Supports.doc Page 2 of 10 Ver. 3 VOGTLE UNIT 1 THIRD INTERVAL ISI PLAN COMPONENT SUPPORTS 2. 25% of the non-exempt Class 1 piping supports, 15% of the non-exempt Class 2 piping supports, and 10% of the non-exempt Class 3 piping supports shall be examined per Table IWF-2500-1. (Note: These are considered as minimum numbers to examine).

The supports selected for examination shall be prorated such that the individual sample sizes for each system are proportional to the number of non-exempt supports of each type and function in each system. Piping supports were prorated by system and support type/functions as shown in the table, Scheduled Supports By Category.3. The Class 3 component supports also show an Owner-Elected scope of 1202 system supports per Letter NOE-0 1650, dated February 26, 1987.Examination of Equipment Supports Equipment supports should be selected for examination as follows: 1. Item No. F 1.40 applies to Class 1, 2, and 3 components other than piping. Table IWF-2500-1 footnote 1 requires that Item Numbers be categorized to identify support types by component support function.

Except for equipment snubbers all equipment support are categorized as F 1.40. This rationale was used because these components are not selected for examination by a proration process.2. All of the supports on a piece of equipment are required to be examined, except when there are multiple components within a system that have a similar design, function, and service. Per Note 3 of Table 2500-1, for multiple components other than piping, within a system of similar design, function, and service, the supports of only one of the multiple components are required to be examined..

For example, each of the two Class 2 RHR pumps has three supports for a total of six supports.

Only three of the supports are required to be examined..The four supports on the bottom of the RPV nozzles are not included for examination based on IWF-1230 which exempts components buried in concrete.The ISI scope of the examinations include: ITEM F1.40 EXAMINATIONS Class Total Supports Supports Scheduled For Examination 1 58 19 2 23 14 3 164 45 TOTALS 245 78 Therefore, 78 of 245 or 31.8% of the equipment supports (non-snubbers) are scheduled for examination.

Vogtle 1 Basis Doc -Supports.doc Page 3 of 10 ger. 3 VOGTLE UNIT 1 THIRD INTERVAL ISI PLAN COMPONENT SUPPORTS The Class 2 portion of the four Steam Generators is the only Class 1, 2, or 3 equipment that has snubbers.

While the examination of the snubber unit is performed per OM, not Section XI; the remainder of the support is effectively examined the same as any other support. There are two snubbers on each steam generator with only one set of snubbers on one of the steam generators requiring examination (or 25% of the population).

Nuclear Service cooling Water system pump supports and their integrally welded attachments were examined for second ISI interval Code credit between the Vogtle 1 R13 and 1R14 outages. These examinations will be documented in the update to the second ISI interval ISI Plan for Vogtle- 1. The examinations for third ISI interval Code credit will be performed in the third ISI period.Examination Of Snubbers IWF- 1220 of the 2001 Edition of Section XI with Addenda through 2003 requires that the inservice inspection requirements for snubbers be in accordance with the requirements of IWF-5000, which states: (a) Inservice examinations shall be performed in accordance with ASME/ANSI OM, Part 4, using the VT-3 visual examination method described in IWA-2213.(b) Inservice tests shall be performed in accordance with ASME/ANSI OM, Part 4.10 CFR 50.55a(b)(3)(v) provides an alternative to these two requirements.

Licensees may use Subsection ISTD, "Inservice Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Power Plants," ASME OM Code, 1995 Edition through the 2003 Addenda, in place of the requirements of IWF-5300(a) and (b) by making appropriate changes to their technical specifications or licensee-controlled documents (if required).

Inservice examinations must be performed using the VT-3 visual examination method described in IWA-2213.However, per IWF-5300(c) integral and non-integral attachments for snubbers including bolting, pins, and clamps, shall be examined in accordance with the requirements of this Subsection (IWF). (Attachments to the pressure boundary such as lugs will be examined per Category B-K, C-C, or D-A). IWF allows a percentage of the integral and non-integral attachments for snubbers to be examined as follows: " Attachment welds will be examined in accordance with IWB, IWC, or IWD." The snubber unit including the pins that secure the snubber unit into the support structure will be examined as required by OM requirements.

The support structure (bolting, pin, and clamps outside of the snubber unit), will be VT-3 examined and reported as required by IWF. Therefore, for Class 1 snubbers, 25% of the support structures will be scheduled and VT-3 examined; 15% of the Class 2 support structures will be scheduled and VT-3 examined, and 10% of the Class 3 support structures will be scheduled and VT-3 examined.

For non-piping snubbers, Footnote 3 of Table IWF-2500-1 must be used to determine the scope.Vogtle I Basis Doc -Supports.doc Page 4 of 10 Ver. 3 VOGTLE UNIT 1 THIRD INTERVAL ISI PLAN COMPONENT SUPPORTS Personnel performing the VT-3 examinations may be qualified and certified per IWA-2310 through IWA-2314 (the standard qualification/certification process) or per IWA-2317. IWA-2317 allows the use of plant personnel with at least 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of plant experience in installation, maintenance, or examination of pumps, valves, and supports to perform the VT-3 examinations.

These personnel must have 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of training in the Section XI requirements and procedures for VT-3 visual examinations, meet the vision test requirements of IWA-2321, have an initial exam, and have a follow-up exam every three years. If using these alternate requirements they shall be described in the appropriate written practice.TOTAL CLASS 1, 2, AND 3 PIPING SUPPORTS AND EQUIPMENT SUPPORTS Code requirements were met as shown in the Code Compliance Scheduling Summary for F-A supports and snubbers.SCOPE EXPANSION Component support examinations that reveal flaws or relevant conditions exceeding the acceptance standards of IWF-3400 shall be extended to include the component supports immediately adjacent to those component supports for which corrective action is required.Additional examinations shall be extended to include additional supports within the same system, equal in number and of the same type and function as those scheduled for examination during the period.Alternately, per IWF-3122.3 the component support with the flaw or relevant condition may be accepted for continued service without corrective actions if an evaluation or test demonstrates that the component support is acceptable for service. Since corrective actions are not required, scope expansion is not required.SUCCESSIVE EXAMINATIONS Acceptance of IWF-3410 Conditions by Corrective Measures or Repair Replacement Per IWF-2220(a), when a component support is accepted for continued service by corrective measures (e.g., adjustment for conditions such as loosened mechanical connections, improper hot/cold settings, etc.) or is accepted through repair/replacement activities the component support shall be re-examined prior to returning the system to service.Per IWF-2220(b), when a component support is in a system that operates above 2000 F and is accepted for continued service by corrective measures (e.g., adjustment for conditions such as loosened mechanical connections, improper hot/cold settings, etc.) or is accepted through repair/replacement activities the component support shall be re-examined during the following heatup and cooldown cycle unless determined unnecessary by evaluation.

This examination shall be performed during operation or the next refueling outage.Vogtle 1 Basis Doc -Supports.doc Page 5 of 10 Ver. 3 VOGTLE UNIT 1 THIRD INTERVAL ISI PLAN COMPONENT SUPPORTS Per IWF-2420, the component support shall also be re-examined during the next inspection period.Acceptance of IWF-34 10 Conditions by Evaluation or Test When a component support is accepted for continued service by evaluation or test in accordance with IWF-3122.3 re-examination is not required during the next inspection period. If evaluated or tested and determined acceptable for continued service corrective measures may be used to restore the support to it original design condition re-examination is not required prior to returning the system to service.Vogtle I Basis Doc -Supports.doc Page 6 of 10 Ver. 3 VOGTLE UNIT 1 THIRD INTERVAL ISI PLAN COMPONENT SUPPORTS Vogtle Nuclear Plant Scheduled Supports by Category Count by Percentage of No. No.System Categor Item No. System- Item No. Re quired Scheduled 1201 F-A_... F1.10B(1) 1 100.00% 0.25 1 F1.10F(1) 26 24.07% 6.50 6 FL.IOG(1) 34 33.66% 8.50 9 FI.10H(1) 9 47.37% 2.25 2 FI.10S 39 45.88% 9.75 10 TOTALS 109 27.25 28 1203 F-A .... F1.30C(1) 9 12.33% 0.90 1 F1.30D(1) 9 5.45% 0.90 1 F1.30F(1) 87 12.63% 8.70 9 F1.30G(1) 41 31.78% 4.10 4 F1.30H(1) 21 19.09% 2.10 2 F1.30S 1 9.09% 0.10 0 TOTALS 168 16.80 17 1204 _ F-A .FI.10C(I) 9 75.00% 2.25 2 FI.1OD(1) 32 84.21% 8.00 8 FI.10F(1) 79 73.15% 19.75 20 F1.10G(1) 60 59.41% 15.00 15 FI.10H(1) 5 26.32% 1.25 2 F1.10S 33 38.82% 8.25 8 F1.20A(1) 7 38.89% 1.05 1 FI.20C(1) 16 40.00% 2.40 2 F1.20D(1) 22 36.67% 3.30 3 F1.20E(1) 6 37.50% 0.90 1 F1.20F(1) 65 13.10% 9.75 10 F1.20G(1) 31 14.90% 4.65 5 FI.20H(1) 14 14.43% 2.10 2 TOTALS 379 78.65 79 Vogtle I Basis Doc -Supports.doc Page 7 of 10 Ver. 3 VOGTLE UNIT 1 THIRD INTERVAL ISI PLAN COMPONENT SUPPORTS Vogtle Nuclear Plant Scheduled Supports by Category 1205 F-A F1.20C(1) 6 15.00% 0.90 1 F1.l20D(1) 14 23.33% 2.10 2 F1.20E(1) 2 12.50% 0.30 0 F1.20F(1) 45 9.07% 6.75 7 F1.20G(1) 43 20.67% 6.45 6 F1.20H(1) 25 25.77% 3.75 4 TOTALS 135 20.25 20, 1206 F-A F1.20F(1) 82 16.53% 12.30 13 F1.20G(!)

18 8.65% 2.70 3 F1.20H(1) 18 18.56% 2.70 3 F1.20S 6...6 9.38% 0.90 1 TOTALS 124 18.60 20 1208 F-A FI.10C(1) 3 25.00% 0.75 1 F1.10D(1) 6 15.79% 1.50 2 F1.1OF(1) 3 2.78% 0.75 1 F1.10G(1) 7 6.93% 1.75 2 FI1i0H(1) 5 26.32% 1.25 1 F1.10S 13 15.29% 3.25 4 F1.20A(1) 1 5.56% 0.15 0 FI.20C(1) 16 40.00% 2.40 2 FI.20D(1) 19 31.67% 2.85 3 F1.20E(1) 8 50.00% 1.20 2 F1.20F(1) 42 8.47% 6.30 6 F1.20G(1) 4 1.92% 0.60 1 F1.20H(1) 4 4.12% 0.60 1 TOTALS 131 23.35 26 1213 F-A F1.30F(1) 15 2.18% 1.50 1 F1.30G(1) 9 6.98% 0.90 1 F1.30H(1) 5 4.55% 0.50 0 F1.30S 1 9.09% 0.10 1 TOTALS 30 3.00 3 1217 F-A F1.30F(1) 2 0.29% 0.20 0 FI.30G(1) 1 0.78% 0.10 1 TOTALS 3 0.30 1 1301 F-A F1.20B(1) 1 100.00% 0.15 1 F1.20F(1) 6 1.21% 0.90 1 F1.20G(1) 13 6.25% 1.95 2 F1.20H(1) 11 11.34% 1.65 1 F1.20S 23 35.94% 3.45 4 TOTALS 54 8.10 9 Vogtle 1 Basis Doc -Supports.doc Page 8 of 10 Ver. 3 VOGTLE UNIT 1 THIRD INTERVAL ISI PLAN COMPONENT SUPPORTS Vogtle Nuclear Plant Scheduled Supports by Category 1302 F-A F1.20A(i) i 10 55.56% 1.50 2 F1.20F(I) 45 9.07% 6.75 5 FI.20G(1) 29 13.94% 4.35 4 F1.20H(1) 10 10.31% 1.50 2 F1.20S 18 28.13% 2.70 3 F1.30A(1) 5 50.00% 0.50 0 F1.30C I) 2 2.74% 0.20 1 F1.30D(1) 18 10.91% 1.80 2 F1.30E(1) 1 2.00% 0.10 0 FI.30F(1) 188 27.29% 18.80 19 F1.30G(1) 16 12.40% 1.60 2 F1,30H(1) 7 6.36% 0.70 1 TOTALS 349 40.50 41 1305 .F-A.. F1.20F(1) 5 1.01% 0.75 1 F1.20G(1) 3 1.44% 0.45 1 FI.20H(1) 10 10.31% 1.50 2 F1.20S 16 25.00% _ 2.40 2 TOTALS 34 5.10 6 1592 -~F-A F1.30F(1 160 23.22% 16.00 16 FI.30G(1) 5 3.88% 0.50 0 F1.30H(1) 3 _ 2.73% .0.30 0 .TOTALS 168 16.80 16 Report Summary Total Total Scheduled Total by Item Required by by Item Item No. No. Item No. No.FI.10 364 91.00 94 F1.20 1000 150.00 154 FI.30 1237 123.70 145 Total Category 2601 364.70 393 Vogtle 1 Basis Doc -Supports.doc Page 9 of 10 Ver. 3 VOGTLE UNIT 1 THIRD INTERVAL ISI PLAN COMPONENT SUPPORTS ISI PLAN TABLES Beginning in 2005, ISI Plan Tables are generated by the industry standard ScheduleWorks ISI software.

The following tables were generated using a standard format provided by ScheduleWorks.

It should be noted that the Scope/Method/Procedure field is for information only. This information may be changed during an outage by IDDEAL users at the site, but it will not be reflected in the ISI Plan until the plan is issued after the outage. When using these tables the user needs to understand the following symbols: Scheduled "s" To schedule a component, place the identifier "s" in the required period/outage.

Completed "c" Upon exam completion for a scheduled component and by uploading the outage scope from IDDEAL back to ScheduleWorks, an "s" will be updated to completed "c".Re- "r" Once a component has been scheduled, and you wish to reschedule to another outage, replace the scheduled scheduled "s" with a rescheduled

'r' and enter an "s" in the new outage schedule.Expanded "e" To increase a work scope without taking code credit in the percentage calculations, enter an Scope expanded "e".Expanded "E" Upon exam completion of an expanded scope and by either uploading the outage scope from Scope IDDEAL or manually changing the letter to an upper case "E" the exam scope is completed.

Completed Additional "a" After an initial expanded work scope has been identified and you wish to add an increased Scheduled expanded work scope, enter an additional expanded scope a".Additional "A" Upon exam completion of an additional expanded scope and by either uploading the outage scope Completed from IDDEAL or manually changing the letter to an upper case "A" the exam scope is completed.

Partial "p" To track partially completed component examination requirements enter a partial "p".Deferred "d" Once a component has been scheduled, and you wish to defer the inspection to another Outage, or Period, replace the scheduled "s" with a deferred "d" and enter an "s" in the new Outage.Limited "I" To track limited component examinations or limited completions of requirements enter "I".Multiple "b For multiple scheduling of the same component in successive Outages or Periods within an Interval Scheduled enter "b".Multiple "B" Upon exam completion of a multiple scope in the same Interval and by either uploading the outage Completed scope from IDDEAL or manually changing the letter to an upper case "B" the exam scope is completed.

This multiple scheduling scope will not count as completed for code calculations.

Tickler "t" To track exam scopes or use as reminder or identifier to confirm scheduling enter "t".Successive "h"i Successive examinations.

Exams Successive "H" Upon exam completion of a successive scope and by either uploading the outage scope from Exams Coin IDDEAL or manually changing the letter to an upper case "H" the exam scope is completed.

Vogtle I Basis Doc -Supports.doc Page 10 of 10 Ver. 3 Vogtle Nuclear Plant Code Compliance Scheduling Summary -3rd Interval ISI -Code Edition -2001 Edition with 2003 Addenda Period 1 Period 2 Period 3 Percent Actual Round Total Actual Round Actual Round Actual Hound Cat. Item No. Code Case Population Required Required Up Exams Count Period Up I Count Period Up I Count Period Up F-A Fli.0B(1)F-A F1.10C(1)F-A F1.10D(1)F-A F1.10F(1)F-A Fil.10G()F-A F1.1OH(1)F-A FItOS F-A F1.20A(1)F-A F1.20B(1)F-A F1.20C(1)F-A F1.20D(1)F-A F1.20E(1)F-A F1.20F(1)F-A F1.20G(1)F-A F1.20H(1)F-A F1.20S F-A F1.30A(1)F-A F1.30C(1)F-A F1.301(1)F-A F1.30E(t)F-A F1.30F(1)F-A F1.30G(1)F-A F1.30H(1)F-A F1.30S F-A F1,40 F-A F1.40S Total: 1 12 38 108 101 19 85 18 1 40 60 16 496 206 97 64 10 73 165 50 689 129 109 11 245 a 2851 25%25%25%25%25%25%25%15%15%15%15%15%15%15%15%15%10%10%10%10%10%10%10%10%31.84%25%0.25 3 9.5 27 25.25 4.75 21.25 2.7 0.15 6 9 2.4 74.4 30.9 14.55 9.6 1 7.3 16.5 5 68.9 12.9 10.9 1.1 78.02 2 443 1 3 10 27 26 5 22 3 1 6 9 3 75 31 15 10 1 8 17 5 69 13 11 2 79 2 454 1 3 10 27 26 5 22 3 1 6 9 3 74 32 16 10 1 8 17 5 69 13 11 2 78 2 454 1 0 0 18 9 0 5 1 0 2 6 2 44 12 7 11 0 3 3 17 4 2 0 15 0 153 400.00% 100%0% 0%0% 0%66.679/% 67%35.64% 35%0% 0%23.53% 23%37.04% 34%0%/0 0%33.33% 34%66.67% 67%83.339/% 67%59.14% 59%38&83% 391/6 48.11% 47%10.42% 10%100.00% 100%0% 0%18.18% 18%60.00% 60%24.67% 25%31.01% 31%18.35% 19%0% 0%19.23% 19%0% 0%34.50% 34%0 400.00% 100%3 100.00% 100%8 84.21% 80%1 70.37% 71%6 59.41% 58%2 42.11% 40%8 61.18% 60%0 37.04% 34%1 666.67% 100%3 83.33% 84%2 88.89% 89%1 125.00% 100%9 71.24% 71%11 74.43% 75%5 82.47r/ 80%4 52M08% 50%0 100.00% 100%0 0.00% 0%4 42.42% 42%0 60.00% 60%25 60.96% 61%4 62.02% 62%5 64.22% 64%1 90.91% 50%13 35.89% 36%2 100.00% 100%118 61.10% 60%0 400.00% 100%0 100.00% 100%2 105.26% 100%8 100.00% 100%11 102.97% 100%3 105.26% 100%9 103.53% 100%2 111.11% 100%0 666.67% 100%1 100.00% 100%1 100.00% 100%0 125.00%1o 100%/6 21 99.46% 99%9 103.56% 104%4 109.97% 1079/6 5 104.17% 100%0 100.00% 100%8 109.59% 100%10 103.03% 100%2 100.00% 100%27 100.15% 100%5 100.78% 100%4 100,92% 100%1 181.82% 100%50 99.97% 99%0 100.00% 100/%183 102.00% 100%4/7/2009 Version 3.0 Page 1 -1 SVOTern Nu PLarN peratingO .Co 3rd interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/iSO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary No./CompID/Svstem Scooe / Method / Procedure F-A Vi 11201-030-H041 ISI/VT/NMP-ES-024-203 ISI-11201-030 ISI c -.... .... ..F1.10B(1) 11201-030-H041 CON SPRING AUG ...... ..... ...1 1201 OWN ... .. ......PR E ..............F-A V1 11204-124-H016 IS-1 1204-124 SI ...... ..... ...Ft.10C(1) 11204-124-H016 LIN RACK 1-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-125-H016 ISI-11204-125 SI ...... ..... ...F1.10C(1) 11204-125-H016 LIN RACK 1-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A Vi 11204-127-HO18 ISI-11204-127 ISI ...... ..... ...F1.10C(1) 11204-127-H018 LIN RACK 1-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-244-HO10 ISI-11204-244 SI ...... ..... ...F1.10C(1) 11204-244-HO10 LIN RACK 1-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-245-H007 IS1-11204-245 SI ...... ..... ...F1.10C(1) 11204-245-1-1007 LIN RACK 1-D AUG ...... ..... ...1 1204 OW N ...... .... ....PRE ..............F-A V1 11204-245-H009 ISI-11204-245 ISI ...... ..... ...F1.10C(1) 11204-245-H009 LIN RACK 1-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-246-H007 ISI/VT/ IS1-11204-246 ISI- ------ s -. ... ...----F1.10C(1) 11204-246-H007 LIN RACK 1-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-246-HOII ISIVT/ ISI-11204-246 ISI----------

s-----------

F1.10C(l) 11204-246-HO11 LIN RACK 1-D AUG -......1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-246-H014 F1.10C(1) 11204-246-H014 1 1204 LiN-RA1CK4-240 LIN RACK 1-D ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 1 -37 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 r- .0 a, Period 3 Summary No./ComeiD/Svstem Scope / Method I Procedure F-A V1 11208-043-H007 ISI-11208-043 SI ----....F1.10C(1) 11208-043-H007 LIN RACK 1-D AUG 1 1208 OW N .. .... ..... ....PR E ..............F-A V 11208-045-H005 ISi-1 1208-045 IS1 ...... ..... ...Fl. 1 OC(1) 11208-045-1-1005 LIN RACK i-D AUG ...... ..... ...1 1208 OWN PR E ..............F-A V1 11208-047-H008 SI/VT/ ISI-11208-047 ISI ---------------------

s F1.10C(1) 11208-047-HO08 LIN RACK 1-D AUG ...... ..... ...1 1208 OW N ..... ..... ....PR E ..............F-A V1 11204-023-H009 IS-i 1204-023 ISI ...... ..... ...F1.10D(1) 11204-023-H009 LIN RACK 2-D AUG ...... ..... ...1 1204 OW N ..... ...... ...PR E -. -...........-F-A V1 11204-023-HO12 IS1-11204-023 1SI ...... ..... ...F1.10D(1) 11204-023-H012 LIN RACK 2-D AUG ...... ..... ...1 1204 OWN PR E ..............F-A V1 11204-076-H020 ISI-11204-076 ISI ...... ..... ...F1.10D(1) 11204-076-HO20 LIN RACK 2-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE -----....F-A V1 11204-077-HO0l ISI/VT/ ISI-11204-077 ISI----------

s----------

F1.10D(1) 11204-077-HOl LIN RACK 2-D AUG ...... ..... ...1 1204 OWN PRE ..... .........F-A V1 11204-077-H003 ISI/VT/ ISI-11204-077 ISI ---------

s ----------

F1.10D(1) 11204-077-H003 LIN RACK 2-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A Vi 11204-078-HOOI SI ...... ..... ...F1.10D(1) 11204-078-HOOI LIN RACK 2-D AUG 1 1204 OW N ..... ..... ....PR E ..............P-A Vi 11204-07U-HUU2 F1.10D(1) 11204-078-H002 1 1204 lbI-1 1204-0(/LIN RACK 2-D IsI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 2 -37 Southern Nuclear Operatin, .C mpany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case 10 r- 51 0!w ccc M Iý: ý : : ýSummary No./ComplD/System Scope / Method / Procedure F-A V1 11204-079-HO10 ISI-11204-079 ISl ...... .......F1.10D(1) 11204-079-HO10 LIN RACK 2-D AUG ...... ..... ...1 1204 OWN ----....PRE ..............F-A V1 11204-079-HOll ISI-11204-079 ISI ...... ..... ...Ft.101(1) 11204-079-HOl 1 LIN RACK 2-D AUG ...... ..... ...'1204 OW N ..... ..... ....PR E ..............F-A V1 11204-125-H012 ISI-11204-125 SI ...... ..... ...F1o10D(1) 11204-125-H012 LIN RACK 2-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A Vi 11204-126-Hl11 ISI-11204-126 SI ...... ..... ...Fl.10D(1) 11204-126-H011 LIN RACK 2-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E -. -.- -.-. .-.- ..-. ..F-A V1 11204-127-H012 IS1-11204-127 ISI ...... ..... ...F1.10D(1) 11204-127-HO12 LIN RACK 2-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V 11204-244-HOOI ISI-11204-244 ISI ...... ..... ...F1.100(1) 11204-244-1-1001 LIN RACK 2-D AUG ...... ..... ...1 1204 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A VI 11204-244-H002 IS-i 1204-244 ISI ...... ..... ...F1.100(1) 11204-244-H002 LIN RACK 2-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E -............F-A V1 11204-244-H003 ISI-11204-244 Is[ ...... ..... ...F1.101(1) 11204-244-H003 LIN RACK 2-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-244-1-1006 IS1-11204-244 SI ...... ..... ...F1.10D(1) 11204-244-H006 LIN RACK 2-D AUG ...... ..... ...1R1204 OWN ...... ..... .PRE .......F-A V 11204-244-H007 F1.101(1) 11204-244-H007 1 1204 ISI-11204-244 LIN RACK 2-D ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 3 -37 Southern Operating 3rd Intervail' VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case> 0> , > >Summary No./ComplD/System Scope / Method I Procedure F-A Vi 11204-244-HOO8 ISI-11204-244 ISI .... .F1.10)D(1) 11204-244-H008 LIN RACK 2-D AUG .. .... ..... ...1 1204 OW N ..... ...... ...PRE ..............F-A V 11204-244-H009 ISI-11204-244 ISI ...... ..... ...F1.10D(1) 11204-244-H009 LIN RACK 2-0 AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-245-HOOl ISI-11204-245 ISI ...... ..... ...F1.10D(1) 11204-245-HOOl LIN RACK 2-D AUG ...... ..... ...1 1204 OWN PRE -.. .-.-.. ..F-A Vi 11204-245-1-1002 IS1-11204-245 SI ...... ..... ...F1.10D(1) 11204-245-H002 LIN RACK 2-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A Vl 11204-245-H003 IS1-11204-245 ISI ...... ..... ...Fi.10D(1) 11204-245-H003 LIN RACK 2-D AUG ...... ..... ...1 1204 OW N ..... ..... ....P R E ..............F-A V 11204-245-H004 ISI-11204-245 ISI ...... ..... ...F1.10D(1) 11204-245-H004 LIN RACK 2-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A Vi 11204-245-H005 ISI-11204-245 IS ...... ..... ...Fl.10D(1) 11204-245-H005 LIN RACK 2-D AUG ...... ..... ...1 1204 OW N ..... ...... ...PR E ..............F-A V1 11204-245-H-1006 ISI-11204-245 ISI -----....F1.10D(1) 11204-245-H006 LIN RACK 2-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE -....F-A V1 11204-245-H-008 IS-11204-245 1s1 ...F1.10D(1) 11204-245-H008 LIN RACK 2-D AUG -... .1 1204 OW N ..... ..... ....PRE F-A V1 11204-246-HOO3 Fi.10D(1) 111204-246-H003 1 1204 ISI/V lI ISI-1 1204-246 LIN RACK 2-D IS3 AUG OWN PRE S --8/4/2009 ScheduleWorks V. 8.1 Page 4 -37

S.o:uthIern perating -Company 3rd Interval.VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Ix Period 3 Summary NoiCompID/System Scope/ Method / Procedure F-A Vl 11204-246-H004 ISINT/ IS1-11204-246 ISI .-- ,-- -s -- -"-----Fl.10D(1) 11204-246-H004 LIN RACK 2-D AUG ----....1 1204 OW N ..... ..... ....P R E --. -.- -. -.....- ..F-A V1 11204-246-1-005 ISINT/ ISI-11204-246 IS1 .... --. ... ...- --Fl.10103(1) 11204-246-1-005 LIN RACK 2-D AUG -. ..... ..... ...- -1 1204 OW N -. -.- -.-. .-.- ..-. ..PRE F-A V1 11204-246-HO06 ISI/VT/ ISI-11204-246 ISI -- --. ... ...--------

Fl.10D(1) 11204-246-H006 LIN RACK 2-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-246-HOOB ISINT/ ISI-1 1204-246 ISI --------------------

s F1.10D(1) 11204-246-H008 LIN RACK 2-D AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-246-HO13 ISI/VT/ ISI-11204-246 ISI -- --. ... ...--------

F1.101(1) 11204-246-H013 LIN RACK 2-0 AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11208- H0-1N04 ISI-11208-045 ISI ---------------------

Fl.10D(l) 11208-045-H004 LIN RACK 2-D AUG ...... ..... ...1 1208 OW N ..... ..... ....P R E -. -.- ..-.- ..- .- ...F-A V1 11208-045-H012 ISI-11208-045 ISI ...... ..... ...F1.10D(1) 11208-045-HO12 LIN RACK 2-D AUG ...... ..... ...1 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-045-H014 ISI2T/ ISI-11208-045 SI -S F1.10D(1) 11208-045-HO14 LIN RACK 2-D AUG ...... ..... ...1 1208 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11208-045-H017 ISIN'/ ISI-11208-045 IS1 -- ---- -------- -s -F1.100(1) 11208-045-H017 LIN RACK 2-D AUG ...... ..... ...1 1208 OW N ..... ..... ....PRE F-A V1 11208-045-021 Fl. 10D(1) 11 208-045-H021 1 1208 IN1-1 R1AC-045 LIN RACK 2-D ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 5 -37 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class DwgflSO No.Comp. Desc.Code Case 7, Period 1* U, Period 2 Period 3ý: I 2 1O O 0" w cc MIt Summary No./CompID/System Scope / Method / Procedure F -A V 1 1 1 2 0 8 -0 4 5 -H 0 2 2 IS1 -1 1 2 0 8 -0 4 5 IS I .............F 1 .1 0 D (1 ) 1 1 2 0 8 -0 4 5 -H 0 2 2 L IN R A C K 2 -D A U G ..............1 1208 OWN ...... ..... ...P R E ..............F -A V 1 1 1 2 0 1 -0 2 9 -H 0 1 6 I S I -1 1 2 0 1 -0 2 9 S I ..............F 1 .1 0 F ( 1) 1 1 2 0 1 -0 2 9 -H 0 1 6 L I N R E S T R A I N T A U G ..............1 1201 OWN ...... ..... ...P R E ..............F -A V 1 1 1 2 0 1 -0 2 9 -H 0 1 7 I S I- 1 1 2 0 1 -0 2 9 I S I ..............F 1 .1 0 F (1 ) 1 1 2 0 1 -0 2 9 -H 0 1 7 L IN R E S T R A IN T A U G ..............1 1201 OWN ...... ..... ...PRE ...... ..... ...F-A V1 11201-029-H018 ISI-11201-029 SI ..... ..... ....F 1 .1 0 F ( 1 ) 1 1 2 0 1 -0 2 9 -H O 1 8 L IN R E S T R A IN T A U G ..............1 1 2 0 1 O W N ----....PR E ..............F -A V 1 1 1 2 0 1 -0 2 9 -H 0 2 0 IS1 -1 1 2 0 1 -0 2 9 S I ..............F 1 .1 0 F (1 ) 1 1 2 0 1 -0 2 9 -H 0 2 0 L IN R E S T R A IN T A U G ..............1 1201 OWN ...... ..... ...P R E ..............F -A V 1 1 1 2 0 1 -0 2 9 -H 0 2 2 I S I -1 1 2 0 1 -0 2 9 I S I ..............F 1.10 F (1 ) 112 0 1-02 9-H 0 2 2 L IN R E S T R A IN T A U G -............1 1201 OWN ...... ..... ...PRE ...... ..... ...F-A Vi 11201-030-H017 ISIIVT/ IS1-11201-030 ISI- .--- ----- --- .S -F 1 .1 0 F (1 ) 1 1 2 0 1 -0 3 0 -H 0 1 7 L IN R E S T R A IN T A U G ..............1 1201 OWN ...... ..... ...PRE ..............F-A V1 11201-030-HO21 ISI/VT/ IS1-11201-030 SI[ ..s .s F 1 .1 0 F (1 ) 1 1 2 0 1 -0 3 0 -H 0 2 1 L IN R E S T R A IN T A U G ..............1 1201 OWN ...... ..... ...PR E ..............F-A V1 11201-030-H040 ISIIVT/NMP-ES-024-203 IS1-11201-030 ISI c ----- ....------------

F 1 .1 0 F (1 ) 1 1 2 0 1 -0 3 0 -H 0 4 0 L IN R E S T R A IN T A U G ..............1 1201 OW N ..... ..... ....PR E ..............F-A F1.10F(1)1 V1 11201-031-H004 11201-031-H004 1201 IS1-11201-031 LIN RESTRAINT ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 6 -37 Southern Nuclear Op'eratiin~g

ýComrpany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 ccU It 2 Period 2 M a a 2 Period 3 cc Summary NoJCompID/Svstem Scooe/ Method / Procedure F-A V1 11201-036-H017 ISI-11201-036 SI ...... ..... ...F1.10F(1) 11201-036-H017 LIN RESTRAINT AUG ...... ..... ...1 1201 OWN ...... ...PRE ----....F-A V1 11201-036-H018 IS1-11201-036 ISI ...... ..... ...F1.10F(1) 11201-036-H0I8 LIN RESTRAINT AUG ...... ..... ...1 1201 OW N ..... .........PRE ..............F-A Vi 11201-036-H603 ISI-11201-036 ISI .......... ...F1.10F(1) 11201-036-H603 LIN RESTRAINT AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............F-A V1 11201-042-H002 ISi-11201-042 ISI ...... ..... ...F1.10F(1) 11201-042-H002 LIN RESTRAINT AUG ...... ..... ...1 1201 OW N ..... ..... ....P R E ..............F-A V1 11201-049-H601 ISI-11201-050 ISI ...... ..... ...F1.10F(1) 11201-049-H601 LIN RESTRAINT AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............F-A V1 11201-051-H005 ISI-11201-051 ISI ...... ..... ...F1.10F(t) 11201-051-H005 LIN RESTRAINT AUG ...... ..... ...1 1201 OW N ..... ..... ....P R E ..............F-A V1 11201-056-HOO1 SI/VT/ ISI-11201-056 SI ....----a F.101F(1) 11201-056-HI001 LIN RESTRAINT AUG ...... ...1 1201 OW N ..... ..... ....PRE ..............F-A V1 11201-057-HOOl ISI-11201-057

[SI F1.10F(1) 11201-057-HOOl LIN RESTRAINT AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-058-H001 ISI-11201-058 ISI ...... ..... ...F1.10F(1) 11201-058-HOOl LIN RESTRAINT AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE F-A Vi '1I201-059-H001 F1.10F(1) 11201-059-HOOl 1 1201 12-l 201-059 LIN RESTRAINT 1sI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 7 -37 SOuthern NucSear Op VErating Company0 3rdlInteival VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 ZOE Po t Summary No./CompID/System Scope / Method I Procedure F-A V1 11201-059-H002 ISI-11201-059 ISI ... ..........F1.10F(1) 11201-059-H002 LIN RESTRAINT AUG ...... ..... ...1 1201 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11201-059-H003 ISI/VT/NMP-ES-024-203 ISI-11201-059 ISI c ..... ..... ...F1.10F(1) 11201-059-H003 LIN RESTRAINT AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............F-A Vi 11201-059-H004 ISI-11201-059 ISIs[ ...... ..... .F1.10F(1) 11201-059-H004 LIN RESTRAINT AUG ...... ..... ...1 1201 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11201-059-1-1005 ISI/VT/NMP-ES-024-203 ISI-11201-059 ISI c Fl.10F(1) 11201-059-H005 LIN RESTRAINT AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-060-HOOl ISI-11201-060 ISI ... ....Fl.10F(1) 11201-060-H0O1 LIN RESTRAINT AUG ...... ..... ...1 1201 OW N ..... ..... ....P R E -. -.....- ....- ..-.-F-A V1 11201-060-1-1002 ISI-11201-060 ISI ...... ..... ...F1.10F(1) 11201-060-H002 LIN RESTRAINT AUG ...... ..... ...1 1201 OW N .......... ....PR E ..............F-A V1 11201-208-HI001 ISI-11201-208 ISI ...... ..... ...F1.1OF(1) 11201-208-HOOl LIN RESTRAINT AUG ...... ..... ...1 1201 OW N ..... .........PR E ..............F-A Vi 11204-021-H004 ISI-11204-021 SI ... ....F1.10F(1) 11204-021-1-1004 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE F-A Vi 11204-021-H009 I1S-11204-021 ISI ...... ..... ...F1.10F(1) 11204-021-H009 LIN RESTRAINT AUG ...... ..... ...1 1204 OWN ...... ...PRE .............F-A V! 1WU04-U21-MU1i6 F1.1OF(I) 11204-021-H016 1 1204204-I21 LIN RESTRAINT ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 8 -37

'Southern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary No.ICompIDISystem Scope I Method I Procedure F-A V1 11204-023-HOll ISI-11204-023 ISI ...... ..... ...F1.10F(1) 11204-023-HOl 1 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-024-H030 ISI-11204-024 ISI ..... ..... ....F1.10F(i) 11204-024-H030 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11204-024-H031 ISI-11204-024 ISI ...... ..... ...F1.10F(I) 11204-024-H031 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....P R E ..............F-A V1 11204-024-H035 ISI-11204-024 ISI ...... ..... ...Fl.10F(1) 11204-024-H035 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-024-H036 ISI-11204-024 SI ...... ..... ...F-.10F(1) 11204-024-H036 LIN RESTRAINT AUG ----....1 1204 OW N ..... ..... ....PR E ..............F-A V1 1204-025-H004 IS1-11204-025 SI ...... ..... ...F1.10F(1) 11204-025-H004 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-025-H005 ISI-11204-025 IS] ...... ..... ...F1.10F(1) 11204-025-H005 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....P R E ..............F-A V1 11204-025-H006 11-11204-025 ISI ...... ..... ...F1.10F(1) 11204-025-H006 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ...... ...PR E ..............F-A V1 11204-025-H009 ISI-11204-025 ISI F1.10F(1) 11204-025-H009 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............IF-A V! 112U4-U25-HU1U F1.10F(1) 11204-025-HO10 1 1204 IN1-1 ESR4-AN5 LIN RESTRAINT ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 9 -37 So I uthern Nucl ear Oper ati n g Company 3rd Interval .VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/1SO No.Comp. Desc.Code Case Period 1 Period 2> >-Period 3 Summary No./CompIDISystem Scope / Method I Procedure F-A V1 11204-034-H001 ISINT/ ISI-11204-034 ISI ..-. ...-.-- .--- s ---F1.10F(1) 11204-034-HOOl LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-042-HO15 ISI-11204-042 ISI ...... ..... ...Fl. 1 OF(1) 11204-042-HO15 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11204-042-H022 IS1-11204-042 SI ...... ..... ...F1.10F(1) 11204-042-H022 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A Vi 11204-043-H009 IS1-11204-043 ISI ...... ..... ...Fl.10F(1) 11204-043-H009 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N -.- .. ..... ...PR E ..............F-A V1 11204-043-HOll ISI-11204-043 ISI ........... ...F1.10F(1) 11204-043-HOll LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....P R E ..............F-A V1 11204-044-H007 ISI-11204-044 ISI ...... ..... ...F1.iOF(1) 11204-044-H007 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-044-H009 IS1-11204-044 ISI ...... ..... ...F1.10F(1) 11204-044-HO09 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-04,4-HO10 ISI-11204-044 ISI ...... ..... ...F1.10F(1) 11204-044-HO10 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....P RE ..............F-A V1 11204-045-HO16 ISI-11204-045 ISI ...... ..... ...F1.10F(1) 11204-045-HO16 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A Vi 11204-045-H0i9 Fl.10F(1) 11204-045-HO19 1 1204 IsI/Vi/ISI-11204-045 LIN RESTRAINT ISI AUG OWN PRE S 8/4/2009 ScheduleWorks V. 8.1 Page 10 -37 Southiern Nuclear Operatingt CompIal n y.3rd Interval....

VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period I Period 2 Ir La Period 3 0"I1 Summary No.IComplD/System Scope I Method / Procedure F-A V1 11204-045-H021 ISI/VT/ ISI-11204-045 ISI- -------- -------- s ---F. .10F(i) 11204-045-H021 IJN RESTRAINT AUG 1 1204 OW N ..... ........P R E -. -.- -.-. .-.- ..-. ..F-A V1 11204-045-H022 SI/VT/ ISI-11204-045 ISI ---------

s F1.I0F(1) 11204-045-H022 LIN RESTRAINT AUG ...... .......1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-045-H024 ISI/VT/ ISI-11204-045 ISI .-.--- --------- s --Ft.10F(1) 11204-045-H024 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-045-H025 ISI/VT/ ISI-11204-045 ISI ------ ----------

s .Fl.1OF(1) 11204-045-H025 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-047-11002 ISI-11204-047 ISI .---- -- ---. ---.-.-. .F1.10F(1) 11204-047-H002 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-076-HOll ISI/VT/NMP-ES-024-203 ISI-11204-076 ISI c ..... ..... ...F1. 10F(1) 11 204-076-HOl 1 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ----....F-A V1 11204-076-H012 ISI/VT/NMP-ES-024-203 ISI-11204-076 ISI C ..... ..... ...F1.10F(1) 11204-076-H012 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A VI 11204-076-H013 ISI/VT/NMP-ES-024-203 ISI-11204-076 SI C ..... ..... ...F1.10F(1) 11204-076-H013 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ...... .... ....PR E ..............F-A VI 11204-076-H015 ISI/VT/NMP-ES-024-203 ISI-11204-076 ISI C ..... ..... ...F1.10F(1) 11204-076-H015 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....P R E ..............F-A Vi 11U'4-U/6-HU1 F1.10F(1) 11204-076-H016 1 1204 1I1-112U4-076 LIN RESTRAINT ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 11 -37 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Dese.Code Case In> >10 N 10> > >010 E ~> >Summary No./CompID/Svstem Scope / Method / Procedure F-A V 11204-076-H018 ISI-11204-076 ISI ...... ..... ...F1.10F(1) 11204-076-HOI8 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ...... ...PR E ..............F-A V1 11204-076-H021 ISI-11204-076 SI --.... ...F1.10F(1) 11204-076-H021 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE F-A V1 11204-076-H022 ISI/VT/NMP-ES-024-203 ISI-11204-076 ISI c ..... ..... ...Fl.10F(1) 11204-076-H022 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ........PR E ..............F-A V1 11204-076-H023 ISI/VT/NMP-ES-024-203 ISI-11204-076 ISI C ..... ..... ...F1.10F(1) 11204-076-H023 LIN RESTRAINT AUG .. ..... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-076-H025 ISINT/NMP-ES-024-203 ISI-11204-076 ISI c ..... ..... ...Fl.10F(1) 11204-076-H025 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE F-A V1 11204-076-H026 ISI/VT/NMP-ES-024-203 IS1-1 1204-076 SI c ..... ..... ...F1.10F(1) 11204-076-H026 LIN RESTRAINT AUG -..........1 1204 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A Vi 11204-076-H027 ISI-11204-076 ISI ...... ..... ...F1.10F(1) 11204-076-H027 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ...... .... ....PRE -. ..--. ---F-A V1 11204-076-H028 ISI/VT/NMP-ES-024-203 ISI-11204-076 ISI c Fl.10F(1) 11204-076-H028 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ...... ...PR E ..............F-A V1 11204-076-H029 ISI-11204-076 ISI ...... ..... ...F1.10F(1) 11204-076-H029 LIN RESTRAINT AUG ...... ..... ...1 1204 OWN -----....PR E ..............F-A V1 11204-U76-HO3U F1.10F(1) 11204-076-H030 1 1204 ISl/V INMP--S-024-203 ISI- 11204-76 LIN RESTRAINT ISI AUG OWN PRE C 8/4/2009 ScheduleWorks V. 8.1 Page 12 -37 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 f- 10I Period 3> >Summary No./ComplD/System Scope I Method I Procedure F-A V1 11204-076-H031 ISI/VT/NMP-ES-024-203 ISHl1204-076 ISI c ..... ..... ...F1.10F(1) 11204-076-H031 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... .....PRE ..............F-A V 11204-076-H032 ISI-11204-076 ISI ...... ..... ...F1.10F(1) 11204-076-H032 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N .......... ...PR E ..............F-A V1 11204-076-H033 ISI-11204-076 ISI ...... ..... ...F1.10F(1) 11204-076-H033 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-076-H034 IS/VVT/NMP-ES-024-203 ISI-11204-076 ISI C ..... ..... ...F1.10F(i) 11204-076-H034 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE F-A V1 11204-076-H035 ISI-11204-076 SI ...... ..... ...F1.10F(1) 11204-076-1-1035 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-076-H036 ISI/V-T/NMP-ES-024-203 ISI-11204-076 ISI C ..... ..... ...F1.10F(1) 11204-076-H036 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-076-H037 ISI-11204-076 ISI ...... ..... ...F1.10F(i) 11204-076-H037 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE F-A V1 11204-076-H038 ISI/VT/NMP-ES-024-203 ISI-11204-076 ISI c ..... ..... ...F1.10F(i) 11 204-076-H038 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-078-H004 ISF-1 1204-078 ISI ...... ..... ...F1.10F(1) 11204-078-1-1004 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ...... ..... ....PR E ..............F-A V1 11204-079-HO12 F1 .1 OF(1) 11204-079-HO12 1 1204 ISI-11204-079 LIN RESTRAINT ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 13 -37 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, itenm No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1>2'Period 2 Period 3 Summary No./CompID/System ScoDe / Method / Procedure F-A V1 11204-079-HO13 ISI-11204-079 SI ...... ... ... ...F1.10F(1) 11204-079-H013 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ...... ..... ...PRE ...... ..... ...F-A V1 11204-079-H014 ISI-11204-079 SI ...... ..... ...F1.10F(1) 11204-079-H014 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-079-H015 ISI-11204-079 ISI ...... ..... ...F1.10F(1) 11204-079-H015 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE F-A V1 11204-079-1-016

-11204-079 ISI ...... ..... .F1 .IOF(1) 11204-079-H016 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-079-H017 IS1-11204-079 ISI ...... ..... ...Fl.10F(1) 11204-079-H017 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A Vi 11204-079-H018 ISI-11204-079 ISI ...... ..... ...F1.10F(i) 11204-079-H018 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A Vi 11204-079-H019 ISI-11204-079 ISI ...... ..... ...F1.10F(1) 11204-079-H019 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-124-H011 ISI-11204-124 ISI ...... ..... ...FlA1OF(1) 11204-124-H011 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A Vl 11204-125-H018 ISI-11204-125 ISI ...... ..... ...F1.10F(1) 11204-125-H018 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A Vi 11204-127-H016 F1.10F(1) 11204-127-H016 1 1204 ISl-11204-127 LIN RESTRAINT ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 14 -37

,Southern Nuclear Operating Compan Iy 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class OwgAISO No.Comp. Desc.Code Case Period 1 Period 2> > > > >Period 3 Summary No./ComplD/System Scope / Method / Procedure F-A V1 11204-243-HOOl ISI-11204-243 ISI ...... ..... ...F1,10F(1) 11204-243-HOOl LIN RESTRAINT AUG ...... ..... ..1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-243-H003 ISI-11204-243 ISI ...... ..... ...Fl.10F(i) 11204-243-H003 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE F-A V1 11204-243-H004 ISI-11204-243 ISI ...... ..... ...F1.10F(1) 11204-243-H004 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A Vi 11204-243-HO05 ISI-11204-243 SI ...... ..... ...F1.101F(1) 11204-243-H005 LIN RESTRAINT AUG ...... ..... ...1 1204 OWN PR E ..............F-A V1 11204-243-1-1006 ISI-11204-243 ISI ...... ..... ...F1.10F(i) 11204-243-HOO6 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-243-H007 ISI-11204-243 ISI ...... ..... ...F1.10F(l) 11204-243-H007 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-243-H009 ISI-11204-243 ISV ...... ..... ...F1.10F(l) 11204-243-H009 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11204-243-HO14 ISI-11204-243 IS1 -----...... ...F1.10F(l) 11204-243-H014 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE F-A V1 11204-243-HO15 ISI-11204-243 ISI ...... ..... ...F1.10F(l) 11204-243-HO15 LIN RESTRAINT AUG ...... ..... ...1 1204 OWN PRE F-A V1 11204-243-HO16 F1.10F(1) 11204-243-HO16 1 1204 IS1-11204-243 LIN RESTRAINT ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 15 -37

'Souithern Nuclear Operat Ing Comp ,any-3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category.Item No., Class DwgfISO No.Comp. Desc.Code Case Period 1 r.~Period 2 Period 3 ao Summary NoiComplD/System Scope / Method / Procedure F-A V1 11204-244-HO14 ISI-11204-244 Is[ I. .... ..... ...F1.10F(l) 11204-244-H014 LIN RESTRAINT AUG ...... ..... ...1 1204 OWN ----....PR E ...............F-A V1 11204-244-HO16 IS1-11204-244 ISI ...... ..... ...Fl.10F(l) 11204-244-HO16 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-245-H013 ISI-11204-245 ISI ...... ..... ...Fl.10F(1) 11204-245-H013 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-245-H014 IS1-11204-245 SI ...... ..... ...F1.10F(1) 11204-245-H014 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-246-H012 ISI-11204-246 ISI ...... ..... ...F1.1OF(1) 11204-246-H012 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ..... ...... ...PR E ..............F-A V1 11204-246-HO15 ISI-11204-246 ISI ...... ..... ...Fl .IOF(1) 11204-246-H015 LIN RESTRAINT AUG ...... ..... ...1 1204 OW N ...... .... ....PR E ..............F-A V1 11208-007-H001 ISI/VT/NMP-ES-024-203 ISI-11208-007 ISI c ..... ..... ...F1.10F(1) 11208-007-HOOI LIN RESTRAINT AUG ...... ..... ...1 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-045-H007 ISI-11208-045 1SI ...... ..... ...Fl.IOF(1) 11208-045-H007 LIN RESTRAINT AUG ...... ..... ...1 1208 OW N ..... ..... ....PRE .......F-A V1 11208-045-H020 If1-11208-045 SI F1.10F(1) 11208-045-H020 LIN RESTRAINT AUG ...... ..... ...1 1208 OW N ..... ..... ....PR E ..............F-A V1 11201-U02-HU1b F1.10G(1) 11201-029-HO15 1 1201 ISI-1 1201-029 RIGID STRUT ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 16 -37

~< ~cwteinNucear

ý Opera ing C ompany'3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case> w w N- w E FE Z Summary No./CompID/System Scope / Method / Procedure F-A V1 11201-029-H019 IS1-11201-029 SI ...... ..... ...Fl.10G(1) 11201-029-H019 RIGID STRUT AUG ...... ..... ...1 1201 OWN PRE ..............F-A V1 11201-029-H025 ISI-11201-029 ISI ...... ..... ...F1.10G(i) 11201-029-H025 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....P R E ..............F-A V1 11201-029-H601 ISI-11201-029 ISI ...... ..... ...F1.10G(1) 11201-029-1-1601 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V 11201-029-H602 ISM-11201-029 ISI ...... ..... ...Fl.i1G(1) 11201-029-1-1602 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............F-A V1 11201-030-H022 1SI-11201-030

[SI ...... ..... ...F1.10G(1) 11201-030-H022 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............F-A V1 11201-030-H023 ISI/VT/NMP-ES-024-203 ISI-11201-030 ISI c F1.10G(1) 11201-030-H023 RIGID STRUT AUG ...... ..... ...1 1201 OW N ...... .... ....PR E ..............F-A V1 11201-030-H024 ISI/VT/ ISI-11201-030 ISI- ------ ---- -s------FI.10G(1) 11201-030-H024 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-030-H028 ISI-11201-030 ISI ...... ..... ...F1.10G(i) 11201-030-H028 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-030-H029 ISI-11201-030 SI ...... ..... ..- " -F1.10G(1) 11201-030-H029 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A Vi 11501-030-H030 F1.10G(1) 11201-030-H030 1 1201 IS]/VTi I11-11201-030 RIGID STRUT IS[AUG OWN PRE S 8/4/2009 ScheduleWorks V. 8.1 Page 17 -37 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class DwgtISO No.Comp. Desc.Code Case eO E ao Summary No./ComplD/System Scope I Method I Procedure F-A V1 11201-030-H036 ISIVT/NMP-ES-024-203 ISI-11201-030 ISI c F1.10G(1) 11201-030-H036 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-030-H037 ISIIVT/NMP-ES-024-203 ISI-11201-030 ISI c ..... .......F1.10G(i) 11201-030-H037 RIGID STRUT AUG ---.. .... ...1 1201 OW N --. .... ..... .PRE -.- --........F-A V1 11201-030-H039 ISI/VT/NMP-ES-024-203 IS1-11201-030 iSI c --. .... .....F1.10G(1) 11201-030-H039 RIGID STRUT AUG ----....1 1201 OW N .......... ....P R E ..............F-A V1 11201-030-H043 ISI/V1/NMP-ES-024-203 ISI-11201-030 ISI c ..... ..... ...F1.10G(1) 11201-030-H043 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............F-A V1 11201-030-HO44 ISI-11201-030 SI ...... ..... ...F1.10G(1) 11201-030-H044 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....P R E ..............F-A V1 11201-030-H045 ISI-11201-030 ISI .. ..... ..... ...F1.10G(i) 11201-030-H045 RIGID STRUT AUG ...... ..... ...1 1201 OWN ...... ...PRE F-A V1 11201-031-H002 ISI-11201-031 ISI ...... ..... ...F1.10G(1) 11201-031-H002 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-036-HOll ISI-11201-036 ISI ...... ..... ...F1.10G(i) 11201-036-HOll RIGID STRUT AUG ...... ..... ...1 1201 OW N ..............PRE ..............F-A V1 11201-036-H012 ISI-11201-036 ISI F1.10G(1) 11201-036-H012 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....P R E ..............F-A Vi 11201-036-H013 F1.10G(1) 11201-036-H013 1 1201 ISI-11201-036 RIGID STRUT ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 18 -37 Southern Nucl ,ear Operating Company 3rd: Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case a,> >w N: a M M I 0c Summary No./CompID/System Scope/ Method / Procedure F-A V1 11201-036-H014 IS1-1 1201-036 ISI F1.10G(1) 11201-036-H014 RIGID STRUT AUG ...... ..... ..1 1201 OW N ..... ..... ...PR E ..............F-A V1 11201-036-H015 ISI-11201-036 ISI ...... ..... ...F1.10G(1) 11201-036-HO15 RIGID STRUT AUG 1 1201 OW N ..... ..... ....PRE F-A V1 11201-036-HO19 ISI-11201-036 ISI ...... ..... ...F1.10G(i) 11201-036-H019 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....P R E ..............F-A V1 11201-042-H004 ISI-11201-042 ISI ...... ...F1.10G(1) 11201-042-H004 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-046-H003 ISI-11201-046 ISI ...... ...Fi.10G(1) 11201-046-H003 RIGID STRUT AUG ...... ...1 1201 OW N ..... ..... ....PRE ..............F-A V1 11201-046-H004 ISI-11201-046 ISI ...... ..... ...F1.10G(1) 11201-046-H004 RIGID STRUT AUG ...... ..... ...1 1201 OW N .......... ....PRE ..............F-A V1 11201-049-H006 IS1-11201-049 SI ...... ..... ...F1.10G(1) 11201-049-H006 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... .........PRE ..............F-A V1 11201-049-HOll ISI-11201-049 ISI ...... ..... ...F1.10G(1) 11201-049-HOl1 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............F-A V1 11201-049-HO12 ISINT/ ISI-11201-049 ISI ----- -- ---- -- -s ---F110G(1) 11201-049-HO12 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-049-HU14 Fl.IOG(1) 11201-049-HO14 1 1201 ISI/V T/IS-1D T2U1-04 RIGID STRUT ISI AUG OWN PRE s 8/4/2009 ScheduleWorks V. 8.1 Page 19 -37 Southern Nuclear Oper4atin'g Company 3rd: Interval.VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 to .0 Summary No./ComeID/System Scope / Method / Procedure F-A V1 11201-051-H003 ISI-11201-051 ISI .......... ...F1.10G(1) 11201-051-1-1003 RIGID STRUT AUG .......... ...1 1201 OW N ..... ..... ....PRE ..............F-A Vi 11201-053-1-1002 IS-1i1201-053 SI ...... ..... ...F1.10G(i) 11201-053-H002 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11201-238-H002 ISI ...... ..... ...F1.10G(1) 11201-238-H002 RIGID STRUT AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11204-021-H002 ISINT/NMP-ES-024-203 ISI-11204-021 ISI c ..... ..... ...F1.10G(1) 11204-021-H002 ISINT/NMP-ES-024-203 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-021-H008 ISINT/NMP-ES-024-203 ISI-11204-021 ISI C ..... ..... ...F1.10G(1) 11204-021--H008 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-021-H012 ISINT/NMP-ES-024-203 ISI-11204-021 ISI c ..... ..... ...F1,10G(1) 11204-021-H012 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A Vi 11204-021-HO15 ISI/VT/NMP-ES-024-203 ISI-11204-021 ISi c ..... ..... ...F1.10G(1) 11204-021-HO15 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-021-HO17 ISI-11204-021 ISI ...... ..... ...F1.10G(1) 11204-021-HO17 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... .........PRE -......F-A Vi 11204-023-H008 ISI-11204-023 ISI ...... ..... ...F1.1iG(i) 11204-023-1-1008 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A Vi 11204-024-H027 F1.10G(i) 11204-024-H027 1 1204 ISI-1 1204-024 RIGID STRUT ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 20 -37

'Southtern NucIeAr Op erating' Coim'pany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/tSO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 M cc r- M M Summary No,/CompID/System Scope / Method / Procedure F-A V 11204-024-H028 ISI-11204-024 ISI ...... ..... ...Ft.10G(I) 11204-024-H028 RIGID STRUT AUG 1 1204 OW N ..... ..... ....PRE ..............F-A VI 11204-024-H032 ISI/VT/ ISI-11204-024 ISI ....--- -------- -- s Fi.10G(I) 11204-024-H032 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-024-H033 ISIMT/ IS1-11204-024 ISI .-.----- ..- ---F1.10G(1) 11204-024-H033 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-024-H034 ISI/VT/ ISI-11204-024 ISI ----- -------- -s ---F1.10G(1) 11204-024-H034 RIGID STRUT AUG ...... .......1 1204 OW N ..... ........PRE .............F-A V1 11204-024-H037 ISI/VT/ ISI-11204-024 ISI ...................

s F1.10G(1) 11204-024-H037 RIGID STRUT AUG ...... ..... ...1 1204 OWN -------....PRE ..............F-A V1 11204-024-H039 ISI-11204-024 ISI ...... ..... ...F1.10G(I) 11204-024-H039 RIGID STRUT AUG ...... ..... ...A 1204 OW N ..... ..... ....PRE F-A Vi 11204-025-11003 ISI-1 1204-025 ISI ----....F.iA0G(1) 11204-025-11003 RIGID STRUT AUG ...... ..... ...1 1204 OWN PR E ..............F-A V1 11204-025-H008 ISI-11204-025 ISI ...... ..... ...Fi.10G(1) 11204-025-H008 RIGID STRUT AUG t 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-025-HOil IS1-11204-025 ISI ...... ..... ...F1.10G(i) 11204-025-H011 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............--A Vi 11204-025-H013 F1.10G(1) 11204-025-H013 1 1204 0I-11204-025 RIGID STRUT ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 21 -37 Southern Nuclear Operating Company.3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class DwgIISO No.Comp. Desc.Code Case NW>=CA 0 2>Summary No./CompID/System Scope / Method / Procedure F-A V1 11204-025-H014 ISI-11204-025 IS1 ...... ..... ...F1.10G(1) 11204-025-H014 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE .............F-A VI 11204-042-H013 IS1-11204-042 IS1 ...... ..... ...F1.10G(1) 11204-042-H013 RIGID STRUT AUG ...... ..... ...1 1204 OW N .. .... ..... ....PRE ..............F-A V1 11204-042-H017 IS1-11204-042 ISI ...... ..... ...F1.10G(1) 11204-042-HO17 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-042-H020 IS1-11204-042 SIS F1.10G(I) 11204-042-H020 RIGID STRUT AUG ...... ..... ...1 1204 OW N ...... .... ....PRE .........F-A V1 11204-042-H021 IS1-11204-042 SI ...... ..... ...F1.10G(1) 11204-042-HO21 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A VI 11204-042-H024 ISINT/ ISI-11204-042 SI-- ---------

s---------

F1 .'0G(l) 11204-042-H024 RIGID STRUT AUG .. ..... ..... ...1 1204 OW N ..... ..... ....PRE F-A V1 11204-042-H-025 ISIV\Ti IS1-11204-042 SI- -.- -- --s --------Fl.10G(1) 11204-042-H025 RIGID STRUT AUG ...... ..... ...1 1204 OWN P R E ..............F-A V 11204-043-H007 ISI-11204-043 ISI ...... ..... ...F1.10G(i) 11204-043-H007 RIGID STRUT AUG 1 1204 OWN PRE ..............F-A VI 11204-043-HO12 ISI-11204-043 SI ...... ..... ...F1.10G(1) 11204-043-HO12 RIGID STRUT AUG ...... ..... ...1 1204 OW N ...... .... ....PRE ..............F-A V1 11204-044-1008 F1.10G(1) 11204-044-H008 1 1204 ISGIT204-044 RIGID STRUT 1SI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 22 -37 Southern Nuclear aOperating Co mpany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case-e Period 1 ccn 10 Period 2 N 00 M Period 3 Summary No./ComolD/Svstem Scope/ Method / Procedure F-A V1 11204-045-H015 ISI-11204-045 ISI ...... ..... ...Fl.10G(1) 11204-045-HO15 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....P R E ..............F-A V! 11204-045-H018 ISIIVT/ ISI-11204-045 ISI .-.-- -----.-----

s----s-F1.10G(1) 11204-045-H018 RIGID STRUT AUG ...... .......1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-045-H023 ISI/VT/ IS1-11204-045 ISI- ------ -------- -- s ---F1.10G(1) 11204-045-H023 RIGID STRUT AUG ...... ..... ...1 1204 OWN P R E ..............F-A Vi 11204-045-H601 ISI-11204-045 SI ...... ..... ...Fi.10G(i) 11204-045-1-1601 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A Vl 11204-076-HO17 ISI-11204-076 ISI ...... ..... ...F1.10G(1) 11204-076-H017 RIGID STRUT AUG ...... .......1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-076-HO19 ISI-11204-076 ISI ...... ..... ...F1.10G(1) 11204-076-HO19 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....P R E ..............F-A Vi 11204-076-H024 ISI-11204-076 is] ...... ..... ...F1.10G(1) 11204-076-H024 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....P R E .............F-A V1 11204-076-H041 IS1-11204-076 ISI ...... ..... ...F1.10G(1) 11204-076-H041 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ........PRE .............F-A Vi 11204-078-H003 ISI-11204-078 ISI ...... ..... ...F1.10G(1) 11204-078-H003 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E .............F-A V1 112U4-124-MU12 F1.10G(l) 11204-124-H012 1 1204 II-11 2U4-124 RIGID STRUT ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 23 -37 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 0 Period 2 r, co Period 3 Om0 Summarv No,/ComplD/System Scope / Method / Procedure F-A VI 11204-124-H013 ISI-11204-124 ISI ...... ..... ...F1.10G(1) 11204-124-H013 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-124-H020 ISI-11204-124 ISI ...... ..... ...F1.10G(1) 11204-124-H020 RIGID STRUT AUG -..... ..... ..1 1204 OW N ..... ...... ...PRE --I -....F-A V1 11204-124-H021 ISI-11204-124 ISI ... ....F1.10G(1) 11204-124-H021 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ...... ...PRE ..............F-A V1 11204-125-H013 ISI-11204-125 ISI ...... ..... ...F1.10G(1) 11204-125-H013 RIGID STRUT AUG ..... ..1 1204 OW N ..... ..... ....PR E ..............F-A VI 11204-125-H014 IS1-11204-125 ISI --... ...F1.100(1) 11204-125-H014 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A VI 11204-125-HO15 ISI-11204-125 ISI ... ..........F1.10G(1) 11204-125-HO15 RIGID STRUT AUG ...... ..... ...1 1204 OW N ...... .... ....PR E ..............F-A V1 11204-125-H019 ISi-11204-125 ISI ...... ..... ...F1.10G(1) 11204-125-H019 RIGID STRUT AUG ...... ..... ...1 1204 OWN PRE ....F-A V1 11204-125-H020 1S1-11204-125 ISI -.. ........F1.10G(1) 11204-125-H020 RIGID STRUT AUG ...... ...1 1204 OW N ...... .... ....PRE F-A VI 11204-126-H012 IS1-11204-126 iSI Fl.10G(1) 11204-126-H012 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-126-H013 F1.10G(1) 11204-126-H013 1 1204 IS1-11204-126 RIGID STRUT ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 24 -37 Southern Nuclear Operat ,ing Company..3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Caseit)!2 :> ->M cc it>Summary No./ComoID/System Scone IMethod I Procedure F-A V1 11204-126-HO15 IS1-11204-126 SI -" --F. ,10G(1) 11204-126-H015 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE .............F-A V1 11204-126-H016 ISI-11204-126 ISI ...... .......F1.10G(1) 11204-126-H016 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....P RE ..............F-A V1 11204-126-HO17 IS1-11204-126 ISI ...... ..... ...F1.10G(1) 11204-126-H017 RIGID STRUT AUG ----....1 1204 OW N ..... ..... ....P R E ..............F-A V1 11204-126-H019 ISI-11204-126 ISI ...... ..... ...F1.10G(1) 11204-126-HO19 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... .....P RE ..............F-A V1 11204-127-H013 ISI/VT/ IS1-11204-127 ISI --...---- --- -- --s --Fl.10G(1) 11204-127-H013 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-127-H014 ISI/VT/ ISI-11204-127 ISI ---------

s ----------

F1.10G(1) 11204-127-H014 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-127-H017 ISM-11204-127 is[ ...-...-....F1.10G(1) 11204-127-H017 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A VI 11204-127-H020 ISINT/ ISI-11204-127 ISI----------

s ---------FI.10G(1) 11204-127-H020 RIGID STRUT AUG ...... ..... ...1 1204 OWN -..........PRE -.- ......F-A Vi 11204-127-H021 ISI-11204-127 ISI .......... ...F1.10G(1) 11204-127-H021 RIGID STRUT AUG ----....1 1204 OWN ..... ...... ...PRE ..............F-A V1 l1204-243-HOO1 F1.10G(1) 11204-243-HO10 1 1204 ISI-112024-243 RIGID STRUT 11 AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 25 -37 SbUthern1Nuclear OperatiONg.0Cpany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case>=>=> >> >Summary NoJCompID/System Scope / Method / Procedure F-A V1 11204-244-H005 ISI-11204-244 SI ...... ..... ...F1.10G(1) 11204-244-H005 RIGID STRUT AUG ...... ..... ...1 1204 OW N -..... ..... ....PR E ..............F-A V1 11204-245-HO12 IS1-1 1204-245 ISI ...... ..... ...F1.10G(1) 11204-245-H012 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE O .............F-A Vi 11204-246-H002 ISI-1 1204-246 iSI ...... ..... ...F1.10G(1) 11204-246-H002 RIGID STRUT AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A Vi 11208-001-H026 ISI/VT/ ISI-11208-001 Is[ .-.-- ---- -- ---- -S .Fi.10G(1) 11208-001-H026 RIGID STRUT AUG ...... ..... ...1 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-001-H030 ISI-11208-001 ISI ...... ..... ...F1.10G(1) 11208-001-H030 RIGID STRUT AUG ...... ..... ...1 1208 OW N ..... ..... ....PRE O ..... ..... ...F-A V1 11208-001-HO31 ISI-11208-001 ISI ...... ..... ...F1.10G(1) 11208-001-H031 RIGID STRUT AUG ...... ..... ...1 1208 OW N ..... ..... ....PRE ..............F-A Vi 11208-012-HO10 ISI/vT/ ISI-11208-012

[SI ---------

s ----------

F1.10G(i) 11208-012-H010 RIGID STRUT AUG ...... ..... ...1 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-024-H006 ISI-11208-024 ISI ...... ..... ...F1.10G(i) 11208-024-H006 RIGID STRUT AUG ...... ..... ...1 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-045-HOOI ISI-11208-045 ISI ...... ..... ...F1.10G(i) 11208-045-HOOl RIGID STRUT AUG ...... ..... ...1 1208 OW N ...... .... ....PRE O ... .....F1.10G(1) 11208-045-H003 1 1208 RIGID STRUT AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 26 -37

':, ,.... ' !i! : :!i : l~ t P~i~ :,= .... ....., ...... ..South~rnLNclear Opeeatingopn 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Dese.Code Case In el 0 Summary No./ComplDISystem Scope I Method I Procedure F-A V1 11201-029-H026 ISI-11201-029 iSI ...... ..... ...F1.10H(1) 11201-029-H026 VAR SPRING AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ----....F-A V1 11201-030-H019 IS1-11201-030 ISI ----....F1.10H(1) 11201-030-H019 VAR SPRING AUG ...... ..... ...1 1201 OWN ----....PR E ..............F-A V1 11201-030-H025 ISI/VT/ ISI-11201-030 IS] -...... ..s --Fl.10H(1) 11201-030-H025 VAR SPRING AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-030-H034 ISM-11201-030 ISI ...... ..... ...Fl.10H(1) 11201-030-H034 VAR SPRING AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............F-A V1 11201-030-H047 ISI-11201-030 1SI ...... ..... ...Fl.10H(1) 11201-030-H047 VAR SPRING AUG 1 1201 OWN PRE F-A V1 11201-048-H003 ISI-11201-048 ISI ...... ..... ...F1.10H(1) 11201-048-H003 VAR SPRING AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ----I F-A V1 11201-049-H003 ISI/VT/ ISI-11201-049 ISI .........

s Fl.10H(1) 11201-049-H003 VAR SPRING AUG ... ..........1 1201 OW N ..... ..... ....PRE ..............F-A Vi 11201-049-H004 ISI-11201-049 ISI ...... ..... ...F1.10H(1) 11201-049-H004 VAR SPRING AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............F-A V1 11201-053-H003 ISI-11201-053 ISI .. ..... ..... ...F1.10H(1) 11201-053-H003 VAR SPRING AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V 11204-023-H004 Fi.10H(1) 11204-023-H004 1 1204 ISI/VT/ISI-11204-023 VAR SPRING IS[AUG OWN PRE S 8/4/2009 ScheduleWorks V. 8.1 Page 27 -37 Southern, Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2-r- cc Ur Period 3 Summary No./ComplD/System Scope / Method / Procedure F-A V1 11204-124-H017 ISI-11204-124 ISI ...... ..... ...F1.10H(1) 11204-124-H017 VAR SPRING AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-125-HOll IS1-11204-125 ISI ...... ..... ...F1.10H(1) 11204-125-HOI 1 VAR SPRING AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-126-H018 IS1-11204-126 ISI ...... ..... ...F1.1OH(1) 11204-126-HO18 VAR SPRING AUG ...... ..... ...1 1204 OWN PR E ..............F-A V1 11204-127-HO19 ISINT/ IS1-11204-127 iSi].........

s -. ... ....Fi.10H(1) 11204-127-H019 VAR SPRING AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11208-012-HO13 ISi-11208-012 ISI ...... ..... ...FI.10H(1) 11208-012-H013 VAR SPRING AUG ...... ..... ...1 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-024-HOl I ISI-11208-024 SI ...... ..... ...F1I10H(1) 11208-024-HOll VAR SPRING AUG ...... ..... ...1 1208 OWN PRE ..............F-A V1 11208-045-H006 ISi-11208-045 ISI ...... ..... ...F1.10H(1) 11208-045-H006 VAR SPRING AUG ...... ..... ...1 1208 OW N ..... ........PR E ..............F-A VI 11208-045-H024 IS1-11208-045 ISI Fl.10H(i) 11208-045-H024 VAR SPRING AUG 1 1208 OWN PRE -.- .-.- ....F-A Vi 11208-047-H009 ISI/VT/ ISI-11208-047 ISI s F1,10H(1) 11208-047-1-1009 VAR SPRING AUG ...... ..... ...1 1208 OW N ..... ..... ....PR E ..............F-A Vi1 1120-029-HU21 FI.10S 11201-029-H021 1 1201 IS]/VT/SI-11E201-029 MECH SNUBBER ISI AUG OWN PRE S 8/4/2009 ScheduleWorks V. 8.1 Page 28 -37 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2ýa c m Period 3 2>=>Summary NoJCompID/System Scope I Method I Procedure F-A V1 11201-029-H023 ISI-11201-029 ISI ...... ..... ...FI.10S 11201-029-H023 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... .........P R E ..............F-A V1 11201-029-H024 ISI-11201-029 SI ...... ..... ...FI.10S 11201-029-H024 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-029-H027 IS1-11201-029 ISI ... ......Fi.10S 11201-029-H027 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....P R E ..............F-A V1 11201-030-H018 ISI-11201-030 ISI ...... ..... ...FI.10S 11201-030-H018 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-030-H020 ISI-11201-030 ISI ...... ..... ...FI10S 11201-030-H020 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....P RE ..............F-A V1 11201-030-H026 ISI/VT/ ISI-11201-030 ISI .-.- ....----s ---Fi.10S 11201-030-H026 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE F-A V1 11201-030-H035 ISI/V-F/NMP-ES-024-203 ISI-11201-030 ISI c ..... ..... ...FI.10S 11201-030-H035 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..............PRE ..............F-A V1 11201-030-H042 ISI/VT/NMP-ES-024-203 IS1-11201-030 ISI c ..... ..... ...FI.10S 11201-030-F-042 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E .............F-A V1 11201-030-H046 ISI-11201-030 IS1 ...... .......F1.10S 11201-030-H046 MECH SNUBBER AUG .......... ...1 1201 OW N -.... ..... ...PRE ..............F-A VA 11201-030-H049 FI.10S 11201-030-H049 1 1201 Is--11201-030 MECH SNUBBER ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 29 -37 SVOuthern NucISarNVeratIN gCmpany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 M c Period 2 0: ri io>: ýL >Period 3 Summary NoJCompID/System Scope / Method I Procedure F-A V1 11201-030-HO51 IS1-11201-030 ISi ...... ..... ...F .10S 11201-030-H051 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A Vi 11201-030-HO55 ISI-11201-030 ISI ...... ..... ...FI.10S 11201-030-HO55 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A Vi 11201-030-H601 ISI-11201-030 ISI ...... ..... ...F1.10S 11201-030-1601 ME -CH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....P R E ..............F-A VI 11201-030-11602 IS1-11201-030 SI ...... ..... ...FI.10S 11201-030-11602 MECH SNUBBER AUG ...... ..... ...1 1201 OWN --... ...PR E ..............F-A Vl 11201-031-HOOl ISI-11201-031 SI ...... ..... ...F1.10S 11201-031-HOOl MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............F-A Vi 11201-031-11003 ISI-11201-031 ISI FI.10S 11201-031-11003 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-031-11005 ISI-11201-031 ISI ...... ..... ...FI.10S 11201-031-1005 MECH SNUBBER AUG ...... ..... ...1 1201 OWN -... .... .PRE ..............F-A V1 11201-036-H010 ISI-11201-036 ISI ...... ..... ...Fi.10S 11201-036-HO10 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A Vi 11201-036-H016 ISI-11201-036 SI ... ....FI.1S 11201-036-H016 MECH SNUBBER AUG ... ... ..... ..1 1201 OW N ..... ..... ....PRE ..............F-A Vi 11201-042-H001 F1.10S 11201-042-H001 1 1201 ISI-11201-042 MECH SNUBBER ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 30 -37

Nuc6lear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3: cc cc M~ w Summary NoJComplD/System Scooe / Method / Procedure F-A V1 11201-042-H003 IS1-11201-042 ISI ...... ..... ...F1.10S 11201-042-H003 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-042-H005 ISI-11201-042 ISI ...... ..... ...FI.10S 11201-042-H005 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............F-A V1 11201-046-H002 ISI-11201-046 ISI .......... ...FI.10S 11201-046-H002 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............F-A V1 11201-046-H005 ISIIVT/ SI-11201-046 ISI -. -...-----------

s --FI.10S 11201-046-HOO5 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-046-HOO6 ISI-11201-046

'SI -......FI.10S 11201-046-H006 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE F-A V1 11201-048-HOOl ISI-11201-048 ISI ...... ..... ...FI.10S 11201-048-HOOl MECH SNUBBER AUG ..... -----....1 1201 OW N ..... ..... ....PRE ...............F-A V1 11201-048-H002 ISI-l1201-048 ISI ...... ..... ...FI.10S 11201-048-H002 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............F-A V1 11201-049-HOOl ISI-11201-049 ISI ...... ..... ...Fl.105 1 1201-049-HOOI MECH SNUBBER AUG -..........1 1201 OW N ..... ..... ....P R E ..............F-A V1 11201-049-H002 1SI/VT/ ISI-11201-049 ISI .-. .-.--.-.-- -s .F1.10S 11201-049-H002 MECH SNUBBER AUG ...... ..... ...1201 OW N ..... ...... ...PRE ..............F-A V1 11201-049-1-1005 F.10S 11201-049-H005 1 1201 ISi-11201-049 MECH SNUBBER ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 31 -37 Southern~

Nuclear Operating Company.3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 cc w M0 Period 3 0M 0 Summary NoICompID/System Scope/ Method / Procedure F-A V1 11201-049-H008 ISI-11201-049 ISI ...... ..... ...FI.10S 11201-049-HOOB MECH SNUBBER AUG ...... ..... ...1 1201 OW N .. .............PR E ..............F-A V1 11201-049-HI010 ISINT/ ISI-11201-049 ISi .-.-- ---- ---- -s --s F1.1OS 11201-049-HO10 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....P R E ..............F-A V1 11201-051-HOOl ISI/VT/ IS1-11201-051 ISI- ----------------

s ---7 Fi.1OS 11201-051-HOOl MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-051-H007 ISI-11201-051 ISI ...... ..... ...Fl.10S 11201-051-1-1007 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-051-H008 ISI/VT/ ISI-11201-051 SI- .-.-- -- -- ------ -s ---F1.10S 11201-051--H008 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-053-HO l ISI-1 1201-053 ISI ...... ..... ...FI.10S 11201-053-HO01 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PR E ..............F-A V1 11201-053-HOO5 ISI-11201-053 SI ...... ..... ...Fl. 1 OS 11201-053-H005 MECH SNUBBER AUG ...... ..... ...1 1201 OW N .......... ....PR E ..............F-A V1 11201-053-H-006 SI/VT/ ISI-11201-053 ISI ---- -- ---- ------ s ---Fi.1OS 11201-053-1-1006 MECH SNUBBER AUG ...... ..... ...1 1201 OW N ..... ..... ....PRE ..............F-A V1 11204-021-H013 ISI-11204-021 SI ...... ..... ...FI.10S 11204-021-H013 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-021-H014 Fl.IOS 11204-021-H014 1 1204 SI/VT/N MP-ES-024-203 ISI-11204-021 MECH SNUBBER IS'AUG OWN PRE C --8/4/2009 ScheduleWorks V. 8.1 Page 32 -37 SoGthe-n Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period I t 2, cc cc a Period 2> V Period 3 Summary NoJComllD/Svstem Scope / Method / Procedure F-A V1 11204-021-H021 ISI/VT/NMP-ES-024-203 IS1-11204-021 SI c Fi.1OS 11204-021-HO21 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-021-H022 ISI/VT/NMP-ES-024-203 ISt-1 1204-021 ISI c ..... ..... ...Fi.10S 11204-021-H022 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ...... ...P R E -. -.- .- .-.-.-. .F-A V1 11204-023-HOOl ISI-11204-023 ISI ...... ..... ...Fi.10S 11204-023-HO00 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11204-023-H002 IS1-11204-023 ISI ...... ..... ...Fi.10S 11204-023-H002 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-023-H-O 6 ISI-11204-023 ISI ...... ..... ...F1.10S 11204-023-HOO6 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-023-H007 ISI-11204-023 SI ...... ..... ...Fl.10S 11204-023-H007 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ...... .... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11204-023-H010 ISI-11204-023 SI ...... ..... ...F1.10S 11204-023-HO10 MECH SNUBBER AUG --.. ...1 1204 OW N ..... ..... ....PRE ..............F-A Vi 1'1204-023-H015 ISI-i1204-023 tSt ...... ..... ...F1.10S 11204-023-H015 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-024-H029 ISI-11204-024 iSt ...... ..... ...Fi.10S 11204-024-H029 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-024-H038 FI.10S 11204-024-H038 1 1204 ISI-11204-024 MECH SNUBBER SIi AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 33 -37 Southern Nuclear OperSaing Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Q I Period 2 Period 3 IC N> IC *" Summary No./CompID/System Scope / Method / Procedure F-A V1 11204-025-HOOl ISI-11204-025 ISI ...... ..... ...F1.10S 1 1204-025-HOOl MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-025-H002 ISH 1204-025 IS1 ...... ..... ...F110S 11204-025-H002 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....P R E ..............F-A V1 11204-025-H007 ISi-11204-025 ISI Fl.10S 11204-025-H007 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE F-A V1 11204-025-H012 ISI.,V/ ISi-11204-025 ISI --- -s- .-.-.-. ..Fi.10BS 11204-025-H012 MEC-i SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-034-H002 ISIIVT/ ISI-11204-034 ISI .-.-.-.-.-.-..

.s --F.10S 11204-034-H002 MECH SNUBBER AUG 1 1204 OW N .......... ....P R E ..............F-A V1 11204-042-HO12 IS1-11204-042 ISI ...... ..... ...Fi,10S 11204-042-HO12 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE -...-.-. ...F-A V1 11204-042-HO14 ISM-11204-042 ISI ...... ..... ...Fi.10S 11204-042-H014 MECH SNUBBER AUG ...... ..... ...1 1204 OWN ---... ..... ...PR E ..............F-A V1 11204-042-H016 ISM-1i204-042 ISI -..........FI.10S 11204-042-HO16 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-042-HO18 ISI-11204-042 SI ...... ..... ...FI.10S 11204-042-HO18 MECH SNUBBER AUG ...... ...1 1204 OW N -..........PR E ..............F-A Vi liiU4-U4-HOUI FI.10S 11204-043-H013 1 1204 MECH SNUBBER ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 34 -37 hOueGTr-nF Nuclear, Operalng.

Coma.ny 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class DwgitSO No.Comp. Desc.Code Case Period 1Period 2>> a)Period 3 M 0r Summary No./ComplD/System Scope / Method / Procedure F-A V1 11204-045-H017 ISI-11204-045 SI .......... ...Fi.10S 11204-045-H017 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A VI 11204-124-H014 ISI/VT/ ISI-11204-124 ISI -. .....-- s -. ... ...--Fi.10S 11204-124-H014 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ........PR E ..............F-A V1 11204-124-H018 ISI-1 1204-124 ISl ...... ..... ...F1.10S 11204-124-HO18 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A Vi 11204-124-H022 ISI-11204-124 ISI ...... ..... ...FI.10S 11204-124-H022 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ...... ..... ...PRE ..............F-A V1 11204-125-H017 ISI-11204-125 SI ...... ..... ...Fi.10S 11204-125-H017 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-126-H014 IS1-11204-126 ISI ...... ..... ...F1.10S 11204-126-H014 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A Vi 11204-126-H020 ISI-11204-126 ISI .......... ...F1.10S 11204-126-H020 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-126-H601 ISI-11204-126 ISI ...... ..... ...F,10S 11204-126-1-1601 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-127-HO15 ISI/VT/ IS1-11204-127 SI- ---. ... ...---------

F1.10S 11204-127-H015 MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PRE F-A Vi 11204-243-t1008 Fl.10S 11204-243-HOO8 1 1204 IS1-1 1204-243 MECH SNUBBER ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 35 -37 Southern Nuc¢lea r Operating Cormpan y Vrd Interval VOGTLE-1 1SI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class DwgAISO No.Comp. Desc.Code Case> , IC F- V c Ix c> >Summary No./CompID/System Scope I Method I Procedure F-A V1 11204-246-HOOl ISINT/ ISI-11204-246 ISI ------------------

s Fi.10S 11204-246-HOOI MECH SNUBBER AUG ...... ..... ...1 1204 OW N ..... ..... ....PR E ..............F-A V1 11208-001-H024 IS1-11208-001 Is[ ...... ..... ...FI.10S 11208-001-H024 MECH SNUBBER AUG ... ... ..... ..1 1208 OW N ..... ...... ...PR E -...-.-. ...F-A V1 11208-001-H028 ISI-11208-001 SI -..........FI.10S 11208-001-H028 MECH SNUBBER AUG 1 1208 OW N ..... ..... ....PRE ..............F-A V1 11208-001-H032 ISI/VT/ ISI-11208-001 IS] .-.-- -s ---FI.10S 11208-001-H032 MECH SNUBBER AUG .......... ...1 1208 OWN PR E ..............F-A VI 11208-007-H002 ISI-11208-007 ISI ...... ..... ...Fl.10S 1 1208-007-H002 MECH SNUBBER AUG ...... ..... ...1 1208 OWN PR E ..............F-A V1 11208-009-HOOI ISI-11208-009

'SI ...... ..... ...FI.1OS 11208-009-HOOl MECH SNUBBER AUG ...... ..... ...1 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-009-H002 ISI/VT/ ISI-11208-009 SI- --------------------

s F. 10S 11208-009-H002 MECH SNUBBER AUG ...... ..... ...1 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-012-HOll ISI-11208-012 SI --- -----....F1.10S 11208-012-HOll MECH SNUBBER AUG ...... ..... ...1 1208 OW N ..... ..... ....PRE ..............F-A V1 11208-012-HO12 JSI/VT/ ISI-11208-012 SI------------

s --------F1.10S 11208-012-HO12 MECH SNUBBER AUG ...... ..... .. ..1 1208 OWN PRE ..............F-A VI 11208-0L1-HO14 FI.10S 11208-012-HO14 1 1208 IMH-1 12SUBBE MECH SNUBBER ISI AUG OWN PRE 8/4/2009 ScheduleWorks V. 8.1 Page 36 -37 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category,'Item No., Class Dwg/ISO No.Comp. Desc.Code Case 0D 1- c> >I Summary NoiComplD/System Scope/ Method / Procedure F-A V1 11208-024-H005 ISI-1 1208-024 SI ...... ..... ...FI.10S 11208-024-H005 MECH SNUBBER AUG ...... ..... ...1 1208 OW N ...... .... ....PR E ..............F-A V1 11208-043-HOO6 ISI-11208-043 SI ----....FI.10S 11208-043-H006 MECH SNUBBER AUG ----....1 1208 OW N ..... ..... ....PRE ..............F-A V1 11208-045-H002 ISI-11208-045 ISI FI.10S 11208-045-H002 MECH SNUBBER AUG ...... ..... ...1 1208 OW N ..... ..... ....PRE ..............F-A V1 11208-047-H006 F110S 11208-047-H006 1 1208 ISI/VT/ISI-11208-047 MECH SNUBBER ISI AUG OWN PRE S 8/4/2009 ScheduleWorks V. 8.1 Page 37 -37 Suth6ern N kuc lea r .Operating.Comnpany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Summary No./ComplD/System Dwg/1SO No.Comp. Desc.Code Case> >wo -!2> >>m 0 Scope / Method / Procedure F-A V1 11204-020-1007 ISI-11204-020 ISI ...... ..... ...F1.20A(1) 11204-020-H007 ANCHOR AUG ..... -..... ...2 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-039-H020 ISI-1 1204-039 ISI ...... ..... ...F1.20A(1) 11204-039-H020 ANCHOR AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ..............F-A V 11204-039-H031 IS1-11204-039 SI ...... ..... ...F1.20A(1) 11204-039-HO31 ANCHOR AUG -... .... .2 1204 OWN -.... -..... ...PRE ..............F-A V1 11204-041-HO21 IS1-11204-041 SI ...... ..... ...F1.20A(1) 11204-041-H021 ANCHOR AUG ... ..........2 1204 OW N ..... ..... ....PRE ...... ..... ...F-A VI 11204-041-H027 ISI-11204-041 ISI ...... ..... ...F1.20A(1) 11204-041 -H027 ANCHOR AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-057-H007 ISI/VT/NMP-ES-024-203 ISI-1 1208-057 SI C ..... ..... ...F1.20A(1) 11204-057-H007 ANCHOR AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-201-H009 ISI-11204-201 -SI ...... ..... ...Fi.20A(1) 11204-201-H009 ANCHOR AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ..............F-A V1 11208-003-H067 ISI-1 1208-003 SI ...... ..... ...F1.20A(1) 11208-003-H067 ANCHOR AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............F-A V1 11302-029-H009 IS1-11302-029 1SI ...... ..... ...F1.20A(1) 11302-029-H009 ANCHOR AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE ...... ..... ...(-A V! 11302-030-H001 F1.20A(1) 11302-030-HOOl 2 1302 I31-11302-030 ANCHOR Is[AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 1 -100 Southern Nuclear Oper .ati ng Comp~any 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 0, 0 cc w Summary No./ComplD/System Scope I Method / Procedure F-A V1 11302-030-H002 ISI/VT/ ISI-11302-030 iSI .- .s---- -------- ----Ft .20A(1) 11302-030-H002 ANCHOR AUG ...... ..... ...2 1302 OW N ..... ..... ....P R E ..............F-A VI 11302-030-H006 ISI-11302-030 ISI ...... ..... ...Fl.20A(1) 11302-030-H006 ANCHOR AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11302-030-H008 ISI-11302-030 ISI F1.20A(1) 11302-030-H008 ANCHOR AUG ...... ..... ...2 1302 OW N ..... ...... ...PRE ....F-A V1 11302-031-H005 ISI-11302-031 ISI ... ....F1.20A(1) 11302-031-H005 ANCHOR AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE -.- ......F-A V1 11302-032-H005 ISI-11302-032 SI -..........F1.20A(1) 11302-032-H1-005 ANCHOR AUG ...... ..... ...2 1302 OW N ..... ...... ...PRE ..............F-A V1 11302-032-H006 ISI-11302-032 ISt -... .... .F1.20A(1) 11302-032-H006 ANCHOR AUG ...... ..... ...2 1302 OWN PRE F-A V1 11302-036-HOOl ISI/T/ IS[ .--.--- ----s ---F1.20A(1) 11302-036-HOOl ANCHOR AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE -...-.-. ...F-A V1 11302-087-HOOl IS1-11302-029 ISI ...........Fl.20A(1) 11302-087-HOOl ANCHOR AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE ..............F-A Vi 11301-016-HOOl ISI/VT/ IS1-11301-016 ISI ---------

s ----------

F1.20B(1) 1 1301-016-HOOI CON SPRING AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE M.. ..........F-A V1 11202-188-HOIO F1.20C(1) 11202-188-HO10 2 1202 IN11 RACK2-1-8 LIN RACK 1-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 2 -100 Southern Nuclear O'perating Companhy,:

3rd Interval f:: VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwgoISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 2e ý- m2 mý 0 M CC M >2 M M>Summary No./ComptD/System Scope / Method / Procedure F-A V1 11202-197-1-1003 ISI/VT/NMP-ES-024-203 ISI-11202-197 ISI c F1.20C(1) 11202-197-1-1003 LIN RACK 1-D AUG ...... ..... ...2 1202 OWN ...... ..... ...PRE ----....F-A V 11204-006-H-005 I1-11204-006 ISI ...... ..... ...F1.20C(1) 11204-006-H005 LIN RACK 1-D AUG ...... ..... ...2 1204 OWN ..... ...... ...P R E ..............F-A V1 11204-007-H001 ISIV-T/NMP-ES-024-203 ISI-1 1204-007 IS] c F1.20C(1) 11204-007-HOOl LIN RACK 1-D AUG .......... ...2 1204 OWN PR E ..............F-A V1 11204-007-H002 IS1-11204-007 IS ...... ..... ...Fi.20C(1) 11204-007-1-1002 LIN RACK 1-D AUG ...... ..... ...2 1204 OWN PRE ..............F-A V1 11204-011-H002 I1S-11204-011 ISI ...... ..... ...Fl.20C(1) 11204-011-H002 LIN RACK 1-D AUG 2 1204 OWN ...... ..... ...PRE ..............F-A Vi 11204-011-1003 ISI-11204-011

[SI ..... ..... ....F1.20C(1) 11204-011 -H003 LIN RACK 1-0 AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE -------....F-A Vi 11204-012-HO15 ISi-1 1204-012 ISI -......F1.20C(1) 11204-012-H015 LIN RACK 1-D AUG 2 1204 OW N ..... ..... ....PRE F-A VI 11204-012-H024 IS-11204-012 SI3 -... .... .F1.20C(1) 11204-012-H024 LIN RACK 1-D AUG ...... ..... ...2 1204 OW N ..... ...... ...PRE ..............F-A Vl 11204-012-H025 IS1-11204-012 SI ...... ..... ...F1.20C(1) 11204-012-H025 LIN RACK 1-D AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............F-A Vi 11204-012-HO26 F1.20C(1) 11204-012-H026 2 1204 1I1-11204-012 LIN RACK 1-D IsI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 3 -100 So0utherin' Nuc lea r. Operati ng6"`dm Copany-.3rd Interval'VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 r t2 Period 2 Period 3 Ir cc 0 Summary No./ComplD/Svstem Scope/ Method / Procedure F-A V1 11204-012-H027 ISVVT/ ISt-11204-012 ISI- ------ -------- -- ----F 1 .2 0 C ( 1 ) 1 1 2 0 4 -0 1 2 -H 0 2 7 L I N R A C K 1 -D A U G .............2 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-020-H004 ISI-11204-020 ISI ...... ..... ...F1.20C(1) 11204-020-H0)04 LIN RACK 1-D AUG ...... ..... ...2 1204 OWN ...... ..... ...PRE ..............F-A V1 11204-020-11009 ISI-11204-020 ISI ...... ..... ...F1.20C(1) 11204-020-H0-09 LIN RACK 1-D AUG ...... ..... ...2 1204 OWN ...... ..... ...PRE .-....F-A V1 11204-039-H038 ISI-11204-039 ISI ..... ..... ....F1.20C(1) 11204-039-H038 IUN RACK 1-D AUG ...... ..... ...2 1204 OWN ...... ..... ...PR E ..............F-A V1 11204-123-H002 ISI-11204-123 ISI F1.20C(1) 11204-123-11002 LIN RACK 1-D AUG ...... ..... ...2 1204 OW N ..... ...... ...PR E ..............F-A V1 11204.177-H012 ISI-11204-177 SI ...... ..... ...F 1 .2 0 C (1 ) 1 1 2 0 4 -1 7 7 -H O 1 2 L N R A C K 1 -D A U G ---............2 1204 OWN AC 1- AUG... ..PR E ..............F-A V1 11204-192-H007 IS1-11204-192 iSi ...... ..... ...F 1 .2 0 C ( 1 ) 1 1 2 0 4 -1 9 2 -H 0 0 7 L I N R A C K 1 -D A U G ..............2 1204 OWN ...... ..... ...PRE ..............F-A V1 11205-007-H049 ISI/vT/ ISI-11205-007 ISI ....s .F 1 .2 0 C ( 1 ) 1 1 2 0 5 -0 0 7 -H 0 4 9 L I N R A C K 1 -D A U G ..............2 1 2 0 5 O W N ----....PRE ----F-A V1 11205-007-H053 ISI-11205-007 ISI ...... ..... ...Fl1.20C(1) 11205-007-H053 LIN RACK 1-D AUG ........2 1205 OW N ..... ..... ....PRE ----....F1.20C(1) 11205-007-H055 2 1205 LIN RACK 1-0 ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 4 -100 Southern.-Nuclear Operaiting

`Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period I I>=2 Period 2 2>Period 3 Summary No./CompID/System Scope / Method I Procedure F-A V1 11205-007-H057 IS-i 1205-007 I -1 ...... ..... ...F1.20C(1) 11205-007-H057 LIN RACK 1-D AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A V1 11205-008-H059 ISI-11205-008 1SI ...... ..... ...F1.20C(1) 11205-008-H059 LIN RACK 1-D AUG ...... ..... ...2 1205 OW N ..... ..... ....P RE ..............F-A V1 11205-008-H601 IS1-11205-008 ISI -..... .... ..F1.20C(1) 11205-008-H601 LIN RACK 1-D AUG ...... ..... ...2 1205 OW N ..... ...... ...PRE ..............F-A V1 11208-003-H020 ISI-11208-003 SI ...... ..... ...F1.20C(1) 11208-003-H020 LIN RACK 1-0 AUG 2 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-137-H014 ISI-11208-137 ISI ...... ..... ...F1.20C(1) 11208-137-H014 LIN RACK 1-D AUG ...... ..... ...2 1208 OWN PRE ..............F-A V1 11208-139-HO13 ISI-11208-139 ISI ...... ..... ...F1.20C(1) 11208-139-HO13 LIN RACK 1-D AUG ...... ...2 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-144-H001 ISI-11208-144 ISI -. ..... ..... ...- -F1`120C(1) 11208-144-H001 U(N RACK I1-D AUG -. ..... .......-2 1208 OW N -. ...-. ...- ....- ..PR E ..............--F-A V1 11208-144-H006 IS1-1 1208-144 ISI -. ..... .......-F1.20C(1) 11208-144-H006 LIN RACK 1-D AUG -. ......... ...-2 1208 OW N -. -.- -. -. .-.-. .-. ..PR E -. -.- .- .-.-.-. .F-A V1 11208-145-H001 IS1-1 1208-145 ISI -. ..... ..... ...-F1.20C(1) 11208-145-H00l LIN RACK 1-D AUG -. ..... ..... ...- -2 1208 -OW N -. -.- -. -. .-.-. .-. ..PR E I .- .- I. -. .-.- ..-. ..F-A V1 11208-411-H016 F1.20C(1) 11208-411-HO16 2 1208 ISINT/IS1-11208-411 LIN RACK 1-D ISI AUG OWN PRE S 8/31/2009 ScheduleWorks V. 8.1 Page 5 -100 VSouthern NuclaNr Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case> >.a C Summary NoJComplD/System Scope/ Method / Procedure F-A V1 11208-411-H018 ISI-11208-411 ISI ...... ..... ...F1.20C(1) 11208-411-H018 LIN RACK 1-D AUG -------2 1208 OW N ...... .... ....PRE ....F-A V1 11208-411-H024 IS-1i 1208-411 ISf ...... ..... ...F1.20C(1) 11208-411-H024 LIN RACK 1-D AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE ..............F-A V1 11208-411-H025 ISI-11208-411 ISI ...... ..... ...F1.20C(1) 11208-411-H025 LIN RACK 1-D AUG ...... ..... ...2 1208 OW N ..... ...... ...PRE ..............F-A V1 11208-411-H027 1S1-11208-411 ISI ...... ..... ...F1.20C(1) 11208-411-H027 LIN RACK 1-D AUG ...... ..... ...2 1208 OWN -----....PRE ..............F-A V1 11208-411-H028 ISI-11208-411 ISI ...... ..... ...F1.20C(1) 11208-41 1-H028 LIN RACK 1-D AUG ...... ..... ...2 1208 OW N ...... .... ....PRE F-A Vi 11208-411-H029 ISI-11208-411 ISI ...... ..... ...F1.20C(1) 11208-411-H029 LIN RACK 1-D AUG -..........2 1208 OW N ...... .... ....PRE F-A V1 11208-411-H030 ISI-11208-411 SI ...... ..... ...F1 .20C(1) 11208-411-H030 LIN RACK 1-D AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE ..............F-A V1 11208-411-H032 ISIVTI ISI-11208-411 ISi ....-----F1.20C(1) 11208-411-H032 LIN RACK 1-D AUG ...... ..... ...2 1208 OW N ..... ...... ...PR E ..............F-A V1 11208-411-H033 ISI-11208-411 ISI ...... ..... ...F1.20C(1) 11208-411-H033 LIN RACK 1-0 AUG ...... ..... ...2 1208 OW N ..... ...... ...PRE ..............F1.20D(1) 11202-001-H014 2 1202 LIN RACK 2-D AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 6 -100 South"e"rn' N'uclear Operactin'Ig"" Cm~panýy.3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 2.Period 2 x M cc>2.!>-Period 3 0l 0 N2 Summary No./ComplD/System Scope / Method I Procedure F-A Vi 11202-001-H019 ISI-11202-001 ISI ...... ..... ...F1.20D(i) 11202-001-H019 LIN RACK 2-D AUG .......... ...2 1202 OWN ----....PR E ..............F-A Vi 11202-001-H020 ISI-11202-001 ISI ...... ..... ...F1.200(i) 11202-001-H020 LIN RACK 2-D AUG -----....2 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-001-HO21 ISI/VT-/NMP-ES-024-203 ISI-11202-001 ISI c ..... ..... ...F1.20D(i) 11202-001-H021 LIN RACK 2-D AUG ...... ..... ...2 1202 OW N ..... ...... ...PR E ..............F-A Vi 11202-001-H022 IS1-11202-001 ISI ...... ..... ...Fl.20D(1) 11202-001-H022 LIN RACK 2-D AUG ...... ..... ...2 1202 OW N ..... ..... ....P R E ..............F-A Vi 11204-006-H004 ISI-11204-006 ISI ...... ..... ...Fl.20D(1) 11204-006-H004 LIN RACK 2-D AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............F-A Vi 11204-006-H006 ISIIVT/NMP-ES-024-203 ISI-11204-006 iSI c ..... ..... ...F1.20D(1) 11204-006-1-1006 LIN RACK 2-D AUG ...... ..... ...2 1204 OW N ..... ...... ...PR E ..............F-A Vi 11204-006-H007 IS1-11204-006 SI ...... ..... ...F1.201(1) 11204-006-H007 LIN RACK 2-D AUG ...... ..... ...2 1204 OW N ..... ...... ...PRE ..............F-A Vl 11204-006-H036 ISI-11204-006 ISI ...... ..... ...Fl.20D(1) 11204-006-H036 LIN RACK 2-D AUG ...... ..... ... .2 1204 OWN .......... ...PRE ..............F-A V 11204-007-H004 ISI-1 1204-007 SI ...... ..... ...Fl.20D(1) 11204-007-H004 LIN RACK 2-D AUG ...... ..... ...2 1204 OW N ..... ...... ...P RE ..............F-A VI 11204-011-HOOl F1.20D(1) 11204-011-H001 2 1204 IS1-1 1204-011 LIN RACK 2-D ISI AUG OWN PRE B/31/2009 ScheduleWorks V. 8.1 Page 7 -100 Southern Nuclear Op erating, Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case t)0 r- ý2 r it c> >Summary No./ComplD/System Scope I Method / Procedure F-A VI 11204-011-H004 IS1-11204-011 ISI ...... ...F1.20D(1) 11204-011 -H004 LIN RACK 2-D AUG ...... ..... ...2 1204 OW N ...... .... ....PRE .........F-A V1 11204-011-HOO5 IS1-11204-011 ISI ...... .......F1.20D(1) 11204-011 -H005 LIN RACK 2-D AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-012-H020 IS1-11204-012 iSI -..........F1.20D(1) 11204-012-H020 LIN RACK 2-D AUG ...... ..... ...2 1204 OW N ..... ..... ....P R E ..............F-A V1 11204-012-H022 ISM-11204-012 ISI ...... ..... ...F1.20D(1) 11204-012-H022 LIN RACK 2-D AUG ...... ..... ...2 1204 OWN P R E ..............F-A V1 11204-012-H023 ISI-11204-012 SI- .--- -- ----- ---- -----F1.201(1) 11204-012-H023 LIN RACK 2-D AUG -- -- ----- -- ---- -----2 1204 OWN -----------------


PR E ..............F-A V1 11204-039-H036 ISI-11204-039 SI ...... ..... ...F1.20D(1) 11204-039-H036 LIN RACK 2-D AUG ...... ...2 1204 OW N ..... ..... ....PRE .. ............F-A V1 11204-039-H037 ISI-1 1204-039 IV ...... ..... ...F1.20D(1) 11204-039-H037 LIN RACK 2-D AUG ...... ..... ...2 1204 OWN PRE F-A V1 11204-041-H040 ISIVT/ ISI-11204-041 SI -.-.-. -- .-- ---s Fl20D(1) 11204-041-H040 LIN RACK 2-D AUG ...... ..... ...2 1204 OW N ..... ...... ...PRE ..............F-A V1 11204-057-H003 ISI-11204-057 ISI ...... ..... ...F1.201(1) 11204-057-H003 LIN RACK 2-D AUG ...... ..... ...2 1204 OW N ..... ...... ...PRE ..............F-A Vi 11204-057-H024 F1.20D(1) 11204-057-H024 2 1204 ISI/VTI/NMP-'ES-024-203 IN!-! RAK4-057 LIN RACK 2-D ISi AUG OWN PRE C 8/31/2009 ScheduleWorks V. 8.1 Page 8 -100 Southern Nuclear Operating ,Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwgfISO No.Comp. Desc.Code Case Period 1 Period 2 cc t- It Period 3 IC Summary NoJCompID/System Scope / Method / Procedure F-A V1 11204-063-HOOl ISI-11204-063 SI ...... ..... ...F1 20D(1) 11204-063-HOOl LIN RACK 2-D AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-063-H002 ISI-11204-063 ISt -..........F1.201(I) 11204-063-H002 LIN RACK 2-D AUG -..........2 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-063-1-1003 ISI-11204-063 SI ...... ..... ...F1.20D(1) 11204-063-H003 LIN RACK 2-D AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-063-H004 IS1-11204-063 SI ...... ..... ...F1.200(1) 11204-063-H004 LIN RACK 2-D AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-063-H012 IS1-11204-063 ISI ...... ..... ...F1.20D(l) 11204-063-H012 LIN RACK 2-D AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............F-A Vi 11204-177-HOll IS1-11204-177 SI ...... ..... ...F1.200(1) 11204-177-HOl 1 LIN RACK 2-D AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE -.- ......F-A V1 11205-007-H038 ISI-11205-007 ISI ...... ..... ...F1.20D(1) 11205-007-H038 LIN RACK 2-D AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A V1 11205-007-H042 ISI/VT/ IS1-11205-007 ISI ----s F1.20D(1) 11205-007-H042 LIN RACK 2-D AUG ...... ..... ...2 1205 OW N ..... ...... ...PRE ...... ..... ...F-A V1 11205-007-H043 ISI-11205-007 SI ...... ..... ...Fl1.200(1) 11205-007-H043 LIN RACK 2-D AUG ...... ..... ...2 1205 OW N ..... ..... ....P R E ..............F-A V1 11205-0U7-H052 F1.20D(1) 11205-007-H052 2 1205 1I- 12U5-007 LIN RACK 2-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 9 -100 S Outhern Nu clear Operat ti ri gCompany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Iu Period 2 Period 3 (N .0 !(4 0-' it -I -ýSummary NoJComPIDlSvstem Scope / Method / Procedure F-A Vi 11205-007-H054 IS1-11205-007 ISI -.. ........F1.20D(1) 11205-007-H054 LIN RACK 2-D AUG .. ..... ..... ...2 1205 OW N ..... ..... ....PRE ..............F-A V1 11205-007-H056 ISI-11205-007 IsI ...... ..... ...F1.201(1i) 11205-007-H056 LIN RACK 2-D AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............F-A V1 11205-007-H058 ISI-11205-007 ISI -...... ...F1.20D(1) 11205-007-H058 LIN RACK 2-D AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A V1 11205-007-HO59 ISI-11205-007 ISI ...... ..... ...Fl.200(1) 11205-007-H059 LIN RACK 2-D AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............F-A V1 11205-007-HO60 ISI/VT/NMP-ES-024-203 ISI-11205-007 I ISI c ..... ..... ...F1.20D(1) 11205-007-H060 LIN RACK 2-D AUG ...... ..... ...2 1205 OWN ..... ..... ....PR E ..............F-A Vi 11205-008-1-1028 ISI-1 1205-008 ISI ...... ..... ...F1.20D(1) 11205-008-H028 LIN RACK 2-D AUG ...... ..... ...2 1205 OW N ...... .... ....PR E ..............F-A V1 11205-008-H029 ISI-11205-008 ISI ...... ..... ...F1.20D(1) 11205-008-H029 LIN RACK 2-D AUG ...... ..... ...2 1205 OWN ...... ..... ...P R E -. -.- -.-. .-.- ..-. ..F-A V1 11205-008-HO31 ISI-11205-008 ISI ...... ..... ...F1.201(1) 11205-008-H031 LIN RACK 2-D AUG ...... ..... ...2 1205 OW N ...... ..... ...PRE ..............F-A V 11205-008-H032 ISI- 1205-008 ISI -......F1.20D(1) 11205-008-H032 LIN RACK 2-D AUG ...... ..... ...2 1205 OWN ..... ..... ....PR E ..............F-A Vi 11205-010-HO12 F1.20D(1) 11205-010-HO12 2 1205 ISI-11205-010 LIN RACK 2-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 10 -100 Southern u clear Operating!

Co mpany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Summary No.lComplDlSystem Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 cc i Period 3 cc Scope / Method / Procedure F-A V1 11208-003-H021 IS1-11208-003 SI ...... ..... ...F1200(1) 11208-003-H021 LIN RACK 2-D AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE ...........- ' ---F-A V1 11208-137-H006 ISI-11208-137 ISI ...... ..... ...F1.200(i) 11208-137-H-006 LIN RACK 2-0 AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-137-H012 ISI-11208-137 ISI ...... ..... ...F1.200(1) 11208-137-H012 LIN RACK 2-D AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-139-HO10 ISI-11208-139 ISI ...... ..... ...F1.20D(1) 11208-139-HOIO LIN RACK 2-D AUG ----....2 1208 OW N ..... ..... ....PRE -......F-A V1 11208-139-HOll IS1-11208-139 SI ...... ..... ...F1.20D(1) 11 208-139-HOl 1 LIN RACK 2-D AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE ..............F-A V1 11208-139-H014

[SH- 1208-139 SI ...... ..... ...F1.20D(1) 11208-139-H014 LIN RACK 2-D AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-141-H002 ISINT/NMP-ES-024-203 ISI-11208-141 ISI c ..... ..... ...F1.200(1) 11208-141-H002 LIN RACK 2-D AUG ...... ..... ...2 1208 OW N ---"-... ..... ....PR E ..............F-A V1 11208-141-H004 ISI-11208-141 IS ...... ..... ...F1.20D(1) 11208-141-H004 LIN RACK 2-D AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-141-H005 ISI-11208-141 ISI ...... ..... ...F1.20D(1) 11208-141-H005 LIN RACK 2-D AUG ...... ..... ...2 1208 OWN -.. ....PRE I-A V1 112U0-144-1UU2 F1.20D(1) 11208-144-H002 2 12082US-144 LIN RACK 2-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 11 -100 Southern Nuclear Operating' Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case a)> >E) M Summary NoJCompID/System Scope/ Method / Procedure F-A V1 11208-144-H004 ISI/VN / ISHl1208-144 SI[----------

s -. ... ...F1.20D(1) 11208-144-1-1004 LIN RACK 2-D AUG ----....2 1208 OWN ...... ..... ...PR E ..............F-A V1 11208-144-HOl ISI-1 1208-144 ISI ...... ..... ...F1.20D(1) 11208-144-HOl 1 LIN RACK 2-D AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE ---...........F-A V1 11208-145-H002 ISI-11208-145 ISI ...... ..... ...FA.20D(1) 11208-145-H002 LIN RACK 2-D AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-145-H003 ISI-11208-145 ISI .......... ...F1.201(1) 11208-145-H003 LIN RACK 2-D AUG .......... ...2 1208 OW N ..... ..... ....PRE .............F-A Vi 11208-145-H004 ISI-11208-145 SI[ .-.--- -- -. -- -----. --F1.200(1) 11208-145-H004 LIN RACK 2-D AUG ...... ...2 1208 OW N ...... ..... ...P RE ..............F-A V1 11208-411-HO17 ISI/VT/NMP-ES-024-203 ISI-11208-411 SI c ..... ..... ...F1.20D(1) 11208-411-H017 LIN RACK 2-D AUG ...... ..... ...2 1208 OWN ...... ..... ...PR E ...............F-A V1 11208-411-H019 ISI-1 1208-411 iSI ...... ..... ...F1.20D(1) 11208-411-HO19 LIN RACK 2-D AUG ...... ..... ...2 1208 OW N ..... ...... ...PR E ..............F-A V1 11208-411-H022 ISI-11208-411 SI ...... ..... ...F1.20D(i) 11208-411 -H022 LIN RACK 2-D AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE -.- ......F-A Vi 11208-411-H026 IS1-11208-411 ISI ...... ..... ...F1.20D(1) 11208-41 1-H026 LIN RACK 2-D AUG ... .... ..2 1208 OW N ..... ..... ....PR E ..............--A V1 11204-006-HOBU F1.20E(1) 11204-006-1-1008 2 1204 LIS RACK 34-00 LIN RACK 3-D Is1 AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 12 -100 Southiern Nuclear Operating.

Company.3rd interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ASO No.Comp. Desc.Code Case u>w0 N 10 a:F a. 0 Summary No.lCompID/System Scope/ Method I Procedure F-A V1 11204-006-H038 ISI-11204-006 ISI ...... ..... .. ..Fi.20E(1) 11204-006-H038 LIN RACK 3-D AUG ...... ..... ...2 1204 OWN ..... ........PRE ..............F-A V1 11204-007-H003 ISIIVT/NMP-ES-024-203 ISI-11204-007 ISI c ..... ..... ...Fl.20E(1) 11204-007-H003 LIN RACK 3-D AUG -.... .... ..2 1204 OW N ...... ..... ...PR E ..............F-A V1 11204-008-H009 ISI-11204-008 SI ...... ..... ...F1.20E(1) 11204-008-H009 LIN RACK 3-D AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-012-H016 ISI-11204.012 SI ...... ..... ...F1.20E(1) 11204-012-H016 LIN RACK 3-D AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ----....F-A V1 11204-012-H019 IS1-11204-012 SI ...... ..... ...F1.20E(1) 11 204-012-H019 LIN RACK 3-D AUG ...... ..... ...2 1204 OWN -----....PR E ..............F-A V1 11205-008-H030 ISI-11205-008 ISI ...... ..... ...F1.20E(1) 11205-008-H030 LIN RACK 3-D AUG ...... ..... ...2 1205 OW N ..... ...... ...PRE ----....F-A V1 11205-008-H043 ISI-11205-008 SI ...... ..... ...F1.20E(1) 11205-008-H043 LIN RACK 3-D AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A V1 11208-003-HO19 ISI-11208-003 SI ...... ..... ...F1.20E(1) 11208-003-HO19 LIN RACK 3-D AUG -..........2 1208 OW N ..... ..... ....PRE ..............F-A V1 11208-099-1-1009 ISIVTINMP-ES-024-203 ISI-11208-099 SI c ..... ..... ...F1.20E(1) 11208-099-H009 LIN RACK 3-0 AUG ...... ..... ...2 1208 OWN -..........PRE ...... ..... ...F'A V1 l11U2-1U1-1UU8 F1.20E(1) 11208-101-1-1008 2 1208 INS-1 12RA-1 3-LIN RACK 3-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 13 -100 Southern Nuclear Operating Cbom-pany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 LO r, co 3> >0)Period 3 cc Summary NoJCompID/Svstem Scope / Method / Procedure F-A Vii 1208-137-H-008 iIS-11208-137 ISI F1.20E(1) 11208-137-HOOB LIN RACK 3-D AUG 2 1208 OW N ..... ...... ...PRE F-A V1 11208-139-1-1006 SI/VT/ ISI- 1208-139 ISI----------

s ----------

F1.20E(1) 11208-139-H006 LIN RACK 3-D AUG 2 1208 OWN ...... ..... ...PRE ..............F-A V1 11208-139-H015 IS1-11208-139 ISI ...... ..... ...F1.20E(1) 11208-139-H015 LIN RACK 3-D AUG ...... ..... ...2 1208 OWN PRE F-A V1 11208-411-HO15 ISI-11208-411 ISI --F1.20E(1) 11208-411-H015 LIN RACK 3-D AUG ...... ..... ...2 1208 OWN PRE -......F-A V1 11208-411-H031 ISI-11208-411 ISI -......F1.20E(1) 11208-411-H031 LIN RACK 3-D AUG ...... ..... ...2 1208 OWN ...... ..... ...PR E ..............F-A V1 11202-001-H004 ISIVT/NMP-ES-024-203 ISI-11202-001 ISI C ..... ..... ...F1.20F(1) 11202-001-H004 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN PRE -............F-A V1 11202-001-HOO5 ISI-11202-001 ISI -......Fl.20F(1) 11202-001--H005 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE -......F-A Vi 11202-001-H006 ISI/VT/NMP-ES-024-203 ISI-11202-001 ISI c ..... ..... ...F1.20F(1) 11202-001-H006 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...PRE F-A V1 11202-001-H008 ISINVT/NMP-ES-024-203 ISi-1 1202-001 ISI c ..... ..... ...F1.20F(1) 11202-001-HOOB LIN RESTRAINT AUG 2 1202 OW N ..... ..... ....PR E ..............F-A Vi 11202-001-H009 F1.20F(1) 11202-001--H009 2 1202 ISI-1 1202-001 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 14 -100 Southfer'n Nucl.ear O1perating Co~mpany.3rd Intervaýl VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 FC n Period 2-cD Period 3 Ix Summary No/CompID/System Scope I Method / Procedure F-A V1 11202-001-H011 ISI-11202-001 ISI ...... ..... ...F 1 .2 0 F ( 1 ) 1 1 2 0 2 -0 0 1 -H 1 0 1 1 L I N R E S T R A I N T A U G ..............2 1202 OWN ...... ..... ...PRE ...... ..... ...F -A V 1 1 12 02 -0 0 1-H 0 12 IS I/V T /N M P -E S -02 4 -20 3 IS1 -1 12 0 2 -0 0 1 IS I c .............F 1 .2 0 F ( 1 ) 1 1 2 0 2 -0 0 1 -H 0 1 2 L I N R E S T R A I N T A U G ..............2 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-001-H013 ISI-11202-001 ISI F 1 .2 0 F ( 1 ) 1 1 2 0 2 -0 0 1 -H 0 1 3 L I N R E S T R A I N T A U G ..............2 1202 OWN ...... ..... ...PRE ...... ..... ...F-A V1 11202-001-HO15 IS1-11202-001 ISI ...... ..... ...F 1 .2 0 F ( 1 ) 1 1 2 0 2 -0 0 1 -H O 1 5 L I N R E S T R A I N T A U G ..............2 1202 OWN ...... ..... ...PRE -.- ......F-A V1 11202-001-H017 ISI-11202-001 ISI ...... ..... ...F 1 .2 0 F ( 1 ) 1 1 2 0 2 -0 0 1 -H 0 1 7 L IN R E S T R A I N T A U G ..............2 1202 OWN ...... ..... ...PRE ...... ..... ...F-A V 1 1 12 0 2 -0 0 1-H 0 2 4 IS I/V T /N M P -E S -02 4 -20 3 IS I-1 12 02 -0 0 1 IS I C .............F 1 .2 0 F ( 1 ) 1 1 2 0 2 -0 0 1 -H 0 2 4 L I N R E S T R A I N T A U G ..............2 1202 OWN ...... ..... ...PRE F -A V 1 11202-00 1-H 02 5 )S IV T )N M P -E S -024-203 IS I-11202-00 1 IS I C .............F 1 .2 0 F ( 1 ) 1 1 2 0 2 -0 0 1 -H 0 2 5 L I N R E S T R A IN T A U G ..............2 1202 OWN ...... ..... ...PRE ...... ..... ...F-A V1 11202-140-1003 IS1-11202-140 SI ...... ..... ...F 1 .2 0 F ( 1 ) 1 1 2 0 2 -1 4 0 1 0 0 3 L I N R E S T R A IN T A U G ..............2 1202 OWN ...... ..... ...PRE ...... ..... ...F-A V1 11202-140-H004 ISI-11202-140 ISI ...... ..... ...F 1 .2 0 F ( 1 ) 1 1 2 0 2 -1 4 0 -H 0 0 4 L I N R E S T R A I N T A U G ..............2 1202 OWN ...... ..... ...PRE ...... ..... ...F-A V1 11202-140-11005 F1 .20F(1) 11202-140-H005 2 1202 1i11V l/INS-11202-140 LIN RESTRAINT ISI AUG OWN PRE S 8/31/2009 ScheduleWorks V. 8.1 Page 15 -100

" ... ... ... .: " : "3d i t ~ a !' ..... ' .: : .' .. .... "ýlI :4~Southern Nuclear OpVeRatingCompany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/lSO No.Comp. Desc.Code Case Period 1 r 2 Period 2 (D o: ý2 o Cc. 0 Period 3 Summary No./CompID/System Scope / Method / Procedure F-A V1 11202-140-H006 ISI/VTI IS1-11202-140 IS- ------ -------- -- ----F1.20F(1) 11202-140-H0O6 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...PR E ..............F-A V 1 11202-140-HOO 7 IS I(VT / 1 S1-11202-140 IS I ..-....-.- ---.S -F 1 .2 0 F ( 1 ) 1 1 2 0 2 -1 4 0 -H O O 7 L IN R E S T R A IN T A U G ..............2 1202 OW N ...... .... ....PR E ..............F-A V1 11202-140-H008 ISI-11202-140 ISI ...... ..... ...F 1 .2 0 F ( 1 ) 1 1 2 0 2 -1 4 0 -H 0 0 8 L I N R E S T R A IN T A U G ..............2 1202 OW N ..... ..... ....P R E ..............F-A V1 11202-141-H003 IS1-11202-141 ISI ...... ..... ...F1.20F(1) 11202-141-HOO3 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...PRE ..............F-A Vi 11202-141-H004 ISI-11202-141 ISI ...... ..... ...F1.20F(1) 11202-141-H004 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... .... ....PRE ..............F-A V1 11202-141-HOO5 ISIVT/ ISI-11202-141 ISI .......--------

s ---F1.20F(1) 11202-141-HOO5 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... .... ....P R E ..............F-A V1 11202-141-H006 ISI/VT/ ISI-11202-141 ISI ..-. ...-.- ---. s ...F1.20F(1) 11202-141-HOO6 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...PRE F-A V1 11202-141-H007 1SI/VT/ IS1-11202-141 ISI ....----- ---s F1.20F(1) 11202-141-H007 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... .... ....PR E ..............F-A V1 11202-141-H008 ISI/VT/ ISI-1 1202-141 IS] .....---------

s -F1.20F(l) 11202-141-H008 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....P R E ..............F-A V1 11202-141-H009 Fl.20F(1) 11202-141-H009 2 1202 SI1-11202-141 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 16 -100 Southern Nuclear Operating Company VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwgJISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 0) P- c 0o0 Summary NoJComplD/System Scope/ Method / Procedure F-A V1 11202-141-HO10 ISI-11202-141 ISI ...... ..... ..Fi.20F(1) 11202-141-HO10 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-188-H005 ISI-11202-188 ISI F1.20F(1) 11202-188-H005 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN PRE F-A V1 11202-188-H006 ISI-11202-188 ISI ...... ..... ...Fi.20F(1) 11202-188-H006 LIN RESTRAINT AUG .. ..... ..... ...2 1202 OWN ...... .......PRE -------....F-A V1 11202-188-H008

[S1-11202-188 ISI ...... ..... ...F1.20F(1) 11202-188-H008 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... .... ....PRE F-A V1 11202-188-HOl ISI-11202-188 ISI ...... ..... ...F1.20F(1) 11202-188-HOI 1 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A Vi 11202-188-H013 ISI-11202-188 ISI ...... ..... ...F1.20F(1) 11202-188-H013 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A Vi 11202-188-HO16 ISI-11202-188 ISI ...... ..... ...F1.20F(1) 11202-188-HO16 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN PRE ..............F-A V1 11202-188-H017 ISI-11202-188 ISI ...... ..... ...F1.20F(1) 11202-188-H017 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...PRE -.- ......F-A V1 11202-188-H018 ISI-11202-188 ISI ...... ..... ...F1.20F(1) 11202-188-H018 LIN RESTRAINT AUG 2 1202 OW N ...... .... ....PRE F-A Vi 11202-i89-H-002 Fi.20F(1) 11202-189-1-1002 2 1202 INRS-R1202-189 LIN RESTRAINT[SI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 17 -100 Southern Nuclear Oper~atingf Company.3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwgfISO No.Comp. Desc.Code Case Period 1> >Period 2 0e N-> : Period 3 Summary No./ComplD/System Scope / Method / Procedure F-A Vi 11202-189-H003 IS1-11202-189 ISt ...... ..... ...F1.20F(1) 11202-189-H003 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A Vi 11202-189-1-1004 ISI-11202-189 ISI ...... ..... ...F1.20F(1) 11202-189-H004 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... .... ....PRE -......F-A V1 11202-189-H005 ISI-11202-189 ISI ...Fl.20F(1) 11202-189-1-1005 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...PR E ..............F-A V1 11202-192-HOOl ISI-11202-192 ISI ...... ..... ...Fl.20F(1) 11202-192-HOOl LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...P R E ---- -. ..........F-A V1 11202-192-H002 ISI-11202-192 ISI ...... ..... ...Fl.20F(1) 11202-192-H002 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... ..... ...PRE -......F-A V1 11202-192-H003 IS1-11202-192 ISI ...... ..... ...F1.20F(1) 11202-192-H003 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A Vl 11202-192-H004 ISI-11202-192 SI ...... ..... ...F1.20F(1) 11202-192-H004 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ..............F-A Vi 11202-192-1005 IS1-11202-192 ISI -... .... .F1.20F(1) 11202-192-H005 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN ...... ..... ...PRE O .............F-A V1 11202-A92-H006 IS-11202-192 SI ...... ..... ...Fi.20F(i) 11202-192-H006 LIN RESTRAINT AUG -..........2 1202 OW N ...... ..... ...PRE O .............F-A V1 11202-192-H010 F1.20F(1) 11202-192-HO10 2 1202 IS1-11202-192 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 18 -100 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ASO No.Comp. Desc.Code Case Period 1 Period 2 cc cc 'Period 3'00w Summary No./Compi)[System Scope / Method I Procedure F-A V1 11202-192-HOll IS1-11202-192 ISI ...... ..... ...F1.20F(1) 11202-192-HOI1 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... .... ....PRE .............F-A V1 11202-192-H012 IS1-11202-192 ISI -----........F1.20F(1) 11202-192-H012 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....P R E ..............F-A Vi 11202-192-H013 ISI-11202-192 SI ...... ..."-F1.20F(1) 11202-192-H013 LIN RESTRAINT AUG ...... ...2 1202 OW N ..... ..... ....PR E ..............F-A Vi 11202-196-H002 ISI/VF/ IS1-11202-196 ISI ----s -----F1.20F(1) 11202-196-H002 LIN RESTRAINT AUG -- ---- -- ----- ------ ---2 1202 OW N ..... ..... ....PRE ... ....F-A Vi 11202-196-H005 ISI/VT/NMP-ES-024-203 ISI-11202-196 ISI c ..... ..... ...F-1.20F(1) 11202-196-1-1005 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-196-H007 ISI/VT/NMP-ES-024-203 ISI-11202-196 ISI c ..... ..... ...F1.20F(1) 11202-196-H007 LIN RESTRAINT AUG .......... ...2 1202 OWN --...... ...PRE -......F-A V1 11202-196-HOI ISIMNTINMP-ES-024-203 iSl-11202-196 ISI c ..... ..... ...F1.20F(1) 11202-196-HO10 LIN RESTRAINT AUG ....2 1202 OW N ..... ..... ....PR E ..............F-A Vi 11202-196-Hl011 ISI-11202-196 ISI ...... ..... ...F1.20F(1) 11202-196-HOl1 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N .......... ...P RE ..............F-A V1 11202-196-H012 ISI/VT/NMP-ES-024-203 ISI-11202-196 ISI c ..... ..... ...F1.20F(1) 11202-196-H012 LIN RESTRAINT AUG .......... ...2 1202 OW N ..... ..... ....PRE ..............F-A Vi 11202-i96-H013 F1.20F(1) 11202-196-H013 2 1202 SI1-11202-196 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 19 -100 Sout'hern Nuclear~ Operatingq Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class DwgIISO No.Comp. Desc.Code Case wO N w:>Summary No./CompID/System Scope / Method / Procedure F-A V1 11202-196-H014 ISIArT/NMP-ES-024-203 ISI-11202-196

[SI G --------F1.20F(1) 11202-196-H014 LIN RESTRAINT AUG 2 1202 OW N ..... ...... ...PR E ..............F-A Vi 11202-196-H015 ISI-11202-196 ISI ...... ..... ...F1.20F(1) 11202-196-H015 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-196-H016 ISI/VT/NMP-ES-024-203 ISI-11202-196 ISI c ..... ..... ...F1.20F(i) 11202-196-HO16 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN -..........PRE .............F-A V1 11202-196-H019 ISI-11202-196 ISI FI.20F(I) 11202-196-H019 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-196-H020 ISI/V'/NMP-ES-024-203 ISI-11202-196 ISI c ..... ..... ...F1.20F(1) 11202-196-H020 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN ...... ..... ...PRE ..............F-A Vi 11202-196-H021 IS1-11202-196 ISI ...... .......F1.20F(1) 11202-196-H021 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...P R E ..............F-A V1 11202-196-H022 ISI-11202-196 SI ...... ..... ...F1.20F(1) 11202-196-H022 LIN RESTRAINT AUG -..... ..... ...2 1202 OW N ..... ..... ....P R E ..............F-A V1 11202-196-H023 IS1-11202-196 ISI ...... ..... ...F1.20F(1) 11202-196-H023 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-196-H024 ISI-11202-196 ISI ...... ..... ...F1.20F(1) 11202-196-H024 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-196-H02b F1.20F(1) 11202-196-H025 2 1202 1I1-11202-196 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 20 -100 SVOthern-NucIear OperatiNg Cm 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 a Period 2co> >oh Period 3 Summary No./CompID/System Scope / Method / Procedure F-A V1 11202-196-1602 ISI/VT/NMP-ES-024-203 ISI-11202-196 SI c ...... ...F1.20F(1) 11202-196-11602 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN --....PR E ...-...-...-'F-A V1 11202-196-11604 ISI-11202-196 ISI ...... ..... ...F1.20F(1) 11202-196-H604 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE I F-A V1 11202-196-H609 ISI-11202-196 ISI F1.20F(1) 11202-196-11609 LIN RESTRAINT AUG -.. ... ... ..2 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-197-H001 ISIVT/NMP-ES-024-203 ISI-11202-197 SI ' -.... ..... ...F1.20F(1) 11202-197-H001 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN PRE ..............F-A V1 11202-197-11002 ISI/VT/NMP-ES-024-203 IS1-11202-197 ISI -..... ..... ...F1.20F(1) 11202-197-H002 LIN RESTRAINT AUG 2 1202 OWN ...... ..... ...PRE ..............

F-A V1 11202-197-H004 ISI/VT/NMP-ES-024-203 IS1-11202-197 is] -..... ..... ...F1.20F(1) 11202-197-H004 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE F-A V1 11202-197-H604 ISI/VT/NM P-ES-024-203 ISI-11202-197 ISI --.. ......F1.20F(1) 11202-197-H604 LIN RESTRAINT AUG ---, -2 1202 OWN ..... ..... ....PR E ..............F-A V1 11202-202--H002 ISI-11202-202 ISI ...... ..... ...Fi.20F(1) 11202-202-1-1002 LIN RESTRAINT AUG ----....2 1202 OW N M.. .. ..... ...PR E ..............F-A V1 11202-202-H003 ISI-11202-202 Is[ I. .... ..... ...F1.20F(1) 11202-202-H003 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE -.. .....-.. ..I-- V1 1120U-20U-1'lUU4 F1.20F(1) 11202-202-11004 2 1202 INR-11202TAIN LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 21 -100 Southern Nuc'lear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case re e-M, M- M M~>>> >>ý: 1ýSummary NoJCompID/System Scope/ Method / Procedure F-A V1 11202-202-1-1005 ISI-11202-202 ISI ...... ...F1.20F(1) 11202-202-1-1005 LIN RESTRAINT AUG 2 1202 OWN PRE F-A V1 11202-202-H006 ISI-11202-202 ISI ...... ..... ...F120F(1) 11202-202-H006 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN ..... ...... ...P R E ..............F-A V1 11202-202-H007 ISI-11202-202 ISI -......Fl.20F(1) 11202-202-H007 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN ..... ..... ....PRE ... ......F-A V1 11202-204-HOOl ISI-11202-204 ISI ...... ..... ...F1.20F(1) 11202-204-HOOl LIN RESTRAINT AUG ...... ..... ...2 1202 OWN ...... ..... ...PRE ..............F-A V1 11202-204-H002 ISI-11202-204 ISI ...... ...F1.20F(1) 11202-204-H002 LIN RESTRAINT AUG 2 1202 OWN ..... ..... ....PRE F-A V 11202-204-H003 ISI-11202-204 ISI Fl.20F(1) 11202-204-H003 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... .... ....PRE -.- ......F-A V 11202-204-1-1004 ISI-11202-204 ISI ...... ..... ...F1.20F(1) 11202-204-H004 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE F-A V1 11202-204-H005 IS1-11202-204 ISI F1.20F(1) 11202-204-H005 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... ..... ...PRE F-A V1 11202-205-H002 ISI-11202-205 SI ...... ..... ...Fl.20F(1) 11202-205-H002 LIN RESTRAINT AUG .. ..... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-205-H003 F1.20F(1) 11202-205-H003 2 1202 ISI-11202-205 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 22 -100 Southern NuOclear Operating-Comnpany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 i> I.Period 2 Period 3 Summarv No./ComolO/System Scope / Method / Procedure F-A V1 11202-205-H004 ISi-1 1202-205 ISI -..... .--. .F1.20F(1) 11202-205-H004 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-205-H005 ISI-1 1202-205 ISI ...... ..... ...F1,20F(1) 11202-205-HOO5 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-205-1-006 ISI-1 1202-205 ISI ...... ..... ...F1.20F(1) 11202-205-H006 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... ..... ...PR E ..............F-A V1 1202-205-H007 ISI-11202-205 ISI M ..... ..... ..F1.20F(1) 11202-205-H007 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-207-HO00 ISI-11202-207 ISI ...... ..... ...F1.20F(1) 11202-207-HOOl LIN RESTRAINT AUG -... .... .2 1202 OWN ...... .... ....PRE -......F-A V1 11202-207-HOO3 ISI-11202-207 ISI F1.20F(1) 11202-207-1003 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-209-HOOl ISI-11202-209 SI ...... ..... ...F1.20F(1) 11202-209-HOOl LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE -.- ......F-A V1 11202-209-H002 ISI-11202-209 iSI ...... ..... ...F1.20F(1) 11202-209-H002 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN PRE F-A V1 11202-209-H006 ISI-11202-209 tSI ...... ..... ...F1.20F1(1) 11202-209-H006 LIN RESTRAINT AUG M 2 1202 OW N ..... ..... ....PR E ..............F1.20F(1) 11202-209-H007 2 1202 II-N 1RES-RAN LIN RESTRAINT iai AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 23 -100 Southern Nucl Iear O perating Compan.y'3rd Interval VOGTLE-1 IS1 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class DwgoISO No.Comp. Dese.Code Case" !>>>Summary No./ComplD/System Scope / Method I Procedure F-A V1 11202-209-H009 ISI-11202-209 ISI -..... ..... ..F1.20F(1) 11202-209-H009 LIN RESTRAINT AUG -..... ..... ..2 1202 OW N ...... .... ....PRE ..............F-A V1 11202-209-H011 ISI-11202-209 ISI ...... ..... ...F1.20F(1) 11202-209-HOI 1 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-209-H013 ISI-11202-209 ISI ... ....F1,20F(1) 11202-209-HO13 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... ..... ...PR E ..............F-A V1 11202-209-HO14 ISI-11202-209 ISI ...... ..... ...F1.20F(1) 11202-209-HO14 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11202-209-HO15 ISI-11202-209 ISI -... .... .F1.20F(1) 11202-209-HO15 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-209-H601 ISI-11202-209 SI -..... ...F1.20F(1) 11202-209-H601 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... .... ....PR E ..............F-A V1 11202-209-H602 ISI-11202-209 ISI ...... ..... ...F1.20F(1) 11202-209-H602 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11202-211-Hoo1 ISI-11202-211 ISI ...... ..... ...F1.20F(1) 11202-211-HOOl LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-211-H002 ISI-11202-211 SI ...... ..... ...F1.20F(1) 11202-211-H002 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE .... .........F'-A V1 1l2U0-11-1-1UU3 Fl.20F(1) 11202-211--H003 2 1202 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 24 -100 South'ern Nuclear Operating

ýCompany 3rd Interval VOGTLE-1 IS PLAN, VERSION 3.0 Category, Item No., Class Dwg/1SO No.Comp. Deec.Code Case Period 1 M22 Period 2 cca- a-Period 3 ac 0r Summary NoJCompID/System Scope / Method / Procedure F-A V1 11202-211-H004 IS1-11202-211 ISI ...... ..... ...F1.20F(1) 11202-21 1-H004 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN ...... ..... ...PRE ..............F-A V1 11202-212-HOOl IS1-11202-212 IS] -..... ..... ..F1.20F(1) 11202-212-H001 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...P R E ..............F-A V1 11202-212-H002 IS1-11202-212 ISI ...... ..... ...F1.20F(1) 11202-212-H002 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-212-Hoo3 IS1-11202-212 ISI . .F1.20F(1) 11202-212-HOO3 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-212-H006 IS1-11202-212 ISI ...... .....F1.20F(1) 11202-212-HOO6 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... .... ....PRE ..............F-A V1 11202-212-HOO7 IS1-11202-212 ISI ...... ..... ...F1.20F(1) 11202-212-HOO7 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN ..... ...... ...PRE ..............F-A V1 11202-212-H009 IS1-11202-212 ISI ...... ..... ...F1.20F(1) 11202-212-HOQ9 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11202-212-HO10 IS1-11202-212 ISI ...... ..... ...F1.20F(1) 11202-212-HO10 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-212-HMOl ISI-11202-212 ISI ...... ..... ...F1.20F(1) 11202-212-HOl 1 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...PRE ..............F-A V!

Fi.20F(1) 11202-212-H012 2 1202 151-11202-212 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 25 -100 Southern Nuclear Operaitir-q Comhpany'3rd Intervial VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 10 r- to It .>Period 3 2>=>Summarv NoJCompID/Svstem Scope / Method / Procedure F-A V1 11202-212-H013 IS1-11202-212 ISI ... ....F1.20F(1) 11202-212-HO13 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...PR E ..............F-A V1 11202-212-H015 ISI-11202-212 SI ...... ..... ...F1.20F(1) 11202-212-H015 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN -......PR E ..............F-A V1 11202-212-HO16 ISI-11202-212 ISI ...F1.20F(1) 11202-212-H016 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... .... ....PRE F-A V1 11202-213-HO0 ISI ...... ..... ...F1.20F(1) 11202-213-HOOl LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...PRE -.- .-.I.. ....F-A V1 11202-216-HOOl ISI-11202-216 ISI ----....F1.20F(1) 11202-216-HOOl LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... .... ....PRE ..............F-A V1 11202-216-H004 ISI-11202-216 ISI ----....F1.20F(1) 11202-216-H004 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ...... .......F-A V1 11202-216-H008 IS1-11202-216 ISI -... .F1.20F(1) 11202-216-H008 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... .... ....PRE F-A V1 11202-216-H009 ISI-11202-216 ISI ...... ..... ...Fl.20F(1) 11202-216-H009 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11202-216-HO10 ISI-11202-216 ISI ...... ..... ...F1.20F(1) 11202-216-HOIO LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE -.. .-. -. ...F-:A V1 112 2-1 MI-:1. ) .01 Il F1.20F(1) 11202-216-H013 2 1202 LIN RESTRAINT AUG OWN -PRE ---8/31/2009 ScheduleWorks V. 8.1 Page 26 -100

Nuclear Operati ng ;Company'3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3ý U) U) N: U) 1 0O FE cc cc M >t a: Summary No./CompID/System Scope / Method / Procedure F-A V1 11202-216-014 ISl-11202-216 ISI ...... ..... ...F1.20F(1) 11202-216-H014 LIN RESTRAINT AUG ---....2 1202 OW N ..... ...... ...PR E ..............F-A V1 11202-216-HO15 ISI-11202-216 ISI ...... ..... ...F1.20F(1) 11202-216-HO15 LIN RESTRAINT AUG 2 1202 OW N ...... .......PRE ----....F-A V1 11202-216-H016 ISI-11202-216 ISI -......F1.20F(1) 11202-216-H016 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....P R E ...............F-A V1 11202-216-H017 ISI-11202-216 SI ...... ..... ...F1.20F(1) 11202-216-H017 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...P R E ..............F-A V1 11202-216-H018 ISI-11202-216 ISI ...... ..... ...F1.20F(1) 11202-216-HO18 LIN RESTRAINT AUG 2 1202 OWN .......... ...PRE ..............F-A V1 11202-216-H020 ISI-11202-216 ISI ...... ..... ...F1.20F(1) 11202-216-H020 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE -......F-A V1 11202-216-H021 ISI-11202-216 ISI ...... ..... ...F1.20F(1) 11202-216-H021 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-216-H023 ISI-11202-216 ISI ...... ..... ...F1.20F(1) 11202-216-H023 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-216-H024 ISI-11202-216 Is[F1.20F(1) 11202-216-H024 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN -...... ...PR E ..............F-A V1 11202-216-H026 F1.20F(1) 11202-216-H026 2 1202 ISI-11202-216 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 27 -100 SouThern-NuiScLear OpERating C.o y 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case i> w m* 0> cc Summary No./ComplDISystem Scope / Method / Procedure F-A V1 11202-216-H027 ISI-11202-216 ISI .......... ...F 1 .2 0 F (1 ) 1 1 2 0 2 -2 1 6 -H 0 2 7 L IN R E S T R A IN T A U G .............2 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-216-H035 ISI-11202-216 ISI ...... ..... ...FI.20F(i) 11202-216-H035 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ....... ..... ...F-A Vi 11202-216-H037 ISI-11202-216 ISI ...... ..... ...F l .2 0 F (1 ) 1 1 2 0 2 -2 1 6 -H 0 3 7 L IN R E S T R A IN T A U G ..............2 1202 OW N ..... ..... ....PR E ...............F-A VI 11202-216-H038 ISI-11202-216 SI ...... ..... ...F1.20F(1) 11202-216-H038 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ...... ..... ...F -A V I 1 1 2 0 2 -2 1 6 -H 0 3 9 IS I- 1 1 2 0 2 -2 1 6 IS I -.. ........F1.20F(1) 11202-216-H039 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-216-H040 ISI-11202-216 SI ...... ..... ...F1.20F(1) 11202-216-H040 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN ...... ..... ...P R E ..............F-A Vi 11202-218-H029 ISI-11202-218 ISI .. ..... ..... ...F1.20F(1) 11202-218-H029 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....P R E ..............F -A V l 1 1 2 0 2 -2 1 8 -H 0 3 0 IS1 -1 12 0 2 -2 1 8 IS I .........F1.20F(1) 11202-218-H030 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V 11202-218-H031 ISI-11202-218 ISI ...... ..... ...F1.20F(1) 11202-218-H031 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... .... ....PRE 5MA VI 11202218-HlO32 Fi.20F(i) 11202-218-H032 2 1202 INE-1S1TI2-218 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 28 -100 Southern Nuclear Operating Company.3rd Interval VOGTLE-1 ISl PLAN, VERSION 3.0 Category, Item No., Class Dwg/lSO No.Comp. Desc.Code Case Period 1 Period 2> > > > >Period 3 Summary No./CompID/System Scope / Method / Procedure F-A V1 11202-218-H033 ISI-11202-218 ISI ---.... ..... ...F1.20F(1) 11202-218-H033 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE -.....-. ...F-A V1 11202-218-H034 IS1-11202-218 ISI ...... ..... ...F1.20F(1) 11202-218-H034 UN RESTRAINT AUG ...... ..... ...2 1202 OWN ...... .......PRE ...... ..... ...F-A V1 11202-220-HOOl ISI-11202-220 ISI ...... ..... ...F1.20F(i) 11202-220-HOOI LIN RESTRAINT AUG ...... ..... ...2 1202 OWN PRE .............F-A Vi 11202-220-1-1002 IS1-11202-220 ISI ...... ..... ...F1.20F(1) 11202-220-H002 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN PRE ----....F-A V1 11202-220-HOll ISI-11202-220 ISI -..... ..... ..F1.20F(1) 11202-220-HOl 1 LIN RESTRAINT AUG -... .2 1202 OW N ..... ..... ....P RE ..............F-A V1 11202-220-H012 IS1-11202-220 ISI ...... ..... ...F1.20F(i) 11202-220-HO12 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-220-HO13 ISI-11202-220 ISI ...... ..... ...F1.20F(1) 11202-220-H013 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11202-220-H014 ISI-11202-220 ISI ...... ..... ...F1.20F(1) 11202-220-HO14 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...P R E ..............F-A V1 11202-220-HO15 ISI-11202-220 ISI -......F1.20F(1) 11202-220-H015 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN ... ....PRE F1.20F(1) 11202-220-HO16 2 1202 LIN-1RESTRAIN LIN RESTRAINT AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 29 -100 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Z Period 1 Period 2 Period 3 I, CC Summary No./CompID/System Scope / Method / Procedure F-A V1 11202-220-H017 IS]-11202-220 ISI ...... ..... ...F1.20F(1) 11202-220-H-017 LIN RESTRAINT AUG 2 1202 OW N ..... ...... ...P R E ..............F-A V1 11202-220-HO18 ISI-11202-220 ISI ...... ..... ...F1.20F(1) 11202-220-HO18 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN PRE ..............F-A V1 11202-220-H022 ISI-11202-220 SI ...... ..... ...F1.20F(i) 11202-220-H022 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ..............F-A Vi 11202-220-H023 IS1-11202-220 ISI ...... ..... ...Fi.20F(1) 11202-220-H023 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE F-A V1 11202-220-H025 ISI-11202-220 ISI ...... ..... ...F1.20F(i) 11202-220-HQ25 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-220-H026 ISI-11202-220 ISI ...... ..... ...F1.20F(1) 11202-220-H026 LIN RESTRAINT AUG -------....2 1202 OWN PRE ...... ..... ...F-A V1 11202-220-H027 ISI-11202-220 ISI F1.20F(1) 11202-220-H027 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-220-H028 ISI-11202-220 ISI ...... ..... ...F1.20F(1) 11202-220-H028 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-220-H029 ISI-11202-220 ISI ...... ..... ...F1.20F(1) 11202-220-H029 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...PRE .............F-A Vi 11202-220-H030 F1.20F(1) 11202-220-HO30 2 1202 ISI-11202-220 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 30 -100 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Iteni No., Class Dwg/ISO No.Comp. Desc.Code Caseýt a, 0 2.Summary NoJComplDISystem Scope/ Method / Procedure F-A Vi 11202-220-H031 ISI-11202-220 ISI ...... ..... ...F1.20F(1) 11202-220-H031 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN PR E ..............F-A V1 11202-220-H032 IS1-11202-220 ISI F1.20F(1) 11202-220-H032 LUN RESTRAINT AUG ...... ..... ...2 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-220-H033 ISI-11202-220 SI ...... ..... ...Fl-.20F(1) 11202-220-H033 LIN RESTRAINT AUG 2 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-220-H604 ISI-11202-220 ISI ...... ..... ...F1.20F(1) 11202-220-H604 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....P R E -. -.- ..-.- ..- .- ...F-A V1 11202-223-H003 ISI-11202-223 SI ...... ..... ...Fl.20F(1) 11202-223-H003 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....P R E -. -.-.-. .-. -. ....F-A V1 11202-223-H004 ISI/VTI/NMP-ES-024-203 IS1-11202-223 ISI C ..... ..... ...F1.20F(1) 11202-223-H004 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ........P R E -. -.- ..-.- ..- .- ...F-A Vl 11202-223-HOO ISI-11202-223 ISI ...... ..... ...F1.20F(1) 11202-223-H005 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... ..... ...PR E -. -.- -.-........-F-A VI 11202-223-H006 IS1-11202-223 SI ...... ..... ...F1.20F(1) 11202-223-H-00 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...F-A VP 1202-223-H009 ISI--1202-223 -SI F1 .20F(1) 11 202-223-H009 LIN RESTRAINT AUG .......2 1202 OWN .......PREE ....F-A V1 11202-M2-1101I F1.20F(1) 11202-223-HOll 2 1202 iSI-11202-223 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 31 -100 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case:! 1!2 00 0q c." Summary No./CompID/System Scope / Method / Procedure F-A V1 11202-223-H013 ISI-11202-223 ISI ..... ..... ....F 1 .2 0 F (1 ) 1 1 2 0 2 -2 2 3 -H 0 1 3 L IN R E S T R A IN T A U G ..............2 1202 OWN ...... ..... ...PRE ...... ..... ...F-A V1 11202-223-H022 ISI/VT/ ISI-1 1202-223 SI ...s -.... ...F 1 .2 0 F (1 ) 1 1 2 0 2 -2 2 3 -H 0 2 2 L IN R E S T R A IN T A U G ..............2 1202 OWN ...... ..... ...PRE ...... ..... ...F -A V 1 1 1 2 0 2 -2 2 5 -H 0 0 2 IS 1- 1 1 2 0 2 -2 2 5 IS I ..............F 1 .2 0 F (1 ) 1 1 2 0 2 -2 2 5 10 0 2 L IN R E S T R A IN T A U G ..............2 1 2 0 2 O W N -" ------....PRE ...... ..... ...F-A V1 11202-225-H005 ISI/VT/ IS1-11202-225 1S -.-- -- -- -- ------ s ---F 1 .2 0 F (1 ) 1 1 2 0 2 -2 2 5 -H 0 0 5 L IN R E S T R A IN T A U G ..............2 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-225-1-1009 ISI/V'- ISI-11202-225 ISI- -.-- ---- -- ---- -S ---F1.20F(1) 11202-225-H009 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... ..... ...PRE ...... ..... ...F-A Vi 11202-225-HOl iSI/VT/ ISI-11202-225 ISI ---- ---- -- ------ s ---F 1 .2 0 F (1) 1 12 0 2 -2 2 5 -H O l 1 L IN R E S T R A IN T A U G ..............2 1202 OW N ......... ....PRE -.-F-A V1 11202-225-H017 ISI-11202-225 ISI ...... ..... ...F 1 .2 0 F (1 ) 1 1 2 0 2 -2 2 5 -H O 1 7 L IN R E S T R A IN T A U G ..............2 1202 OWN ...... ..... ...PRE ...... ..... ...F-A V1 11202-225-H018 ISI-11202-225 ISI .. ..... ..... ...F 1 .2 0 F (1 ) 1 1 2 0 2 -2 2 5 -H 0 1 8 L IN R E S T R A IN T A U G ...............2 1202 OWN ...... ..... ...PRE ...... ..... ...F -A V 1 1 1 2 0 2 -2 2 5 -H 0 2 2 IS I- 1 1 2 0 2 -2 2 5 IS I ..............F 1 .2 0 F (1 ) 1 1 2 0 2 -2 2 5 -H 0 2 2 L IN R E S T R A IN T A U G ..............2 1202 OW N ..... ..... ....PR E ...............F-A F1.20F(1)2 V1 11202-225-H023 11202-225-H023 1202 IS1-11202-225 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 32 -100 SouthernNulaOprtnCman 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 u >Period 2 fe M x Period 3 Summary No./ComplD/System Scope / Method I Procedure F-A V1 11202-225-H602 ISM-11202-225 ISI ...... ..... ...F1.20F(1) 11202-225-H602 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... .... ....P R E -. -.- -.-. .-.- ..-. ..F-A Vi 11202-229-H005 IS1-11202-229 ISI ...... ..... ...F1.20F(1) 11202-229-H005 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-229-HOO8 ISI-11202-229 ISI -... .F1,20F(1) 11202-229-H008 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....-PRE ........F-A V1 11202-229-HO12 ISI-1 1202-229 ISI ...... .......Fi.20F(1) 11202-229-H012 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE .............F-A V1 11202-229-H013 ISI-11202-229 ISI ...... ..... ...F1.20F(1) 11202-229-H013 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ........PRE ----....F-A V1 11202-229-HO15 IS1-11202-229 IS1 ...... ..... ...F1l20F(I) 11202-229-HO15 LIN RESTRAINT AUG .......... ...2 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-229-HO16 IS1-11202-229 IS ...... .......F1.20F(1) 11202-229-H016 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ..... ....F-A V1 11202-229-H017 ISI-11202-229 ISI ----....Fl.20F(1) 11202-229-HO17 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-229-H020 ISI-11202-229 ISI ...... ..... ...F1.20F(1) 11202-229-H020 LIN RESTRAINT AUG .......... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-229-H021 F1.20F(1) 11202-229-H021 2 1202 ISI-11202-229 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 33 -100 Southern Nuclear, Operatingl Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case>: > > >Summary No./ComplDlSystem

-Scope / Method / Procedure F-A V1 11202-229-H022 ISI-11202-229 ISI ...F1.20F(1) 11202-229-H022 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V 11202-229-H023 ISI-11202-229 ISI ...... ..... ...F1,20F(l) 11202-229-H023 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... ..... ...PR E ..............F-A V1 11202-231-H003 ISI-1 1202-231 ISI ...... ..... ...F1,20F(1) 11202-231-1003 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE -......F-A V1 11202-231-1005 IS1-11202-231 SI ...... ..... ...F1,20F(1) 11202-231--H005 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... ..... ...PR E ..............F-A Vi 11202-231-H008 ISI-11202-231 SI ...... ..... ...F1.20F(1) 11202-231-HOO8 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-231-H012 ISI-11202-231 ISI ...... ..... ...F1.20F(1) 11202-231-H012 LIN RESTRAINT AUG ...... ..... ...2 1202 OWN ...... .... ....PR E ..............F-A V1 11202-231-H014 ISI-11202-231 ISI ...... ..... ...F1.20F(1) 11202-231-H014 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...P R E ..............F-A VI 11202-231-HO15 ISI-11202-231 ISI ...... ..... ...Fl.20F(1) 11202-231-HO15 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ...... .... ....PRE ..............F-A V1 11202-231-HO17 ISI-11202-231 ISI ...... ..... ...Fl.20F(1) 11202-231-HO17 LIN RESTRAINT AUG ...... ..... ...2 1202 OW N ..... ...... ...PR E ..............F-A Vi 11202-231-HO18 F1.20F(1) 11202-231-HO18 2 1202 ISI-11202-231 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 34 -100 Southern Nuclear Operating,,:ompany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1>i>Period 2 Period 3 0 Summarv No./CompID/System Scope / Method / Procedure F-A V1 11202-231-H023 IS1-1 1202-231 ISI ...... ..... ...F1.20F(1) 11202-231-H023 LIN RESTRAINT AUG -..... ..... ..2 1202 OW N ..... ..... ....PR E ..............F-A V1 11204-001-H004 IS1-11204-001 ISI ...... ..... ...F1.20F(1) 11204-001-H004 LIN RESTRAINT AUG 2 1204 OW N ..... ..... ....PRE ... ........F-A V1 11204-006-H009 ISI-1 1204-006 ISI ...... ..... ...F1.20F(1) 11204-006-1009 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11204-006-H013 ISI/VT/NMP-ES-024-203 IS1-11204-006 ISI c ..... ..... ...F1.20F(1) 11204-006-HO13 LIN RESTRAINT AUG --...... ...2 1204 OWN --...... ...PR E -. -. -. .-. -. .-. -. ..F-A V1 11204-006-H015 ISI-11204-006 SI[ .-. .-- -------- ----F1.20F(1) 11204-006-HO15 LIN RESTRAINT AUG --- ----------


2 1204 OW N ..... ...... ...P R E -. -. -. .-. -. .-. -. ..F-A V1 11204-006-H023 ISI-11204-006 ISI -. ..... ..... ...--------

F1.20F(1) 11204-006-H023 LIN RESTRAINT AUG -----------------------

2 1204 OWN -----------


----PRE ............F-A V1 11204-006-H032 ISI-11204-006 ISI ...... ..... ...F1.20F(1) 11204-006-H032 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V 11204-006-H034 ISI-11204-006 ISI ...... ..... ...F1.20F(1) 11204-006-H034 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11204-006-H035 ISI-11204-006 ISI ...... ..... ...F1.20F(1) 11204-006-H035 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ...............-A V1 11209f4006RH60Rf2Q ISI-11204-006I1 F1.20F(1) 11204-006-1-1602 2 1204 LIN RESTRAINT AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 35 -100 Southern Nuclear Oper.ating4 Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/iSO No.Comp. Desc.Code Case-:r t2 M ,-ý: !2 M M M Summarv No./CompID/System Scope / Method I Procedure F-A V1 11204-007-H 006 ISI/VT/NM P-ES-024-203 ISI-1 1204-007 SI c .............F 1 .2 0 F ( 1 ) 1 1 2 0 4 -0 0 7 -H 0 0 6 L IN R E S T R A IN T A U G ..............2 1204 OW N ..... ..... ....PRE ..............F-A V 1 11204-008-H 004 IS IIV T/N M P -E S -024-203 IS I-11204-008

[SI c .............F 1 .2 0 F ( 1 ) 1 1 2 0 4 -0 0 8 -H 0 0 4 L IN R E S T R A IN T A U G ..............2 1204 OW N ...... .... ....P R E ..............F-A V1 11204-008-H 005 ISI-11204-008 ISI ----....F 1 ,2 0 F ( 1 ) 1 1 2 0 4 -0 0 8 -1 0 0 5 L I N R E S T R A I N T A U G ..............2 1204 OWN ...... ..... ...PR E ..............F -A V 1 1 120 4 -0 0 8-H O 10 IS I/V T /N M P -E S -02 4 -2 0 3 IS I-1120 4 -0 0 8 IS I c .............F i .2 0 F ( 1 ) 1 1 2 0 4 -0 0 8 -H 0 1 0 L IN R E S T R A IN T A U G ..............2 1204 OWN ...... ..... ...PRE ..............F-A V 1 11204-008-H013 IS IIV T/ IS I-11204-008 IS I ----s ........F1.20F(1) 11204-008-H013 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ...... .... ....PR E ..............F-A V1 11204-010-H005 ISI-1 1204-010 ISI ..... ..... ....F 1 .2 0 F ( 1 ) 1 1 2 0 4 -0 1 0 -H 0 0 5 L I N R E S T R A IN T A U G ..............2 1204 OW N ...... .... ....PRE -......F-A V1 11204-010-HO10 ISI-11204-010 ISI ...... ...... ...F 1 .2 0 F ( 1 ) 1 1 2 0 4 -0 1 0 -H O I O L IN R E S T R A IN T A U G ..............2 1204 OWN ...... ..... ...PR E ..............F-A V1 11204-010-H601 ISI-11204-010 ISI ...... ..... ...F1.20F(1) 11204-010-H601 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-011-H601 ISI-11204-011 ISI ...... ..... ...F1.20F(1) 11204-011-H601 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-012-HO0i F1.20F(1) 11204-012-H001 2 1204 ISI-11204-012 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 36 -100 SoutliernNu'clear O~perating Compan'y 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/tSO No.Comp. Desc.Code Case->-Summary NoJCompID/System Scope / Method / Procedure F-A VI 11204-012-HO14 ISf-11204-012 SI ...... ..... ...F1.20F(1) 11204-012-H014 LIN RESTRAINT AUG 2 1204 OW N ...... ..... ...PR E ..............F-A VI 11204-012-Ho18 IS1-11204-012 ISI ...... ..... ...F1.20F(i) 11204-012-HolB LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....P R E ..............F-A V1 11204-020-HOOl ISI-11204-020 IS ...... ..... ...F1.20F(1) 11204-020-HOOl LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ...... .... ....PRE ..............F-A VI 11204-020-H002 ISI-11204-020 ISI ...... ..... ...F1.20F(1) 11204-020-H002 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ...... ..... ...PRE ..............F-A V1 11204-038-H601 ISI/VT/NMP-ES-024-203 ISI-11204-038 ISI c ..... ..... ...F1.20F(1) 11204-038-1-1601 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE .............F-A Vi 11204-039-H021 ISI-11204-039 ISI ...... ...F1.20F(1) 11204-039-H021 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-039-H022 ISI-11204-039 ISI ...... ..... ...F1.20F(i) 11204-039-H022 LIN RESTRAINT AUG ...... ...2 1204 OWN ......... ....PRE ....F-A Vi 11204-039-H035 ISI-11204-039 ISI ----....Fl.20F(1) 11204-039-H035 LIN RESTRAINT AUG ...... ..... ...2 1204 OWN ...... .... ....PRE .............F-A Vi 11204-041-H032 ISI-11204-041 ISI ...... .......F1.20F(l) 11204-041-H032 LIN RESTRAINT AUG .......... ...2 1204 OW N ..... ........PRE ----....F-A vl 11204-041-HO38 F1.20F(i) 11204-041-H038 2 1204 II-1 1RS4-0AN LIN RESTRAINT I51 AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 37 -100 Southern Nu~clear Operaiting.'

Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Casew > >o>Summary No.IComplDlSystem Scope / Method / Procedure F-A V1 11204-041-H042 K1-11204-041 ISI -.. ...... ..Ft .20F(1) 11204-041-H042 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-057-HOOI ISI/VTI/NMP-ES-024-203 ISI-11208-057 ISI c ..... ..... ...F1.20F(1) 11204-057-H001 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ...... .... ....PR E ..............F-A V1 11204-057-H002 IS1-11204-057 ISI ...... ..... ...F1.20F(1) 11204-057-H002 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............F-A Vi 11204-057-1008 ISI/VT/ ISI-11204-057 ISI ----s ..... ...Fl.20F(i) 11204-057-HOOB LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-057-H009 JS1-1 1204-057 SI ...... ..... ...F1.20F(1) 11204-057-H009 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ......... ....PR E .............F-A V1 11204-057-H0t0 ISI-11204-057 ISI ...... ..... ...Fl.20F(1) 11204-057-HO10 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-057-H011 ISI-11204-057 ISI ...... ..... ...F1.20F(1) 11204-057-HOl1 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE F-A Vi 11204-057-H012 ISI/VT/NMP-ES-024-203 ISI-11204-057 SI c ..... ..... ...Fl.20F(1) 11204-057-HO12 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-057-H013

]S1-1 1204-057 IS] ...... ..... ...F1,20F(i) 11204-057-HO13 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-057-H014 F1.20F(1) 11204-057-H014 2 1204 IS1-11204-057 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 38 -100 Southern Nuclear Operating C-ompany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 m I. £Period 3 Summary No./CompID/System Scope/ Method / Procedure F-A V1 11204-057-HO15 ISI-11204-057 ISI -... .... .F1.20F(1) 11204-057-H015 LIN RESTRAINT AUG ...... ..... ...2 1204 OWN .......... ...PRE ..............F-A V1 11204-057-HO16 IS1-11204-057 ISI ...... ..... ...F1.20F(1) 11204-057-HO16 LIN RESTRAINT AUG ...... ..... ...2 1204 OWN ...... ..... ...PR E ..............F-A V1 11204-057-H017 ISI-11204-057 ISI -- --- -.- --. ..F1.20F(1) 11204-057-HO17 LIN RESTRAINT AUG ...... ..... ...2 1204 OWN ...... ..... ...PRE ..............F-A V1 11204-057-HO18

[S-11204-057 ISI -... .F1.20F(1) 11204-057-HO18 LIN RESTRAINT AUG ...... ..... ...2 1204 OWN ...... ..... ...PRE ..............F-A V1 11204-057-H019 ISI-11204-057 ISI ...... ..... ...F1.20F(1) 11204-057-HO19 UN RESTRAINT AUG ...... ..... ...2 1204 OWN ...... ..... ...PRE ..............F-A V1 11204-057-H020 ISI-1 1204-057 ISI ...... ..... ...F1.20F(1) 11204-057-H020 LIN RESTRAINT AUG ...... ..... ...2 1204 OWN -..........PRE ..............F-A V1 11204-057-H022 ISI-11204-057 ISI ...... ..... ...F1.20F(1) 11204-057-H022.

LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-057-H023 ISV-11204-057 ISi ...... ..... ...Fi1.20F(1) 11204-057-H023 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ...... ...PRE -......F-A V1 11204-057-H025 ISI-11204-057 ISI ...... ..... ...F1.20F(1) 11204-057-H025 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ...... ..... ...PRE ..............F-A V1 11204-U57-HO26 F1,20F(1) 11204-057-H026 2 1204 L1iNES204-0I7 LIN RESTRAINT 1SI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 39 -100 Southern Nuclear OperatngECompanyN 3rd Interval VQGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/lSO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 0l Summary No./ComplD/System Scope / Method / Procedure F-A V1 11204-057-H027 ISI-11204-057 ISI ...... ..... ...F1.20F(1) 11204-057-H027 LIN RESTRAINT AUG ...... ..... ...2 1204 OWN ..... ..... ....PRE ..............F-A V1 11204-057-1-028 IS1-11204-057 ISI ...... ..... ....F1.20F(1) 11204-057-H028 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11204-057-H029 ISI-11204-057 ISI -... .Fl.20F(1) 11204-057-H029 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ...... .... ....PRE ..............F-A V1 11204-057-H030 ISI-11204-057 SI ...... ..... ...F1.20F(1) 11204-057-H030 LIN RESTRAINT AUG ... .. ...... ..2 1204 OWN ----....PRE .............F-A V1 11204-057-HO31 IS1-11204-057 IS1 ...... ..... ...F1.20F(1) 11204-057-H031 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-057-H032 ISIA/T/NMP-ES-024-203 ISI-11204-057 ISI c ..... ..... ...F1.20F(1) 11204-057-H032 LIN RESTRAINT AUG ...... ..... ...2 1204 OWN --PRE ..............F-A V1 11204-057-H033 IS1-11204-057 ISI -......F1.20F(t) 11204-057-H033 LIN RESTRAINT AUG ...... .......2 1204 OWN ...... ..... ...PRE -......F-A V1 11204-057-H034 SI-1 1204-057 ISI ...... ..... ...F1.20F(1) 11204-057-H034 LIN RESTRAINT AUG ...... .......2 1204 OW N ..... ...... ...PRE .........F-A V1 11204-057-H035 IS!-1i1204-057 ISI ...... ..... ...F1.20F(1) 11204-057-H035 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ...... .... ....PR E ..............F-A V1 11 2U4-U03-1-U1 F1.20F(1) 11204-063-H006 2 1204 ISI-11204-063 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 40 -100 Sou6thern Nuclear Operating Company~3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg1ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 0! 0 Summary No./ComplD/System Scope/ Method / Procedure F-A V1 11204-063-1-1007 ISI-11204-063 ISI ...... ..... ...F1.20F(1) 11204-063-H007 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ...... ...PRE ..............F-A V1 11204-063-H009 ISI-11204-063 ISI .......... ...F1.20F(1) 11204-063-H009 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ...... .... ....PRE ...... ..... ...F-A VI 11204-120-H002 ISI-11204-120 SI ...... ..... ...F1.20F(1) 11204-120-H002 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N -. .... ...... ...PRE ...............F-A V1 11204-121-H002 ISI-11204-121 ISI -..... .....F1.20F(1) 11204-121-H002 LIN RESTRAINT AUG ...... ..... ...2 1204 OWN ...... ...PRE ........F-A Vi 11204-122-H002 IS1-11204-122 ISI -.... -..... ...F1.20F(1) 11204-122-H002 LIN RESTRAINT AUG 2 1204 OWN -----....P R E ...............F-A V1 11204-177-HO13 ISI-1 1204-177 ISI ...... ..... ...F1.20F(1) 11204-177-H013 LIN RESTRAINT AUG ...... ..... ...2 1204 OW N ..... ...... ...PRE -.- ....F-A V1 11205-003-1-1005 ISI/VTINMP-ES-024-203 ISI-11205-003 SI c .. ... ...F1.20F(1) 11205-003-H005 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE -......F-A V1 11205-003-HO19 ISI/VT/NMP-ES-024-203 ISI-11205-003 ISI C ..... ..... ...F1.20F(1) 11205-003-HO19 LIN RESTRAINT AUG ...... .......2 1205 OWN -... .... .PR E ............F-A V1 11205-003-H030 ISI-1"1205-003 ISI ...... ..... ...F1.20F(1) 11205-003-H030 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N -..........PRE I-A Vi 11205-003-H04i F1.20F(1) 11205-003-H041 2 1205 IS1-11205-003 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 41 -100 So Iuthern Nuclear 'Operating Com-pany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2ý wS !2 C !cc cc cc M M Period 3 Ce Summary NoiCompID/System Scope / Method / Procedure F-A V1 11205-003-H042 ISI-11205-003 ISI ...... ..... ...F120F(1) 11205-003-H042 LIN RESTRAINT AUG ...... ..... ...2 1205 OWN ...... ...PRE .........F-A V1 11205-003-H044 ISI-11205-003 SI ...... ..... ...F1.20F(1) 11205-003-H044 LIN RESTRAINT AUG -..........2 1205 OWN --...... ...P R E ..............F-A V1 11205-004-HOIO ISI-11205-004 ISI F1.20F(1) 11205-004-HO10 LIN RESTRAINT AUG ...... ..... ...2 1205 OWN ----....PR E ..............F-A V1 11205-004-HOl1 ISI-11205-004 ISI ...... ..... ...F1.20F(1) 11205-004-HOl 1 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E -...-.-. ...F-A V1 11205-004-H020 ISI-11205-004 ISI ...... ..... ...F1.20F(1) 11205-004-H020 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE -......F-A V1 11205-004-H024 ISI-11205-004 SI ...... ..... ...F1.20F(1) 11205-004-H024 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ...... .... ....PR E .............F-A V1 11205-004-H025 ISI-11205-004 ISI ...... ..... ...F1.20F(1) 11205-004-H025 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ...... .... ....PRE -......F-A V 11205-005-H013 ISI/VT/NMP-ES-024-203 ISI-1 1205-005 ISI C ..... ..F1.20F(1) 11205-005-H013 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ...... .... ....PR E ..............F-A V1 11205-005-H021 ISI-11205-005 ISI ------. .Fi.20F(1) 11205-005-HO21 LIN RESTRAINT AUG .. ..... ..... ...2 1205 OW N ..... ..... ....PR E -............F-A V1 11205-006-H030 F1.20F(1) 11205-006-H030 2 1205 ISI-1 1205-006 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 42 -100 Southern Nucler Opra~tilng.

Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Summary No./ComplD/System Dwg/ISO No.Comp. Desc.Code Case Period 1 Ir>Period 2>0 T.-x x c Period 3 cc Scope / Method / Procedure F-A V1 11205-007-HOOl ISI/VT/ ISI-11205-007 SI- -..-. .-- .-.-- s------F1.20F(1) 11205-007-HOOI LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A V1 11205-007-H002 ISI-11205-007 SI ...... ..... ...F1.20F(1) 11205-007-H002 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A V1 11205-007-H032 ISI/VT/NMP-ES-024-203 ISI-11205-007 SI C ..... ..... ...F1.20F(1) 11205-007-H032 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ...... .... ....PR E ..............F-A V1 11205-007-H033 ISIVr/NMP-ES-024-203 ISI-11205-007 SI C ..... ..... ...F1.20F(1) 11205-007-H033 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ...... .... ....PR E ..............F-A V1 11205-007-H034 ISI-11205-007 ISI ...... ..... ...F1.20F(1) 11205-007-H034 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A V1 11205-007-H037 ISIVT/NMP-ES-024-203 ISI-11205-007 ISI c ..... .......F1.20F(i) 11205-007-H037 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............F-A V1 11205-007-H040 ISI-11205-007 ISI ...... ..... ...F1.20F(1) 11205-007-H040 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............F-A V1 11205-007-H603 ISI-11205-007 ISi ...... ..... ...F1.20F(1) 11205-007-H603 LIN RESTRAINT AUG ----....2 1205 OW N ..... ..... ....PR E ..............F-A V1 11205-008-HOi1 iSI-11205-008 ISI ...... ..... ...F1.20F(1) 11205-008-HO0i LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F1.20F(1) 11205-008-HO16 2 1205 II-N REST-RAN LIN RESTRAINT AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 43 -100 Southern Nuclear Operating.

Comparnyr,,.

3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 cc Period 3>0 Summary No./CompID/System Scope / Method / Procedure F-A V1 11205-008-H017 ISI-11205-008 ISI ...... ..... ...F1.20F(1) 11205-008-H017 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ...... ...PRE ...... ..... ...F-A V1 11205-008-HO18 ISI-11205-008 ISI ...... ..... ...F1.20F(1) 11205-008-HO18 LIN RESTRAINT AUG ...... ..... ...2 1205 OWN ...... ..... ...PRE ...... ..... ...F-A V1 11205-008-H025 ISI-11205-008 ISI ...... ..... ...F1.20F(1) 11205-008-H025 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ...... .... ....PR E ..............F-A V1 11205-008-H034 ISI-11205-008 ISI ...... ..... ...F1.20F(1) 11205-008-H034 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............F-A V1 11205-008-H035 ISI-11205-008 ISI ...... ..... ...F1.20F(1) 11205-008-H035 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A V1 11205-008-H053 ISI-11205-008 Is) ...... ..... ...F1.20F(1) 11205-008-H053 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A V1 11205-008-H055 ISI-11205-008 ISI ...... ..... ...F1.20F(1) 11205-008-HO55 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11205-008-HO56 ISI-11205-008 ISI ...... ..... ...F1.20F(1) 11205-008-HO56 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ...... .... ....PR E ..............F-A V1 11205-008-H057 ISI-11205-008 ISI ...... ..... ...F1.20F(1) 11205-008-H057 LIN RESTRAINT AUG ...... ..... ...2 1205 OWN P R E ..............F-A V1 11205-0U0-H1U-Fi.20F(1) 11205-009-H005 2 1205 INS-11I05-009 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 44 -100 SoutLhern Nuclear Operaing Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 cc Period 2 cc cc cc Period 3 m01 M cc Summary NoJCompID/Svstem Scope I Method / Procedure F-A V 11205-009-H006 ISI-11205-009 IIs[ -...F1.20F(1) 11205-009-H006 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE .....-. ...- ..-. ..F-A V1 11205-009-HOI I IS1-11205-009 1S1 ...... ..... ...F1.20F(1) 11205-009-H-011 LIN RESTRAINT AUG ...... ..... ...2 1205 OWN P R E -. -.- -.-. .-.- ..-. ..F-A V1 11205-009-H012 IS1-11205-009 ISI ...... .......F1.20F(1) 11205-009-H012 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A VI 11205-010-H010 ISI-11205-010 ISI ...... ..... ...F1.20F(1) 11205-010-HO10 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ...... ..... ...F-A V 11205-010-H01l ISI-11205-010 ISI ...... ..... ...F1.20F(1) 11205-010-H012 LIN RESTRAINT AUG ...... .......2 1205 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11205-010-H013 ISI-11205-010 ISI ...... ..... ...Fl.20F(1) 11205-010-H013 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ..... ....P R E ..............F-A V1 11205-010-H002 ISI-11205-010 ISI -. ..... ..... ...F1.201'(1) 11205-010-H002 LIN RESTRAINT AUG -. ..... ..... ...- -2 1205 OW N -. -.- -.-. .-.- ..-. ..PRE -. -.- .- ..- .- .....F-A V1 11205-027-1-002 IS1-1 1205-027 ISI -----------F1.20F(1) 11205-027-1-002 LIN RESTRAINT AUG -. ..... ..... ...- -2 1205 OW N -. -.- -.-. .-.- ..-. ..PR E -. -.- -.-. .-.- ..-. ..I-A V1 112u0-U039-1-1U6 F1.20F(1) 11205-039-H006 2 1205 ISN- 1205-039 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 45 -100 S§outh:er'n "Nuc~lear Operatfing'l

ýCoimpany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case tn (o co 0, 0 Summary No./CompID/System Scone / Method / Procedure F-A V1 11205-040-H004 ISI-11205-040 ISI ...... ..... ...F1.20F(1) 11205-040-H004 LIN RESTRAINT AUG ...... ..... ...2 1205 OW N ..... ...... ...PR E ..............F-A V1 11206-001-H004 ISI-11206-001 IS] ...... ..... ...F1.20F(1) 11206-001-H004 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ...... ...PR E ..............F-A V1 11206-001-HO15 ISI-11206-001 ISI .......... ...F1.20F(1) 11206-001-HO15 LIN RESTRAINT AUG ...... ..... ...2 1206 OWN ...... .......PRE ..............F-A V1 11206-001-H018 ISIVT/NMP-ES-024-203 ISI-11206-001 SI c -.... .... ..F1.20F(1) 11206-001-HO18 LIN RESTRAINT AUG -....----2 1206 OW N ...... .... ....PR E ..............F-A V1 i1206-001-H022 ISNvTINMP-ES-024-203 ISI-1 1206-001 ISI c ..... ..... ...Fl.20F(1) 11206-001-H022 LIN RESTRAINT AUG -..... ..... ..2 1206 OWN -..... .... ----PR E ..............F-A V1 11206-001-H024 ISI/VT/NMP-ES-024-203 IS1-11206-001 ISI c ..... ..... ...F1.20F(1) 11206-001-H024 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ...... ...PRE ..............F-A V1 11206-001-H025 ISI-11206-001 SI ...... ..... ...F1.20F(1) 11206-001-H025 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-001-H027 ISI-11206-001 ISI ...... ..... ...F1.20F(1) 11206-001-H027 LIN RESTRAINT AUG ...... ..... ...2 1206 OWN -. .........PRE ..... ... ..F-A V 11206-002-H006 ISI-11206-002 SI -.. ... ..... ..F1.20F(1) 11206-002-H006 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE .............F1.20F(1) 11206-002-H022 2 1206 LIN RESTRAINT AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 46 -100 SoutheOrn ,Nuclear Operating Company, 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class DwgIISO No.Camp. Desc.Code Case trn oI Summary No./ComplD/System Scope / Method / Procedure F-A V1 11206-002-H026 ISI-11206-002 ISI ...... ..... ...F1.20F(1) 11206-002-H026 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N .. .... ..... ....PR E ..............F-A V1 11206-002-H029 IS1-11206-002 ISI ...... ..... ...Fi.20F(1) 11206-002-H029 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ...... ...PRE ...... ..... ...F-A V1 11206-002-H034 181-11206-002 ISI ...... ..... ...F1.20F(1) 11206-002-H034 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-003-HOOl ISIVT/NMP-ES-024-203 ISI-11206-003 ISI c ..... ..... ...F1.20F(1) 11206-003-HOOI LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE -......F-A V1 11206-003-1002 ISI-11206-003 1SI ...... .......F1.20F(1) 11206-003-H002 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ...... .... ....PR E .............F-A V1 11206-004-HOOl ISI-11206-004 1i1 ...... ..... ...FI.20F(1) 11206-004-HOOl LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ...... .... ....PRE ..............F-A V1 11206-005-HOO1 ISI-11206-005 ISI -......F1-20F(1) 11206-005-HOOl LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-005-H008 ISI-11206-005 ISI ...... ..... ...F1.20F(1) 11206-005-H008 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ...... ...PRE ...... ..... ...F-A V1 11206-005-HOll IS/'VT/ ISI-11206-005 ISI ...................

s -F1.20F(1) 11206-005-HOl 1 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ...... ...PRE ..............F1.20F(1) 11206-005-H013 2 1206 ISI-/NMP-ES-024-203 LIN RESTRAINT I5I AUG OWN PRE C 8/31/2009 ScheduleWorks V. 8.1 Page 47 -100 Southern Nuclear Operating"Comnpany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2ý w r Period 3 Summary No./CompID/System Scope I Method ! Procedure F-A V1 11206-005-HO18 ISI-11206-005 ISI ...... ..... ...F1.20F(1) 11206-005-H-06 LIN RESTRAINT AUG -..... ..... ..2 1206 OW N ..... ..... ....PR E ..............F-A V1 11206-005-H019 ISI/VT/NMP-ES-024-203 ISI-11206-005 ISI c ..... ..... ...F1.20F(1) 11206-005-H019 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ...... ..... ...PR E ..............F-A V1 11206-005-H020 ISI-11206-005 ISI .. .... ..... ...F1.20F(1) 11206-005-H020 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PR E ..............F-A VI 11206-005-H021 ISI/VT/ ISI-1 1206-005 ISI -- ---- ---- -- -s ---F1.20F(1) 11206-005-H021 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-005-H022 ISI-11206-005 ISI ...... ..... ...Fl.20F(1) 11206-005-H022 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PR E ..............F-A V1 11206-005-H023 ISI/VT/ ISI-11206-005 1SI- -.------ -- ---s ---F1.20F(i) 11206-005-H023 LIN RESTRAINT AUG ...... ..... ...2 1206 OWN ...... .... ....PRE ..............F-A V1 11206-006-H002 ISI/VT/ ISI-11206-006 ISI- ------ ----------

s ---F1.20F(1) 11206-006-1-1002 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....P R E ..............F-A V1 11206-006-H003 IS1-11206-006 ISI ...... ..... ...F1.20F(1) 11206-006-11003 LIN RESTRAINT AUG ... ... ..... ..2 1206 OW N ..... ...... ...P RE ..............F-A V1 11206-006-H004 ISI/VT/ ISI-11206-006 ISI- ----- ---F1.20F(1) 11206-006-11004 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-006-H005 F1.20F(1) 11206-006-11005 2 1206 ISI-11206-006 LIN RESTRAINT IS]AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 48 -100 Southfern Nuc6lear Operating pCompany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Summary No./ComplD/System Dwg/ISO No.Comp. Desec Code Case Period 1 Period 2 Period 3 w1 a, I, CC ccM : c Scope I Method / Procedure F-A Vl 11206-006-H007 ISI-11206-006 ISI ...... ..... ...Fl.20F(l) 11206-006-H007 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....P R E ..............P-A V1 11206-006-HOOB ISI-11206-006 ISI ...... ..... ...F1.20F(1) 11206-006-H008 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PR E ..............P-A V1 11206-006-H009 ISI-11206-006 ISI ...... ..... ...51.20F(i) 11206-006-H009 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ...... ...PR E ..............F-A V1 11206-006-HO10 ISI/VT/ ISI-11206-006 ISI -.................

s --F1.20F(1) 11206-006-HO10 LIN RESTRAINT AUG ...... ..... ...2 1206 OWN PR E .. ............P-A V1 11206-006-Hall ISI-11206-006 ISI ...... ..... ...F1.20F(1) 11 206-006-HOl 1 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ...... ...PR E ..............F-A V1 11206-006-HO12 IS1-11206-006 ISI ...... ..... ...Fi.20F(1) 11206-006-H012 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PR E ..............F-A V1 11206-006-HO15 ISI-11206-006 ISI ...... ..... ...F1.20F(1) 11206-006-HO15 LIN RESTRAINT AUG ...... ..... ...2 1206 OWN P R E ..............F-A V1 11206-006-HO16 ISI-11206-006 IS] ...... ..... ...F1.20F(1) 11206-006-HO16 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11206-006-H018 IS1-11206-006 ISI ...... ..... ...F1,20F(1) 11206-006-H018 UN RESTRAINT AUG ...... ..... ...2 1206 OWN PR E ..............F1.20F(1) 11206-006-H021 2 1206 LIN RESTRAINT iSI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 49 -100

..... ......... "= ' inrq `ý .. .... " ... .. ..Southern -Nuclear pERaiON C ay 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Owg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3r- e, w c c cc Ic cc a> > >> > >Summarv No.lComplD/Svstem Scope / Method / Procedure F-A V1 11206-006-H022 ISI-11206-006 ISI ...... ..... ...F1.20F(1) 11206-006-H022 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ...... ...PRE ----....F-A V1 11206-006-H023 IS1-11206-006 ISI ...... .......F1.20F(1) 11206-006-H023 LIN RESTRAINT AUG 2 1206 OWN ...... ..... ...PRE ..............F-A V1 11206-006-H025 ISI-11206-006 ISI ...... ..... ...F1.20F(1) 11206-006-H025 LIN RESTRAINT AUG .. ..... ..... ...2 1206 OW N ..... ...... ...PRE ..............F-A V1 11206-007-H001 ISI-11206-007 ISI F1.20F(1) 11206-007-H001 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-007-H003 ISI-11206-007 SI ...... ..... ...Fl.20F(1) 11206-007-H003 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-007-H021 ISI/VT/ ISI-11206-007 ISI .....................

s F1.20F(1) 11206-007-H021 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PR E ..............F-A V1 11206-007-H037 ISI-11206-007 ISI ...... ..... ...F1.20F(1) 11206-007-H037 LIN RESTRAINT AUG 2 1206 OWN -..... ..... ..PRE ..............F-A V1 11206-007-H038 ISI-11206-007 iSI F1.20F{1) 11206-007-H0'38 LIN RESTRAINT AUG 2 1206 OW N ..... ..... ....PRE ....F-A Vi 11206-007-H039 ISI-11206-007 ISI -..........F1.20F(1) 11206-007-H039 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ...... ...PRE F-A V1 11206-007-H040 Fi.20F(1) 11 206-007-H040 2 1206 SI- 11205-007 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 50 -100 So-uthern Nucl.ear Operating Company.3rd Interval: VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class DwgAISO No.Comp. Desc.Code Case-T wr- mo 0~ ~> >Summary No./CompID/Svstem Scope I Method / Procedure F-A V1 11206-007-H041 ISI-11206-007 iSI ...... ..... ...F1.20F(1) 11206-007-H041 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PR E ..............F-A V1 11206-007-H044 ISI-11206-007 ISI ...... ..... ...F1.20F(1) 11206-007-H044 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-007-H047 IS1-1 1206-007 SI ...... ..... ...F1.20F(1) 11206-007-H047 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....P R E ..............F-A V1 11206-007-H048 ISI-11206-007 ISI ...... ..... ...F1.20F(1) 11206-007-H048 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-007-H050 ISI-11206-007 ISI ...... ..... ...F1.20F(1) 11206-007-H050 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ...... .... ....P R E ..............F-A V1 11206-007-H053 ISI-11206-007 ISI ...... ..... ...Fl.20F(i) 11206-007-H053 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PR E ..............F-A V1 11206-007-H055 ISI-11206-007 Is[F1.20F(l) 11206-007-H055 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PR E ..............F-A VI 11206-007-H056 ISI-11206-007 SI ...... ..... ...F1.20F(1) 11206-007-H056 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PR E ..............F-A Vi 11206-007-H058 ISI-11206-007 ISI ...... ..... ...F1,20F(i) 11206-007-H058 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ...... ...PR E ..............F'A V1 11206-007-HO59 F1.20F(1) 11206-007-H059 2 1206[ISN-1 I LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 51 -100 Sout .hern Nuclear operating' Comnpany 3rd Interval'VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Summary No JComplD/System Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Scope / Method / Procedure F-A Vi 11206-007-H062 ISI-11206-007 ISI F1,20F(l) 11206-007-H062 LIN RESTRAINT AUG ...... ..... ...2 1206 OWN PRE F-A V1 11206-007-H063 IS1-11206-007 ISI ...... ..... ...Fl.20F(1) 11206-007-H063 LIN RESTRAINT AUG ...... ..... ...2 1206 OWN PR E ..............F-A V1 11206-008-H009 ISI-11206-008 ISI ...... ..... ...F1.20F(1) 11206-008-H009 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ...... ...PRE ..............F-A V1 11206-008-HO-i ISI-11206-008 tSI ...... ..... ....F1.20F(1) 11 206-008-HOl 1 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE F-A V1 11206-008-H012 ISI-11206-008 SI ...... ..... ...F1.20F(1) 11206-008-HO12 LIN RESTRAINT AUG ...... ..... ...2 1206 OWN PRE ..............F-A V1 11206-008-H060 ISI-1 1206-008 ISI ...... ..... ...F1.20F(1) 11206-008-H060 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-008-H061 ISI-11206-008 SI -... .... .F1.20F(1) 11206-008-HO61 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A VI 11206-008-H062 ISI-11206-008 iSI F1.20F(1) 11206-008-H062 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-008-H063 ISI-11206-008 Is[ I. .... ..... ...F1.20F(1) 11206-008-H063 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE F-A Vi 11206-008-H066 Fl.20F(1) 11206-008-H066 2 1206 IS1-1i1206-008 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 52 -100 Southern Nuclear OperatINg Cma 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/1ISO No.Comp. Desc.Code Case Period I I 0 Period 2 Period 3> >m 0 Summary No./CompiD/System Scope / Method / Procedure F-A V1 11206-008-H068 ISI-11206-008 ISI .......... ...F1.20F(1) 11206-008-H068 LIN RESTRAINT AUG ----....2 1206 OWN PR E ..............F-A V1 11206-008-H069 ISI-11206-008 ISI .......... ...F1.20F(1) 11206-008-H069 LIN RESTRAINT AUG ...... ..... ...2 1206 OWN ...... ..... ...PR E ..............F-A V1 11206-008-HO71 ISI-11206-008

[SI -... .F1.20F(1) 11206-008-H071 LIN RESTRAINT AUG ... ..........2 1206 OWN -------....PR E ..............F-A V1 11206-008-H077 ISI-11206-008 ISI .......... ...F1.20F(1) 11 206-008-H077 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-008-H078 ISI-11206-008 ISI ...... ..... ...F1.20F(1) 11206-008-H078 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ...... ..... ....PR E ..............F-A V1 11206-008-HO80 ISI-11206-008 ISI ...... ..... ...Fl.20F(1) 11206-008-H080 LIN RESTRAINT AUG ...... ..... ...2 1206 OWN ...... ..... ...PRE ..............F-A V1 11206-008-HO81 ISI-11206-008 ISI -..... ..... ...F1.20F(1) 11206-008-HO81 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-008-H086 IS1-11206-008 ISI ...... ..... ...Fl.20F(1) 11206-008-H086 LIN RESTRAINT AUG ...... ..... ...2 1206 OWN ...... .... ....PRE ..............F-A V1 11206-008-H087 SI-1 1206-008 ISI .........F1.20F(1) 11206-008-H087 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE .............F1.20F(1) 11206-008-HO91 2 1206 INI-1REST-RAN UIN RESTRAINT AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 53 -100 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISl PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary No./ComplD/System Scope / Method / Procedure F-A V1 11206-008-H094 ISI-11206-008 iSI ...... ..... ...F1.20F(1) 11206-008-H094 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ...... .... ....PRE ..............F-A V1 11206-008-H099 ISI-11206-008 ISI ...... ..... ...F1.20F(1) 11206-008-H099 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE F-A V1 11206-008-H102 IS1-11206-008 SI ... ....F1.20F(1) 11206-008-HI02 LIN RESTRAINT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE F-A V1 11208-003-H014 ISI/VT/NMP-ES-024-203 ISI-11208-003 ISI c ..... ..... ...F1.20F(1) 11208-003-H014 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ...... .... ....PRE ..............F-A V1 11208-003-H016 ISI-11208-003 ISI ...... ..... ...F1.20F(1) 11208-003-HO16 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE ..............F-A V1 11208-003-HO17 ISI-11208-003 SI ...... ..... ...F1.20F(1) 11208-003-H017 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ...... ...PRE ..............F-A V1 11208-003-HO18 ISI/VT/NMP-ES-024-203 ISI-11208-003 ISI c ..... ..... ...F1.20F(1) 11208-003-H018 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E -............F-A V1 11208-003-H022 ISI-11208-003 1SI ...... ...F1.20F(1) 11208-003-H022 LIN RESTRAINT AUG 2 1208 OW N ..... ..... ....PRE ...... ...F-A V1 11208-003-H023 ISI-11208-003 ISI .. .......F1.20F(1) 11208-003-H023 LIN RESTRAINT AUG ...... ...2 1208 OW N ..... ...... ...PR E ..............F-A V1 11208-003-HO27 F1.20F(1) 11208-003-H027 2 1208 IS1-1 1208-003 LIN RESTRAINT ISI AUG-OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 54 -100 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 IS1 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1> >t0 Period 2 r-Period 3 Summary No./ComDlD/Svstem Scooe / Method / Procedure F-A V1 11208-003-H028 ISI-11208-003 ISI ...... ..... ...Fl.20F(1) 11208-003-H028 LIN RESTRAINT AUG ...... ..... ...2 1208 OWN PR E ..............F-A V1 11208-003-H029 ISl-11208-003 ISI F1.20F(1) 11208-003-H029 LIN RESTRAINT AUG ----....2 1208 OW N ..... ..... ....P R E ..............F-A V1 11208-003-H030 ISI-11208-003 ISI ...... ..... ...F1.20F(i) 11208-003-H030 LIN RESTRAINT AUG ...... ..... ...2 1208 OWN .......... ...PRE .............F-A V1 11208-003-H031 ISI-11208-003 ISI ...... ..... ...F1.20F(1) 11208-003-H031 LIN RESTRAINT AUG -..........2 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-003-H032 ISI-11208-003 ISI ...... ..... ...Fl.20F(1) 11208-003-H032 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N -.... ..... ...PRE F-A V1 11208-003-H033 IS1-1 1208-003 Is] ..... ...Fl.20F(1) 11208-003-H033 LIN RESTRAINT AUG ...... .......2 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-003-H034 ISI-11208-003 ISI F1.20F(1) 11208-003-H034 LIN RESTRAINT AUG ----....2 1208 OW N ..... ..... ....PRE F-A Vi 11208-003-H035 ISI-11208-003 ISI F1.20F(1) 11208-003-H035 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE ..................

..- -F-A V1 11208-003-H036 ISI-11208-003 ISI ..................-

--Fl.20F(1) 11208-003-H036 LIN RESTRAINT AUG ....................-

-2 1208 OWN ...... ...PRE ............."-F-A Vi 11208-003-H037 Fl.20F(i) 11208-003-H037 2 1208 ISI-11208-003 LFN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 55 -100 Southern Nuclear, OperatingCompany 3rd IntervalI VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Crass Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 o9 Summary No./ComoID/Svstem Scone i Method / Procedure F -A V 1 1 1 2 0 8 -0 0 3 -H 0 3 8 IS1 -1 1 2 0 8 -0 0 3 IS1 -..........---F1.20F(1) 11208-003-H038 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE ..............F-A V1 11208-003-H039 ISI-11208-003 SI ...... ..... ...F1.20F(1) 11208-003-H039 LIN RESTRAINT AUG ...... ..... ...2 1208 OWN ---, ---PRE ..............F-A V1 11208-003-H040 ISI-11208-003 ISI ....F1.20F(1) 11208-003-H040 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ...... .... ....PRE ..............F-A V1 11208-003-H041 ISI-11208-003 ISI ..... ..... ....F1.20F(1) 11208-003-H041 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE .............F-A V1 11208-003-H045 ISI/V-T/NMP-ES-024-203 ISI-11208-003 SIS C ..... ..... ...Fi.20F(1) 11208-003-H045 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-003-H046 ISI-11208-003 ISI ...... ..... ...F1.20F(1) 11208-003-H046 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-003-H047 ISI-11208-003 ISI ...... ..... ...F1.20F(1) 11208-003-H047 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ...... ...PR E ..............F-A V1 11208-003-H049 ISI-11208-003 ISI ...... ..... ...F1.20F(1) 11208-003-H049 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE F-A V1 11208-003-H050 ISINT/NMP-ES-024-203 ISI-11208-003 ISI c F1.20F(1) 11208-003-HO50 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ...... .... ....PRE ..............F-A V1 11208-003-HO51 F1.20F(1) 11208-003-HO51 2 1208 I51-11208-003 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 56 -100

-SOuthLE-r LNuclAr OpeRating Company'3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 a: Period 2 U, 1-0 Period 3 CC Summary NoICompiD/Svstem Scope / Method / Procedure F-A V1 11208-003-1-1052 ISI-11208-003 ISI ...... ..... ...F1.20F(1) 11208-003-H052 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-003-H053 ISI-11208-003 ISI .. ..... ..... ...F1.20F(1) 11208-003-H053 LIN RESTRAINT AUG .. ..... ..... ...2 1208 OW N ..... ..... ....PRE ..............F-A V1 11208-003-H054 ISI-11208-003 ISI ...... ..... ...F1.20F(1) 11208-003-H054 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............F-A V 11208-003-HO55 ISI-11208-003 SI ...... ..... ...F1.20F(1) 11208-003-HO55 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N -.... ..... ...PR E ..............F-A V1 11208-003-H056 ISI-11208-003 ISI ...... ..... ...F1.20F(1) 11208-003-H056 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ...... ...PR E ..............F-A V1 11208-003-H057 ISI-11208-003 ISI ...... ..... ...F1.20F(1) 11208-003-H057 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE -.- ......F-A V1 11208-003-H058 ISI-11208-003 ISI ...... ..... ...F1.20F(1) 11208-003-H058 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-003-H059 ISI-11208-003 ISI -... .... .Fl.20F(1) 11208-003-H059 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-003-HO68 ISI-11208-003 ISI ...... ..... ...Fl.20F(1) 11208-003-H068 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE ..............F-A V1 11208-003-HO72 F1.20F(1) 11208-003-H072 2 1206 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 57 -100 S~uhe~n.ucear.

OpratIng Company 3rdý Intrval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Summary NoJCompID/System Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 ixs .It Period 3 Scope / Method I Procedure F-A Vl 11208-003-H604 ISI/VT/ ISI-11208-003 SI -.-. -s Fl.20F(1) 11208-003-H604 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ...... ...PR E ..............F-A Vi 11208-003-H605 ISI-11208-003 SI ...... ..... ...Fl.20F(1) 11208-003-H605 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ...... .... ....PRE ..............F-A Vi 11208-137-H602 ISI-11208-137 ISI .......... ....Fl.20F(1) 11208-137-H602 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE ..............F-A VI 11208-137-H603 ISI/VT/NMP-ES-024-203 IS1-11208-137 ISI c ..... ..... ...Fl.20F(1) 11208-137-H603 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE ..............F-A Vl 11208-411-H610 ISI-11208-411 ISI ..... ..... ....F1.20F(1) 11208-411-H610 LIN RESTRAINT AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E .............F-A Vi 11301-001-H001 ISI-11301-001 ISI ...... ..... ...F1.20F(1) 11301-001-HOOl LIN RESTRAINT AUG ...... ..... ...2 1301 OW N ..... ..... ....P R E ..............F-A Vi 11301-002-HOOI ISI-11301-002 ISI -... .Fl.20F(l) 11301-002-HO01 LIN RESTRAINT AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE ----....F-A V1 11301-002-H002 ISI-11301-002 IS[ I. .... ..... ...Fl.20F(1) 11301-002-H002 LIN RESTRAINT AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE F-A V1 11301-003-HOO1 ISI-11301-003 ISI ...... .......Fl.20F(1) 11301-003-HOOl LIN RESTRAINT AUG ...... ..... ...2 1301 OW N ..... ..... ....PR E ..............F-A Vl i1301-003-H002 F1.20F(1) 11301-003-H002 2 1301 N1-1 13ER-003 LIN RESTRAINT SI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 58 -100 Southern Nuclear Op er Atn Cmpn 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Dwg/ISO No.Item No., Comp. Deso.Class Summary No.IComlID/Svstem Scope / Method / Procedure Code Case Period 1 a Period 2 U 2 Period 3 2.F-A V1 11301-004-H002 ISJVT/ ISI-11301-004 ISI ---s ..... ..Fl.20F(1) 11301-004-H002 LIN RESTRAINT AUG ...... ..... ...2 1301 OWN -----PR E ..............F-A V1 11302-029-HOOl IS1-11302-029 ISI ...... ..... ...F1.20F(1) 11302-029-HOOl LIN RESTRAINT AUG ...... ..... ...2 1302 OWN ...... ..... ...PR E ..............F-A V1 11302-029-H002 IS1-11302-029 ISI ...... ..... ...F1.20F(I) 11302-029-H002 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ...... ...PRE ..............F-A V1 11302-029-H003 ISI-11302-029 ISI ...... ..... ...F1.20F(1) 11302-029-H003 LIN RESTRAINT/LUGS AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE -......F-A V1 11302-029-H004 ISI-11302-029 SI ...... ..... ...F1.20F(1) 11302-029-H004 LIN RESTRAINT/LUGS AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE F-A V1 11302-029-1-1005 IS1-11302-029 SI -, F1.20F(1) 11302-029-H005 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ...... ..... ....PR E ..............F-A Vii 11302-029-H006 1S1-11302-029 ISI .......F1.20F(1) 11302-029-HOO6 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE F-A V1 11302-030-H003 ISI-11302-030 ISI ...... ..... ...F1.20F(1) 11302-030-H003 LIN RESTRAINTILUGS AUG ----....2 1302 OW N ..... ..... ....P RE ..............F-A V1 11302-030-H004 ISI-11302-030 ISI ...... ..... ...Fl.20F(1) 11302-030-H004 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE -...- -" -----P-A V1 1130-0U3U-HU15 F1.20F(1) 11302-030-H005 2 1302 1I1-i 302-0-30j LIN RESTRAINT/LUGS ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 59 -100 Southern Nuclear OpVerating Copany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 2 Period 3 10 r, co ae FEF c" Summary No./CompID/System Scope / Method / Procedure F-A V1 11302-030-H007 IS1-11302-030 ISI ...... ..... ...F1.20F(1) 11302-030-H007 LIN RESTRAINT/LUGS AUG ...... ..... ...2 1302 OWN -... .PRE .......F-A V1 11302-031-HOOl ISI-11302-031 ISI ...... ..... ...F1.20F(1) 11302-031-H001 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-031-1-1002 ISI-11302-031 ISI ...... ..... ...F1.20F(1) 11302-031-H002 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ..... ....P R E ..............F-A V1 11302-031-H003 ISI-11302-031 ISI ...... ..... ...F1 20F(1) 11302-031-1003 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ...... ..... ...PR E ..............F-A V1 11302-031-1-1004 IS1-11302-031 ISI ...... ..... ...F1 .20F(1) 11302-031-H004 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-032-HOO ISI-1 1302-032 SI ...... ..... ...F1.20F(1) 11302-032-HOOl LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE -...-.-. ...F-A V1 11302-032-H002 ISI-11302-032 SI ...... ..... ...F1.20F(1) 11302-032-H002 LIN RESTRAINT AUG -..........2 1302 OW N ..... ..... ....PRE -...-.-. ...F-A V1 11302-032-H003 ISI-11302-032 ISI -..........F1,20F(1) 11302-032-H003 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E -............F-A V1 11302-032-H007 ISM-11302-032 ISI .. .... ..... ...Ft.20F(1) 11302-032-H007 LIN RESTRAINT AUG ... ..........2 1302 OW N ..... ...... ...PRE ..............F-A V1 11302-033-Hool F1.20F(1) 11302-033-HOOl 2 1302 ISI-11302-033 LIN RESTRAINT W/LUGS ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 60 -100 Southern Nuclear OperatingComnpa'ny 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Summary No./CompID/System Dwg/ISO No.Comp. Desc.Code Case QD 1- 00 0) 0 Scooe / Method / Procedure F-A V1 11302-033-H002 1SI-11302-033 ISI ...... ..... ...F1.20F(1) 11302-033-H002 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-034-HOOI ISI-11302-034 ISI ...... ..... ...F1.20F(1) 11302-034-HOOl LIN RESTRAINT W/LUGS AUG ...... ..... ...2 1302 OWN ...... ..... ...PRE F-A V1 11302-034-H002 ISI-1i302-034 ISI ...... ..... .--F1.20F(1) 11302-034-H002 LIN RESTRAINT AUG ...... ..... ...2 1302 OWN PRE ..............F-A V1 11302-035-HOOI ISI-1 1302-035 IsI F1.20F(1) 11302-035-H001 LIN RESTRAINT/LUGS AUG ...... ..... ...2 1302 OWN -..... ..... ..PR E ..............F-A V1 11302-036-H002 ISI ...... ..... ...F1.20F(1) 11302-036-H002 LIN RESTRAINT/LUGS AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-084-HOOI IS1-11302-084 ISI ...... ..... ...FI.20F(1) 11302-084-H001 LIN RESTRAINT/LUGS AUG ...... ..... ...2 1302 OWN ...... .... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11302-084-1-1002 1S1-11302-084 ISI ...... ..... ...F1.20F(1) 11302-084-1-002 LIN RESTRAINT AUG -..... ..... ..2 1302 OW N ...... ..... ...PR E ..............F-A Vi 11302-085-HOOl ISI-11302-085 ISI ........F1,20F(1) 11302-085-HOOl LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE --.........F-A V1 11302-085-H002 ISI-11302-085 ISI ...... ..... ...F1.20F(1) 11302-085-H002 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ...... ...PR E ..............F-A Vi 11302-085-H003 F1.20F(1) 11302-085-H003 2 1302 S1-i11302-05 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduieWorks V. 8.1 Page 61 -100

.SoutbhernN~uclear Operating.;

Company.3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, hem No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 cc CC0 Period 3 Summary No.lComplD/System Scope I Method / Procedure F -A V 1 1 1 3 0 2 -0 8 5 -H 0 0 4 IS I- 1 1 3 0 2 -0 8 5 IS I ..............F1.20F(1) 11302-085-H004 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-086-HOOI ISI-11302-086 ISI ...... ..... ...F1.20F(1) 11302-086-HOOl LIN RESTRAINT AUG ...... ..... ...2 1302 OWN ...... ..... ...P R E ..............F-A Vi 11302-086-H002 ISI-11302-086 ISI .......... ...F1.20F(1) 11302-086-H002 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ...... ..... ...PR E ..............F-A V1 11302-086-H003 ISI-11302-086 SI ...... ..... ...F1.20F(1) 11302-086-H003 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE ...... ..... ...F-A Vii 1302-086-H004 IS1-11302-086 ISI .......F1.20F(1) 11 302-086-H004 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-086-H005 ISI-11302-086 SI ...... ..... ...F1.20F(1) 11302-086-HOS LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-087--H002 ISI-11302-029 ISI ...... ..... ...F1.20F(1) 11302-087-H002 LIN RESTRAINT AUG ...... ..... ...2 1302 OWN ..... ..... ....PRE ..............F-A Vl 11302-107-HOOl ISI-11302-107 iSI ...... ..... ...F1.20F(1) 11302-107-H001 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E ..............F-A Vi 11302-107-H004 ISI/VT/ ISI-11302-107 SI- .-.-- .-.- ---F1.20F(1) 11302-107-H004 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E .............--A Vi 11302-101-r1UU5 F1.20F(1) 11302-107-H005 2 1302 IUlV I/I21-11,302-107 LIN RESTRAINT ISI AUG OWN PRE S 8/31/2009 ScheduleWorks V. 8.1 Page 62 -100 SOGThern Nuclea OPeratnCompany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3> > I Summary No./CompID/System Scope/ Method I Procedure F-A V1 11302-107-1-1009 ISIN/T/ ISI-11302-107 ISI -- ---- -------- -s ---F1.20F(1) 11302-107-H009 LIN RESTRAINT AUG ...... ..... ...2 1302 OWN ...... ..... ...PR E ..............F-A V1 11302-108-H007 IS1-11302-108 SI ...... ..... ...F1.20F(1) 11302-108-H007 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ...... ..... ...PR E ..............F-A V1 11302-108-H028 ISI-11302-108 ISI .......... ...F1.20F(1) 11302-108-H028 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-109-HOOl ISI/VT/ ISI-11302-109 ISI ----s ..... .F1.20F(1) 11302-109-tI001 LIN RESTRAINT AUG ...... ..... ...2 1302 OWN -------- -....PRE F-A V1 11302-109-H003 ISI/VT/ ISI-11302-109 ISI ----s F1.20F(1) 11302-109-H003 LIN RESTRAINT AUG ...... ..... ...2 1302 OW N -..... ..... ..PRE ..............F-A V1 11302-110-HO10 ISI-11302-110 ISI ...... ..... ...F1.20F(1) 11302-110-HO10 LIN RESTRAINT AUG -. ..... .... ..2 1302 OW N --..... ..... ...PR E ..............F-A V1 11305-058-HOOI ISIMVT/ ISI-11305-058 ISt ..... -----F1.20F(1) 11305-058-HO00 LIN RESTRAINT AUG ...... ..... ...2 1305 OW N ..... ..... ....PR E ..............F-A V1 11305-060-HOOI ISI-11305-060 ISI ...... ..... ...F1.20F(1) 11305-060-H001 LIN RESTRAINT AUG ...... ..... ...2 1305 OW N ...... .... ....PR E ..............F-A V1 11305-062-HOOl ISI-11305-062 ISI ...... ..... ...F1.20F(1) 11305-062-H001 LIN RESTRAINT AUG ...... ..... ...2 1305 OW N ..... ..... ....PR E ..............F-A V1 11305-064-H002 F1.20F(1) 11305-064-H002 2 1305 ISI-11305-064 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 63 -100 Southern Nuclear Operaltinig Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Dwg/ISO No.Period 1 Period 2 Period 3 Category, Item No., Class Summary No./ComplD/System Scope / Method / Procedure Comp. Desc.Code Case> r->0 0 F-A V1 11305-154-H004 ISI-11305-154 SI -... .F1.20F(1) 11305-154-1-1004 LIN RESTRAINT AUG ...... ..... ...2 1305 OW N ..... ...... ...PRE .......F-A Vl 11202-001-H01 ISIT/ IS--11202-001 l- ---.. .s ...F 1 .2 0 G ( 1 ) 1 1 2 0 2 -0 0 1 -H 0 0 1 R I G ID S T R U T A U G ..............2 1202 OW N ..... ..... ....PR E ..............F-A V 1 11202-00 1-H 003 IS I/V T /N M P -E S -024-203 IS1 -11202-00 1 IS I C .............F1.20G(1) 11202-001--H003 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A Vi 11202-001-H007 ISI-11202-001 SI ..... ..... ....F1.20G(1) 11202-001-H007 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-001-H023 ISI-11202-001 ISI -.. ........F1.20G(1) 11202-001-H023 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-001-H602 ISIVVTINMP-ES-024-203 ISI-11202-001 ISI c ..... ..... ...F1.20G(1) 11202-001-H602 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....P R E ..............F-A V1 11202-140-H001 IS1-11202-140 ISI ...... ..... ...F1.20G(1) 11202-140-H001 RIGID STRUT AUG ...... .......2 1202 OW N ..... ........PR E ..............F-A V1 11202-140-H010 ISI-11202-140 ISI ...... ..... ...F1.20G(1) 11202-140-HO10 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE -............F-A V1 11202-188-HO01 IS1-11202-188 ISI --' .....F1.20G(1) 11202-188-HOOl RIGID STRUT AUG ...... ..... ...2 1202 OW N ...... .... ....PR E ..............F-A V1 11202-188-1-1002 F1.20G(1) 11202-188-H002 2 1202 ISI-11202-188 RIGID STRUT ISI AUG OWN PRE 8/3112009 ScheduleWorks V. 8.1 Page 64 -100

-Southern Nuclea`ibjýr Oeating Company;*3 rd iterval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwgIISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Ur- W e C 1- cc>>Summary No./CompID/System Scope / Method / Procedure F-A V1 11202-188-1-1004 ISI-A1202-188 ISt ...... ..... ...F1.20G(i) 11202-188-H004 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-188-H012 ISI-11202-188 ISI ...-...-....F1.20G(1) 11202-188-H012 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE .........F-A Vi 11202-188-H014 ISI-11202-188 ISI ...... ..... ...F1.20G(1) 11202-188-H014 RIGID STRUT AUG ...... ..... ...2 1202 OWN ..... ...... ...PRE ..............F-A Vl 11202-188-HO15 IS1-11202-188 SI ...... ..... ...F1.20G(i) 11202-188-HO15 RIGID STRUT AUG ...... ..... ...2 1202 OWN ...... ..... ...PRE I.. ..........F-A Vi 11202-189-HOOl ISI-11202-189 ISI ...... ..... ...F1.20G(i) 11202-189-HOOI RIGID STRUT AUG ...... ..... ...2 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-192-H007 ISI-11202-192 ISI ...... ..... ...F1.20G(i) 11202-192-H007 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE I F-A V 11202-192-1-1008 ISI-11202-192 ISI ...... ..... ...F1.20G(i) 11202-192-H008 RIGID STRUT AUG .......... ...2 1202 OW N ..... ..... ....PR E ..............F-A Vi 11202-196-H003 ISI/VT/NMP-ES-024-203 IS1-11202-196 ISI c -.... .... ..F1.20G(i) 11202-196-H003 IS)VTINMP-ES-024-203 RIGID STRUT AUG ...... ..... ...2 1202 OWN ...... ..... ...PRE ..............F-A Vi 11202-196-H004 ISI-11202-196 ISI ...... ..... ...F1.20G(1) 11202-196-H004 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-196-H006 Fl.20G(1) 11202-196-H006 2 1202 1SI-11202-196 RIGID STRUT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 65 -100 Southern Nuclear6 Oerating Ctomrp'any 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item Ho., Class Dwg/ISO No.Comp. Desc.Code Caseý !to U, co cc cc>M a Summary NoJCompID/System Scope / Method / Procedure F-A V 1 11202-196-H 017 IS I-11202-196 IS I -... ...F l .2 0 G ( 1 ) 1 1 2 0 2 -1 9 6 -H 0 1 7 R I G I D S T R U T A U G ..............2 1202 OW N ..... ...... ...PRE ... ......F-A V1 11202-196-H608 ISI-11202-196 ISI ...... ..... ...F 1 .2 0 G ( 1 ) 1 1 2 0 2 -1 9 6 -H 6 0 8 R IG ID S T R U T A U G ..............2 1202 OWN ...... ..... ...P R E ...............F-A V1 11202-197-1-1601 ISI-11202-197 Is[ ...... ..... ...F1.20G(1) 11202-197-H601 RIGID STRUT AUG ---....2 1202 OW N ...... ..... ...PR E ..............F-A V1 11202-197-H602 ISI-11202-197 ISI ...... ..... ...F1.20G(1) 11202-197-H602 RIGID STRUT AUG -..........2 1202 OW N ..... ..... ....PRE -............F-A V1 11202-197-H603 ISI/VT/NMP-ES-024-203 ISI-11202-197 ISI c -....F 1 .2 0 G ( 1 ) 1 1 2 0 2 -1 9 7 -H 6 0 3 R IG I D S T R U T A U G ..............2 1202 OWN ...... .... ....PRE ..............F-A V1 11202-205-HOOI IS]-11202-205 SI ...... ..... ...F l .2 0 G ( 1 ) 1 1 2 0 2 -2 0 5 1 0 0 1 R IG ID S T R U T A U G ..............2 1202 OW N ..... ..... ....PRE ..............F -A V 1 1 2 0 2 -2 0 7 -H 0 0 2 IS I-1 1 2 0 2 -2 0 7 S I -..........Fi.20G(1) 11202-207-H002 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11202-207-H004 ISH-11202-207 ISI ...... ..... ...F 1 .2 0 G ( 1 ) 1 1 2 0 2 -2 0 7 -H 0 0 4 R IG I D S T R U T A U G ..............2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-209-HO10 ISI-11202-209 ISI ...... ..... ...F 1 .2 0 G ( 1 ) 1 1 2 0 2 -2 0 9 -H 0 1 0 R I G I D S T R U T A U G ..............2 1202 OW N ..... ..... ....PR E ..............F.A V11 1 oflAfluW lg HI.1_e 1 On o iOl F1.20G(1) 11202-209-H605 2 1202 RIGID STRUT AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 66 -100 SOuThern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case>=>=n-Period 2 Period 3 r, c e Summary No.ICompIO/System Scope / Method / Procedure F-A V1 11202-212-H014 ISI-11202-212 ISI ...... ..... ...F1.20G(1) 11202-212-H014 RIGID STRUT AUG ...... ..... ...2 1202 OWN ...... ..... ...PR E ..............F-A Vi 11202-216-H005 ISI-11202-216 ISI ...... ...Fl .20G(1) 11202-216-H005 RIGID STRUT AUG ...... ..... ...2 1202 OWN ----....PRE .......... ...F-A V1 11202-216-HOli IS1-11202-216 ISI ...... ..... ...F1.20G(1) 11202-216-HOl1 RIGID STRUT AUG ...... ..... ...2 1202 OWN ....PR E ..............F-A V1 11202-216-H022 ISI-11202-216 SI ...... ..... ...F1.20G(1) 11202-216-H022 RIGID STRUT AUG ...... ..... ...2 1202 OW N ...... ..... ...PRE -......F-A V1 11202-216-H025 ISI-11202-216 ISI -...-...-....F1.20G(1) 11202-216-H025 RIGID STRUT AUG ...... ..... ...2 1202 OWN ...... ..... ...PRE ... .....F-A V1 11202-216-H028 ISI-11202-216 SI ...... ..... ...F1.20G(1) 11202-216-H028 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-216-H036 ISI-11202-216 ISI ...... ..... ...F1.20G(1) 11202-216-H036 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE -......F-A V1 11202-220-H009 IS1-11202-220 SI ...... ..... ...F1.20G(1) 11202-220-H009 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ...... ..... ...F-A Vi 11202-220-H020 151-11202-220 ISI ...... ..... ...Fl.200(1) 11 202-220-H020 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ..............F-A Vi 11202-220-H021 F1.20G(1) 11202-220-HO21 2 1202 IS21i 1202-220 RIGID STRUT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 67 -100 Southern Nuclear Operating Company 3rd Interval.VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg1ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 IT rw ý- 0,!2 0ýSummary No./ComDID/System Scope / Method / Procedure F-A V1 11202-220-H024 IS1-11202-220 ISI ...... ..... ...F1.20G(1) 11202-220-H024 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-223-1-1002 ISI/VT/NMP-ES-024-203 IS1-11202-223 ISI -..... ..... ...F1.20G(1) 11202-223-H002 RIGID STRUT AUG ...... ..... ...2 1202 OW N ...... ..... ...PRE F-A V1 11202-223-HO10 ISI/V'T/NMP-ES-024-203 IS1-11202-223 ISI c0 ..... ..... ...F1,20G(1) 11202-223-HO IO RIGID STRUT AUG ...... ..... ...2 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-223-HO12 ISI-11202-223 ISI ...... ..... ...F1,20G(1) 11202-223-HO12 RIGID STRUT AUG ...... ..... ...2 1202 OW N ...... .... ....PRE ..............F-A V 11202-223-H014 ISI-11202-223 ISI -... .F1,20G(1) 11202-223-HO14 RIGID STRUT AUG ----....2 1202 OWN PRE F-A V1 11202-223-HO15 ISI-11202-223 ISI ...... ..... ...F1,20G(1) 11202-223-HO15 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....P R E ..............F-A Vi 11202-223-H016 ISI-11202-223 ISi ...... ..... ...F1,20G(1) 11202-223-HO16 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-223-HO18 ISI-11202-223 tSI ...... ..... ...F1,20G(1) 11202-223-HO18 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....P R E ..............F-A V1 11202-223-H020 ISINT/ I1S-11202-223 SI .. .. ----F1,20G(1) 11202-223-H020 RIGID STRUT AUG -..........2 1202 OWN ..... ..... ....PR E ..............F-A V 11202-223-HO21 F1,20G(1) 11202-223-H021 2 1202 ISI-11202-223 RIGID STRUT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 68 -100 Southern Nuclear Operating -Cormpany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwgfISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 r- to at o Ir M:>Summary No./ComplD/System Scope / Method / Procedure F-A V1 11202-223-H023 ISI-11202-223 ISI ...... ..... ...F1.20G(1) 11202-223-H023 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-223-H024 ISI-11202-223 ISI ...... ..... ...Fi.20G(i) 11202-223-H024 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ...... ...P R E -. -.- -.-. .-.- ..-. ..F-A V1 11202-223-H025 ISH-11202-223 ISI -.......F1.20G(i) 11202-223-H025 RIGID STRUT AUG ----....2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-225-H006 ISI-11202-225 ISi ...... ..... ...F1.20G(1) 11202-225-H006 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A Vi 11202-225-H008 ISI/VT/ i1S-11202-225 ISI -s ----....F1.20G(1) 11202-225-H00B RIGID STRUT AUG ...... ..... ...2 1202 OW N ...... ..... ....PRE ...... ..... ...F-A V1 11202-225-H010 I31-11202-225 ISI ...... ...F1.20G(1) 11202-225-HO10 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ........PR E ..............F-A V1 11202-225-H013 ISI/VT/ ISI-11202-225

]SI ---- ----F1.20G(1) 11202-225-H013 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-225-H014 ISI-11202-225 ISI ...... ..... ...F1.20G(1) 11202-225-HO14 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11202-225-HO15 IS1-11202-225 ISI ...... ..... ...F1l20G(1) 11202-225-H015 RIGID STRUT AUG ...... ..... ...2 1202 OW N ...... ..... ...PR E ..............F:.A V/1 11202 225-1.-10t1R liIt Io,3,0 F1.20G(1) 11202-225-H016 2 1202 RIGID STRUT AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 69 -100 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/iSO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary No./ComplD/System Scope / Method I Procedure F-A V1 11202-225-H021 ISI-11202-225 ISI ...... ..... ...Fi.20G(1) 11202-225-H021 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-225-H025 ISI-11202-225 ISI ...... ..... ...F1.20G(1) 11202-225-H025 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PRE F-A V1 11202-229-H003 ISI-11202-229 ISI ...... ..... ...F1.20G(1) 11202-229-1-1003 RIGID STRUT AUG ...... ..... ...2 1202 OW N ...... .... ....PRE ..............F-A V1 11202-229-H004 ISI-11202-229 ISI F1.20G(1) 11202-229-1-1004 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ...... ...PRE -. ..-.- ....F-A V1 11202-229-HO10 ISI-11202-229 ISI ...... ..... ...F1.20G(1) 11202-229-HO IO RIGID STRUT AUG ...... ..... ...2 1202 OW N ...... .... ....PRE ..............F-A V1 11202-229-H ill ISI-11202-229 SI ...... ..... ...Fi.20G(1) 11202-229-HOl1 RIGID STRUT AUG ...... ..... ...2 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-231-H004 ISI-11202-231 SI ...... ..... ...F1.20G(1) 11202-231-H004 RIGID STRUT AUG ...... ..... ...2 1202 OW N ...... .... ....PRE F-A V1 11202-231-HOI ISI-11202-231 ISI ...... ..... ...F1.20G(1) 11202-231-HOl1 RIGID STRUT AUG ...... ..... ...2 1202 OW N .. .... ..... ....PRE ...........---F-A V1 11204-001-HOO1 ISI-11204-001 ISI ...... ..... ...F1.20G(1) 11204-001-HOOI RIGID STRUT AUG ...... ..... ...2 1204 OWN ...... ..... ...P R E ..............F-A V1 11204-US-Hu014 F1.20G(1) 11204-006-H014 2 1204 SI-1i1204-006 RIGID STRUT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 70 -100 Southern Nuclear Operati ng. Co ; .m..pany Grd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Summary No./CompID/System DwgIISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3'r w- ý2 e,!2 1 0>3- > > >ScoDe / Method / Procedure F-A V1 11204-006-H030 ISI-11204-006 SI] .-.--- --- -- -- -----F1.20G(1) 11204-006-H030 RIGID STRUT AUG ...... ..... ...2 1204 OWN ........ ............

..-PRE .-- -- -- ---- ------ ----F-A V1 11204-006-H033 ISI-11204-006 ISI --................-

--F1.20G(1) 11204-006-H033 RIGID STRUT AUG ...... ..... ...2 1204 OW N ...... .... ....PR E ..............F-A V1 11204-006-H601 ISI-11204-006 ISI ...... ..... ...F1 .20G(1) 11204-006-1-1601 RIGID STRUT AUG ...... ..... ...2 1204 OW N ..... ..... ....P R E ..............F-A V1 11204-006-H603 ISI-1 1204-006 ISI ...... ..... ...Fl1.206(1) 11204-006-H603 RIGID STRUT AUG ...... ..... ...2 1204 OWN ...... ..... ...PR E ..............F-A V1 11204-007-H007 ISI-11204-007 ISI -..... ..... ..Fi.20G(1) 11204-007-H007 RIGID STRUT AUG ...... ..... ...2 1204 OWN ... ..........PRE -.- ......F-A V1 11204-007-H008 ISI/VT/NMP-ES-024-203 IS1-11204-007 ISI c ..... ..... ...F1.20G(1) 11204-007-H008 RIGID STRUT AUG ...... ..... ...2 1204 OWN ..... ..... ....PRE ..............F-A V1 11204-008-1-1006 ISI-11204-008 ISI ...... ..... ...F1.20G(1) 11204-008-H006 RIGID STRUT AUG ...... ..... ...2 1204 OW N ..... ...... ...PRE F-A Vi 11204-008-HOll ISI/VT/NMP-ES-024-203 ISI-11204-008 ISI c ..... ..... ...F1.20G(1) 11204-008-H011 RIGID STRUT AUG ...... ..... ...2 1204 OWN ... ..........PRE O .............F-A V1 11204-006-H012 ISI-11204-008 ISI ...... ..... ...F1.20G(1) 11204-008-HO12 RIGID STRUT AUG ...... ..... ...2 1204 OW N ...... ..... ...P R E ..............F-A V1 11204-008-H015 F1.20G(1) 11204-008-H015 2 1204 iSI-11204-008 RIGID STRUT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 71 -100 SSouthern Oper'ating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2>L > >Period 3 eo Summary No./ComplD/System Scope / Method / Procedure F-A V1 11204-008-H017 IS1-11204-008 ISI ...... ..... ...Fl.20G(1) 11204-008-HO17 RIGID STRUT AUG ...... ..... ...2 1204 OWN PR E ..............F-A V1 11204-010-1003 IS1-11204-010 ISI ...... ..... ...F1.20G(1) 11204-010-H003 RIGID STRUT AUG ...... ..... ...2 1204 OW N ...... .... ....P R E ..............F-A Vi 11204-010-1008 ISI-11204-010 SI ...... ..... ...F1.20G(1) 11204-010-H00B RIGID STRUT AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE --.............F-A V1 11204-012-H017 ISI-11204-012 ISI ...... ..... ...F1.20G(1) 11204-012-H017 RIGID STRUT AUG ...... ..... ...2 1204 OWN PR E ..............F-A V1 11204-012-H021 ISI-11204-012 ISI F1.20G(1) 11204-012-H021 RIGID STRUT AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE F-A V1 11204-020-H005 IS1-11204-020 ISI ...... ..... ...F1.20G(1) 11204-020-1-1005 RIGID STRUT AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE F-A V1 11204-020-H008 ISI-11204-020 ISI ...... ..... ...Fl.20G(1) 11204-020-HOO RIGID STRUT AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11204-020-HOll ISI-1 1204-020 ISI ...... ..... ...F1.20G(1) 11204-020-H0l1 RIGID STRUT AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ..............F-A V1 11204-038-H004 IS1-11204-038 ISI -..........F1.20G(1) 11204-038-H004 RIGID STRUT AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............F1.20G(1) 11204-039-H033 2 1204 RIGID STRUT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 72 -100 VOGTthern NucS apr Vaing Company 3rd In'terýv~al VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DWg/iSO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Or- !! 0 Summary No,/CompID/System Scope / Method / Procedure F-A Vi 11204-041-H028 ISI-11204-041 ISI ...... ..... ...F1.20G(1) 11204-041-H028 RIGID STRUT AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-041-H034 IS1-11204-041 ISI ...... ..... ...F1.20G(1) 11204-041-H034 RIGID STRUT AUG ...... ..... ...2 1204 OWN -..... ..... ...PR E ..............F-A V1 11204-041-H041 ISI/VT/ ISI-11204-041 SI-- -. -..--11.20G(1) 11204-041 -H041 RIGID STRUT AUG ...... ..... ...2 1204 OW N ...... .... ....PRE F-A V1 11204-057-H036 ISI-11204-057 ISI ...... ..... ...1'i.20G(1) 11204-057-H036 RIGID STRUT AUG ...... ..... ...2 1204 OW N -..... ..... ..PRE F-A V1 11204-063-HO10 ISI/VT/ ISI-11204-063 SI-- ---------

s -... ..Fl.20G(1) 11204-063-HO10 RIGID STRUT AUG ...... ..... ...2 1204 OW N ..... ...... ...PRE ..............F-A V1 11204-192-H008 IS1-11204-192 ISI ...... ..... ...Fl.20G(1) 11204-192-H008 RIGID STRUT AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ..............F-A Vi 11204-201-H006 ISI/vT/ IS1-11204-201 ISI ..-. ---s --F1.20G(1) 11204-201-H006 RIGID STRUT AUG ...... ..... ...2 1204 OW N ...... .... ....PR E ...............F-A Vi 11204-201-H007 IS1-11204-201 ISI ...F11.20G(1) 11204-201--H007 RIGID STRUT AUG ...... ..... ...2 1204 OW N ..... ..... ....P R E ..............F-A V1 11204-201-H008 ISI-1 1204-201 ISI ...... ..... ...F1.20G(1) 11204-201 -H008 RIGID STRUT AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............p-A Vl 1120U0-UVJ-10U3 Fi1.20G(1) 11205-003-H003 2 1205 IGI-D 12STUT03 RIGID STRUT IS[AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 73 -100 Southern Nuclear Opera§tin~g Comnpany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/1SO No.Comp. Desc.Code Case V Period 1 Period 2 M: a a: cc> >>>a-Period 3> : Summary No.ICompID/System Scope / Method / Procedure F-A V1 11205-003-H007 ISI-11205-003 ISI ...... ..... ...F1.20G(1) 11205-003-H007 RIGID STRUT AUG ...... ..... ...2 1205 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11205-003-H012 ISI/VT/ ISI-11205-003 ISI-- ------ -.. 7 F1.20G(1) 11205-003-H012 RIGID STRUT AUG ...... ..... ...2 1205 OW N ..... ..... ....P R E -. --. ..-. .--. .--F-A V1 11205-003-HO13 ISIJVT/ IS1-11205-003 ISI .-- -- -- ---- ---- -s ---F1.20G(1) 11205-003-H013 RIGID STRUT AUG ...... ..... ...2 1205 OW N ..... ..... ....P R E -. -.- ..-.-. .-. -. ..F-A V1 11205-003-H027 ISI/VT/NMP-ES-024-203 ISI-11205-003 ISI c -.... ..... ...F1.20G(1) 11205-003-H027 RIGID STRUT AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E -. -.- -.-. .-.- ..-. ..F-A V1 11205-003-H038 ISI-1 1205-003 SI ...... ..... ...Fl.20G(1) 11205-003-1-1038 RIGID STRUT AUG ...... ..... ...2 1205 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11205-003-H039 ISI-11205-003 ISI ...... ..... ...F1.20G(1) 11205-003-H039 RIGID STRUT AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A V1 11205-003-H040 ISHl1205-003 ISI -... .F1.20G(1) 11205-003-H040 RIGID STRUT AUG .. ...2 1205 OW N .. .... ..... ....SP R E -. -.- -.-. .-.- ..-. ..F-A V1 11205-003-H043 ISI-11205-003 ISI .. ..... ..... ...F1.20G(1) 11205-003-H043 RIGID STRUT AUG --...... ...2 1205 OWN ..... ...... ...PR E ..............F-A V1 11205-003-H045 ISI-11205-003 ISI ...... ..... ...F1.20G(1) 11205-003-H045 RIGID STRUT AUG ----....2 1205 OW N ..... ...... ...PRE .............F-A Vi 11205-003-H047 F1.20G(1) 11205-003-H047 2 1205 IS1-11205-003 RIGID STRUT iSI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 74 -100 Southern, Nuclear.'Opierating Comlpany.3rd interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 t M Period 2 10 ý- I>Period 3_0 Summary No./ComplD/System Scope / Method / Procedure F-A V1 11205-004-H002 ISM-11205-004 ISI -......F1.20G(1) 111205-004-H002 RIGID STRUT AUG ...... ..... ...2 1205 OW N ...... .... ....PRE ..............F-A V1 11205.004-1-1003 ISI-11205-004 ISI .. ..... ..... ...F1.20G(1) 11205-004-H003 RIGID STRUT AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE F-A V1 11205-004-1-1007 ISM-11205-004 ISI -..........F1.20G(1) 11205-004-H007 RIGID STRUT AUG ...... ..... ...2 1205 OW N .. ..... ..... ....PRE ..............F-A V1 11205-004-H008 IS1-11205-004 ISI ...... ..... ...F1.20G(1) 11205-004-H008 RIGID STRUT AUG ...... ..... ...2 1205 OW N ...... ..... ...PR E ..............F-A V1 11205-004-H016 IS1-11205-004 ISI ...... ..... ...F1.20G(1) 11205-004-HO16 RIGID STRUT AUG ...... ..... ...2 1205 OWN ...... ..... ...PR E ..............F-A V1 11205-004-H017 151-11205-004 ISI ...... ..... ...F1.20G(1) 11205-004-H017 RIGID STRUT AUG ...... ..... ...2 1205 OWN ...... ..... ...PR E ..............F-A V1 11205-004-H018 IS1-11205-004 ISI ...... ..... ...F1.20G(1) 11205-004-HO18 RIGID STRUT AUG ...... ..... ...2 1205 OWN P R E ..............F-A V1 11205-004-H023 IS1-11205-004 ISI ... ....F1.20G(1) 11205-004-H023 RIGID STRUT AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............F-A V1 11205-005-H002 ISI-11205-005 ISI ...... ..... ...F1.20G(1) 11205-005-H002 RIGID STRUT AUG ...... ..... ...2 1205 OW N ..... ...... ...PRE ..............F-A Vi 1 12U5-UU05-H1UO F1.20G(1) 11205-005-HOOB 2 1205 ISI-1i1205-005 RIGID STRUT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 75 -100 90Siouthern Nuclear OperatIng CompanyI:., 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period I Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case U, C cc R a Summary No./CompID/System Scope/ Method / Procedure F-A V1 11205-005-H018 ISI-11205-005 SI ...... ..... ...F 1 .2 0 G ( 1 ) 1 1 2 0 5 -0 0 5 -H 0 1 8 R I G I D S T R U T A U G ..............2 1205 OW N ..... ...... ...P R E ..............F-A V1 11205-006-HOl 1 ISI-11205-006 ISI ...... ..... ...F 1 .2 0 G ( 1 ) 1 1 2 0 5 -0 0 6 -H 0 l 1 R I G I D S T R U T A U G ..............2 1205 OW N ...... .... ....PRE -......P-A V1 11205-006-H016 ISI-11205-006 ISI ...... ..... ...F1.20G(1) 11205-006-HO16 RIGID STRUT AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A V1 11205-006-H020 IS1-11205-006 ISI ...... ..... ...F1.20G(1) 11205-006-H020 RIGID STRUT AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A V1 11205-006-H021 ISI-11205-006 ISI ...... ..... ...F1.20G(1) 11205-006-HO21 RIGID STRUT AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A V1 11205-006-H026 ISI-11205-006 ISI F1.20G(1) 11205-006-H026 RIGID STRUT AUG ...... ..... ...2 1205 OW N ...... .... ....P R E ..............F-A V1 11205-006-H027 ISI-11205-006 ISI ...... ..... ...F1.20G(1) 11205-006-H027 RIGID STRUT AUG ...... ..... ...2 1205 OW N ..... ...... ...PRE ...... ..... ...F-A V1 11205-007-H012 ISI/VT/NMP-ES-024-203 IS1-11205-007 ISI c ..... ..... ...F1.20G(1) 11205-007-HO12 RIGID STRUT AUG ...... ..... ...2 1205 OWN ...... .... ....PRE ..............F-A V1 11205-007-HO16 ISI-11205-007 ISI ...... ..... ...F1.20G(1) 11205-007-HO16 RIGID STRUT AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............F-A V! 1125U-007-H'lUb]

F1.20G(1) 11205-007-HO61 2 1205 I II/VT/NMP-"S--24-203 RIG-1120-TU07 RIGID STRUT ISI AUG OWN PRE C ---8/31/2009 ScheduleWorks V. 8.1 Page 76 -100

-',§uth~ern Nuclear OpercatI n g" Co!Mpany 3rd Interval'VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 0)Period 3 cc Summary No./ComplD/System Scope / Method I Procedure F-A V1 11205-007-H601 IS1-11205-007 SI ...... ..... ...F1.20G(1) 11205-007-1601 RIGID STRUT AUG ...... ..... ...2 1205 OW N ..... ...... ... .PRE F-A V1 11205-007-H604 ISI/VT/ ISI-11205-007 ISI --...............

...F1.20G(1) 11205-007-H604 RIGID STRUT AUG 2 1205 OW N ...... .... ....PR E ..............F-A V1 11205-008-H026 ISI-11205-008 ISI ...... ..... ...F1 .20G(1i) ii1205-008-H026 RIGID STRUT AUG .......2 1205 OW N ..... ........PRE ..............F-A V1 11205-008-H052 IS1-11204-041 ISI ...... ..... ...F1.20G(1) 11205-008-H052 RIGID STRUT AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............F-A V1 11205-008-H058 ISI-11205-008 tSI ...... ..... ...F1.201(1) 11205-008-H058 RIGID STRUT AUG ...... ..... ...2 1205 OW N ...... ..... ...P R E ..............F-A Vi 11205-010-H017 ISI-11205-010 ISI ...... ..... ...Fi.20G(1) 11205-010-H017 RIGID STRUT AUG ...... ..... ...2 1205 OW N ...... .... ....PRE F-A V1 11205-010-H019 ISI-11205-010 ISI ...... ..... ...F1.20G(1) 11205-010-HO19 RIGID STRUT AUG ...... ..... ...2 1205 OW N ...... .... ....PRE ......F-A V1 11205-010-H601 ISI-11205-010 ISI ...... ..... ...F1.20G(1) 11205-010-1-1601 RIGID STRUT AUG ...... ..... ...2 1205 OW N ...... .... ....PRE -.. ..........F-A V1 11205-027-HOOl ISI-11205-027 ISI ...... ..... ...Fl.20G(1) 11205-027-HOOl RIGID STRUT AUG .......... ...2 1205 OWN ....PRE F-A Vi 11205-027-H004 F1.20G(1) 11205-027-11004 2 1205 SI-1 1205-027 RIGID STRUT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 77 -100 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Dwg/ISO No.Comp. Desc.Code Case 0) 0 Summry~~n NnJCom.nlD/Svstem Scooe / Method I Procedure F-A V1 11205-027-HOO5 ISI-11205-027 ISI ...... ..... ...F 1 .2 0 G ( 1 ) 1 1 2 0 5 -0 2 7 -H 0 0 5 R IG I D S T R U T A U G ..............2 1205 OW N ..... ..... ....P R E ..............F-A V1 11205-028-H007 ISI-11205-028 ISI ...... ..... ...F1.20G(1) 11205-028-H007 RIGID STRUT AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11206-001-HOO5 ISI/NT/ ISI-11206-001 ISI -. --------------- -s F1.20G(1) 11206-001-H005 RIGID STRUT AUG ...... ..... ...2 1206 OW N ..... ...... ...PR E ..............F-A V1 11206-001-H023 ISI-11206-001 1SI ...... ..... ...F1.20G(1) 11206-001-H023 RIGID STRUT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ....F-A V1 11206-001-H026 ISI/VT/ ISI-11206-001 ISI ---------

s ----------

F1.20G(1) 11206-001-H026 RIGID STRUT AUG ...... ..... ...2 1206 OW N ..... ..... ....PR E ..............F-A V1 11206-002-H019 ISI-11206-002 ISI .. ..... ..... ...F1.20G(1) 11206-002-HO19 RIGID STRUT AUG .. ..... ..... ...2 1206 OW N ...... .... ....PRE ..............F-A V1 11206-002-H028 ISI-11206-002 ISI ...... ..... ...F1.20G(1) 11206-002-H028 RIGID STRUT AUG ...... ..... ...2 1206 OW N ..... ..... ....P R E ..............F-A V1 11206-002-H030 ISI-11206-002 ISI ...... ..... ...F1.20G(1) 11206-002-H030 RIGID STRUT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ----I ....F-A V1 11206-002-H031 ISI-11206-002 ISI ...... ..... ...F1.20G(i) 11206-002-H031 RIGID STRUT AUG .......... ...2 1206 OW N ......... ....PR E ..............F-A V1 Fl.20G(1) 11206-002-H035 2 1206 RIGID STRUT AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 78 -100 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 IS1 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 t- 2 Period 2 cc -M a a Period 3 cc Summary NoJComplD/System Scope / Method I Procedure F-A V1 11206-003-H006 IS -11206-003 ISt ....Fl.20G(1) 11206-003-1006 RIGID STRUT AUG ...... ..... ...2 1206 OWN ...... .......PRE -......F-A V1 11206-004-H003 IS1-11206-004 ISI ...... ..... ...F1.20G(1) 11206-004-H003 RIGID STRUT AUG ...... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-004-H005 ISI-11206-004 ISI -, .F1.20G(1) 11206-004-HOO5 RIGID STRUT AUG ...... ..... ...2 1206 OW N ..... ..... ....PR E .............F-A V1 11206-005-H004 ISINT/ $SI-11206-005 ISI .-. ...-.-.-.-

s Fi.20G(1) 11206-005-H004 RIGID STRUT AUG ...... ..... ...2 1206 OWN PRE F-A V1 11206-005-H007 ISI-11206-005 ISI ...... ..... ...F1.20G(1) 11206-005-H007 RIGID STRUT AUG ...... ..... ...2 1206 OW N ...... .... ....PRE -------....F-A V1 11206-005-H012 IS1-11206-005 ISI ...... ..... ...Fl.20G(1) 11206-005-HO12 RIGID STRUT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-007-H043 ISI-11206-007 ISI ...... ..... ...F1,20G(1) 11206-007-H043 RIGID STRUT AUG -..... ..... ...2 1206 OW N ..... ...... ...PR E ..............F-A V1t 1206-008-H089 ISI-11206-008 ISI ...... ..... ...F1.20G(1) 1 1206-008-H089 RIGID STRUT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE -......F-A V1 11206-008-H096 ISI-11206-008 ISI ...... ..... ...F1.20G(1) 11206-008-H096 RIGID STRUT AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE -...-.-. ...F-A Vi 11206-008-H100 F1.20G(1) 11206-008-HlOC 2 1206 IS-i 1206-008 RIGID STRUT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 79 -100

ý'oblthern Nuc~lear Op~erating-Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case I> > !0o0 Summary NoJCompID/System Scope / Method / Procedure F-A V1 11208-003-H004 ISI-11208-003 SI ...... ..... ...F1.20G(1) 11208-003-H004 RIGID STRUT AUG ...... ..... ...2 1208 OWN ...... ..... ...PR E ..............F-A V1 11208-139-HOOl IS1-11208-139 ISI ...... ..... ...F1.20G(1) 11208-139-HOOl RIGID STRUT AUG ...... ..... ...2 1208 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11208-141-H006 ISI/vT/ ISI-11208-141 ISI-- ---- -- s -F1.20G(1) 11208-141-HOO6 RIGID STRUT AUG --...... ...2 1208 OWN ....PRE .............F-A V1 11208-141-HO10 ISI-11208-141 ISI ...... ..... ...F1.20G(1) 11208-141-HOlD RIGID STRUT AUG ...... ..... ...2 1208 OWN .......... ...PRE ----....F-A V1 11301-001-H003 ISI/VT/ ISI-11301-001 ISI ----- ---- ------ -s --s F1.20G(1) 11301-001-H003 RIGID STRUT AUG ...... ..... ...2 1301 OWN ----....PRE .............F-A Vi 11301-004-H003 ISI/T/ ISI-11301-004 ISI ---s F1.20G(1) 11301-004-H003 RIGID STRUT AUG -..........2 1301 OW N ...... .... ....PRE ...... ..... ...F-A V1 11301-013-H003 ISI-11301-013 ISI ...... ..... ...F1.20G(1) 11301-013-H003 RIGID STRUT AUG ...... .......2 1301 OW N ...... .... ....PRE .............F-A V1 11301-014-H002 ISI-11301-013 SI ...... ..... ...F1.20G(1) 11301-014-H002 RIGID STRUT AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE .......... ...F-A V1 11301-014-HO05 IS1-11301-014 SI ...... ..... ...F1.20G(1) 11301-014-H005 RIGID STRUT AUG ...... ...2 1301 OW N ..... ..... ....PRE ........F1.20G(1) 11301-014-HO06 2 1301 RIGID STRUT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 80 -100 Southern Nu'clear OQperating Company IGL-3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Summary NoJComplDSystem DwgA1SO No.Comp. Desc.Code Case>3.3>=>=>3.Scope I Method I Procedure F-A V1 11301-014-HO10 IS1-1 1301-014 SI ...... ..... ...F1.20G(1) 11301-014-HO10 RIGID STRUT AUG ...... ..... ...2 1301 OW N ......... ....PRE .............F-A V1 11301-015-H002 ISI-11301-015 ISI ...... ..... ...F1.20G(1) 11301-015-1-1002 RIGID STRUT AUG ...... ..... ...2 1301 OW N ..... ..... ....PR E ..............F-A V1 11301-015-H004 IS1-11301-015 iSI ..........F1.20G(1) 11301-015-H004 RIGID STRUT AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE I. ...F-A V1 11301-015-H005 ISI-11301-015 ISI ...... ..... ...Fl.20G(1) 11301-015-HOOS RIGID STRUT AUG ...... ..... ...2 1301 OW N ..... ..... ....PR E ..............F-A V1 11301-015-H008 ISI-11301-015 iSI ...... ..... ...F1.20G(1) 11301-015-H008 RIGID STRUT AUG ...... ..... ...2 1301 OW N ..... ..... ....PR E ..............F-A V1 11301-068-H613 SI ...... ..... ...Fl.20G(i) 11301-068-H613 RIGID STRUT AUG ...... ..... ...2 1301 OW N ..... ..... ....PR E ..............F-A V1 11301-110-H003 ISI ..... ..... ....F1.20G(1) 11301-110-H003 RIGID STRUT AUG ...... ..... ...2 1301 OWN ----....PR E ..............F-A V1 11302-029-H008 ISI-11302-029 ISI ...... ..... ...Fl.20G(1) 11302-029-H008 RIGID STRUT AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-031-H009 ISI/VT/ ISI-11302-031 SI[ -.---- -------- -s -=F1.20G(1) 11302-031-1-1009 RIGID STRUT AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-031-HO10 F1.20G(1) 11302-031-HO10 2 1302 RIG-ID302-03 RIGID STRUT ISi AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 81 -100 Southern Nucleaý:r Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class DwgIISO No.Comp. Desc.Code Case m- wr 1s r- is w it>>C- 0.Summary No./CompID/System Scope I Method / Procedure F-A V1 11302-032-HO10 ISI-11302-032 ISI -..... ..... ..Fl.20G(1) 11302-032-HO10 RIGID STRUT AUG ...... ..... ...2 1302 OWN PRE ..............F-A V1 11302-107-H006 IS1-11302-107 ISI ...... ..... ...F1.20G(1) 11302-107-H006 RIGID STRUT AUG --- -----....2 1302 OW N ..... ..... ....P R E ..............F-A V1 11302-107-1-1007 ISI-1 1302-107 iSI ... ..........F1.20G(1) 11302-107-H007 RIGID STRUT AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-107-H008 ISI-11302-107 ISI ...... ..... ...F1.20G(1) 11302-107-H008 RIGID STRUT AUG ...... ..... ...2 1302 OW N ..... ...... ...PR E ..............F-A V1 11302-108-H008 151-11302-108

]SI ...... ..... ...F1.20G(1) 11302-108-HOO8 RIGID STRUT AUG 2 1302 OW N ...... .... ....PRE ..............F-A V1 11302-108-HOll ISI-11302-108 SI ...... ..... ...F1.20G(1) 11302-108-HOll RIGID STRUT AUG ...... ..... ...2 1302 OWN ...... ..... ...PR E ..............F-A V1 11302-108-H020 ISI-11302-108 ISI ...... ..... ...F1.20G(1) 11302-108-H020 RIGID STRUT AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11302-108-H025 IS1-11302-108 ISI ...... ..... ...F1.20G(1) 11302-108-H025 RIGID STRUT AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E ..............F-A Vi 11302-109-H002 ISIVT/ ISM-11302-109 ISI .-.-.-...

S -. ... ...--F1.20G(1) 11302-109-H002 RIGID STRUT AUG ...... ..... ... .2 1302 OW N ...... .... ....PRE I F1.20G(1) 11302-109-H005 2 1302 I -IVI RIGID STRUT 121 AUG OWN PRE S 8/31/2009 ScheduleWorks V. 8.1 Page 82 -100 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwgIISO No.Camp. Desc.Code Case Period 1 Period 2 a-> > >2->>Period 3 cc cc Summary No./ComDID/Svstem Scope / Method / Procedure F-A V1 11302-109-H006 ISI-11302-109 IS] ...... ..... ...F1,20G(,1) 11302-109-1-1006 RIGID STRUT AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-109-H007 IS1-11302-109 SI ...... ..... ...F1.20G(1) 11302-109-H007 RIGID STRUT AUG ...... ..... ...2 1302 OW N ..... ...... ...P R E ..............F-A V1 11302-109-H008 ISINT/NMP-ES-024-203 ISI-11302-109 ISI c .. ... ..... ...F1.20G(1) 11302-109-1-1008 RIGID STRUT AUG 2 1302 OW N ..... ..... ....P RE ..............F-A V1 11302-109-HO10 IS1-11302-109 ISI ...... ..... ...F1.20G(1) 11302-109-HO10 RIGID STRUT AUG .......... ...2 1302 OWN PR E ..............F-A V1 11302-109-H013 IS1-11302-109 ISI ...... ..... ...F1.20G(1) 11302-109-H013 RIGID STRUT AUG ...... ..... ...2 1302 OW N ..... ..... ....P R E ..............F-A V1 11302-109-H021 ISI-11302-109 ISI ...... ..... ...F1.20G(1) 11302-109-H021 RIGID STRUT AUG ...... ..... ...2 1302 OWN PR E ..............F-A V1 11302-110-1-1009 ISI-11302-110 ISI ...... ..... ...F1.20G(1) 11302-110-H009 RIGID STRUT AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-110-HOll IS1-11302-110 is] .. ........F1.20G(1) 11302-110-HO11 RIGID STRUT AUG ...... .......2 1302 OWN ...... ...PR E ..............F-A V1 11302-110-H012 IS1-11302-110 ISI ...... ..... ...F1,20G(1) 11302-110-H012 RIGID STRUT AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-110-H014 Fl.20G(1) 11302-110-H014 2 1302 IS1-11302-110 RIGID STRUT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 83 -100 Southern, Nuc lear Operatin g, Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Um to ý- (O> >r m cc 0 Summary NoJComplD/System Scope / Method / Procedure F-A V1 11302-110-HO15 ISl-11302-110 ISI ...... ..... ...F 1 .2 0 G ( 1 ) 1 1 3 0 2 -1 1 0 -H O 1 5 R I G I D S T R U T A U G ..............2 1302 OWN ...... ..... ...PR E ..............F-A V1 11302-110-H016 ISI-11302-110 ISI .......... ...F1.20G (l) 11302-110-HO 16 R IG ID ST R UT A UG -........2 1302 OWN ...... .......PR E ..............F-A V1 11302-110-HO20 ISI-11302-110 IS1 ...... ..... ...F1.20G(1) 11302-110-H020 RIGID STRUT AUG 2 1302 OWN ...... ..... ...PR E ...............F-A Vi 11302-110-H024 ISI-11302-110 ISI ...... ..... ...F1.20G(1) 11302-110-H024 RIGID STRUT AUG 2 1302 OW N ..... ..... ....PRE ..............F-A V1 11305-155-H002 ISI-11305-155 ISI ...... ..... ...F 1 .2 0 G ( 1 ) 1 1 3 0 5 -1 5 5 -H 0 0 2 R IG ID S T R U T A U G ..............2 1305 OWN ...... ..... ...P R E -. -.- ..-. -. .-. -. ..F-A V1 11305-156-1-002 IS I/vTr/ Is1-1 1305-156 ISi -. ...s -. .... ...F 1 .2 0 G (1 ) 1 13 0 5 -15 6 -H 0 0 2 R IG ID S T R U T A U G IN G. ..........2 1305 OW N ..............PR E ..............F-A V1 11305-157-H002 ISI-11305-157 ISI ...... ..... ...F1.20G(1) 11305-157-1-002 RIGID STRUT AUG -. ..... ..... ...-2 1305 OW N -. -.- -.-. .-.- ..-. ..P R E .-....I -. .-. ...-. ..-F-A V1 11202-188-1-009 IS1-1 1202-188 IS] -. ..... ..... ...-F1.20H(1) 11202-188-1-009 VAR SPRiNG AUG -. ..... ..... ...- -2 1202 OW N -. -.- -.-. .-.- ..-. ..P R E -. -.- -.-.-- ......F-A V1 11202-212-1-005 IS1-1 1202-212 ]SI -. ..... ..... ...- -F1.20-i(1) 11202-212-1-1005 VAR SPRING AUG -......2 1202 OW N ..... ..... ....PR E ..............F-A& V1 11M2-20.9 603.J1 Ic:_ lntoo P F1.20H(1) 11202-220-H603 2 1202 VAR SPRING AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 84 -100 Southern NucdIear Operatirig Cyomany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg1ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 M x cc M >c Summary No./ComIlD/Svstem Scone I Method I Procedure F-A Vi 11202-223-HO19 ISI-11202-223 ISI F1.20H(1) 11202-223-H019 VAR SPRING AUG ...... ..... ...2 1202 OW N ...... .... ....PR E ..............F-A V1 11202-225-H019 ISI/VT/ ISI-11202-225 ISI ---s ..... ...F1.20H(1) 11202-225-HO19 VAR SPRING AUG ...... ..... ...2 1202 OW N ..... ...... ...PRE F-A Vi 11204-006-H00l ISI/VT/ ISI-11204-006 IS1 ..--- ------- S F1.20H(1) 11204-006-HOOl VAR SPRING AUG ...... ..... ...2 1204 OW N ...... .... ....PRE ..............F-A V1 11204-006-H027 ISI/VT/NMP-ES-024-203 ISI-11204-006 ISI c ..... ..... ...F1.20H(1) 11204-006-H027 VAR SPRING AUG ...... ..... ...2 1204 OW N ...... .... ....PR E ..............F-A V1 11204-006-H604 ISI-11204-006 ISI ...... ..... ...F1.20H(1) 11204-006-H604 VAR SPRING AUG ...... ..... ...2 1204 OW N ..... ...... ...PR E ..............F-A V1 11204-006-H605 IS-111204-006 ISI ...... ..... ...F1.20H(1) 11204-006-H605 VAR SPRING AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............F-A Vi 11204-010-H007 ISI-11204-010 ISI ...... ..... ...Fl.20H(1) 11204-010-H007 VAR SPRING AUG ...... ..... ...2 1204 OW N ..... ..... ....PR E ..............F-A V1 11204-012-H002 ISI-11204-012 ISI ...... ..... ...F1.20H(1) 11204-012-1-1002 VAR SPRING AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11204-038-H005 ISI-11204-038 SI ...... ..... ...F1.20H(1) 11204-038-1-1005 VAR SPRING AUG ...... ..... ...2 1204 OWN ...... ..... ...PR E -.. .-. -. ...r.A V1 11204lq~-03 9-H2 ICI~l~q F1.20H(1) 11204-039-H028 2 1204 VAR SPRING.Io AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 85 -100 Southern NuclearNperatng Company 3rd Interval.VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period I Period 2 M M~ ,o M Period 3 Summary No./CompID/System Scooe / Method / Procedure F-A V1 11204-039-H032 ISI-11204-039 (SI ...... ..... ...F1.20H(1) 11204-039-H032 VAR SPRING AUG ...... ..... ...2 1204 OWN ...... .... ....PR E ..............F-A V1 11204-041-H030 ISI-11204-041 ISI ...... ..... ...F1.20H(1) 11204-041-H030 VAR SPRING AUG ...... ..... ...2 1204 OW N ...... .... ....PRE ..............F-A V1 11204-041-H037 ISI-11204-041 ISI ...... ..... ...F1.20H(1) 11204-041-H037 VAR SPRING AUG ...... ..... ...2 1204 OW N ..... ...... ...PRE ..............F-A V1 11204-063-H005 ISI-11204-063 ISI ...... ..... ...F1.20H(1) 11204-063-H005 VAR SPRING AUG ...... ..... ...2 1204 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11204-063-HOll ISI-11204-063 ISI ...... ..... ...F1.20H(1) 11204-063-HOl 1 VAR SPRING AUG ...... ..... ...2 1204 OW N ..... ..... ....P R E ..............F-A VI 11204-063-H013 ISI-11204-063 ISI .......- ""- ... ...F1.20H(1) 11204-063-H013 VAR SPRING AUG ...... ..... ...2 1204 OWN ...... ..... ...PRE F-A Vi 11205-003-H004 ISI/VT/ ISI-11205-003 ISI ---- -- ---- ---- -- s ---F1.20H(1) 11205-003-1-1004 VAR SPRING AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A V1 11205-003-H008 ISI-11205-003 ISI ...... ..... ...F1.20H(1) 11205-003-HOO8 VAR SPRING AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ...... ..... ...F-A Vi 11205-003-HO21 ISI-11205-003 ISI ...... ..... ...F1.20H(1) 11205-003-H021 VAR SPRING AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............C..-A \/I 1 I-fl=;_flnq]-f l'fl icz].11 og..f-n i-, F1.20H(1) 11205-003-HO50 2 1205 VAR SPRING AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 86 -100

'Southern' Nclear Operatinig Co6mlpany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ASO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summarv No.ICompID/Svstem Scope / Method / Procedure F-A V1 11205-004-HOOl ISI-11205-004 ISI ...... ..... ...F1.20H(1) 11205-004-HOOl VAR SPRING AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A V1 11205-004-HO1i5 IS-1"1205-004 ISI ...... ..... ...F1.20H(1) 11205-004-HO15 VAR SPRING AUG ...... ..... ...2 1205 OW N ...... .... ....PRE ..............F-A Vi 11205-004-H026 ISI-11205-004 SI ...... ..... ...F1.20H(1) 11205-004-H026 VAR SPRING AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11205-005-1-1004 ISIfVT/NMP-ES-024-203 ISI-11205-005 ISI c ..... ..... ...F1.20H(1) 11205-005-H004 VAR SPRING AUG ...... ..... ...2 1205 OW N ...... .... ....PRE ..............F-A Vi 11205-005-H016 ISI-11205-005 ISi ...... ..... ...Fi.20H(1) 11205-005-HO16 VAR SPRING AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............F-A V1 11205-006-H1OO ISI-11205-006 SIS F1.20H(1) 11205-006-HOOI VAR SPRING AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............F-A V1 11205-006-HO17 ISI-11205-006 ISI ...... ..... ...F1.20H(1) 11205-006-H017 VAR SPRING AUG ...... ..... ...2 1205 OW N ...... .... ....PR E ..............F-A V1 11205-007-H007 ISI-11205-007 Is] ...........F1.20H(1) 11205-007-H007 VAR SPRING AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A V1 11205-007-H035 ISI-11205-007 ISI ...... ..... ...F1.20H(1) 11205-007-H035 VAR SPRING AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE -.- ......UIA V1 1120.0l07-.1-l41 1-i1lr iC11O2 flfl F1.20H(1) 11205-007-H041 2 1205 VAR SPRING AUG OWN PRE (j 8/31/2009 ScheduleWorks V. 8.1 Page 87 -100

=::~~~~~~

~~~ .. ': "," ::"I , : "::' -! 1 -1":: " : r " i jý"v " ' -- ' o "z : , : VSouthern INucIar OpA erating Cmpany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class DwgAISO No.Comp. Desc.Code Case>r >rD N. ý(r ESummary NoJComplD/Svstem Scope / Method I Procedure F-A V1 11205-007-H051 IS1-11205-007 ISI ....F1.20H(1) 11205-007-HO51 VAR SPRING AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A V1 11205-008-H004 ISI-11205-008 ISI ...... ..... ...F1.20H(1) 11205-008-H004 VAR SPRING AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............F-A Vi 11205-008-H024 ISI-11205-008 -SI ...... ..... ...F1.20H(1) 11205-008-H024 VAR SPRING AUG ...... ..... ...2 1205 OW N ..... ..... ....PR E ..............F-A Vi 11205-008-H027 ISI-11205-008 ISI Fl.20H(1) 11205-008-H027 VAR SPRING AUG ...... ..... ...2 1205 OW N ..... ...... ...PRE F-A VI 11205-008-H033 ISI-11205-008 ISI ...... ..... ...F1.20H(1) 11205-008-H033 VAR SPRING AUG ...... ..... ...2 1205 OW N ...... .... ....PRE F-A Vi 11205-008-H042 IS1-11205-008 ISI ...... ..... ...F1.201-1(1) 11205-008-H042 VAR SPRING AUG ...... ..... ...2 1205 OWN PR E ..............F-A V1 11205-009-H004 ISI-11205-009 SI ...... ..... ...F1.20H(1) 11205-009-H004 VAR SPRING AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE ..............F-A V1 11205-009-1-1009 ISINVT/ ISI-1 1205-009 ISI ----S ---F1.20H(1) 11205-009-H009 VAR SPRING AUG 2 1205 OW N ..... ...... ...PR E ..............F-A VI 11205-010-HOOI ISI-11205-010 ISI ...... ..... ...F1.20H(1) 11205-010-HOOl VAR SPRING AUG ...... ..... ...2 1205 OW N ..... ..... ....PRE I ---....F-A V1 11205-010-H015 F1.20H(1) 11205-010-HO15 2 1205 ISI-11205-010 VAR SPRING ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 88 -100 SouGTern NucIlar, Oerating C.opany 3rd Initerval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Summary No./ComllD/Svstem DwgdISO No.Comp. Desc.Code Case;2 (0 P- co 2->0 Scone / Method / Procedure F-A Vi 11205-010-H018 ISI-11205-010 ISI ...... ..... ...Fl.20H(i) 11205-010-HO18 VAR SPRING AUG ...... ..... ...2 1205 OWN ...-... ..-.-----.PRE ..............F-A Vl 11206-001-1-1009 ISI-11206-001 SI ...... ..... ...F l .2 0 H (1 ) 1 1 2 0 6 -0 0 1 -H 0 0 9 V A R S P R I N G A U G ..............2 1206 OW N ..... ..... ....PR E ..............F-A V1 11206-001-H012 ISI/VT/NMP-ES-024-203 ISI-11206-001 ISI c ..... ..... ...F l .2 0 H ( 1 ) 1 1 2 0 6 -0 0 1 -H O 1 2 V A R S P R I N G A U G ..............2 1206 OW N -.... ..... ...PR E ..............F-A Vi 11206-002-H007 15-11206-002 SI ...... ..... ...F 1 .2 0 H ( 1 ) 1 1 2 0 6 -0 0 2 -H 0 0 7 V A R S P R I N G A U G ..............2 1206 OWN ...... .... ....PRE ..............F-A V1 11206-002-H032 ISi-11206-002 ISI ...... ..... ...F t .2 0 H ( 1) 1 1 2 0 6 -0 0 2 -H 0 3 2 V A R S P R IN G A U G ..............2 1206 OW N ..... ..... ....PR E ..............F-A Vi 11206-002-H036 ISI-11206-002 ISI ...... ..... ...F l .2 0 H ( 1) 1 1 2 0 6 -0 0 2 -H 0 3 6 V A R S P R I N G A U G .............2 1206 OW N ..... ..... ....PRE ..............F -A V 1 1 12 06 -00 3 100 5 IS I/V T/N M P -E S -0 24 -2 03 IS1 -1 120 6 -00 3 IS I c .............F l .2 0 H ( i ) 1 1 2 0 6 -0 0 3 -H 0 0 5 V A R S P R I N G A U G ..............2 1206 OW N ..... ..... ....PRE ..............F-A V 11206-005-H006 ISI-11206-005 ISI ...... ..... ...Fl.20H(1) 11206-005-H006 VAR SPRING AUG 2 1206 OW N ..... ..... ....PR E ..............F-A Vi 11206-006-H001 ISI-11206-006 ISI ...... ..... ...Fi.20H(1) 11206-006-HOOl VAR SPRING AUG -......2 1206 OWN ... ..........P R E ..............t-A Vi1 11U0-Uu0-Hu24 Fl.20H(1) 11206-006-H024 2 1206 VAR SPRING ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 89 -100 Southern Nuclear Operating Company L 3rd ILnterval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1-e Period 2 1 N 10 a a Period 3 Summary No./CompID/System Scope / Method / Procedure F-A V1 11206-007-H046 IS1-11206-007 ISI- --------------


--Fl.20H(1) 11206-007-H046 VAR SPRING AUG ----..-..-.-

-2 1206 OW N ..... ..... ....PR E ..............F-A V1 11206-007-H049 ISI-11206-007 ISI ...... ..... ...F1.20H(i) 11206-007-H049 VAR SPRING AUG ...... ..... ...2 1206 OWN PR E ..............F-A V 11206-007-H052 ISI-11206-007 ISI ...... ..... ...F1.20H(1) 11206-007-H052 VAR SPRING AUG ...... ..... ...2 1206 OWN ----....PRE ..............F-A Vi 11206-007-HO61 ISI-11206-007 ISI ...... .......F1.20H(1) 11206-007-HO61 VAR SPRING AUG ...... ..... ...2 1206 OW N ...... .... ....P RE ..............F-A Vi 11206-008-H070 ISI-11206-008 0SI ...... .......F1.20H(1) 11206-008-H070 VAR SPRING AUG 2 1206 OW N ..... ..... ....PR E ..............F-A V1 11206-008-H082 ISI/VT/ [SI-11206-008 IS1 .......--------

s -F1.20H(1) 11206-008-H082 VAR SPRING AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-008-H090 ISM-11206-008 ISI ...... ..... ...F1.20H(1) 11206-008-H090 VAR SPRING AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-008-H093 ISI-11206-008 ISI ...... ..... ...F1.20H(1) 11206-008-H093 VAR SPRING AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ........--F-A Vi 11206-008-H095 IS1-11206-008 ISI ...... ..... ...F1.20H(1) 11206-008-H095 VAR SPRING AUG ...... ..... ...2 1206 OW N ..... ...... ...PRE-A VI 11208j-139-HO16 Fl .20H(i) i11208-139-HO16 2 1208 I~i/V I/VRS-1120I-139 VAR SPRING ISI AUG OWN PRE S 8/31/2009 ScheduleWorks V. 8.1 Page 90 -100 Southern Nuclear Operating .Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Summary No./ComplD/System DwgIlSO No.Comp. Desc.Code Case Period 1 m.Period 2 Period 3 cr0 m m Scooe / Method / Procedure F-A VI 11208-144-H009 IS1- 1208-144 SI ...... ..... ...F1.20H(1) 11208-144-H009 VAR SPRING AUG 2 1208 OW N ..... ..... ....PRE .............F-A V1 11208-144-H012 ISI-11208-144 ISI ...... ..... ...Fl.20H(i) 11208-144-HO12 VAR SPRING AUG ...... ..... ...2 1208 OW N ..... ..... ....PR E ..............F-A V1 11208-145-HOll ISI-11208-145 IS i ----....Fl.20H(1) 11208-145-H-011 VAR SPRING AUG ...... ..... ...2 1208 OW N ..... ...... ...PRE ..............F-A V1 11301-013-H006 ISI-11301-013 SI ...... ..... ...Fl.20H(1) 11301-013-H006 VAR SPRING AUG 2 1301 OW N ..... ..... ....PRE ..............F-A V1 11301-015-H006 ISI-11301-015 ISI F1.20H(1) 11301-015-H006 VAR SPRING AUG 2 1301 OWN PRE -....F-A V1 11301-016-H003 ISI-11301-016 ISI ...... ..... ...F1.20H(1) 11301-016-H003 VAR SPRING AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE F-A VI 11301-104-H001 ISI-11301-104 SI ...... ..... ...F1.20H(1) 11301-104-H001 VAR SPRING AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE ..............F-A V1 11301-104-H007 ISIfVT/NMP-ES-024-203 ISI-11301-104 ISI c ..... ..... ...F1.20H(1) 11301-104-HO07 VAR SPRING AUG ...... ..... ...2 1301 OWN PRE ..............F-A V1 11301-105-HOO ISMS-11301-105 ISI ...... ......-"- --F1.20H(1) 11301-105-HI001 VAR SPRING AUG 2 1301 OW N ..... ..... ....PRE ..............F-A V1 11301-105-H007 F1.20H(1) 11301-105-H007 2 1301 ISI-11301-105 VAR SPRING ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 91 -100

-Southern Nuclear Op~erating Comrpany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class DwgIlSO No.Comp. Desc.Code Case Period 1>r w Period 2 Cc P. i,ý!ý:ýUr Period 3 Summary No./ComplD/System Scope / Method / Procedure F-A V1 11301-106-HOOl lSI-11301-106 iSI ...... ..... ...F1.20H(1) 11301-106-H001 VAR SPRING AUG ...... ..... ...2 1301 OW N ..... ..... ....PR E ..............F-A V1 11301-106-H007 ISI-11301-106 ISI ...... ..... ...F1.20H(1) 11301-106-H007 VAR SPRING AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE ..............F-A V1 11301-107-HOOl ISI-11301-107 ISI F1.20H(1) 11301-107-Hl001 VAR SPRING AUG ...... ..... ...2 1301 OWN ----....PRE F-A V1 11301-107-H007 IS1-11301-107 IS] .......... ...F1.20H(1) 11301-107-1-1007 VAR SPRING AUG ----....2 1301 OW N ..... ..... ....PR E ..............F-A V1 11302-107-HO15 ISM-11302-107 IS1 ...... ..... ...F1.20H(1) 11302-107-HO15 VAR SPRING AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-107-H021 ISI-11302-107 SI ...... ..... ...Fl.20H(1) 11302-107-H021 VAR SPRING AUG ...... ..... ...2 1302 OWN ----....P R E ..............F-A V1 11302-108-H006 ISI-11302-108 ISI -..........F1.20H(1) 11302-108-H006 VAR SPRING AUG -..........2 1302 OWN -..........PR E ..............F-A V1 11302-108-H009 ISI-11302-108 ISI -..........F1.20H(1) 11302-108-H009 VAR SPRING AUG ...... ..... ...2 1302 OWN ..... ...... ...PRE -.....-. ...F-A V1 11302-108-H018 ISI-11302-108 ISI .--- --- ----- -F1.20H(1) 11302-108-H018 VAR SPRING AUG -----------------------

2 1302 OWN --------------

--- --- -P RE ..............P-A Vl 11302-108-HJ21 F1.20H(1) 11302-108-H021 2 1302 ISI-11302-108 VAR SPRING ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 92 -100 Southern Nuclear Operating .Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Owg/ISO No.Comp. Desc.Code Case Period 1t2 Ur it Period 2> >2 Period 3 o w Summary No.ICompID/System Scope / Method / Procedure F-A Vl 11302-109-1004 ISI-1 1302-109 iSI ..... ...... ...Fi .20H(i) 11302-109-H004 VAR SPRING AUG ...... ..... ...2 1302 OW N ..... ..... ....P R E ..............F-A Vi 11302-109-H014 ISI/VT/NMP-ES-024-203 ISI-11302-109 ISI c ..... ..... ...Fl.20H(1) 11302-109-H014 VAR SPRING AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-109-H020 ISIIVT/ IS1- 1302-109 ISI ----F1.20H(1) 11302-109-H020 VAR SPRING AUG .. ..... ..... ...2 1302 OW N ...... .... ....PRE F-A Vi 11302-110-H018 ISI-11302-110 ISI .------ -- -----. .Fi.20H(1) 11302-110-H018 VAR SPRING AUG ...... ..... ...2 1302 OW N ...... ..... ...PR E ..............F-A Vi 11305-058-11002 ISI/VT/ ISI-11305-058 ISI ----s ..... ...Fl.20H(1) 11305-058-1002 VAR SPRING AUG .. ..... ..... ...2 1305 OW N ..... ..... ....PR E ..............F-A Vl 11305-058-H007 ISI/VT/ ISI-11305-058 ISI s ---F1.20H(1) 11305-058-H007 VAR SPRING AUG -.. ........2 1305 OWN P R E ..............F-A V1 11305-060-11002 ISI-11305-060 ISI ...... ..... ...F1.20H(1) 11305-060-11002 VAR SPRING AUG ...... ..... ...2 1305 OWN PRE -.- ......F-A V1 11305-060-11007 IS1-11305-060 SI ...... .......F1.20H(i) 11305-060-H007 VAR SPRING AUG ...... ..... ...2 1305 OW N ..... ..... ....PRE ...... .......F-A VI 11305-062-11002 (St-11305-062 ISI ...... ..... ...F1.20H(1) 11305-062-11002 VAR SPRING AUG ...... ..... ...2 1305 OW N ..... ...... ...PR E ..............F-A Vi 11305-062-11003 Fi.20H(1) 11305-062-11003 2 1305 ISI-11305-062 VAR SPRING ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 93 -100 So utherýn` iNurci`ear OprtngCmay 3rdlntervAl:

VOGTLE-1 151 PLAN, VERSION 3.0 Period I Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case 2.>.> >2.>Summary No./ComplD/System Scope / Method / Procedure F-A V1 11305-062-H008 ISI-11305-062 ISI ...... ..... ...Fl.20H(1) 11305-062-H008 VAR SPRING AUG ...... ..... ...2 1305 OW N ..... ..... ....P R E ..............F-A V1 11305-064-H001 ISI-11305-064 ISI ...... ..... ...Fi.20H(1) 11305-064-H001 VAR SPRING AUG ...... ..... ...2 1305 OWN ..... ..... ....PR E ..............F-A V1 11305-064-H003 ISI-11305-064 ISI ...... ..... ...F1.20H(1) 11305-064-H003 VAR SPRING AUG ...... ..... ...2 1305 OW N ..... ..... ....PRE ..............F-A V1 11305-064--H008 ISI-11305-064 ISI --... ...F1.20H(1) 11305-064-H008 VAR SPRING AUG 2 1305 OW N ..... ..... ....PR E ..............F-A V1 11202-229-H601 ISM-11202-229 SI ...... ..... ...F1.20S 11202-229-H601 MECH SNUBBER AUG ...... ..... ...2 1202 OW N ..... ..... .... .P R E ..............F-A V1 11206-002-HO13B ISI-11206-002 ISI ...... ..... ...Fi.20S 11206-002-HO13B MECH SNUBBER AUG ...... ..... ...2 1206 OW N ..... ..... ....PR E ..............F-A V1 11206-002-HO13T ISI/VT/ ISM- 1206-002 ISI ......----- -- s ---F1.20S 11206-002-HO13T MECH SNUBBER AUG ...... ..... ...2 1206 OW N ..... ..... ....PR E ..............F-A V1 11206-002-H027 ISI-11206-002 ISI ...... ..... ...F1.20S 11206-002-H027 LISEGA HYD SNUBBER AUG ...... ..... ...2 1206 OW N ..... ..... ....PR E ..............F-A Vi 11206-005-HO09 ISI-11206-005 ISI ...... ..... ...F1.20S 11206-005-1-1009 MECH SNUBBER AUG ...... ..... ...2 1206 OW N ..... ..... ....PRE ..............F-A V1 11206-005-HU10 F1.20S 11206-005-H10 2 1206 1I1-11206-005 MECH SNUBBER ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 94 -100

-~~~ ~ SotenNcerOerating C.ompany 3rd IniterVal VOGTLE-1 IS[ PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 cc n Period 2>r>= tM Period 3 Summary No./CompID/System Scope/ Method / Procedure F-A V1 11206-006-H020 ISI-11206-006 ISI ...... ..... ...Ft .20S 11206-006-H020 HYDRAULIC SNUBBER AUG -... .2 1206 OW N ..... ...... ...PR E .............F-A V1 11301-015-H007 ISI/V-I/ ISI-11301-015 ISI -- ,------ ---- --s ---F1.20S 11301-015-H007 HYDRAULIC SNUBBER AUG ----....2 1301 OWN ...... ..... ...PRE F-A V1 11301-104-H002 ISI/VT/ ISI-11301-104 ISI .-.---- s -----------

F1.20S 11301-104-H002 MECH SNUBBER AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE ...... ...F-A V1 11301-104-H003 ISI-11301-104 ISI ...... ..... ...F1.20S 11301-104-1-1003 MECH SNUBBER AUG ...... ..... ...2 1301 OW N ..... ..... ....PR E ..............F-A V1 11301-104-H004 ISI-11301-104 ISI -----. .F1.20S 11301-104-H004 MECH SNUBBER AUG ...... ..... ...2 1301 OW N ..... ..... ....PR E ..............F-A V1 11301-104-H005 ISI-11301-104 ISI ...... ..... ...F1 .20S 11301-104-H005 HYDRAULIC SNUBBER AUG ...... ..... ...2 1301 OW N ..... ...... ...PR E ..............F-A V1 11301-104-HOO6 ISI-11301-104 ISI .......... ...F1.20S 11301-104-H106 MECH SNUBBER AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE ..............F-A V1 11301-105-H002 ISI-11301-105 ISI ...... ..... ...F1.20S 11301-105-H002 MECH SNUBBER AUG ...... ..... ...2 1301 OWN ...... ...PRE -.- ..... .F-A V1 11301-105-H003 ISI-11301-105 ISI ...... ..... ...F1.20S 11301-105-H003 MECH SNUBBER AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11301-105-4004 F1.20S 11301-105-H004 2 1301 ISI-11301-105 MECH SNUBBER ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 95 -100 Sout'ther~n Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class DwgIISO No.Comp. Desc.Code Case t2 w- I n-e~o Summary NoJComplD/System Scooe/ Method / Procedure F-A VI 11301-105-H005 ISI-11301-105 ISI F1.20S 11301-105-H005 HYDRAULIC SNUBBER AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE ..............F-A V1 11301-105-HO06 ISI-11301-105 ISI --..... ..... ...F1.20S 11301-105-H006 MECH SNUBBER AUG ...... ..... ...2 1301 OW N ..... ..... ....PR E ..............F-A V1 11301-106-H002 ISI-11301-106 ISI ...... ..... ...F1.20S 11301-106-H002 LISEGA HYD SNUBBER AUG ...... ..... ...2 1301 OWN ..... ...... ...PRE ..............F-A V1 11301-106-H003 ISI/VT/ ISI-11301-106 SI------------

s --------F1.20S 11301-106-H003 MECH SNUBBER AUG ...... ..... ...2 1301 OW N ..... ..... ....PR E ..............F-A V1 11301-106-H004 ISI-11301-106 ISI -... .F1.20S 11301-106-1004 MECH SNUBBER AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE F-A V1 11301-106-H005 ISI-11301-106 ISI ...... ..... ...F1.20S 11301-106-1005 MECH SNUBBER AUG ...... ..... ...2 1301 OW N ..... ..... ....P R E ..............F-A V1 11301-106-HOO ISI-11301-106 ISI ...... ..... ...F1.20S 11301-106-H006 MECH SNUBBER AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE -......F-A Vl 11301-107-H002 ISI/T/ IS1-11301-107 ISI -.-.-- .-.- --F1.20S 11301-107-H002 MECH SNUBBER AUG ...... ..... ...2 1301 OW N ..... ........PRE ----F-A V1 11301-107-H003 ISI-11301-107 ISI ...... ..... ...F1.20S 11301-107-H003 MECH SNUBBER AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE H F-A V1 11301-107-H004 F1.20S 11301-107-1-1004 2 1301 IS1-11301-107 MECH SNUBBER Is[AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 96 -100 Southern INuclear Operating C Iompany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Glass Dwg1ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 FE zi m .I mm 2ý> > > > > >!Summary No./CompID/System Scope / Method / Procedure F-A V1 11301-107-HOO5 ISI-11301-107 SI ...... ..... ...51 .20S 11301-107-H005 HYDRAULIC SNUBBER AUG ...... ..... ...2 1301 OW N ..... ..... ....PR E ..............F-A Vi 11301-107-H006 ISI-11301-107 ISI ...... ..... ...F-1.20S 11301-107-1-1006 MECH SNUBBER AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE ..............F-A V1 11301-129-H016 1K4-1301-129-02 ISI ...... ..... ...51.20S 11301-129-HO16 MECH SNUBBER AUG ...... ...2 1301 OW N -.... ..... ...PR E ..............F -A V 1 1 1 3 0 1 -1 3 9 -H 0 0 4 1 K 4 -1 3 0 1 -1 6 8 -0 2 I S I ..............-l1.20S 11301-139-H004 MECH SNUBBER AUG ...... ..... ...2 1301 OW N ..... ..... ....PRE -.............F-A VI 11302-107-HO10 IS1-11302-107 is] -..... ..... ..F1.20S 11302-107-HO10 HYDRAULIC SNUBBER AUG ...... ..... ...2 1302 OW N .. ..... .... ....PR E ..............F-A V1 11302-107-H ill ISI-11302-107 ISI ..... ..... ....F1.20S 11302-107-HOl1 MECH SNUBBER AUG ...... ..... ...2 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-107-H014 ISI-11302-107 ISI ...... ..... ...F1.20S 11302-107-H014 MECH SNUBBER AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE .. ............F-A V1 11302-107-HO16 ISI-11302-107 ISl ...... ..... ...F1.20S 11302-107-HO16 MECH SNUBBER AUG ...... ..... ...2 1302 OW N ...... .... ....PR E ..............F-A V1 11302-108-H003 ISI-11302-108 ISI ...... ..... ...F1.20S 11302-108-H003 MECH SNUBBER AUG ...... ..... ...2 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-108-HO10 F1.20S 11302-108-HO10 2 1302 ISI-11302-108 HYDRAULIC SNUBBER ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 97 -100 Southern Nuclear Operating,-Company,.

3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case n -0o r- ý0 0 Summary No./CompID/System Scope / Method / Procedure F -A V 1 1 1 3 0 2 -1 0 8 -H 0 1 3 IS I-1 1 3 0 2 -1 0 8 IS I -........F 1 .2 0 S 1 1 3 0 2 -1 0 8 -H 0 1 3 M E C H S N U B B E R A U G ..............2 1302 OWN ...... ..... ...PRE ..............F-A V1 11302-108-H017 IS1-11302-108 ISI ...... ..... ...F1.20S 11302-108-H017 MECH SNUBBER AUG ...... ..... ...2 1302 OW N ..... ...... ...PR E ..............F -A V 1 1 1 3 0 2 -1 0 0 -H 0 1 9 IS I- 1 1 3 0 2 -1 0 8 S I ..............F 1 .2 0 S 1 1 3 0 2 -1 0 8 -H 0 1 9 M E C H S N U B B E R A U G ..............2 1302 OWN ...... ..... ...PR E ..............F-A V1 11302-109-11009 ISI-11302-109 ISi .. ..... ..... ...F1.20S 11302-109-11009 MECH SNUBBER AUG ...... .......2 1302 OW N ..... ........PR E ..............F-A V 1 1 13 0 2 -10 9 -H 0 12 IS I/V T /N M P -E S -02 4 -2 03 IS1 -113 02 -109 IS I c .............F1.20S 11302-109-H012 MECH SNUBBER AUG --.- .......2 1302 OW N ...... .... ....PRE ---------....F-A V1 11302-109-H015 ISI-11302-109 ISI ...... ..... ...F 1 .2 0 S 1 1 3 0 2 -1 0 9 -H 0 1 5 M E C H S N U B B E R A U G ..............2 1302 OW N ..... ...... ...PRE ...... ..... ...F-A V 1 11302-109-H 022 ISI/VT/ ISI-11302-109 IS I ..-....-.- ---.s F 1 .2 0 S 1 1 3 0 2 -1 0 9 -H 0 2 2 M E C H S N U B B E R A U G ..............2 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-109-H023 ISI-11302-109 ISI ...... ..... ...F 1 .2 0 S 1 1 3 0 2 -1 0 9 -H 0 2 3 M E C H S N U B B E R A U G ..............2 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-109-H025 ISI-11302-109 ISI ...... ..... ...F 1 .2 0 S 1 1 3 0 2 -1 0 9 -H 0 2 5 M E C H S N U B B E R A U G ..............2 1302 OW N ..... ..... ....PRE --.........F-A Vi 11302-110-H013 F1.20S 11302-110-H013 2 1302 ISI-11302-110 HYDRAULIC SNUBBER IS0 AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 98 -100 SouthErn Nuclear Operaing .Co 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 ur Period 2 Period 3 F, cc E, m Summary NoJCompID/System Scope / Method / Procedure F-A V1 11302-110-H017 ISI-1i302-110 ISI ...... ..... ...F1.20S 11302-110-H017 MECH SNUBBER AUG ...... ..... ...2 1302 OWN ----....PRE .............F-A VI 11302-110-H019 ISI/VT/ ISI-11302-110 ISI .... .............

s F1.20S 11302-110-H019 MECH SNUBBER AUG ...... ..... ...2 1302 OWN ...... ..... ...PRE ...... ..... ...F-A V1 11305-058-H003 ISINT/ IS1-11305-058 ISI .........s --F1.20S 11305-058-1-1003 MECH SNUBBER AUG -..........2 1305 OWN PR E -.-.-.-.-.

......F-A V1 11305-058-11004 IS1-11305-058

[SI ...... ..... ...F1.20S 11305-058-H004 MECH SNUBBER AUG ...... ..... ...2 1305 OW N ...... .... ....PRE -.- ......F-A Vi 11305-058-11005 ISI-11305-058 SI ...... ..... ...F1.20S 11305-058-H005 MECH SNUBBER AUG ...... ..... ...2 1305 OW N ...... .... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11305-058-H006 ISI-11305-058 SI ...... ..... ...F1.20S 11305-058-11006 MECH SNUBBER AUG -..........2 1305 OW N ..... ..... ....PR E -. -.- .- ..- .- .....F-A V1 11305-060-11003 IS1-11305-060 SI ...... ..... ...F1.20S 11305-060-11003 MECH SNUBBER AUG -..........2 1305 OW N ...... .... ....PRE ..............F-A Vi 11305-060-11004 ISI-11305-060 ISI ...... ..... ...F1.20S 11305-060-11004 MECH SNUBBER AUG 2 1305 OW N ..... ..... ....PR E ..............F-A V1 11305-060-11005 ISM-11305-060 SI ...... ..... ...F1.20S 11305-060-H005 MECH SNUBBER AUG -..........2 1305 OW N ..... ..... ....PRE ..............F-A V1 11305-060-1-100 F1.20S 11305-060-H006 2 1305 IMS-1 1305-060 MECH SNUBBER IS'AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 99 -100

,SouthernNuclea N Operati iiCompany 3rdVInterval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 CC M Period 2 Period 3 CC NO cc 00 2.> 2.>:Iý:ýSummary No./CompID/System Scope / Method / Procedure F-A V1 11305-062-1-1004 ISI-11305-062 ISI .. ........F1.20S 11305-062-11004 MECH SNUBBER AUG ...... ..... ...2 1305 OW N ..... ..... ....PRE F-A V1 11305-062-H005 ISI-11305-062 SI ...... ..... ...F1.20S 11305-062-H005 MECH SNUBBER AUG ...... ..... ....2 1305 OWN --...... ...PRE ..............F-A V1 11305-062-HOO6 ISI-11305-062 ISI ...... ...F1.20S 11305-062-1-1006 MECH SNUBBER AUG ...... ..... ...2 1305 OW N ...... .... ....PRE .........F-A V1 11305-062-H007 ISI-11305-062 SI ...... ..... ...F1.20S 11305-062-H007 MECH SNUBBER AUG ...... ..... ...2 1305 OWN ...... ..... ...PRE ...... ..... ...F-A VI 11305-064-H004 ISINT/ ISI-11305-064 ISI .-- ---- s F1.20S 11305-064-H004 MECH SNUBBER AUG ... ... ..... ..2 1305 OW N ..... ..... ....PRE ..............F-A V1 11305-064-1-1005 IS1-11305-064 ISI ...... ..... ...F1.20S 11305-064-HOO5 MECH SNUBBER AUG ...... ..... ...2 1305 OWN PRE .... .....F-A V1 11305-064-11006 ISI-11305-064 SI ...... ..... ...Fl.20S 11305-064-H006 LISEGA HYD SNUBBER AUG -..........2 1305 OW N ..... ...... ...PR E ..............Fl1.20S 11305-064-H007 2 1305 IE-113 SUB-B4 MECH SNUBBER ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 100 -100 Southern Nuclear OperAting CoNpany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwgIISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 cc Summary No./CompID/System Scope / Method I Procedure F-A V1 11202-029-H021 ISI ...... ..... ...F1.30A(1) 11202-029-H021 ANCHOR AUG ...... ..... ...3 1202 OWN PRE F-A V1 11202-029-H025 ISIIVT/NMP-ES-024-203 1K5-1202-029-07 ISI c F1.30A(1) 11202-029-H025 ANCHOR AUG -------....3 1202 OWN PR E ..............F-A V1 11202-030-HO16 ISI ...... ..... ...F1.30A(1) 11202-030-HO16 ANCHOR AUG .......... ...3 1202 OW N ..... ..... ....PR E -. -.- -.-. .-.- ..-. ..F-A V1 11202-030-H021 ISa ...... ..... ...F1.30A(1) 11202-030-H021 ANCHOR AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E -. -.- .- ..- .- .....F-A Vl 11202-030-H024 ISI .......... .. ..F1.30A(1) 11202-030-H024 ANCHOR AUG ...... ..... ...3 1202 OWN P R E -. -.- -.-. .-.- ..-. ..F-A V1 11302-011-HOOI ISI ...... ..... ...Fl.30A(1) 11302-011-HOOI ANCHOR AUG ...... ...3 1302 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11302-011-H036 ISI/VT/NMP-ES-024-203 1K5-1302-011-03 ISI c ..... ..... ...F1.30A(1) 11302-011 -H036 ANCHOR AUG ...... ..... ...3 1302 OW N ..... ..... ....P R E -. -.- ..I .- ..-.- ...F-A V1 11302-013-H022 ISI Fi.30A(1) 11 302-013-H022 ANCHOR AUG ...... ..... ...3 1302 OWN ...... .......PRE F-A V1 11302-018-HOO5 ISI ...... ..... ...F1.30A(1) 11302-018-H005 ANCHOR AUG ...... ..... ...3 1302 OWN ----....PR E ..............F-A V1 11302-020-H035 F1.30A(1) 11302-020-H035 3 1302 ANCHOR ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 1 -124 Southern NucLear Operating Company 3rd Interval VOGTLE-1 IS[ PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1-:T LO Period 2 Period 3 (Of-0o 0>0 CO4 Summary No./CompID/System Scope / Method I Procedure F-A VI 11202-006-HO13 ISI ...... ..... ..-- ---- ----F 1 .3 0 C (1 ) 1 1 2 0 2 -0 0 6 -H 0 1 3 L IN R A C K 1 -D A U G ..............3 1202 OWN ...... ..... ..-- --------PRE F -A V 1 1 1 2 0 2 -0 0 6 -H 0 3 2 SIS ( ............-- -- -- ----F1.30C(1) 11202-006-H032 LIN RACK 1-D AUG -.---- -- -- ----- ---- ---3 1202 OWN ...... ..... ...PRE --.............F-A V1 11202-029-HO16 ISI .. ..... ..... ...F 1 .3 0 C (1) 1 12 0 2 -0 2 9 -H O 16 L IN R A C K 1-D A U G -............3 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-029-H027 Is[ S. .... ..... ...F 1 .3 0 C (1 ) 1 1 2 0 2 -0 2 9 -H 0 2 7 L IN R A C K 1 -D A U G ..............3 1202 OWN ...... ..... ...PRE ...... ..... ...F-A V1 11202-035-HOOl ISI ...... ..... ...F 1 .3 0 C (1 ) 1 1 2 0 2 -0 3 5 -H O O l L IN R A C K 1 -D A U G ..............3 1202 OW N ..... ...... ...PRE ...... ..... ...F-A V1 11202-035-H003 ISI ...... ..... ...F 1 .3 0 C (1 ) 1 1 2 0 2 -0 3 5 -H 0 0 3 L IN R A C K 1 -D A U G ..............3 1202 OWN ...... ..... ...P R E ..............F-A V1 11202-035-H005 ISI ...... ..... ...F 1 .3 0 C (1 ) 1 1 2 0 2 -0 3 5 -H 0 0 5 L IN R A C K 1 -D A U G ..............3 1202 OWN ...... ..... ...PR E ..............F-A Vi 11202-035-HO10 ISI ..... ..... ....F1,30C (1) 11202-035-HO 10 LIN RA C K 1-D A UG .........3 1202 OWN ...... ..... ...PRE ...... ..... ...F-A V1 11202-035-HO14 ISI ...... ..... ...F 1 .3 0 C (1 ) 1 1 2 0 2 -0 3 5 -H O 1 4 L IN R A C K 1 -D A U G ..............3 1202 OW N ..... ..... ....PRE .......... ....F-A F1.30C(1)3 V 11202-036-1H002 11202-036-H002 1202 isi/VI/LIN RACK 1-D ISI AUG OWN PRE S 8/31/2009 ScheduleWorks V. 8.1 Page 2 -124 S§outhiern Nuc'leair Operatin giCompany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1>r Period 2 10 ow cc c c Period 3 Tcc Summary NoICompID/System Scope / Method / Procedure F-A V 11202-036-H003 ISI ...... ..... ...F1.30C(1) 11202-036-H003 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE -----....F-A V1 11202-036-H004 ISr ...... ..... ...F1.30C(1) 11202-036-1-1004 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ...... .... ....PRE ..............F-A V1 11202-036-H005 ISI -... .F1.30C(1) 11202-036-H005 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-036-H007 ISI ...... ..... ...F1.30C(1) 11202-036-H007 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE -.- ......F-A V1 11202-036-H022 ISI ...... ..... ...F1.30C(1) 11202-036-H022 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ...... ...PR E ..............F-A V1i 1202-036-H024 ISI/VT/ IS; ...... ...s -F1.30C(1) 11202-036-H024 LIN RACK 1-D AUG ...... ..... ...3 1202 OWN -......PRE ..............F-A V1 11202-036-H028 ISI ...... ..... ...F1.30C(1) 11202-036-H028 LIN RACK 1-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-036-H029 Is; ...... ..... ...F1.30C(1) 11202-036-H029 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-036-H031 ISI/VT/ isl ...... ...s ---F1.30C(1) i1202-036-HO31 LIN RACK 1-D AUG ...... ..... ...3 1202 OWN ..... ..... ....PRE ...... ..... ...1-A Vi1 1122-036-HO32 F1.30C(i) 11202-036-H032 3 1202 LIN RACK 1-D IsI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 3 -124 Southern eiNuc!ear Operating Compa n y'3rdV Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1Period 2 to r, co Period 3 cc Summary No./CompID/System Scope / Method / Procedure F-A V1 11202-036-H034 ISI ...... ..... ...F1.30C(1) 11202-036-H034 LIN RACK 1 -D AUG --....3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-036-H035 ISI ...... ..... ...F1.30C(1) 11202-036-H035 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-036-H036 ISI ...... ..... ...F1.30C(1) 11202-036-H036 LIN RACK 1-D AUG 3 1202 OWN ...... ..... ...PRE ..............F-A V1 11202-036-H041 ISI F1.30C(1) 11202-036-H041 LIN RACK 1-D AUG ...... ..... ...3 1202 OWN PRE ..............F-A V1 11202-037-HOil ISI F1.30C(1) 11 202-037-HOl1 LIN RACK 1-D AUG ...... ..... ...3 1202 OWN PR E ..............F-A V1 11202-037-H013 ISI/VT/ ISI-- ------- s ---F1.30C(1) 11202-037-HO13 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ...... .... ....PR E ..............F-A V1 11202-037-H017 ISI F1.30C(1) 11202-037-HO17 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-037-H020 ISI ...... ..... ...F1.30C(1) 11202-037-H020 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ...... .... .F-A V1 11202-037-HO21 ISI -......F1.30C(i) 11202-037-HO21 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-037-H022 F1.30C(1) 11202-037-H022 3 1202 LIN RACK 1-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 4 -124

'Sout hern Nuciear6Operatin-g Company 3rd inte'rval VOGTLE-1 IS1 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case2>>o)Summary No./CompID/System Scope/ Method / Procedure F-A V1 11202-037-H032 ISI ...... ..... ...F1.30C(1) 11202-037-H032 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ...... ..... ...P R E -. -.- -.-. .-.- ..-. ..F-A V1 11202-038-HO03 ISI ...... ..... ...F1.30C(1) 11202-038-H003 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ...... ...P R E_ -. ...- ....- ....- ..F-A Vii 11202-038-H007 ISI F1.30C(1) 11202-038-H007 LIN RACK 1-D AUG ...... ..... ...3 1202 OWN P R E -. -.- -.-. .-.- ..-. ..F-A V1 11202-038-H008 ISI ....F1.30C(1) 11202-038-H008 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A Vi 11202-038-H017 ISI .. ..... ..... ...F1.30C(1) 11202-038-H017 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ...... .... ....PRE .. ............F-A V1 11202-038-H019 ISI --...... ...F1.30C(1) 11202-038-H019 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ...-...--. ...-- -F-A V1 11202-038-H601 ISI ...... ..... ...F1.30C(1) 11202-038-H601 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ...... ...P R E -. -.- -.-. .-.- ..-. ..F-A Vi 11202-038-H602 SI ...... ..... ...F1.30C(1) 11202-038-H602 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ...... ...PR E ..............F-A Vi 11202-038-H603 SI ...... ..... ...F1.30C(1) 11202-038-H603 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-072-HO19 F1.30C(1) 11202-072-H019 3 1202 LIN RACK 1-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 5 -124 Sout hern N .ucl.Ii.ear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class DwgfISO No.Comp. Desc.Code Case Period 1 Period 2 i.> >o Period 3 0o0 Summary No./ComplD/System Scope / Method / Procedure F-A V1 11202-072-H023

]SI ...... ..... ...F1.30C(1) 11202-072-H023 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-088-HO16 ISI ...... ..... ...F1.30C(1) 11202-088-H016 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-088-H017 SI ...... ..... ...F1.30C(1) 11202-088-H017 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-088-HO18 ISI ...... ..... ...F1.30C(1) 11202-088-HO18 LIN RACK 1-D AUG -.-- ----- ------ ---.-3 1202 OWN ---- ----- ------ -----PRE ....F-A V1 11202-088-H022 Is ...... ..... ..F1.30C(1) 11202-088-H022 LIN RACK 1-D AUG -..........3 1202 OWN -......PR E ..............F-A V1 11202-088-H031 ISI/VT/ SI- --.-- ------ ---- -s ---F1.30C(1) 11202-088-H031 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-098-HO10 ISI ...... ..... ...F1.30C(1) 11202-098-H010 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-098-HOl ISI ... ....F1.30C(1) 11202-098-HOli LIN RACK 1-D AUG -......3 1202 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11202-098-HO12 ISI ...... ..... ...F1.30C(1) 11202-098-H012 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ...... ..... ...F'A V1 112U0-U09-HU13 F1.30C(1) 11202-098-H013 3 1202 LIN RACK 1-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 6 -124 Southern Nuclear O-peratinget Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case>->D N: !2 M M Summary No./ComplDlSystem Scope/ Method / Procedure F-A V1 11202-098-H014 ISI ...... ..... ...F1.30C(1) 11202-098-H014 LIN RACK 1-D AUG ...... ..... ...3 1202 OWN ..... ...... ...PRE ..............F-A V1 11202-098-H015 1SI ...... ..... ...F1.30C(1) 11202-098-H015 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............F-A V1 11202-098-H023 ISI -.. ........F1.30C(1) 11202-098-H023 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-099-HOOB Is] -SI ...... ..... ...F1.30C(1) 11202-099-H008 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ........... ...F-A V 11202-099-H010 ISI .......... ...F1.30C(1) 11202-099-H010 LIN RACK 1-D AUG ----....3 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-099-H012 ISI ...... ..... ...F1.30C(1) 11202-099-HO12 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ...... ...PRE ....I --....F-A V1 11202-099-H014 ISI ... ....F1.30C(1) 11202-099-H014 LIN RACK 1-D AUG .. ........ ...3 1202 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11202-099-HO15 ISI ...... ..... ...F1.30C(1) 11202-099-HO15 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11202-099-HO17 ISl ...... ..... ...F1,30C(1) 11202-099-H017 LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-099-H-01 F1.30C(1) 11202-099-HO18 3 1202 LIN RACK 1-D Is]AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 7 -124 SoutLhern NucrI Operating Company 3rd Interval VOGTLE-1 IS1 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ASO No.Comp. Desc.Code Case> t2 10 !: 1 3.>Summary No.IComplD/System Scope I Method / Procedure F-A Vl 11202-099-H019 ISi ...... ..... ...F 1 .3 0 C ( 1 ) 1 1 2 0 2 -0 9 9 -H 0 1 9 L IN R A C K 1 -D A U G ..............3 1202 OW N ...... .... ....PRE ..............F-A V1 11202-181-HOOl ISI/VT/ ISI ..-. ...-.- ---. s F1.30C(1) 11202-181-HOOI LIN RACK 1-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11203-021-H601 ISI ...... ..... ...F1.30C(1) 11203-021-H601 LIN RACK 1-D AUG 3 1203 OW N ..... ..... ....PR E ..............F-A VI 11203-021-H602 Is ...... ..... ..F1.30C(1) 11203-021-H602 LIN RACK 1-D AUG ...... ..... ...3 1203 OW N ..... ..... ....PRE ..............F-A V 11203-021-1-1603 ISI -.. ..F1.30C(1) 11203-021-H603 LIN RACK 1-D AUG ...... .......3 1203 OW N ..... ...... ...PRE ..............F-A VI 11203-063-H008 iSI -.. ........F 1 .3 0 C ( 1 ) 1 1 2 0 3 -0 6 3 -H O O L I N R A C K 1 -D A U G ..............3 1203 OWN -......PR E ..............F-A V1 11203-063-HO10 ISI/VT/ ISI- ------ -------- -- s ---F1.30C(1) 11203-063-H010 LIN RACK 1-D AUG .. ..... ..... ...3 1203 OWN ...... ..... ...PR E ..............F-A Vi 11203-065-H007 SI ...... ..... ...F1.30C(1) 11203-065-H007 LIN RACK 1-D AUG ...... ..... ...3 1203 OWN , M -----....PR E ..............F-A Vi 11203-065-H009 ISI .... .. ..F1.30C(1) 11203-065-H009 LIN RACK 1-D AUG -..... ..... ..3 1203 OWN PR E ..............F'A Vl 11203-065-HOIO F1.30C(1) 11203-065-HO10 3 1203 LIN RACK 1-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 8 -124 Southern Nucliear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 ta Period 2 I-. 12 M cc cc Period 3 Summary No./ComplD/System Scope / Method / Procedure F-A Vi 11203-065-H015 SI ...... ..... ...F1.30C(1) 11203-065-HOi5 LIN RACK 1-D AUG ...... ..... ...3 1203 OW N ..... ..... ....P RE ..............F-A Vl 11302-011-H004 IsI -----....F1.30C(i) 11302-011-H004 LIN RACK 1-D AUG .......... ...3 1302 OWN ...... ..... ...PRE ...... ..... ...F-A VI 11302-011-H020 ISI/VT/ SI-- -.. .------ ----- -s F1.30C(1) 11302-011-H020 LIN RACK 1-D AUG ...... ..... ...3 1302 OW N ..... ...... ...PRE ..............F-A Vl 11202-002-H012 SI ----....Fl.30D(1) 11202-002-H012 LIN RACK 2-D AUG ...... ...3 1202 OW N ...... .......PRE .............F-A Vi 11202-004-H025 IS[/VT/NMP-ES-024-203 I K5-1202-004-01 ISI C ..... ..... ...F1.300(1) 11202-004-H025 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN ...... ..... ...P R E -......---.- .- ..F-A Vl 11202-004-H029 ISI/Vr/ ISI ..-. ...-.-.----

s -Fl.30D(1) 11202-004-H029 LIN RACK 2-0 AUG ...... ..... ...3 1202 OWN ----....PRE ..............F-A V1 11202-004-H030 ISI/VT/NMP-ES-024-203 1K3-1202-004-03 ISI c ..... ..... ...F1.301(1i) 11202-004-H030 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ........PRE F-A Vi 11202-004-H038 ISI/VT/NMP-ES-024-203 1K5-1202-004-01 ISI c ..... ..... ...Fl.30D(i) 11202-004-H038 LIN RACK 2-D AUG ...... .......3 1202 OW N ...... .... ....PR E ..............F-A Vl 11202-005-H1-009 ISI ...... ..... .F1.300(1) 11202-005-H009 LIN RACK 2-D AUG ..... ..3 1202 OWN ........PRE Fi.30D(I) 11202-006-H035 3 1202 LIN RACK 2-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 9 -124 Southern Nuiclear O 1peratinlg Corpny 3rd Interval.

pn VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 w 0 !2 ý: 1 r > M cc w Period 3 C40 ff.>I Summary No./ComplD/System Scope / Method / Procedure F-A V1 11202-029-H006 SI ...... ..... ...F1.30D(1) 11202-029-H006 LIN RACK 2-D AUG 3 1202 OW N ..... ...... ...PRE -...-.-. ...F-A V1 11202-029-1-1007 ISI ...... ..... ...F1.30D(1) 11202-029-H007 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ...... ...PR E ..............F-A Vi i1202-029-H012 ISI .......Fl.30D(1) 11202-029-H012 LIN RACK 2-D AUG -..........3 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-029-H013 ISI ...... ..... ...F1.30D(1) 11202-029-H013 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ...... .... ....PRE ..............F-A V1 11202-029-H015 -Sr ...... ..... ...F1.30D(1) 11202-029-H015 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ...... .... ....PRE ..............F-A V1 11202-029-H017 ISI ...... ..... ...F1.30D(1) 11202-029-H017 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ...... .... ....PR E ..............F-A V1 11202-029-H019 ISI -..........F1.301(1) 11202-029-H019 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V i 11202-030-1-1002 ISI ...... ..... ...F1.30D(1) 11202-030-H002 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE F-A V1 11202-030-H006 IS -...... ..... ...F1.30D(1) 11202-030-H006 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN ..... ..... ....PRE ..............F-A V1 11202-030--10U7 F1l.300(1) 11202-030-H007 3 1202 LIN RACK 2-D iSi AUG OWN PRE 8131/2009 ScheduleWorks V. 8.1 Page 10 -124 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 0 Period 2 Period 3> > I >o Summary NoJComplD/System Scope / Method / Procedure F-A V 11202-030-H009 ISI .......... ...F1.30D(1) 11202-030-H009 LIN RACK 2-D AUG 3 1202 OW N ...... .... ....PR E ..............F-A V1 11202-030-H010 Isi F1.300(1) 11202-030-HO10 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ...... .... ....PRE ..............F-A Vi 11202-030-H012 SI ...... ..... ...F1.30D(1) 11202-030-H012 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ...... .... ....PR E ..............F-A V1 11202-030-H013 ISI ...... ..... ...F1l.300(1) 11202-030-H013 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ........ ...F-A V1 11202-030-H014 ISI -... .F1.30D(1) 11202-030-HO14 LIN RACK 2-D AUG .3 1202 OW N ...... ..... ...PR E ..............F-A V1 11202-030-H017 ISI ..............F1.300(1) 11202-030-HO17 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN PR E ..............F-A V1 11202-030-H018 ISI ...... ..... ...Fl.30D(1) 11202-030-H018 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE .. ............F-A V1 11202-030-HO19 ISI F1.30D(1) 11202-030-H019 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE ..............F-A V1 11202-030-H027 ISI ..... ..... ....F1.300(1) 11202-030-H027 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ...... .... ....PRE F-A V1 11202-030-HO28 F1.300(1) 11202-030-H028 3 1202 LIN RACK 2-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 11 -124 VSouthern Nuca !LOpsErating Company 3rd interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/lSO No.Comp. Desc.Code Case Period 1 Period 2 o >Period 3 Summary No./ComplD/Svstem Scope / Method / Procedure F-A V1 11202-035-H002 SI ...... ..... ...FI.30D(1) 11202-035-H002 LIN RACK 2-D AUG ...... .......3 1202 OW N ...... ..... ...PRE ... ..........F-A V1 11202-035-H004 Is] ...... ..... ...F1.300(1) 11202-035-H004 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ...... ...PRE F-A V1 11202-035-H006 ISi F1.30D(1) 11202-035-H006 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE -----....F-A V1 11202-035-H009 ISI -'- -F1.30D(1) 11202-035-H009 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE .............F-A V1 11202-035-HOlI ISI .-. .-.-.-----

.F1.30D(1) 11202-035-HOll LIN RACK 2-D AUG ------ -- ----- ---- ----3 1202 OW N ...... .... ....PRE ....F-A VI 11202-035-H015 ISI ...... ..... ...F1.30D(1) 11202-035-HO15 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E .............F-A V1 11202-035-HO16 ISI ...... ..... ...F1.30D(1) 11202-035-HO16 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-035-HO17 SI ...... ..... ...F1.30D(1) 11202-035-HO17 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-035-H022 ISI ...... ..... ...F1.30D(1) 11202-035-H022 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ...... .... ....PR E ..............F-A VI 11202-035-H023 Fi.30D(1) 11202-035-H023 3 1202 LIN RACK 2-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 12 -124 Southern SNuIlear Operating-ompany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwgnISO No.Comp. Desc.Code Case Period 1 Period 2 P, .Period 3 Summary NoiComplD/System Scope / Method / Procedure F-A V1 11202-035-H024 ISI ...... ..... ..- ' -F1.30D(1) 11202-035-H024 LIN RACK 2-D AUG 3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-036-1-1008 ISI F1.30D(1) 11202-036-1-1008 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-036-1-1009 SI ...... ..... ...F1.30D(1) 11202-036-H009 LIN RACK 2-0 AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-036-HOll ISI ...... ..... ...Fl.30D(i) 11 202-036-HO 1i LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ...... .... ....PRE ..............F-A V1 11202-036-HO15 ISI F1.30D(1) 11202-036-HO15 LIN RACK 2-D AUG 3 1202 OW N ..... ...... ...PR E ..............F-A V1 11202-036-H023 ISI ...... ..... ...Fl.30D(1) 11202-036-H023 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-036-H026 ISI ...... ..... ...F1.30D(1) 11202-036-H026 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE -.. ..........F-A V 11202-036-H027 ISI ...... .......F1.30D(1) 11202-036-H027 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ...... .... ....PRE ..............F-A VI 11202-036-H033 ISI ...... ..... ...F1.30D(1) 11202-036-H033 LIN RACK 2-D AUG 3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-036-H039 F1.30D(1) 11202-036-H039 3 1202 LIN RACK 2-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 13 -124 VO'GSotE-PNuclear Operating Company.3rd. Interval VOGTLE-1 IS1 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class DwgIISO No.Comp. Desc.Scope / Method / Procedure Code Case n in in >o>Summarv NoJComolD/Svstem F-A V1 11202-036-H042 SI --..... ...F1.30D(1) 11202-036-H042 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE ..............F-A Vl 11202-036-H043 ISI ...... ..... ...F I .3 0 D ( 1 ) 1 1 2 0 2 -0 3 6 -H 0 4 3 L I N R A C K 2 -D A U G ..............3 1202 OW N ...... .... ....PRE -......F-A V1 11202-037-HOOl ISI ...... ..... ...Fl.30D(1) 11202-037-H001 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-037-H005 ISI ... ....F1.301(1) 11202-037-H005 UN RACK 2-D AUG ...... ..... ...3 1202 OWN ..... ..... ....PR E ..............F-A V1 11202-037-HO10 ISI ...... ..... ...F1.30D(1) 11202-037-HO10 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ...... ..... ...PR E ..............F-A V1 11202-037-H012 ISI F1.30D(1) 11202-037-H012 LIN RACK 2-D AUG 3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-037-H018 ISI Fl.300(1) 11202-037-HO18 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE I F-A V1 11202-037-H024 ISI ...... ..... ...F1.30D(1) 11202-037-H024 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ...... .... ....PRE ...............F-A V1 11202-037-H025 ISI/VT/ ISI ---- ---- ------ -s ---F1.30D(1) 11202-037-H025 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PR E ..............F-A Vi 11202-037-H026 F1.300(1) 11202-037-H026 3 1202 1S1-VT/UN RACK 2-D ISI AUG OWN PRE-s 8/31/2009 ScheduleWorks V. 8.1 Page 14 -124 Southern Nuclear Operating.

Company 3rd Interval VOGTLE-1 IS! PLAN, VERSION 3.0 Category, Item No., Class Dwg/lSO No.Comp. Desc.Code Case Period 1 t2 Period 2 U, 1- Wo Period 3 cc ,a: Summary No./CompID/System Scope / Method / Procedure F-A V1 11202-037-H027 ISI ...... ..... ...F1.301(1) 11202-037-H027 LIN RACK 2-D AUG 3 1202 OW N ..... ...... ...PR E ..............F-A V1 11202-037-H028 ISI ...... ..... ...F1.30D(1) 11202-037-H028 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-037-H030 ISI ...... ..... ...Fl.30D(1) 11202-037-H030 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN PRE -----....F-A V1 11202-038-HOOl ISI .....F1.301(1) 11202-038-HOOl LIN RACK 2-0 AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-038-H005 ISI ...... ..... ...F1.30D(1) 11202-038-H005 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ...... .... ....PR E ..............F-A V1 11202-038-H009 ISI F1.30D(1) 11202-038-H009 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN PR E ..............F-A Vii 1202-038-H0i3 iSI .......F1.30D(1) 11202-038-H013 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A Vi 11202-038-HO15 ISI ...... ..... ...F1.300(1) 11202-038-H015 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN PRE ...... ..... ...F-A V1 11202-038-H023 ISI ...... ..... ...F1.301(1) 11202-038-H023 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE F-A Vi 11202-038-H024 F1.30D(1) 11202-038-H024 3 1202 LIN RACK 2-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 15 -124 VG6uthern NuIclearpeVratingCompany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1> >Period 2 Pe -mo Period 3~cc Summary No./ComplD/System Scope / Method / Procedure F-A V1 11202-038-H028 ISI ...... ..... ...F1.30D(1) 11202-038-H028 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN PRE ......... ......F-A V1 11202-038-H029 ISI ...... ..... ...F1.30D(1) 11202-038-H029 LIN RACK 2-0 AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-072-H002 ISI ...... ..... ...F1.30D(1) 11202-072-H002 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE F-A V1 11202-072-H003 ISI ...... ..... ...F1.30D(1) 11202-072-H003 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-072-11004 ISI . ...F1 300(1) 11202-072-H004 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN PRE ..............F-A V1 11202-072-H013 ISV ...... ..... ...F1.30D(1) 11202-072-H013 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E -.. ..........F-A V1 11202-072-H014 ISI ...... ..... ...F1.300(1) 11202-072-HO14 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-072-H021 SI ...... ..... ...F1.30D(1) 11202-072-H021 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-072-H025 ISI ...... ..... ...F1.30D(1) 11202-072-H025 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F1.301(1) 11202-072-H026 3 1202 LIN RACK 2-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 16 -124

',Southern NI OperRaing Compan 3rd Interval VOGTLE-1 IS1 PLAN, VERSION 3.0 Category, Item No., Class DwgIISO No.Comp. Desc.Code Case Period 1 I 2-Period 2 Period 3 o a Summary No./CompID/System Scope / Method / Procedure F-A V1 11202-072-H027 ISI ...... ..... ...F1.30D)(1) 11202-072-H027 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ...... ...PR E ..............F-A V1 11202-072-H028 ISI ...... ..... ...F1.30D(1) 11202-072-H028 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-072-H604 ISI ...... ..... ...F1.30D(1) 11202-072-H604 LIN RACK 2-D AUG 3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-072-H605 ISI F1.30D(1) 11202-072-H605 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ...... ...PR E ..............F-A V1 11202-084-HOOl ISI ...... ..... ...F1.30D(1) 11202-084-H001 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-088-HO21 ISI ...... ..... ...F1.30D(1) 11202-088-HO21 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N -.... ...... ..PRE ..............F-A V1 11202-088-H032 ISI ...... ..... ...F1.30D(1) 11202-088-H032 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-088-H033 ISI ...... ..... ...Fl.30D(1) 11202-088-H033 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE -......F-A V1 11202-088-H037 ISI ...... ..... ...F1.30D(1) 11202-088-H037 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A Vi 11202-088-H058 Fl.30D(1) 11202-088-H058 3 1202 LIN RACK 2-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 17 -124 Southern NlUclear OperatingC Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class DwgAiSO No.Comp. Desc.Code Case Neý: !0)0 Summary No./ComplD/System Scope / Method / Procedure F-A V 11202-098-1-002 ISI ...... .......F1.30D(1) 11202-098-H002 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN .......... ...PRE ----....F-A V1 11202-098-H004 ISI .......... ...F1.30D(1) 11202-098-H004 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN .......... ...PRE -......F-A V1 11202-098-H1-006 ISI ...... ..... .F1.30D(1) 11202-098-H006 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-098-H007 ISI .......... ...F1.30D(1) 11202-098-1-1007 LIN RACK 2-D AUG .......... ...3 1202 OWN -..... ..... ..PRE ....F-A V1 11202-098-H009 ISI ...... ..... ...F1.30D(1) 11202-098-H009 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN ...... ..... ...P R E ..............F-A V1 11202-098-H016 ISI ...... ..... ...F1.300(1) 11202-098-HO16 LIN RACK 2-D AUG ----....3 1202 OWN ...... ..... ...PRE ...... ..... ...F-A V1 11202-098-HO21 ISI F1.30D(1) 11202-098-HO21 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE O .............F-A V1 11202-098-H022 Is[ .......... ...F1.301(1) 11202-098-H022 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE O ..........F-A Vi 11202-099-H002 ISI ...... ..... ...F1.30D(1) 11202-099-H002 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN PRE F-A Vl i1202-099-HOu4 F1.30D(1) 11202-099-1-1004 3 1202 UN RACK 2-D ISI AUG OWN PRE S 8/31/2009 ScheduleWorks V. 8.1 , Page 18 -124 Southern Nuclear ERaIN C pany 3rd Interval: VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class DwgfISO No.Comp. Desc.Code Case;! !;!2 fý- !2 O2 0 cc M M cc c Summary No.ICompllD/Svstem Scope / Method / Procedure F-A V1 11202-099-H005 ISI/VT! ISI ----s F1.30D(1) 11202-099-H005 IUN RACK 2-D AUG ...... ..... ...3 1202 OWN ...... ...PRE ..............F-A V1 11202-099-HO16 iSI/vr/ ISI ....s .F1,30D(1) 11202-099-HO16 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............F-A V1 11202-104-H007 ISI ...... ..... ...F1.301(1) 11202-104-H007 LIN RACK 2-D AUG .......... .. ..3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-104-H1-008 ISi ...... ..... .F1.30D(1) 11202-104-H008 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-104-H010 ISI ...... ..... ...F1.30D(1) 11202-104-H010 LIN RACK 2-D AUG -..........3 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-104-HOll ISI/VT/ ISI ----- ---- ----- -- ----F1.30D(1) 11202-104-H011 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ...... .... ....P R E ..............F-A V1 11202-104-H012 Is] -......F1.30D(1) 11202-1041-012 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN -..... ..... ..PRE ..............F-A V1 11202-104-H015 SI ...... ..... ...Fl1.300(1) 11202-104-HO15 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-104-HO16 Isi ...... ..... ...F1.30D(1) 11202-104-HO16 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE I F-A V1 11202-104-n017 F1.301(1) 11202-104-H017 3 1202 1.IV1 I LIN RACK 2-D ISI AUG OWN PRE S 8/31/2009 ScheduleWorks V. 8.1 Page 19 -124 S"Outhern INuPlearN VeRStIg ompanN 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2> .>o Period 3 coM Summary No.IComplDlSystem Scope / Method / Procedure F-A V1 11202-104-HO18 IS ...... ..... ...F1.30D(1) 11202-104-H018 LIN RACK 2-D AUG -----, 3 1202 OW N ...... .... ....PRE ..............F-A V1 11202-104-H023 ISI ...... ..... ...Fl.30D(1) 11202-104-H023 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-104-H024 SI ...... ..... ...F1.30D(1) 11202-104-H024 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-104-H025 ISI ...... ..... ...F1.300(1) 11202-104-H025 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE F-A V1 11202-104-H029 ISI/VT/ I-1 ---. ... ...--------

F1.30D(1) 11202-104-H029 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-104-H032 ISI F1.30D(1) 11202-104-H032 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN PRE -.- ......F-A V1 11202-104-H034 ISI/VT/ ISI -------- -- ----F1.301(1) 11202-104-H034 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-104-H035 tSI ...... ..... ...F1.301(1) 11202-104-H035 LIN RACK 2-D AUG 3 1202 OW N ..... ..... ....PRE ...... ..... ..F-A V1 11202-104-H036 ISI/VT/ SI] .......--------

s -F1.301(1) 11202-104-H036 LIN RACK 2-0 AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V! 11202-104-HU37 F1.30D(1) 11202-104-H037 3 1202 LIN RACK 2-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 20 -124 Southe~rn N~uclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 r* U Period 2 Period 3 r' w 0) 0)>> > I> ýSummary No./ComplD/System Scope I Method I Procedure F-A V1 11202-104-H038 ISI ...... ..... ...F1.30D(1) 11202-104-H038 LIN RACK 2-D AUG 3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-104-H039 ISI ...... ..... ...F1.30D(1) 11202-104-H039 LIN RACK 2-0 AUG ... ..........3 1202 OWN ...... .... ....PR E ..............F-A V1 11202-134-HO07 ISI ...... ..... ...F 1 .3 0 D ( 1 ) 1 1 2 0 2 -1 3 4 -H 0 0 7 L I N R A C K 2 -D A U G ..............3 1202 OW N ...... ..... ...PR E ..............F-A V1 11202-134-HOOB ISI ...... ..... ...F1.30D(1) 11202-134-H008 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE ..............F-A V1 11202-134-H0OI ISI ...... ..... ...F1.30D(1) 11202-134-Ho10 LIN RACK 2-D AUG ... ..........3 1202 OW N ...... .... ....PR E ..............F-A V1 11202-134-HOll Is] ...... ..... ...F1.30D(1) 11202-134-HOI1 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-134-H012 ISI ...... ..... ...F 1 .3 0 D ( 1 ) 1 1 2 0 2 -1 3 4 -H 0 1 2 L IN R A C K 2 -D A U G ..............3 1202 OW N ...... .... ....PRE F-A V1 11202-134-H016 ISI ...... ..... ...F1.301(1) 11202-134-H016 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-134-H017 ISi ...... ..... ...F1.300(1) 11202-134-H017 LIN RACK 2-0 AUG ...... ..... ...3 1202 OW N .. ........ ....PRE F-A V!

F1.30D(1) 11202-134-H019 3 1202 LIN RACK 2-D Isi AUG OWN PRE 8/31/200 9 ScheduleWorks V. 8.1 Page 21 -124

~Southern Nuclea'r Ope'drating Company, 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case 3 w3 w ->w M 0 Summary NoJComplD/Svstem Scooe / Method / Procedure F-A V1 11202-134-H022 ISI ...... ..... ...F1.30D(1) 11202-134-H022 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A Vi 11202-134-H024 ISI F1.30D(1) 11202-134-H024 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-134-H025 isi F1.30D(1) 11202-134-H025 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE I F-A Vi 11202-134-H028 ISI ... ....F1.30D(1) 11202-134-H028 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN PRE ..........F-A V1 11202-134-H029 ISI ...... ..... ...F1.30D(1) 11202-134-H029 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN PRE ..............F-A Vi 11202-134-H030 11 ...... ..... ...FI.30D(1) 11202-134-H030 LIN RACK 2-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE F-A V1 11202-134-H038 IS ...... ..... ...F1.301(1) 11202-134-H038 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ...... .... ....PRE F-A V1 11202-134-H043 IS0 ...... ..... ...F1.30D(1) 11202-134-H043 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-134-H044 IS0 ...... ..... ...F1.30D(1) 11202-134-H044 LIN RACK'2-D AUG ...... ..... ...3 1202 OW N ..... ...... ...PR E ..............F-A V1 11202-134-H045 F1.30D(1) 11 202-134-H045 3 1202 LIN RACK 2-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 22 -124 Soiuthern Nuclear O~peralting Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Camp. Desc.Code Case U,> >ID N: U Me0 Summary No./CompiD/System Scope / Method / Procedure F-A Vi 11202-134-H046 ISI ...... ..... ...F1.30D(1) 11202-134-H046 LIN RACK 2-D AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............F-A V1 11203-063-1009 ISI/VT/ ISI -...............

s ---F1.301(1) 111203-063-H009 LIN RACK 2-D AUG ...... ..... ...3 1203 OWN ...... ..... ...PRE ...... ..... ...F-A V1 11203-063-1602 ISf ...... ..... ...F1.300(1) 11203-063-H602 LIN RACK 2-0 AUG ...... ..... ...3 1203 OW N ..... ..... ....PRE F-A V1 11203-063-H604 ISI Fl.30D(1) 11203-063-H604 LIN RACK 2-D AUG ...... ..... ...3 1203 OWN ----....PRE F-A V1 11203-063-H605 ISI ...... ..... ...F1.30D(1) 11203-063-H605 LIN RACK 2-D AUG ...... ..... ...3 1203 OW N ..... ..... ....PRE ...............F-A Vi 11203-063-H606 IS1 ...... ..... ...F1.30D(t) 11203-063-H606 LIN RACK 2-D AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............F-A V1 11203-063-H607 ISI ...... ..... ...F1.30D(1) 11203-063-H607 LIN RACK 2-D AUG ...... ..... ...3 1203 OW N ..... ..... ....PRE ..............F-A Vi 11203-065-HO12 ISI ...... ..... ...F1.30D(1) 11203-065-H012 LIN RACK 2-D AUG ...... ..... ...3 1203 OW N ..... ..... ....PRE ..............F-A V1 11203-065-HO16 IS[ -......F1.30D(1) 11203-065-HO16 LIN RACK 2-D AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............F-A V1 11203-065-HO22 F1.300(1) 11203-065-H022 3 1203 LIN RACK 2-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 23 -124 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 It I Period 3 cc w Summary No./CompID/System Scope I Method / Procedure F-A V1 11302-011-H005 SI -.. ... ..... ..F1.30D(1) 11302-011-H005 LIN RACK 2-D AUG ...... ..... ...3 1302 OW N ...... .... ....PRE -.- ......F-A V1 11302-011-H008 ISI ...... ..... ...F1.30D(1i) 11302-011-11008 LIN RACK 2-D AUG ...... ..... ...3 1302 OW N ..... ...... ...PR E ..............F-A V1 11302-011--H009 ISI ...... ..... ...F1.30D(1) 11302-0111-H009 LIN RACK 2-D AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A Vi 11302-011-HO10

"' -SI ...... ..... ...F1.30D(1) 11302-011-HO10 LIN RACK 2-D AUG ...... ..... ...3 1302 OW N ...... .......PR E ..............F-A V1 11302-011-H011 ISI ...... ..... ...F1.300(1) 11302-011 -HOl1 LIN RACK 2-D AUG ...... ..... ...3 1302 OW N ..... ...... ...PRE ..............F-A V1 11302-011-H012 ISI F1.301(1) 11302-011-H012 LIN RACK 2-0 AUG ...... ..... ...3 1302 OWN ----....PR E ..............F-A Vi 11302-011-H014 ISI -. .... ..... ..Fl.30D(1) 11302-011-H014 LIN RACK 2-D AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-011-H016 ISI ...... ..... ...F1.30D(1) 11302-01 1-H016 LIN RACK 2-D AUG ...... .... .-.-3 1302 OWN ..... ..... ....PR E ..............F-A V1 11302-011-HO17 ISI ------- -- ------ --- ---F1.30D(1) 11302-011-H017 LIN RACK 2-D AUG --- ---.- ---3 1302 OWN ---- ------- ------ ----PR E ..............F-A V1 11302-011-Ho18 F1.300(1) 11302-011-HO18 3 1302 ISI/VT/LIN RACK 2-D ISI AUG OWN PRE S 8/31/2009 ScheduleWorks V. 8.1 Page 24 -124

-ouh~n-NuerO ,ai n g' Company 3rd lInterv'al VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case>3w in- in-r 3-3-3-Mn R Ecr~Summary No.ICompID/Svstem Scope / Method / Procedure F-A V1 11302-011-HO19 ISI ...... ..... ...F1.30D(1) 11302-011-HO19 LIN RACK 2-D AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-011-H021 ISI ...... ..... ...F1.300(1) 11302-011-H021 LIN RACK 2-D AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE .............F-A V1 11302-011-H022 SI ----....F1.30D(1) 11302-011-H022 LIN RACK 2-D AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE .O ......... ...F-A V1 11302-011-H034 SI ...... ..... ...F1.300(1) 11302-011-H034 LIN RACK 2-0 AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-011-H035 ISI ...... ..... ...F1.301)(1) 11302-011-H035 LIN RACK 2-D AUG ...... ..... ...3 1302 OW N ..... ...... ...P R E ..............F-A V1 11302-018-H003 IS -F1.301(1) 11302-018-H003 LIN RACK 2-D AUG ...... ..... ...3 1302 OWN ...... ..... ...PR E ..............F-A V1 11302-018-H004 ISI ...... ..... ...F1.30D(1) 11302-018-H004 LIN RACK 2-D AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-048-H003 ISIT/ -SI ---- -- ----F1.30D(1) 11302-048-H003 LIN RACK 2-D AUG 3 1302 OW N ..... ..... ....P R E ..............F-A V1 11202-002-H014 ISI/VT/NMP-ES-024-203 1K3-1202-002-02 SI c ..... ..... ...F1.30E(1) 11202-002-HO14 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ...... ..... ....PRE O .............F1.30E(1) 11202-004-H021 3 1202!Si, -NIAF-3-044 LIN RACK 3-D AUG OWN PRE C 8/31/2009 ScheduleWorks V. 8.1 Page 25 -124 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case IoN I->>M1 0 Summary No,/ComplDISvstem Scope / Method / Procedure F-A V1 11202-006-H012 iSi --..... ...Fl.30E(1) 11202-006-HO12 LIN RACK 3-D AUG ...... ......- , --3 1202 OW N ..... ..... ....P R E ..............F-A V1 11202-006-H033 ISI ...... ..... ...F1.30E(1) 11202-006-H033 LIN RACK 3-D AUG ...... ..... ...3 1202 OWN ..... ..... ....PR E ..............F-A V1 11202-006-H034 SI ...... ..... ...F1.30E(1) 11202-006-H034 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11202-029-H014 ISi ...... ..... ...F1.30E(1) 11202-029-H014 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-030-H1-008 ISI ...... ..... .F1.30E(1) 11202-030-H008 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E -. -.- ..-.- ..- .- ...F-A V1 11202-035-H012 ISI/VT/ ISI .-. ...-.-.-.-

s ---F1.30E(1) 11202-035-H012 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E -. -.- .- ..- .- .....F-A V1 11202-035-H021 ISI ...... ..... ...F1.306(1) 11202-035-H021 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ...... .... ....PRE ..............F-A Vi 11202-035-H025 ISI ...... ..... ...Fl.30E(1) 11202-035-H025 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-036-HOOl 1Si ...... ..... ...F1.30E(1) 11202-036-HOOl LIN RACK 3-D AUG -..... ..... ..3 1202 OW N ..... ..... ....P R E ..............P-A Vl 11202-036-HO20 F1.30E(1) 11202-036-H020 3 1202 LIN RACK 3-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 26 -124 Southern NuclearOperating Company 3rd Interval 3.n VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 0C C Period 2 M c Period 3 cc c Summary No./CompID/System Scope/ Method / Procedure F-A V1 11202-036-H025 SI -----....Fl.30E(1) 11202-036-H025 LIN RACK 3-D AUG -----....3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-036-H030 ISI ...... ..... ...Fl.302E(1) 1 1202-036-H030 LIN RACK 3-D AUG 3 1202 OW N ..... ...... ...PR E ..............F-A V1 11202-036-H038 ISI F1.30E(1) 11202-036-H038 LIN RACK 3-D AUG -..... ..... ..3 1202 OW N ..... ..... ....PRE -............F-A V1 11202-037-H007 ISI/VT/ IS- .----- ------- -s ---F1.30E(1) 11202-037-H007 LIN RACK 3-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PR E ..............F-A VI 1 1202-037-H023 ISI -..... ..... ..F1.30E(1) 11202-037-H023 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE -............F-A V1 11202-037-H029 IsI ...... ..... ...F1.30E(1) 11202-037-H029 LIN RACK 3-D AUG -..... ..... ..3 1202 OW N ...... ..... ...PRE -.- ......F-A V1 11202-038-1-1022 SI ...... ..... ...F1.30E(1) 11202-038-H022 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-038-H027 ISI ...... ..... ...F1.30E(1) 11202-038-H027 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ...... ..... ...PR E I .- .- .I .- .......F-A V1 11202-072-H1-001 IS ...... ..... ..F1.30E(1) 11202-072-HOOl LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............--A Vl 112U2-O72-H020 F1.30E(1) 11202-072-H020 3 1202 LIN RACK 3-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 27 -124 Sou'thern NUclear pe'rai~ng Company 3rd Interval VOGTLE-1 IS1 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class DwgAISO No.Comp. Desc.Code Case i Uc a~ e>2.Summary No./CompID/System Scope / Method I Procedure F-A V1 11202-072-H022 ISI ...... ..... ...F1.30E(1) 11202-072-Ht22 LIN RACK 3-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE ..............F-A V1 11202-072-H024 SI ...... ..... ...F1.30E(1) 11202-072-H024 LIN RACK 3-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-088-H034 ISI -... .Fl.30E(1) 11202-088-H034 LIN RACK 3-D AUG ...... ..... ...3 1202 OWN ----....PR E ..............F-A Vi 11202-088-H040 SI ...... ..... ...F1.30E(1) 11202-088-H040 LIN RACK 3-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE -...-.-. ...F-A V1 11202-098-H003 ISI ...... ..... ...F .30E(1) 11202-098-H003 LIN RACK 3-D AUG .......... ...3 1202 OWN .......... ...PR E ..............F-A Vi 11202-098-H008 ISi ...... ..... ...F1.30E(1) 11202-098-H008 LIN RACK 3-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-098-H B0-8 ISI ...... ..... ..F1.30E(1) 11202-098-HO18 LIN RACK 3-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE ..............F-A V1 11202-098-H020 IS -.. ........Fl.30E(1) 11202-098-H020 LIN RACK 3-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE ...... ..... ...F-A V 11202-099-H003 ISi ...... ..... ...Ft.30E(i) 11202-099-H003 UN RACK 3-D AUG ...... ..... ...3 1202 OWN ...... ..... ...P R E ..............F-A Vi 11202-099-H007 F1.30E(t) 11202-099-H007 3 1202 LIN RACK 3-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 28 -124 VOGTL-n 101L~AN, g VER Companhy.3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 E .4-Period 2 cc 3- i0>> Period 3 x cc Summary No./CompiD/System Scope I Method / Procedure F-A V1 11202-099-H013 ISI ...... ..... ...F1.30E(1) 11202-099-HO13 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V 11202-099-H020 ISI ...... ..... ...F1.30E(1) 11202-099-H020 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............F-A V1 11202-104-H009 ISI ...... ..... ...F1.301(1) 11202-104-H009 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ...... ..... ...PR E ..............F-A V1 11202-104-H013 ISI ...... ..... ...F1.30E(1) 11202-104-H013 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ... .... ...F-A V1 11202-104-H014 ISI -... .F1.30E(1) 11202-104-H014 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..... .........F-A V1 11202-104-H022 ISI ...... ..... ...F1.30E(1) 11202-104-H022 LIN RACK 3-D AUG -..........3 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-104-H026 ISI ...... ..... ...F1.30E(1) 11202-104-H026 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-104-H033 ISI ... .....F1.30E(1) 11202-104-H033 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A Vi 11202-134-H009 ISI ...... ..... ...F1.30E(1) 11202-134-H009 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 112U0-134-H1Ul F1.30E(1) 11202-134-H013 3 1202 LIN RACK 3-D ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 29 -124

-vi-',Soutfternb&

Nucea Oratinb cman 3rd Interval......

VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Nr Period 3 Summary No./CompID/System Scope / Method I Procedure F-A V1 11202-134-H014 ISI ...... ..-- -- -----. --.Fi.30E(1) 11202-134-H014 LIN RACK 3-D AUG -.-- ----- ---- -- -----3 1202 OWN ....................-

-PRE ..............F-A V1 11202-134-HO15 Is[ -.-.---- -- --- ---- -----F1.30E(1) 11202-134-HO15 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ...... .... ....PRE ...... ..... ...F-A V1 11202-134-H018 SI ........F1.30E(1) 11202-134-HO18 LIN RACK 3-D AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE .............F-A V1 11202-134-H023 ISI ...... ..... ...Fl.30E(1) 11202-134-H023 LIN RACK 3-D AUG ............3 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-134-H027 ISI ...... ..... ...Fi.30E(1) 11202-134-H027 LIN RACK 3-D AUG .......... ...3 1202 OW N ..... ..... ....PRE ----....F-A V1 11202-134-H031 ISI/VT/NMP-ES-024-203 1K3-1202-134-04 SI c -....F1.30E(1) 11202-134-H031 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-134-H035 ISi ...... ..... ...Fi.30E(1) 11202-134-H035 LIN RACK 3-D AUG ...... ..... ...3 1202 OW N ..... ...... ...PR E ..............F-A V1 11302-011-HO15 ISI ----....F1.30E(1) 11302-011-HO15 LIN RACK 3-D AUG ...... ..... ...3 1302 OWN ..... ..... ....PRE ..............F-A V1 11202-002-HO15 ISI -... .... .F1.30F(1) 11202-002-H015 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE .......... ...F-A V1 11202-002-H016 Fl.30F(1) 11202-002-Ho16 3 1202 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 30 -124 Southern Nuclear O perati g"t Com pan 1 y >ION IO> > >CI 0~Summary No./ComoID/Svstem Scope / Method / Procedure F-A V1 11202-005-H023 ISI ...... ..... ...F1.30F(1) 11202-005-H023 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ...............F-A V1 11202-005-H025 ISI F1.30F(1) 11202-005-H025 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A Vi 11202-005-H026 ISI ...... ..... ...F1.30F(1) 11202-005-H026 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ... ..........PR E ..............F-A V i 11202-005-H-027 SI ..... ..... ....F1.30F(1) 11202-005-H027 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...PRE ----....F-A V1 11202-005-H028 ISI ...... ..... ...F1,30F(1) 11202-005-H028 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-005-H029 SI ...... ..... ...Fl.30F(1) 11202-005-H029 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ...... .... ....PR E ..............F-A V1 11202-005-H030 ISI ...... ..... ...F1.30F(1) 11202-005-H030 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............F-A Vi 11202-005-H031 -SI Fl.30F(1) 11202-005-H031 LIN RESTRAINT AUG 3 1202 OWN ...... ..... ...P R E -. -.- -.-. .-.- ..-. ..F-A V1 11202-005-H032 ISI ...... ..... ...F1.30F(1) 11202-005-H032 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....PRE F1.30F(1) 11202-005-H035 3 1202 LIN RESTRAINT AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 33 -124 Southern NcerOperating C ompany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwgAISO No.Comp. Desc.Code Case Period 1Period 2 iW 01 2 Period 3 Summary No.lComiID/Svstem Scooe t Method / Procedure F-A V1 11202-005-H601 isI ...... ..... ...F1.30F(1) 11202-005-H1601 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ...... ..... ...PR E ..............F-A VI 11202-006-H011 ISI ...... ... ... ...F1.30F(1) 11202-006-H011 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...PR E ..............F-A VI 11202-006-H025 ISI ...... ..... ...F1.30F(1) 11202-006-H025 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN PRE -.- ......F-A V1 11202-006-H031 ISI .. ..... ..... ...F1.30F(1) 11202-006-H031 LIN RESTRAINT AUG 3 1202 OWN PRE F-A V 11202-006-H046 ISI Fi.30F(1) 11202-006-H046 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....PR E ...............F-A V1 11202-006-H047 ISI -... .F1.30F(1) 11202-006-H047 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE ..............F-A V1 11202-007-H1003 ISI ...... ..... ...F1.30F(1) 11202-007-H003 LIN RESTRAINT AUG ...... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-007-H1004 SI ...... ..... ...F1.30F(1) 11202-007-H1004 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE ..............F-A V1 11202-007-1-005 ISI ...... ..... ...F1.30F(1) 11202-007-H005 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN PRE F-A V1 11202Z-007-1-100 Fi.30F(I) 11202-007-41006 3 1202 LIN RESTRAINT 161 AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 34 -124 SoTthern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/tSO No.Comp. Desc.Code Case=>>w r" 0-Summary No./CompID/System Scope / Method / Procedure F-A V1 11202-007-H007 ISI -... .F1.30F(1) 11202-007-1007 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....PR E ..............F-A V1 11202-007-H008 ISI ... ....Fi.30F(1) 11202-007-H008 LIN RESTRAINT AUG 3 1202 OWN -......PRE ..............F-A V1 1 202-008-11002 ISI ...... ..... ...F1.30F(1) 11202-008-H002 LIN RESTRAINT AUG -..........3 1202 OW N ...... .... ....PR E ..............F-A VI 11202-008-H003

]SI ...... ..... ...F1.30F(1) 11202-008-H003 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN PRE ..............F-A V1 11202-008-H004 ISI ...... ..... ...F1.30F(1) 11202-008-11004 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE ....F-A Vi 11202-008-HOOS ISI- -.-.-- -- -- -- ---- ---F1.30F(1) t 1202-008-H005 LIN RESTRAINT AUG ------ ------- ------ ---3 1202 OWN -.-- ----- ------ -----PRE --- ---- ----------


F-A V it 1202-008-1-1006 ISI ...... ..... ...Fi.30F(1) 11202-008-H006 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-008-H007 ISI ...... ..... ...F1.30F(1) 11202-008-H007 LIN RESTRAINT AUG .......... ...3 1202 OW N ...... .... ....PR E ..............F-A V1 11202-009-H002 ISI ...... ..... ..Fi.30F(1) 11202-009-H002 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A Vi 11202-009-H003 Fi.30F(1) 11202-009-H003 3 1202 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 35 -124 Southern Nuclear Operating company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 I U, Period 2 Ior- M c Period 3 0r Summary No./CompID/System Scope I Method / Procedure F-A V1 11202-009-H004 SI ...... ..... ...F1.30F(1) 11202-009-H004 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A Vi 11202-009-H005 SI ...... ..... ...F1.30F(1) 11202-009-H005 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....PRE ...............F-A V1 11202-009-H006 ISI .... --.. ... ...F1.30F(i) 11202-009-H006 LIN RESTRAINT AUG 3 1202 OWN ----....PR E ..............F-A V1 11202-009-H007 ISI ...... ..... ...F1.30F(1) 1 t202-009-H007 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN PRE ..............F-A V1 11202-010-H002 ISI ...... ..... ...F1.30F(1) 11202-010-H002 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...PRE -......F-A V1 11202-010-H003 ISI ...... ..... ...F1.30F(1) 11202-010-H003 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ...............F-A Vi 11202-010-H004 ISI ...... ..... ...F1.30F(1) 11202-010-H004 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...PR E ..............F-A V1 11202-010-H005 ISI --...... ...F 1 3 0 F ( 1 ) 1 1 2 0 2 -0 1 0 -H 0 0 5 L I N R E S T R A I N T A U G ..............3 1202 OWN ...... ...P R E ..............F-A V1 11202-010-H006 ISI ... ..........F1.30F(1) 11202-010-H006 LIN RESTRAINT AUG .. ..... .......3 1202 OW N ..... ..... ....PR E .............F-A Vi 11202-t)10-HLOt7 F1.30F(1) 11202-010-H007 3 1202 LIN RESTRAINT is!AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 36 -124 SOutEieIn N LA earVERSION 3.0 3rd lnteri'aI VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class DwglSO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 I> cc> >Summary No.ICompID/System Scope / Method / Procedure F-A V1 11202-011-H002 IS) ...... ..... ...Fl.30F(i) 11202-011--H002 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....PR E ..............F-A Vl 11202-011-H003 ISl ----....F1.30F(1) 11202-011-H003 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... ..... ...PRE .............F-A V1 11202-011-H004 ISI -......Fl.30F(1) 11202-011-H004 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-011-HOO5 ISI ...... ..... ...Fl.30F(1) 11202-011--H005 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN P R E ..............F-A Vi 11202-011-H006 ISI ...... ..... ...Fl.30F(1) 11202-011-H006 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-011-1-1007 ISI ..... ..... ....F1.30F(1) 11202-011-H007 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...PRE I.. ..........F-A Vl 11202-012-H002 ISI ...... ..... ..F1.30F(1) 11202-012-H002 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....P RE ..............F-A Vi 11202-012-H003 ISI ...... ..... ...F1.30F(l) 11202-012-H003 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ... ........F-A Vi 11202-012-H004 ISI F1.30F(1) 11202-012-H004 LIN RESTRAINT AUG -.. ... ..... ..3 1202 OWN -.. ... ..... ..PRE F-A Vi 112'2-012-H005 F1.30F(1) 11202-012-H005 3 1202 LIN RESTRAINT AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 37 -124

SbuthernNuclear Qp Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Deac.Code Case a Period 1 Period 2 I>>Period 3 Summary No./CompID/System Scope / Method / Procedure F-A V1 11202-012-H1-006 ISI -... .... .F1 .30F(1) 11202-012-H006 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-012-H007 ISi ...... ..... ...F1.30F(1) 11202-012-H007 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN PR E ..............F-A V1 11202-013-H002 ISI ...... ..... ...F1.30F(1) 11202-013-H002 LIN RESTRAINT AUG -... .3 1202 OWN PRE ..............F-A V1 11202-013-H003 ISI ...... ..... ...F1.30F(1) 11202-013-H003 LIN RESTRAINT AUG -..........3 1202 OWN ...... ..... ...PRE ..............F-A V 1 1 202-013-H004 ISI ..... ..... ....F1.30F(1) 11202-013-H004 LIN RESTRAINT AUG -... .... .3 1202 OWN ...... ...PR E ..............F-A V1 11202-013-1-1005 ISI F1.30F(t) 11202-013-H005 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE F-A V1 11202-013-H006 ISI -..........Fl1.30F(1) 11202-013-HOO6 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... ..... ...PR E -. -.- .- .-.-.-. .F-A V1 11202-013-H007

]SI ...... ..... ...F1.30F(1) 11202-013-H007 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN -..... ..... ..P R E -. -.- .- .- .......F-A Vi 1i202-014-H002 iSI -..... ..... ..F1.30F(1) 11202-014-H002 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE -......--A Vi 11202-014-H003 F1.30F(1) 11202-014-H003 3 1202 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 38 -124 southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwqf1SO No.Comp. Desc.Code Case Period 1¢r 2 Period 2 Q: 0: cc Period 3>R>c Summarv No./CompID/System Scope / Method / Procedure F-A V1 11202-014-1004 ISI ...... ..... ...F1.30F(1) 11202-014-H004 LIN RESTRAINT AUG 3 1202 OW N .. .... ..... ....PRE .....----, -. .F-A V1 11202-014-H005 ISI ...... ..... ...F1,30F(1) 11202-014-1005 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN PRE F-A V1 11202-014-1006 ISI --... ...F1.30F(I) 11202-014-H006 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN PRE ..............F-A V1 11202-014-H007 ISI F1.30F(1) 11202-014-H007 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....P R E ..............F-A V1 11202-023-H004 ISI ...... ..... ...F1.30F(1) 11202-023-H004 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN PRE F-A V1 11202-024-1004 ISI ...... ..... ...F1.30F(1) 11202-024-H004 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-029-H002 ISIVTI/NMP-ES-024-203 1K5-1202-029-04 ISI c ..... ..... ...F1.30F(1) 11202-029-H002 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............F-A V1 11202-029-1004 ISI ...... ..... ...F1.30F(1) 11202-029-1-1004 LIN RESTRAINT AUG 3 1202 OWN PR E ..............F-A V1 11202-029-H005 ISI/VT/NMP-ES-024-203 1K5-1202-029-04 ISI c ..... ..... ...F1.30F(1) 11202-029-1005 LIN RESTRAINT AUG .......... ...3 1202 OWN -..........PRE F-A V1 11202-029-HOOS F1.30F(1) 11202-029-H008 3 1202 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 39 -124 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 a0 Period 2 Period 3 N co 0)*>>r >-Summary No./CompID/System Scope / Method / Procedure F-A V1 11202-029-H009 ISI ...... ..... ...F1.30F(1) 11202-029-H009 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE -----....F-A V1 11202-029-HO10 ISI ...... ..... ...F1.30F(1) 11202-029-HO10 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-029-H018 ISI ...... ..... ...F1.30F(1) 11202-029-HO18 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-029-H022 ISI ...... ..... ...F1.30F(1) 11202-029-H022 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-029-H023 ISI -......F1.30F(1) 11202-029-H023 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... ..... ...P R E ..............F-A V1 11202-029-H024 SI ...... ..... ...F1.30F(1) 11202-029-H024 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-029-H026 ISI ...... ..... ...F1.30F(1) 11202-029-H026 LIN RESTRAINT AUG ... ........ ..3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-030-H004 ISI -----....Fl.30F(1) 11202-030-H004 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A VI 11202-030-H005 ISI ...... ..... ...F1.30F(1) 11202-030-HO05 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-030-HOll F1.30F(1) 11202-030-HOl1 3 1202 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 40 -124 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2> > r, c Period 3>a Summary No./ComplD/System Scope I Method I Procedure F-A V1 11202-030-H022 ISI ...... ..... ...F1.30F(1) 11202-030-H022 LIN RESTRAINT AUG 3 1202 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11202-030-H023 ISI ---... ..... ...F1.30F(1) 11202-030-H023 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....P R E -. -.I. -.- .......F-A V1 11202-030-H025 ISi ...... ..... ...F1.30F(1) 11202-030-HD25 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-030-H026 ISI ...... ..... ...F1.30F(1) 11202-030-H026 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN P R E -. -.- .- ..- .- .....F-A V1 11202-031 -H004 ISI FR.30F(1) 11202-031-1-1004 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE F-A V1 11202-032-1004 ISI ..... ..... ....F1.30F(1) 11202-032-H004 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...PR E -. -.- -.-. .-.- ..-. ..F-A V1 11202-033-H004

[SI -... .... .F1.30F(1) 11202-033-H004 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN P R E -. -.- -.-. .-.- ..-. ..F-A V1 11202-034-H004 ISI ...... ..... ...F1.30F(1) 11202-034-H004 LIN RESTRAINT AUG ...... ...3 1202 OW N ..... ...... ...P R E -. -.- ..-.- ....I. ..F-A V1 11202-036-H o10 ISI ...... ..... ...F1.30F(1) 11202-036-Ho10 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN -......PRE -......F-A V1 11202-037-H003 F1.30F(1) 11202-037-11003 3 1202 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 41 -124 oGuThern Nuclear Operating Company 3rd Interval VOGTLE-1 IS] PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period I Period 2 Period 3> > > > > > >: Summary No./ComplD/Svstem Scooe I Method / Procedure F-A V1 11202-037-H009 SI ...... ..... ...F1.30F(1) 11202-037-H009 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-037-H014 ISI F1.30F(1) 11202-037-H014 LUN RESTRAINT AUG ...... ..... ...3 1202 OWN ----....PR E ..............F-A V1 11202-037-H015 SI ...... ..... ...Fl.30F(1) 11202-037-HO15 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE ..............F-A V1 11202-037-HO16 ISI ...... ..... ...F1.30F(1) 11202-037-HO16 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....P RE ..............F-A V1 11202-037-H033 ISI ...... ..... ...Fl.30F(1) 11202-037-H033 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE ...... .......F-A V1 11202-037-H034 SI ...... ..... ...Fl.30F(1) 11202-037-H034 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....PR E ..............F-A V1 11202-037-H035 ISI -..... ..... ..F1.30F(1) 11202-037-H035 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-038-H002 ISI ...... ..... ...F1.30F(1) 11202-038-H002 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-038-HOll ISI ...... .......F1.30F(1) 11202-038-HOl1 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ...... .......PRE -......F-A V1 11202-038-H025 F1.30F(1) 11202-038-H025 3 1202 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 42 -124 SO6TLE-1 uc Lear. OERIN Copany'3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/1SO No.Comp. Desc.Code Case Period 1 ar Period 2 i= V (C Period 3 0r Summary NoJCompIDISystem Scope / Method / Procedure F-A V1 11202-038-H031 ISI --.... ..... ...F1.30F(1) 11202-038-H031 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V 11202-038-H032 ISI --....F1.30F(I) 11202-038-H032 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-072-H006 ISI ...... ..... ...F1.30F(1) 11202-072-H006 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............F-A V1 11202-072-H007 ISI ...... ..... ...F1.30F(1) 11202-072-H007 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ...... ...PRE ----....F-A V 11202-072-H008 ISI ...... ..... ...F1.30F(1) 11202-072-HOOB LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-072-H009 ISI ...... ..... ...F1.30F(1) 11202-072-H009 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ----....P R E ..............F-A V1 11202-072-HOIO ISI -..... ..... ..F1.30F(1) 11202-072-HO10 LIN RESTRAINT AUG ...... ...3 1202 OW N ..... ..... ....PR E ..............F-A Vi 11202-072-HOll ISI ...... ..... ..F1.30F(1) 11202-072-HOl 1 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-072-HO12 ISI ...... ..... ...F1.30F(1) 11202-072-H012 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ......... ....PRE F1.30F(1) 11202-072-HO15 3 1202 LIN RESTRAINT 1SI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 43 -124 SOuthe n Nucler Opera t in g ompany 3rdVIntervaI VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 r Period 2 Period 3 ON0 rw ?!00 Summary No,/ComplD/System Scope / Method I Procedure F-A V1 11202-072-HO16 ISI ---... ..... ...F1.30F(1) 11202-072-HO16 LIN RESTRAINT AUG ...... ..... ....3 1202 OW N ...... ..... ...PR E ..............F-A V1 11202-072-H017 ISI ...... ..... ...Fl.30F(I) 11202-072-H017 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-084-H005 IS1 ...... ..... ...F1.30F(1) 11202-084-H005 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ..... ...... ...PR E ..............F-A V1 11202-088-H009 ISI ...... ..... ...F1.30F(1) 11202-088-H009 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE -......F-A V1 11202-088-HO10 ISI .. .... ..... ..F1.30F(1) 11202-088-HO10 LIN RESTRAINT AUG 3 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-0884-1020 ISI ...... ..... ...F1.30F(1) 11202-088-H020 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ... ........F-A V1 11202-088-H024 ISI ...... ..... ...F1.30F(1) 11202-088-H024 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-088-H042 Is) -... .... .F1.30F(1) 11202-088-H042 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...PR E ..............F-A V1 11202-088-H043 SI -... .F1.30F(1) 11202-088-H043 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....PRE -......F-A V1 11202-088-HO44 F1.30F(1) 11202-088-H044 3 1202 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 44 -124 southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case o 0 Summary NoJCompID/Syslem Scope/ Method / Procedure F-A V1 11202-098-H017 ISI ...... ..... ...F1,30F(1) 11202-098-HO17 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... ..... ...PRE ..............F-A V1 11202-098-1-1019 ISI ...... ..... ...F1.30F(1) 11202-098-H019 LIN RESTRAINT AUG .. ..... ..... ...3 1202 OWN ...... ..... ...PR E ..............F-A V1 11202-099-H022 ISI ...... ..... ...Fi.30F(1) 11202-099-H022 LIN RESTRAINT AUG -. ..... ..... ..3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-099-H023 IS[ ...... ..... ...Fl.30F(1) 11202-099-H023 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ...... ..... ...P R E ..............F-A Vi 11202-099-1-1602 ISl ...... ..... ...Fl.30F(1) 11202-099-H602 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-104-H006 ISI ...... ..... ...F1.30F(1) 11202-104-H006 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE -......F-A V1 11202-104-H020 ISI/VT/NMP-ES-024-203 IS c ..... ..... ...Fl.30F(1) 11202-104-H020 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE .............F-A V1 11202-104-HO21 ISI ...... ..... ...F1.30F(1) 11202-104-H021 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... ..... ...PRE ...... ..... ...F-A V1 11202-104-HO31 ISI ...... ..... ...Fl.30F(1) 11202-104-HO31 LIN RESTRAINT AUG .......... ...3 1202 OWN -......PR E -............F1.30F(1) 11202-104-H040 3 1202 LIN RESTRAINT is!AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 45 -124 V ES-1thr I PNuclear Operating Cor0pany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 ao Period 2 r. 10 a Period 3 0 Summary No./CompID/Svstem ScoDe / Method / Procedure F-A V1 11202-104-H041 ISI ...... ..... ...F1.30F(1) 11202-104-H041 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE ...........----F-A V1 11202-104-H042 ISI ...... ..... ...F 1 .3 0 F ( 1 ) 1 1 2 0 2 -1 0 4 -H 0 4 2 L I N R E S T R A I N T A U G ..............3 1202 OWN PRE ..............F-A V1 11202-104-H043 ISI/VT/ ISI ---- -- ---- -- -- s ---F1,30F(1) 11202-104-H043 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-104-H602 ISI ...... ..... ...F1.30F(1) 11202-104-H602 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-104-H604 ISI ...... ..... ...F1.30F(1) 11202-104-H604 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....PRE ----....F-A V1 11202-104-H605 ISI ...... ..... ...Ft.30F(1) 11202-104-1-1605 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...PRE --.........F-A V1 11202-134-H037 ISI ...... ..... ...F1.30F(1) 11202-134-H037 LIN RESTRAINT AUG 3 1202 OW N ..... ..... ....PRE .. ............F-A V1 11202-134-H040 ISI ... ....F1.30F(1) 11202-134-H040 LIN RESTRAINT AUG ----....3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-134-H041 Is[F1.30F(1) 11202-134-H041 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-134-1-1042 F1.30F(1) 11202-134-H042 3 1202 LIN RESTRAINT ISI AUG OWN PRE 8/31/21309 ScheduleWorks V. 8.1 Page 46 -124

§oi'the`r~n Nuclear`!vOpe;_6rating Comparny 3rd.Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 cc ccý: ý>Period 2 M- Cc i Period 3 ( cc Summary No./ComoID/Svstem Scope / Method / Procedure F-A V1 11202-134-H049 ISI ...... ..... ...F1.30F(1) 11202-134-H049 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...P R E -. -.- -.-. .-.- ..-. ..F-A V1 11202-134-H050 ISI ...... ..... ...F1.30F(1) 11202-134-H050 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....PRE F-A VI 11202-134-H601 ISI ...... ..... ...F1.30F(1) 11202-134-H601 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... ..... ...PR E ..............F-A V1 11202-151-H048 ISI ...... ..... ...F1.30F(1) 11202-151-H048 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN PR E ..............F-A Vl 11202-174-HOOl ISIVT/ ISI ....-.--- s-. ...Fl.30F(1) 11202-174-H001 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....P RE ..............F-A V1 11202-174-1003 ISI ...... ..... ...F1.30F(1) 11202-174-H003 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...P R E -. -.- .- ..- .- .....F-A V1 11202-181-1-002 ISINvT/ ISI -. ..... s -. ... ...Fl.30F(1) 11202-181-H002 LIN RESTRAINT AUG -. ..... ..... ...- -3 1202 OW N -. -.- -. -. .-.- ..-. ..PRE F-A V1 11202-181-H005 ISI/VT/ ISI ---------------------

F1.30F(1) 11202-181-11005 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN --..... ...PRE ..............F-A V1 11202-181-HO ll ISI/VT/ iSI ....-.--- s -. .. ....-F1.30F(1) 11202-181-H110 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A VI 11202-181-H019 F1.30F(1) 11202-181-H019 3 1202 ISI5T/LIN RESTRAINT ISI AUG OWN PRE S 8/31/2009 ScheduleWorks V. 8.1 Page 47 -124 SouThLern Nuclear OpertiN Coany 3rd Interval VOGTLE-1 IS1 PLAN, VERSION 3.0 Category, Item No., Class Summary No./CompID/Svstem Dwg/ISO No.Comp. Desc.Code Case Period 1e Period 2 cc cc cc Period 3 Scope/ Method i Procedure F-A Vl 11202-181-H027 ISI/VT/ ISI .-.-. .. S -. ... .F1.30F(1) 11202-181-H027 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... ..... ....PRE -...-.-. ...F-A V1 11202-181-H030 0SI ..... ...F1.30F(1) 11202-181-H030 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...PRE -...-.-. ...F-A V1 11202-181-H032 ISI/VT/ ISI ...... ...- s ---F1.30F(1) 11202-181-H032 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11202-181-H034 ISI/VT/ ISI- ...... .-s -.F1.30F(1) 11202-181-H034 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE -.- ........F-A V1 11202-181o1039 SI ...... ..... ...F1.30F(1) 11202-181-H039 LIN RESTRAINT AUG -..........3 1202 OWN -..........PRE ..............F-A V1 11202-181-H043 ISIVT/ ISI----------

s ----------

F1.30F(1) 11202-181-H043 LIN RESTRAINT AUG --...... ..3 1202 OW N ...... ..... ...PRE -.- ..... .F-A V1 11202-181-H04 SI F1.30F(1) 11202-181-H044 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....PRE -.- ......F-A V1 11202-184-1-1002 SI ...... ..... ...F1.30F(1) 11202-184-H002 LIN RESTRAINT AUG -..........3 1202 OWN ...... ..... ...PRE ..............F-A V1 11202-184-H005 ISI/VT/ ISI --------------------

F1.30F(1) 11202-184-H005 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE F-A Vl 11202-185-1-100 F1.30F(1) 11202-185-H002 3 1202 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 48 -124 Southern Nuclear oVerating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwgIISO No.Comp. Desc.Code Case Period 1 c Period 2 Period 3 Summary No./CompID/System Scope / Method / Procedure F-A V1 11202-185-H005 ISI -...........F1,30F(1) 11202-185-H005 LIN RESTRAINT AUG -..... ..... .. ..3 1202 OW N ...... .... ....PRE ..............F-A V1 11202-187-Hl001 ISI ...... ..... ..FI.30F(1) 11202-187-H001 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... ..... ...PRE ----....F-A V1 11202-187-H003 IS]F1.30F(t) 11202-187-H003 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .......PRE ..... .........F-A V1 11202-187-H004 ISI ...... ..... ...F1.30F(1) 11202-187-H004 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....PR E ..............F-A V1 11202-187-H005 ISI/VT/NMP-ES-024-203 1K3-1202-187-01 ISI C ..... ..... ...F1.30F(1) 11202-187-H005 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... ..... ...PR E ..............F-A V1 11202-187-H006 ISINT/NMP-ES-024-203 1K3-1202-187-01 SI c ..... ..... ...F1.30F(1) 11202-187-H006 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...PR E ..............F-A V1 11202-187-1-1007 IS] ...... ..... ...F1.30F(1) 11202-187-H007 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-187-H008 ISI ...... ..... ...F1.30F(1) 11202-187-H008 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-187-H009 ISI ...... ..... ...F1.30F(1) 11202-187-H009 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ...... ..... ...PR E ..............F-A V! 11202-195-H001 Fl.30F(1) 11202-195-H001 3 1202 LIN RESTRAINT Is]AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 49 -124 SouThern NucleAr ViErating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 00 (0 cc Period 3 cc2 Summary No./ComplD/System Scope / Method / Procedure F-A V1 11202-213-H002 ISI ...... ..... ...F1.30F(1) 11202-213-H002 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-213-H003 ISI ...... ..... ...Fl.30F(1) 11202-213-H003 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN PRE ..............F-A V1 11202-213-1I004 ISI -... .F1.30F(1) 11202-213-H004 LIN RESTRAINT AUG 3 1202 OWN PRE ..............F-A V1 11202-215-H002 ISI ... ....F1.30F(1) 11202-215-1002 LIN RESTRAINT AUG .... ---....3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-215--H003 ISI F1.30F(1) 11202-215-H003 LIN RESTRAINT AUG 3 1202 OW N ...... .... ....PRE F-A V1 11202-215-H004 ISI ...... ..... ...F1.30F(1) 11202-215-1-1004 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A Vl 11202-215-H005 ISI F1.30F(i) 11202-215-1005 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....PR E ..............F-A V1 11202-222-HOOl ISI ... ....F1.30F(1) 11202-222-HOOl LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A Vi 11202-222-H002 ISI ...... ..... ...F1.30F(1) 11202-222-H002 LIN RESTRAINT AUG 3 1202 OWN .......... ...PR E ..............F1.30F(1) 11202-222-H003 3 1202 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 50 -124 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case> >CO CO 0 .>>!3.>Summary NoJComplD/System Scope I Method / Procedure F-A V1 11202-226-HOOl ISI ...... ..... ...Fl.30F(1) 11202-226-HOOI LIN RESTRAINT AUG -- --. ,------ ------3 1202 OWN -.---- -- ----- ------ ---PRE ---- --- ----- ----- ---F-A V1 11202-228-H005 ISI ..................-

--F1.30F(1) 11202-228-H005 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11202-228-H006 SI ...... ..... ...F1.30F(1) 11202-228-H006 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-228-H007 ISI ...... ..... ...Fi.30F(1) 11202-228-1-1007 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PRE ..............F-A Vi 11202-228-H009 ISI ...... ..... ...F1.30F(1) 11202-228-H009 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 I1202-228-HO10 ISI ...... ..... ...F1.30F(1) 11202-228-HO10 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....P R E ..............F-A V 11202-232-1-1004 ISI ...... ..... ...F1.30F(1) 11202-232-H004 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN .......... ...PR E ..............F-A V 11202-232-H005 SI ...... ..... ...F1 .30F(1) 11202-232-HOOS LIN RESTRAINT AUG ...... .......3 1202 OW N ..... ...... ...PRE -----....F-A Vi 11202-232-H008 Is] ..... ..... ...Fl.30F(i) 11202-232-H008 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ----....PRE ..............F1.30F(1) 11202-232-HO10 3 1202 LIN RESTRAINT IsI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 51 -124 SoutL rn PNuclear Operating Company 3rd Interval VOGTLE-1 IS1 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Cc Ir-Period 3 if Summary NoJComplD/Svstem Scope I Method / Procedure F-A V1 1202-232-011 ISI ......F 1.30F(1) 11 202-232-HOl 1 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....PRE F-A V1 11202-390-H002 ISI/VT/ ISI -- ---- -------- -s --F1.30F(1) 11202-390-H002 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....PRE F-A V1 11202-390-H003 ISI/VT/ ISI .--- -- -. -s --F1.30F(1) 11202-390-H003 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...P R E ..............F-A V1 11202-390-H005 ISI ...... ..... ...F1.30F(1) 11202-390-H005 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....PRE ..............F-A V1 11202-390-H006 ISI/VT/NMP-ES-024-203 IK3-1202-390-01 ISI c F1.30F(1) 11202-390-H006 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...P R E ..............F-A V1 11202-390-H007 ISI ...... ..... ...F1i.30F(1) 11202-390-H007 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-390-H008 IS] ...... ..... ...F1.30F(1) 11202-390-H008 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...PRE ..............F-A V1 11202-390-H009 ISI ...... ..... ...F1.30F(1) 11202-390-H009 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-390-H010 ISI ...... ..... ...F1.30F(1) 11202-390-HO10 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...P R E ..............F-A V! 112U2-443-HU01 F1.30F(1) 11202-443-HOOI 3 1202 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 52 -124 VSouthern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class DwgIISO No.Comp. Desc.Code Case U)U) U 0)Summary NoJCompID/System Scope / Method / Procedure F-A V1 11202-447-H601 ISI ...... ..... ...F1.30F(1) 11202-447-1-1601 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN P R E ..............F-A V1 11202-485-H002 ISI F1.30F(1) 11202-485-H002 UN RESTRAINT AUG .. ..... ..... ...3 1202 OW N ..... ..... ....PRE .........F-A V1 11202-485-H004 SI ...... ..... ...F-1.30F(1) 11202-485-H004 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...P R E ..............F-A V1 11202-486-H002 ISI ...... ..... ...F1.30F(1) 11202-486-H002 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E -. -. -. .-. -. .-. --. .F-A V1 11202-486-H004 ISI ... ....F1.30F(1) 11202-486-H004 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... ..... ...PR E ..............F-A V1 11202-512-HOOl ISI ...... ..... ...F1.30F(1) 11202-512-HOOI LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11202-512-H006 ISI ...... ..... ...F1.30F(1) 11202-512-H006 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ..... ....PR E ..............F-A V1 11202-512-H008 ISI ...... ..... ...F1.30F(1) 11202-512-H008 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...PR E ..............F-A Vi 11202-512-H009 ISI ...... ..... ...F1i30F(1) 11202-512-H009 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ...... .... ....P R E ..............P°A Vi 11202-512-H012 F1.30F(1) 11202-512-HO12 3 1202 ISI/V T/NMP-ES-024-203 IK5-1202-512-01 LIN RESTRAINT ISI AUG OWN PRE C 8/31/2009 ScheduleWorks V. 8.1 Page 53 -124 VOGTL1ieIn Nla OEraSing ompany 3rd IntervalIn VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 cc>Period 2 cc c Period 3 Summary NoJComplD/System Scope / Method / Procedure F-A V1 11202-516-H001 ISI F1.30F(1) 11202-516-H001 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN -..... ..... ..PRE ..............F-A V1 11202-516-H006 si ...... ..... ...F1.30F(1) 11202-516-11006 LIN RESTRAINT AUG ...... ..... ...3 1202 OWN ...... ..... ...PRE ..............F-A V1 11202-516-H008 SI ...... ..... ...F1.30F(1) 11202-516-11008 LIN RESTRAINT AUG 3 1202 OW N ..... ..... ....PRE ..............F-A V1 11202-516-H009 ISI F1.30F(1) 11202-516-11009 LIN RESTRAINT AUG 3 1202 OWN PRE F-A V1 11202-516-H012 ISI ...... ..... ...F1.30F(1) 11202-516-H012 LIN RESTRAINT AUG ...... ..... ...3 1202 OW N ..... ...... ...PRE .............F-A V1 11203-021-H001 ISI -......... ...F1.30F(1) 11203-021-H001 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N -..... ..... ..PRE ..............F-A VA 11203-021-1002 ISI ...... ..... ...F1.30F(1) 11203-021-H002 LIN RESTRAINT AUG ...... ..... ...3 1203 OWN PRE .............F-A V1 11203-021-11003 ISI ---.-7 F1.30F(1) 11203-021-H003 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ...... .... ....PRE ...... ..... ...F-A V1 11203-021-11007 ISI -..... ..... ..F1.30F(1) 11203-021-11007 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............F-A V1 11203-021-HOll F1.30F(1) 11203-021-H011 3 1203 LIN RESTRAINT 1S9 AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 54 -124 Southern 'Nuclear O'perating Complany 3rd Interval " VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case M M 0n 0 cc cc Summary No.lCompID/System Scope / Method / Procedure F-A V1 11203-021-H013 ISI ...... ..... ...F 1 .3 0 F ( 1 ) 1 1 2 0 3 -0 2 1 -H 0 1 3 U N R E S T R A IN T A U G ..............3 1203 OWN ...... ..... ...PRE ..............F-A V1 11203-021-HO17 ISI ...... ..... ...F 1 .3 0 F ( 1 ) 1 1 2 0 3 -0 2 1 -H 0 1 7 L I N R E S T R A I N T A U G ..............3 1203 OWN ...... ..... ...PRE -......F-A V1 11203-021-H018 ISI ...... ..... ...F1.30F(1) 11203-021-HO18 LIN RESTRAINT AUG ...... ..... ...3 1203 OWN ...... ..... ...PR E ..............F-A V1 11203-021-HO19 ISI ...... ..... ...F1.30F(1) 11203-021-HO19 LIN RESTRAINT AUG ...... ..... ...3 1203 OWN ...... ..... ...PRE ...... ..... ...F-A V1 11203-021-H020 ISI ...... ..... ...F1.30F(i) 11203-021-H020 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............F-A V1 11203-021-H021 ISI ..... ....F1.30F(1) 11203-021-H021 LIN RESTRAINT AUG ...... ..... ...3 1203 OWN ...... ..... ...PR E .............F-A V1 11203-021-H022 SI ...... ..... ...F1.30F(1) 11203-021-H022 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ..... ....P R E -. -.- -.-. .-.- ..-. ..F-A V1 11203-026-HOOl ISI ...... ..... ...Fi.30F(i) 11203-026-HOOl LIN RESTRAINT AUG ...... ..... ...3 1203 OWN ...... ...P R E -. -.- -.-. .-.- ..-. ..F-A V1 11203-026-H003 ISI ...... ..... ...F1.30F(1) 11203-026-H003 LIN RESTRAINT AUG ...... .......3 1203 OW N ..... ..... ....PRE ..............r- ,V ... I ^ .........i--A VI 1120u,.-026-1-1u7 F1.30F(1) 11203-026-H007 3 1203 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 55 -124 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case mr r- EE Summary No,/CompID/System Scove / Method / Procedure F-A V1 11203-026-H008 ISi ...... ..... ...F1.30F(1) 11203-026-HOOB LIN RESTRAINT AUG ...... ..... ...3 1203 OWN ...... ..... ...PRE ..............F-A V1 11203-030-1-1002 ISI ...... ..... ...F1.30F(1) 11203-030-H002 LIN RESTRAINT AUG ...... ..... ...3 1203 OWN -------....PRE .. .... .......F-A V1 11203-034-HOOl ISI ----....F1.30F(1) 11203-034-HOOl LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ...... ..... ...PR E ..............F-A V1 11203-034-H002 ISI ...... ..... ...F1.30F(1) 11203-034-11002 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11203-034-H003 SI ...... ..... ...F1.30F(1) 11203-034-H003 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............F-A V1 11203-034,H005 ISI ...... ..... ...F1.30F1()

11203-034-1005 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............F-A V1 11203-034-1-1006 ISI -... .F1.30F(1) 11203-034-HOO6 LIN RESTRAINT AUG ... ..........3 1203 OW N ..... ..... ....PRE ..............F-A V1 11203-034-H007 ISI ...... ..... ...F1.30F(1) 11203-034-1-1007 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ..... ....P R E -. -.....- ..- ....-F-A V1 11203-034-H008 iSI ...... ..... ...F1.30F(1) 11203-034-H008 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ..... ....P R E ...-...--. ...--F-A V1 '11203-034-1-100 F1.30F(1) 11203-034-11009 3 1203 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 56 -124 Southern Nuclear OjPerating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwgAISO No.Comp. Desc.Code Case Period 1 IX: Period 2 w Period 3 Summarv No./ComplD/Svstem Scope / Method / Procedure F-A V1 11203-034-HOll ISl ...... ..... ...F1.30F(1) 11203-034-HOl1 LIN RESTRAINT AUG -..........3 1203 OW N ...... .... ....PR E ..............F-A V1 11203-034-H013 ISI ...... ..... ...F1.30F(1) 11203-034-H013 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ...... ...PRE ..............F-A V1 11203-042-H003 ISI/VT/NMP-ES-024-203 1K3-1203-042-03 ISI c -.... .... ..F1.30F(1) 11203-042-1003 LIN RESTRAINT AUG -..........3 1203 OWN ...... ..... ...PRE ..............F-A V1 11203-042-HOO ISI/VT/NMP-ES-024-203 1K3-1203-042-02 SI c ..... ..... ...F1.30F(1) 11203-042-1008 LIN RESTRAINT AUG 3 1203 OWN ..... ...... ...PRE ..............F-A V1 11203-042-HO10 -SI F1.30F(1) 11203-042-HO10 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E -. -.- -.-. .-.- ..-. ..F-A V1 11203-042-H012 ISI ...... ..... ...F1.30F(1) 11203-042-H012 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ...... ...PR E ..............F-A V1 11203-042-H013 ISI/VT/NMP-ES-024-203 1K3-1203-042-05 ISI c ..... ..... ...F1.30F(1) 11203-042-H013 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ...... .... ....PRE ............F-A V1 11203-042-H014 ISI ...... ..... ...F1.30F(1) 11203-042-HO14 LIN RESTRAINT AUG ...... ..... ...3 1203 OWN ...... ..... ...PR E -. -.- .- ..- .- .....F-A V1 11203-042-H015 SI ...... ..... ...F1.30F(1) 11203-042-HO15 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ..... .....PRE F1.30F(1) 11203-042-HO19 3 1203 1IflVl/LIN RESTRAINT ISI AUG OWN PRE S 8/31/2009 ScheduleWorks V. 8.1 Page 57 -124 Sout~hern Nuclear Operat Iing Company 3rd. Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period I Period 2 Period 3ý' ?- ý2 1 ýSummary NoJComplDISystem Scope I Method / Procedure F-A V1 11203-042-H020 ISI F1.30F(1) 11203-042-H020 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ...... .... ....P R E ..............F-A V1 11203-047-1-1002 SI -..... ..... ..F1.30F(1) 11203-047-H002 LIN RESTRAINT AUG ...... ..... ...3 1203 OWN -..... ..... ..PR E ..............F-A Vi 11203-047-H004 ISI -... .F1.30F(1) 11203-047-H004 LIN RESTRAINT AUG -... .3 1203 OW N ...... .... ....PRE ..............F-A V 11203-047-H006 ISI/VT/ SI] ...... .s -F1.30F(1) 11203-047-H006 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ...... .... ....P R E ..............- --F-A V 11203-047-H007 ISI ...... ..... ...F1.30F(1) 11203-047-H007 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ...... .... ....PR E ..............F-A V1 11203-047-H1-009 ISI M ..... ..... .F1.30F(1) 11203-047-H009 LIN RESTRAINT AUG .......... ...3 1203 OW N ..... ..... ....PRE .......F-A V1 11203-051-HOOl -SI ...... ..... ..F1.30F(1) 11203-051-HOO1 LIN RESTRAINT AUG .......... ...3 1203 OW N ..... ..... ....PR E ..............F-A V1 11203-051-H004 ISI ...... ..... ...F1.30F(1) 11203-051-H004 LIN RESTRAINT AUG -..... ..... ..3 1203 OW N ..... ..... ....PRE .. .. .....F-A V1 11203-055-H001 ISI/VT/ ISI ----s ..... ...F1i30F(1) 11203-055-HOOI LIN RESTRAINT AUG 3 1203 OW N ..... ...... ...PRE ..............I-A Vi 11iW3-U55-HUU2 F1.30F(1) 11203-055-H002 3 1203 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 58 -124

-S.uiherntNuclear Operating dCompany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 cc? I cc Period 3 Summary No.ICompID/System Scope I Method I Procedure F-A V1" 1203-055-H1-006 ISI ...... ..... .F1.30F(1) 11203-055-1-1006 LIN RESTRAINT AUG 3 1203 OWN ...... .......PRE ..............F-A V1 11203-055-H012 ISI/VT/ ISI -- -- ---- -- ------ s ---F1.30F(1) 11203-055-H012 LIN RESTRAINT AUG ...... ..... ...3 1203 OWN ...... ..... ...PRE ... ......F-A Vii 11203-063-H002 SI~ .......F1.30F(1) 11203-063-1-1002 LIN RESTRAINT AUG ...... ..... ...3 1203 OWN ...... ..... ...PRE ..............F-A V1 11203-063-H003 ISI ...... ..... ...F1.30F(1) 11203-063-1-1003 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ...... .... ....PRE ..............F-A V1 11203-063-H004 ISI ...... ..... ...F1.30F(1) 11203-063-1-1004 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ...... ...PRE .............F-A V1 11203-063-1005 ISI ...... ..... ...F1.30F(1) 11203-063-H005 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ...... .... ....PR E ..............F-A V1 11203-063-H006 ISI ...... ..... ...F1.30F(1) 11203-063-H006 LIN RESTRAINT AUG 3 1203 OW N ...... .... ....PRE ---" ...........F-A Vl 11203-063-H007 ISI ...... ..... ...F1.30F(1) 111203-063-H007 LIN RESTRAINT AUG 3 1203 OWN PRE -.- ......F-A Vi 11203-063-H1011 ISI F1.30F(1) 11203-063-HNOl LIN RESTRAINT AUG M ..... ..... ..3 1203 OW N -.........-"-PRE F1.30F(1) 11203-063-H012 3 1203 LIN RESTRAINT AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 59 -124 Southern Nuclear Operating Company 3rd Interval, VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case> >e M. M ccý:>>Summary NoJCompID/System Scope I Method / Procedure F-A Vi 1i203-063-H013 ISI .......F1.30F(1) 11203-063-H013 LIN RESTRAINT AUG -..... ..... ..3 1203 OW N ..... ...... ...PRE ..............F-A V1 11203-063-H014 SI ...... ..... ...F1.30F(i) 11203-063-HO14 LIN RESTRAINT AUG ...... ..... ...3 1203 OWN ...... ..... ...PR E ..............F-A Vi 11203-063-HO15 ISI ...... ..... ...F1.30F(1) 11203-063-HO15 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ...... ...PRE ..............F-A V1 11203-063-HO16 ISI ...... ..... ...F1.30F(I) 11203-063-HO16 LIN RESTRAINT AUG -..........3 1203 OWN ..... ...... ...PRE ..............F-A V1 71203-063-H1-601 IS ...... ......FI.30F(1) 11203-063-H601 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ...... ...PRE O. .....F-A V1 11203-063-H603 SI ...... ..... ...F1.30F(1) 11203-063-H603 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ...... .... ....PR E ..............F-A V1 11203-065-HOOI 0SI ...... ..... ..F1.30F(1) 11203-065-HO0l LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............F-A V1 11203-065-H002 ISI ...... ..... ...F1.30F(1) 11203-065-H002 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ...... ...PRE ..............F-A Vi 11203-065-H004 ISI ...... ..... ...F1,30F(1) 11203-065-H004 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ...... ...PRO ..............F1.30F(1) 11203-065-H005 3 1203 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 60 -124 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class DwgfISO No.Camp. Desc.Code Case I t2P,. co a, 0'rcc Summary NoJCompID/System Scope / Method / Procedure F-A V1 11203-065-H006 ISI -......F1.30F(1) 11203-065-H006 LIN RESTRAINT AUG -..........3 1203 OWN PRE ..............F-A V1 11203-065-H008 ISI ...... ..... ...Fl.30F(1) 11203-065-1-1008 LIN RESTRAINT AUG ...... ..... ...3 1203 OWN -..........PRE -...-.-. ...F-A V1 11203-065-HOll ISI ...... ..... ...F1.30F(1) 11203-065-HOl1 LIN RESTRAINT AUG .......... ...3 1203 OWN -..........PRE ..............F-A V1 11203-065-H013 ISI ...... ..... ...F1.30F(1) 11203-065-H013 LIN RESTRAINT AUG -..........3 1203 OW N ..... ..... ....P R E ..............F-A V1 11203-065-H014 ISI ...... ..... ...F1.30F(1) 11203-065-H014 LIN RESTRAINT AUG ...... ..... ...3 1203 OWN PRE ..............F-A V1 11203-065-H017

[SI ...... ..... ...F1.30F(1) 11203-065-HO17 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ..... ....PR E ..............F-A Vi 11203-065-HO18 ISI ...... ..... ...F1.30F(1) 11203-065-H018 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ..... ....PRE ...... ..... ...F-A V 11203-065-HO19 ISI ...... ..... ...F17.30F(1) 11203-065-HN 19 LIN RESTRAINT AUG ...... .......3 1203 OW N ...... ..... ...PRE ..............F-A Vi 11203-065-H020 ISI ...... ..... ...F1.30F(1) 11203-065-H020 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ...... .... ....PR E ..............F-A V1 112U3-U0b-HU21 Fi.30F(1) 11203-065-H021 3 1203 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 61 -124 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISt PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 m a: CC cc mma Summary No.IComplDISystem Scope / Method / Procedure F-A V1 11203-091-H002 ISI ...... ..... ...F1.30F(1) 11203-091--H002 UN RESTRAINT AUG ---, ---3 1203 OW N ...... .... ....P R E ..............F-A V1 11203-091-H003 ISI ...... ..... ...F1.30F(1) 11203-091--H003 LIN RESTRAINT AUG ...... ..... ...3 1203 'OW N ..... ..... ....PR E ..............F-A V1 11203-091-1-1004 ISI ...... ..... ...F1.30F(1) 11203-091 -H004 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ...... .... ....PR E ..............F-A V1 11203-091-H006 SI ...... ..... ...F1.30F(1) 11203-091-H006 LIN RESTRAINT AUG ...... ..... ...3 1203 OWN ...... ..... ...PRE F-A V1 11203-091-H007 ISI ...... ..... ...F1.30F(1) 11203-091-1-1007 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ...... ...PR E ..............F-A V1 11203-091-H008 ISI F1.30F(i) 11203-091-H008 LIN RESTRAINT AUG ...... ..... ...3 1203 OWN PRE ..............F-A V1 11203-091-HO10 ISI/VT/NMP-ES-024-203 1 K3-1203-055-04 SI c ..... ..... ...F1.30F(1) 11203-091-HO10 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ...... ..... ...PRE ..............F-A VI 11203-093-H012 ISI ...... ..... ...F1.30F(1) 11203-093-HO12 LIN RESTRAINT AUG ........3 1203 OW N ..... ...... ...PRE F-A V1 11203-093-HO15 ISI F1.30F(1) 11203-093-HO15 LIN RESTRAINT AUG ...... ..... ...3 1203 OW N ..... ..... ....PRE ..............F1.30F(1) 11203-093-HO16 3 1203 LIN RESTRAINT IS.AUG OWN PRE C 8/31/2009 ScheduleWorks V. 8.1 Page 62 -124 Southern Nucleae, Iper'ating Comrnpany 3rd Interv~al VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/lSO No.Comp. Desc.Code Case> >`0 r- 'aSummary No./ComplD/System Scope / Method I Procedure F-A V1 11203-093-H018 ISI ...... ..... ...F1.30F(1) 11203-093-HO18 LIN RESTRAINT AUG 3 1203 OWN ...... ..... ...PRE ..............F-A Vi 11203-093-H019 ISI ...... ..... ...Fl.30F(1) 11203-093-H019 LIN RESTRAINT AUG .......... ...3 1203 OWN ...... ..... ...PRE F-A V1 11213-O01-H-003 SIS F1.30F(1) 11213-001-1-1003 LIN RESTRAINT AUG ...... ..... ...3 1213 OW N ..... ..... ....PRE ..............F-A V1 11213-001-1-1004 ISI/VT/ Si ----s ..... ...F1.30F(1) 11213-001-H004 LIN RESTRAINT AUG ...... ..... ...3 1213 OW N .. .... .... ....PRE ..............F-A VI 11213-001-H005 ISI .......... ...F1.30F(1) 11213-001-H005 LIN RESTRAINT AUG 3 1213 OWN ..... ...... ...PRE F-A V1 11213-001-HOll ISI ...... ..... ...F1.30F(1) 11213-001-HOll LIN RESTRAINT AUG ...... ..... ...3 1213 OW N ..... ..... ....PRE ..............F-A Vi 11213-002-H003 ISI ...... ..... ...F1.30F(1) 11213-002-H003 LIN RESTRAINT AUG ...... ..... ...3 1213 OW N ...... ..... ...PRE F-A V1 11213-004-HOOl ISI ...... ..... ...F1.30F(1) 11213-004-Hl001 LIN RESTRAINT AUG ...... ..... ...3 1213 OW N ..... ..... ....PR E ..............F-A VI 11213-004-1-1002 ISI ...... ..... ...F1.30F(1) 11213-004-H002 LIN RESTRAINT AUG ...... ..... ...3 1213 OW N ..... ..... ....PR E ..............F-A V1 11213-005-H005 Fi.30F(1) 11213-005-H005 3 1213 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 63 -124 SouthLrE-1ruclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Ir t2 Period 2 ccr-.Period 3 e( 0 Summary No./CompID/System Scope I Method / Procedure F-A V 1 11213-005-H1-006 ISI -... .F1.30F(1) 11213-005-H006 LIN RESTRAINT AUG ...... ..... ...3 1213 OW N ..... ..... ....PRE I F-A V1 11213-005-H007 ISI -..... ..... ..F1.30F(1) 11213-005-1-1007 LIN RESTRAINT AUG ...... ..... ...3 1213 OW N ..... ..... ....PR E ..............F-A V1 11213-005-HO10 ISI ...... ..... ...F1.30F(1) 11213-005-HO10 LIN RESTRAINT AUG ...... ..... ...3 1213 OW N ..... ..... ....PRE -.- ......F-A V1 11213-005-HOll ISI -... .... .Fl1.30F(1) 11213-005-HOl1 LIN RESTRAINT AUG ...... ..... ...3 1213 OW N ..... ..... ....P RE ..............F-A V1 11213-006-H002 ISI ...... ..... ...F1i30F(1) 11213-006-H002 LIN RESTRAINT AUG ...... ..... ...3 1213 OW N ..... ..... ....PR E ..............F-A V1 11213-006-H003 ISIs] ...... ..... .F1.30F(1) 11213-006-H003 LIN RESTRAINT AUG ...... ..... ...3 1213 OW N ..... ..... ....PRE ..............F-A Vi 11213-006-H004 ISI ...... ..... ...F1.30F(1) 11213-006-H004 LIN RESTRAINT AUG -----....3 1213 OWN .... .. ...----PRE ..............F-A V1 11217-011-H001 ISI . ...F1.30F(1) 11217-011-HOOl LIN RESTRAINT AUG ...... ..... ...3 1217 OW N ..... ..... ....PRE ---....I --.-F-A V1 11217-011-H004 ISI ...... ..... ...F1,30F(i) 11217-011-H004 LIN RESTRAINT AUG ...... ..... ...3 1217 OWN M PR E ...............F-A V" 11302-008-HO1 F1.30F(1) 11302-008-HOOl 3 1302 LIN RESTRAINT iSI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 64 -124 Sout Ihern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 cD cc cc i>> >Period 3 0)0 Summary NoJCompID/Svstem Scope I Method / Procedure F-A V1 11302-008-1-1002 ISIVT/ SI- --.. --- --- ----s -F1 30F(1) 11302-008-H002 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... ..... ...PRE ..............F-A V1 11302-008-H003 ISI -. .-...... ...F1.30F(1) 11302-008-1-1003 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... ..... ...PR E ..............F-A V 11302-008-H004 ISI ...... ..... ...F1.30F(1) 11302-008-H004 LIN RESTRAINT AUG ------3 1302 OW N ..... ..... ....PRE F-A V1 11302-010-H002 ISI ...... ..... ...F1-30F(1) 11302-010-H002 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-010-H004 ISIVT/ ISI ------ -------- -- s ---F1.30F(1) 11302-010-1-1004 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE F-A V1 11302-010-H005 ISI F1. 30F(1) 11302-010-HOOS LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ...... ...PR E ..............F-A V1 11302-011-H002 ISI/VT/ SI] .-.-- .-.- ---F1.30F(1) 11302-011-1-1002 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN PRE ..............F-A V1 11302-011-1003 ISI ... ....F1.30F(1) 11302-01 1-N003 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....PRE ..............F-A V1 11302-011 -H013 ISI Fl.30F(1) 11302-011 -H01 3 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE 1. .I ----. ...F-A V1 11302-011-HU23 F1.30F(1) 11302-011 -H023 3 1302 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 65 -124 SoutlhernýNuclear Operating -Company, 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 to Period 2 m- 10 Period 3 0)Summary No./CompID/System Scope / Method / Procedure F-A V1 11302-011-H024 ISI ...... ..... ...F1.30F(1) 11302-011-H024 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....P R E ..............F-A V1 11302-011-H025 ISI ...... ..... ...F1.30F(1) 11302-011 -H025 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-011 -H026 ISI/VT/NMP-ES-024-203 1 K3-1302-011-01 ISI c ..... ..... ...F1.30F(1) 11302-011 -H026 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-011-H027 ISI ...... ..... ...F1.30F(1) 11302-011-H027 LIN RESTRAINT AUG -..........3 1302 OW N ..... ...... ...PRE ..............F-A V1 11302-011-H028 ISI ...... ..... ...F1.30F(1) 11302-011-H028 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ......F-A V1 11302-011-H029 ISI/VT/NMP-ES-024-203 1K3-1302-011-01 ISi c -...... ..F1,30F(1) 11302-011-H029 LIN RESTRAINT AUG .. .... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-011-H030 ISI ...... ..... ...F1.30F(1) 11302-011-H030 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE -.- ......F-A V1 11302-011-H031 ISIT/ ISI .-.-- .-.- ---F1.30F(1) 11302-011-H031 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A Vi 11302-011-1-032 ISI .......F1.30F(1) 11302-011-H032 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ...... ...PRE F-A V1 11302-011-H033 F1.30F(1) 11302-011 -H033 3 1302 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V, 8.1 Page 66 -124 OuThEn INuclear Oerating Co.pany 3rd' Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class DwgIISO No.Comp. Desc.Code Case Period 1 2. I Period 2 Period 3 0) 0 Summary No./CompID/System Scope / Method / Procedure F-A V1 11302-011-H039 ISI ...... ..... ...F1.30F(1) 11302-011-H039 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... ..... ....PRE ..............F-A V1 11302-011-H041 ISI ..... ...... ...F1.30F(1) 11302-011 -H041 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... ..... ...PRE ...... ..... ...F-A V1 11302-012-HOOl ISI .. .... ..... ..F1.30F(1) 11302-012-H001 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-013-1-1002 ISI ...... ..... ...F1.30F(1) 11302-013-H002 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....PRE ..............F-A V1 11302-013-H003 ISI ...... ..... ...F1.30F(1) 111302-013-H003 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ...... ...PRIE ..............-F-A V1 11302-013-H004 SI ...... ..... ...F1.30F(1) 11302-013--H004 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-013-1-1006 ISI ...... ..... ...F1.30F(1) 11302-013-H006 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ...... ...PR E ..............F-A V1 11302-013-H007 ISI ...... ..... ...F1.30F(1) 11302-01 3-H007 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN ..... ..... ....PRE -. ...........F-A V1 11302-013-H008 ISI ...... ..... ...F1.30F(1) 11302-013-HOOB LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ...... ...PRE -.- ......I~~~-A~ Vii6LU121U F-mA V 1 1 1 302U] HOO9 Fi.30F(1) 11302-013-H009 3 1302 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 67 -124 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Scope / Method / Procedure Code Case Period 1 Period 2 Period 3>> c c x Summary No./ComolDlSvstem F-A VI 11302-013-HOll ISI ...... ..... ...Fl 30F(1) 11302-013-HO1I LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ... ....F-A V1 11302-013-H012 ISI -......F1.30F(1) 11302-013-H012 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....P R E ...............F-A V1 11302-013-H013 ISI ...... ..... ...F1.30F(1) 11302-013-H013 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A VI 11302-013-H014 -SI ...... ..... ...F130F(1) 11302-013-HO14 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... ..... ...PRE ...... ..... ...F-A V1 11302-013-HO15 ISI ...... ..... ...F1.30F(1) 11302-013-H015 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE F-A V1 11302-013-H016 ISI ...... ..... ...Fl.30F(1) 11302-013-HD16 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....PRE ..............F-A V1 11302-013-H017 ISI ...... ..... ...Fl.30F(1) 11302-013-H017 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A Vi 11302-013-H018 SI ...... ..... ...Fl.30F(1) 11302-013-HO18 LIN RESTRAINT AUG -..........3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-013-HO19 ISI ...... ..... ...Fl1.30F(1) 11302-013-HO19 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE -............F-A V1 1i1U0-U1I-HUOU F1.30F(1) 11302-013-H020 3 1302 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 68 -124 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2.0 I o Period 3 Summary No./CompID/System Scope / Method I Procedure F-A V1 11302-013-H021

[SI ...... ..... ...F1.30F(1) 11302-013-H021 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....P R E ..............F-A V1 11302-014-HOO is] ...... ..... ...F1.30F(1) 11302-014-HOOl LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... ..... ...PRE ..............F-A V1 11302-014-1-1002 ISI ...F1.30F(1) 11302-014-H002 LIN RESTRAINT AUG --....3 1302 OWN ..... ..... ....PRE ..............F-A V1 11302-014-H003 ISI ...... ..... ...F7130F(1) 11302-014-H003 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-014-H004 ISI ...... ..... ...F1.30F(1) 11302-014-H004 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ...... ...PRE -.- ......F-A V1 11302-014-H005 ISINVT/ ISI .......--------

s --F1.30F(1) 11302-014-H005 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-014-H006 ISI ...... ..... ...F1.30F(1) 11302-014-H006 LIN RESTRAINT AUG -..... ..... ..3 1302 OW N ..... ..... ....P R E ..............F-A V1 11302-014-H007 ISI ...... ..... ...F1..30F(1) 11302-014-H007 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .......PR E .............F-A V1 11302-014-H008 ISI ...... ..... ...Fl.30F(1) 11302-014-HOOB LIN RESTRAINT AUG ...... ..... ...3 1302 OWN -..... ..... ..PR E ..............F-A Vi 11302-014-HO0 F1.30F(1) 11302-014-H009 3 1302 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 69 -124 VOGTLEr-1ISr OAperating Compan 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 cc x-a 2 Period 3> 2-Summary No./CompIDSystem Scope / Method I Procedure F-A V1 11302-014-HO10 IsI ... ....F1.30F(1) 11302-014-HO10 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ...... ...PRE ..............F-A V1 11302-014-HOI ISI ...... .......F1.30F(1) 11302-014-HOl 1 LIN RESTRAINT AUG ...... .......3 1302 OWN ..... ..... ....PR E ..............F-A V1 11302-014-H012 ISI F1.30F(1) 11302-014-H012 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-014-HO16 iSi ...... ..... ...Fl.30F(1) 11302-014-HO16 LIN RESTRAINT AUG ........ ...............

3 1302 OW N ..... ...... ...PRE -......F-A V1 11302-015-HOOl ISI/VT/ ISI ...... ...s F1.30F(1) 11302-015-HOOI LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE F-A V1 11302-015-H002 ISI ...... ..... ...F1.30F(1) 11302-015-H002 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE -.......F-A Vt 11302-015-H003 ISI/VT/ ISI -..................

-F1.30F(1) 11302-015-H003 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-015-H004 IS] ...... ..... ...F1.30F(1) 11302-015-H004 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ...... ...PR E ..............F-A V1 11302-016-HOOl ISI ....................

..-F1.30F(1) 11302-016-HOOl LIN RESTRAINT AUG -----------------------

3 1302 OW N ..... ..... ....PR E ..............I--A V1 1130U2-01U-H102 F1.30F(1) 11302-016-H002 3 1302 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 70 -124 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/lSO No.Comp. Desc.Code Case U,0 (0 NW 0)0~> > >~Summary No./ComplD/System Scope/ Method / Procedure F-A V1 11302-016-H003 ISI/VT/ IS- .--- ---- -- -- -s ---F1.30F(1) 11302-016-H003 LIN RESTRAINT AUG 3 1302 OW N ..... ...... ...PRE ..............F-A V1 11302-016-1-1004 ISI ... ..........F1.30F(i) 11302-016--H004 LIN RESTRAINT AUG ... .. ........3 1302 OW N ..... ..... ....P R E ..............F-A V i 11302-016-H005 ISI ...... ..... ...Fl.30F(1) 11302-016-H005 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN PRE ...... ..... ...F-A Vi 11302-017-HOOI ISI ...... ..... ...F1.30F(1) 11302-017-HOOi LIN RESTRAINT AUG ...... ..... ...3 1302 OWN PR E ..............F-A V1 11302-017-H002 ISI ...... ..... ...F1.30F(1) 11302-017-H002 LIN RESTRAINT AUG 3 1302 OW N ...... .... ....PR E ..............F-A V 11302-017-1-1003 SI ...... ..... ...F1.30F(1) 11302-017-H003 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-018-H002 ISI ...... ..... ...Fi.30F(1) 11302-018-H002 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN PRE ...... ..... ...F-A V 11302-018-HOO6 SI -...........Fi.30F(1) 11302-018-1006 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN -..... ..... ..PRE F-A V 11302-018-H007 SI --....F1.30F(1) 11302-018-H007 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-018-1008 F1 .30F(1) 11302-018-H008 3 1302 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 71 -124 Southern Nuclear Operating 3Copany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 a 2 Period 2 Period 3 Ix >Summary No./CompID/System Scope / Method / Procedure F-A V1 11302-018-H009 ISI ...... ..... ...F1.30F(1) 11302-018-H009 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-018-HO10 ISI ...... ..... ...F1.30F(1) 11302-018-HO10 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-018-H012 ISI ...... ..... ...F1.30F(1) 11302-018-H012 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ...... ...PR E ..............F-A V1 11302-018-H013 ISI ...... ..... ...F1.30F(1) 11302-018-H013 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ----I ....F-A V1 11302-018-H014 ISI -... .F1.30F(1) 11302-018-H014 LIN RESTRAINT AUG -... .3 1302 OW N ...... ..... ...P R E -. -.- -.-. .-.- ..-. ..F-A V1 11302-018-HO15 ISI ...... ..... ...F1.30F(1) 11302-018-HO15 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN ...... ..... ...PRE ..............F-A V1 11302-018-H016 ISi ...... ..... ...F1.30F(1) 11302-018-HO16 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E -. -.- -.-. .-.- ..-. ..F-A V1 11302-018-H017 ISI ...... ..... ...F1.30F(1) 11302-018-HO17 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN ...... ..... ...PR E ..............F-A V1 11302-018-H018 ISI ..... ...... ...F1.30F(1) 11302-018-HO18 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E I .- .- ..........-.-_F-A V1 11302-018-H019 F1.30F(1) 11302-018-HO19 3 1302 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 72 -124 VSouthern Nuclear Operating C.0opan 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2> >>>Period 3 Summary No./CompID/System Scope / Method / Procedure F-A V1 11302-018-H020 ISI ...... ..... ...Fl.30F(1) 11302-018-H020 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....* PRE ..............F-A V1 11302-018-H021 Is] ..... ..... ...F1.30F(1) 11302-018-H021 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ...... ...PRE ..............F-A VI 11302-018-H022 ISi ...... ..... ...F1.30F(1) 11302-018-H022 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-018-H023 ISI ...... ..... ...F1.30F(1) 11302-018-H023 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....P R E ..............F-A V1 11302-019-HOOl ISI/VT/ ISI ......------- -S --S F1.30F(1) 11302-019-H001 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....PRE ..............F-A V1 11302-019-H002 ISI/VT/ ISI ---- ---- -------- s ---F1.30F(1) 11302-019-H002 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-019-H003 II .......F1.30F(1) 11302-019-H003 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A VI 11302-019-H004 IS[ -..... ....- ---Fl.30F(1) 11302-019-H004 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11302-019-H005 ISI ...... ..... ...Fl.30F(1) 11302-019-H005 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F1.30F(1) 11302-019-H006 3 1302 LIN RESTRAINT NIS AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 73 -124 Southern Nuclear Operating Company I I 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case>)O 5>=>=Summary No JComplD/Svstem Scooe f Method I Procedure F-A V1 11302-019-H007 ISI ...... ........F1.30F(1) 11302-019-H007 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-019-H008 ISI ...... ..... ...F1.30F(1) 11302-019-HO00 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... ..... ...PRE ..............F-A V1 11302-019-H009 ISI ...... ..... ...F1.30F(1) 11302-019-H009 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....PR E ..............F-A V1 11302-019-H 1O0 ISI ...... ..... ...F130F(1) 11302-019-H010 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ----I F-A V1 11302-019-HOl IS[ S. .... ..... ...F1.30F(1) 11302-019-H011 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....PR E ..............F-A V1 11302-019-H014 ISI ...... ..... ...F1.30F(1) 11302-019-H014 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....PR E ..............F-A V1 11302-020-H001 ISI ...... ..... ...F1.30F(1) 11302-020-HOOl LIN RESTRAINT AUG ...... ..... ...3 1302 OWN PRE ..............F-A V1 11302-020-H002 ISI ...... ..... ...F1.30F(1) 11302-020-11002 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN ...... ..... ...P R E ..............F-A V1 11302-020-11003 ISI ...... ..... ...F1.30F(1) 11302-020-H003 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN PRE ..............F-A V1 11302-020-11004 F1.30F(1) 11302-020-H004 3 1302 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 74 -124 SOL-t1er NucIIr OperatiOng o.pany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Summary NoJComplD/System Dwg/ISO No.Comp. Desc.Code Case> >ID N: V o! 0 Scope I Method I Procedure F-A Vi 11302-020-H005 SI ...... ..... ...Fl.30F(1) 11302-020-11005 LIN RESTRAINT AUG ....3 1302 OWN ..... ..... ....PR E ..............F-A V1 11302-020-H006 ISI ...... ..... ...F1.30F(1) 11302-020-11006 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A Vi 11302-020-H007 ISI ...... ..... ...Fi,30F(1) 11302-020-11007 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A V 11302-020-11008 ISI ...... ..... ...Fl.30F(1) 11302-020-H008 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN ...... ..... ...PRE ..............F-A Vi 11302-020-11009 ISI ...... ..... ...Fl.30F(1) 11302-020-1-1009 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-020-H010 SI ...... ..... ...Fl.30F(i) 11302-020-H010 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....PRE ..............F-A Vl 11302-020-H011 ISI ...... ..... ...Fl.30F(1) 11302-020-H011 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....PR E ..............F-A Vi 11302-020-H012 ISI ...... ..... ...F130F(i) 11302-020-H012 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN ...... ..... ...PR E ..............F-A VI 11302-020-H013 ISI ...... ..... ...F1.30F(1) 11302-020-H013 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN ...... ..... ...PRE ..............i-A Vl 11302-0U2-H014 F1.30F(1) 11302-020-H014 3 1302 LIN RESTRAINT IS1 AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 75 -124 Southern Nuclear Operating Company 3rd Intervalt VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1Period 2 1-r* c Period 3 00 2.>Summary NoJComplD/System Scope/ Method / Procedure F-A Vi 11302-020-H015 ISI ...... ..... ...F1.30F(1) 11302-020-HO15 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN ...... ..... ...PR E ..............F-A V1 11302-020-H016 ISI F1.30F(1) 11302-020-HO16 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....P R E ..............F-A V1 11302-020-H017 ISI ... ....F1.30F(1) 11302-020-HO17 LIN RESTRAINT AUG 3 1302 OW N ...... .... ....PRE ..............F-A V1 11302-020-HO18 ISI ...... ..... ...F1.30F(1) 11302-020-H018 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-020-H019

ISI ..............Fl.30F(1) 11302-020-HO19 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN ...... ..... ...PR E ..............F-A V1 11302-020-H020 ISI ...... ..... ...F1.30F(1) 11302-020-H020 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE .-.-....F-A V1 11302-020-H021 ISI ...... ..... ...F1.30F(1) 11302-020-H021 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN PRE -----....F-A V1 11302-020-H022 ISI ...... ..... ...F1.30F(1) 11302-020-H022 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN ...... .... ....PRE ..............F-A V1 11302-020-H023 SI ...... ..... ...F130F(1) 11302-020-H023 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ...... ...PRE ..............F-A V1 11302-020-H024 F1.30F(1) 11302-020-H024 3 1302 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 76 -124 So,9thfernNuc lea r .0 ig~ompany 3rd Interval.VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class DwgfISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 U)r o 0>2'> 2>Summary NoJCompID(System Scope I Method / Procedure F-A V1 11302-020-H025 ISI ...... ..... ...F1.30F(1) 11302-020-H025 LIN RESTRAINT AUG --.......3 1302 OWN ..... ...... ...PR E ..............F-A Vi 11302-020-H026 ISI ...... ..... ...F1.30F(1) 11302-020-H026 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN ----....PRE ..............F-A V1 11302-020-H027 ISI ...... ..... ...Fi.30F(1) 11302-020-H027 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... ..... ...PRE ..............F-A V1 11302-020-H028 ISI -... .... .F1.30F(1) 11302-020-H028 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN ...... ..... ...PRE ..............F-A Vi 11302-020-H029 ISI/VT/ SI[ ------ -------- -- s ---F1.30F(1) 11302-020-H029 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-020-H030 ISI ...... ..... ...F1.30F(1) 11302-020-H030 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ...... ...PRE -....F-A V1 11302-020-HO31

]SI -..... ..... ..F1.30F(1) 11302-020-HO31 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A Vi 11302-020-H032 ISI F1.30F(1) 11302-020-H032 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-020-H033 ISI ...... ..... ...F1.30F(1) 11302-020-H033 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....PRE -----.. ..... ...F-A V1 11302-020-H034 F1.30F(1) 11302-020-H034 3 1302 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 77 -124 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3!2 r. !2 1 ,> > > > > >2 Summary No./CompID/System Scope I Method / Procedure F-A Vi 11302-022-HO00 IS -... .....F1.30F(1) 11302-022-HOOl LIN RESTRAINT AUG -... .3 1302 OWN PRE F-A V1 11302-022-H002 ISI ...... ..... ...Fi.30F(1) 11302-022-H002 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-022-H003 ISI ...... ..... ...F1.30F(1) 11302-022-H003 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11302-022-H004 ISI ... ....F1.30F(1) 11302-022-H004 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....P R E ..............F-A V1 11302-022-HOOS ISI/VT/ ISI ------ -------- -- s ---Ft.30F(1) 11302-022-H005 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....PR E ..............F-A V1 11302-022-H006 SI ...... ..... ...F1.30F(1) 11302-022-H006 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11302-023-HOOI ISI ...... ..... ...FI.30F(1) 11302-023-HOOl LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE -.- ......F-A V1 11302-023-H002 ISI ----....Fl.30F(1) 11302-023-H002 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....P RE ..............F-A V 1 11302-024-H003 ISI ...... ..... ...F1.30F(1) 11302-024-H003 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....PRE ..............F-A Vi 11302-025-H601 F1.30F(1) 11302-025-H601 3 1302 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 78 -124

,Southern Nuclear Operating Company.3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case et M, r- a, , R.> F Y Summary No./CompID/System Scope / Method / Procedure F-A V1 11302-027-HOi ISI ----....F1.30F(1) 11302-027-HOOl LIN RESTRAINT AUG ...... ..... ...3 1302 OW N .. .... ..... ....PRE ..............F-A V1 11302-027-H002 ISI F1.30F(1) 11302-027-H002 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN PRE F-A V1 11302-027-H003 iSi ...... ..... ...Fl.30F(1) 11302-027-H003 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-027-H005 ISI --...... ...F1.30F(1) 11302-027-H005 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE -.- ......F-A V1 11302-027-H006 SI ...... ..... ...F1.30F(1) 11302-027-H006 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....PRE F-A Vl 11302-027-H007 SI ...... ..... ...F1.30F(1) 11302-027-H007 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN ...... ..... ...PR E ..............F-A V1 11302-027-H008 ISI ...... ..... ...F1.30F(1) 11302-027-HOOS LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE -.- ......F-A V1 11302-027-H009 iSi ...... ..... ...F1.30F(1) 11302-027-H009 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... ..... ...P R E -. -.- .- ..- .- .....F-A V1 11302-028-HOOl ISI ...... ..... ...Fl.30F(1) 11302-028-H001 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-028-H002 F1.30F(1) 11302-028-1-1002 3 1302 ISIfVT/LIN RESTRAINT ISI AUG OWN PRE S 8/31/2009 ScheduleWorks V. 8.1 Page 79 -124 SiOuthe NuclearQ dperaiting Company, 3rd ILnterval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1> -Period 2 2.>0 2 Period 3 cc Summary NoiComplDISystem Scope / Method / Procedure F-A V1 11302-028-H003 ISI F1.30F(1) 11302-028-11003 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-037-H002 IS1 ...... ..... ...F1.30F(1) 11302-037-H002 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ..............F-A V1 11302-037-11003 1SI ...... ..... ...F1.30F(1) 11302-037-1-1003 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN PR E ..............F-A V1 11302-037-H004 ISI ...... ..... ...F1.30F(1) 11302-037-H004 LIN RESTRAINT AUG 3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-037-1-005 ISI -----------F1.30F(1) 11302-037-11005 LIN RESTRAINT AUG ...... ..... ...-- -------3 1302 OWN -. -.-.- -..--- ----P R E ..............F-A V1 11302-040-HOOl ISI ... ..........F1.30F(1) 11302-040-H001 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN PR E ..............F-A V1 11302-040-1003 ISI ...... ..... ...F1.30F(1) 11302-040-11003 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE .....-----....F-A Vi 11302-040-1-1004 ISI ...... ..... ...F1.30F(1) 11302-040-11004 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN PRE ..............F-A V1 11302-042-H1001 SI ...... ..... ...F1.30F(1) 11302-042-HOOl LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ...... ...PRE ..............t-A V1 11302-042-1002 F1.30F(1) 11302-042-11002 3 1302 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 80 -124

~U outhe4rn N*ýýucýýle'ar Oý--pýe rating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period I Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case> >0>=>>=0~ 0> >Summary NoJCompID/System Scope / Method / Procedure F-A V1 11302-042-H-003 SI .......... .. ..F1.30F(1) 11302-042-H003 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... ..... ...PRE ..............F-A V 11302-045-H002 ISI/VT/ ISI .-- -- ---- -- ---- -s ---F1.30F(1) 11302-045-H002 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN ...... ..... ...PR E ..............F-A V1 11302-045-H003 ISI ...... ..... ...F1.30F(1) 11302-045-H003 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....PRE ..............F-A V1 11302-045-H004 ISI/VTr/ ISI- .-.---- ---F1.30F(1) 11302-045-1-1004 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ...... ...P R E ..............F-A V1 11302-046-H1-001 Is[ ...... ..... .F1.30F(1) 11302-046-HO0 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....PRE ..............F-A VI1" 1302-046-H002 ISI ...... ..... ...Fi .30F(1) 11302-046-H002 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... ..... ...PRE ..... .......F-A V1 11302-046-H003 ISI ...... .......F1.30F(1) 11302-046-H003 LIN RESTRAINT AUG ...... ...3 1302 OW N ..... ...... ...PRE ..............F-A V1 11302-047-Hl00 ISI ...... ..... ...F1.30F(1) 11302-047-HOOl LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....PRE ..............F-A V1 11302-054-HOOl

]SI .. ......F1.30F(1) 11302-054-HOOl LIN RESTRAINT AUG ... ... ..... ..3 1302 OW N ...... .......PRE ..............F-A V! 11302-054-H002 F1.30F(1) 11302-054-H002 3 1302 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 81 -124 gouthern NIu clear, ating ompany 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 Period 3 Summary No./CompID/System Scope / Method / Procedure F-A V1 11302-055-H001 ISI ...... ..... ...F1.30F(1) 11302-055-H1OO LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ...... .... ....PRE ....I --....F-A V1 11302-060-H002 ISI ...... ..... ...F1.30F(1) 1 t302-060-H002 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN ...... ..... ...PRE -. -.- -.-. .-.-.. -. ..F-A V1 11302-088-H602 ISI/VT/ ISI -.. ----- -------- -s --F1.30F(1) 1 1302-088-H602 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....P R E -. -.- ..I .- ..-.- ...F-A V1 11302-088-H603 ISI -......F1.30F(1) 11302-088-H603 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A V it 1302-089-H002 ISI ...... ..... ...Fl.30F(1) 11302-089-H002 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E -. -.- .- ..- .- .....F-A V1 11302-089-H003 ISI ...... ..... ...Ft.30F(1) 11302-089-H003 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-713-H1-601 ISI ...... ..... .F1.30F(1) 11302-7131-601 LIN RESTRAINT AUG ...... ..... ...3 1302 OWN ...... ..... ...P R E -. -.- .- ..- .- .....F-A V1 11302-713-H602 ISI ...... ..... ...F1.30F(1) 11302-713-H602 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ...... ...PR E ..............F-A V1 11302-713-1-1603 ISI ...... ..... ...F1.30F(1) 11302-713-H603 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ...... ..... ...F1.30F(1) 11302-713-H604 3 1302 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 82 -124 o Lte-rn INuc ear, OperatingompanyN 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 xO cc w>t > >Period 3 Summary NoJCompID/System Scope/ Method / Procedure F-A V1 11302-713-H605 ISI -... .F1.30F(1) 11302-713-H605 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE F-A V1 11302-715-H601 WA ISI/VT/ ISI .....s -. ... ....F1.30F(1) 11302-715-H601 WA LIN RESTRAINT AUG --...... ...3 1302 OW N ..... ..... ....PR E ..............F-A V1 11302-715-H602 ISI ...... ..... ...Fi.30F(1) 11302-715-H602 LIN RESTRAINT AUG ----....3 1302 OW N ..... ..... ....PRE .............F-A V1 11302-715-H603 ISI ...... ..... ...FI.30F(t) 11302-715-H603 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE ----....F-A V1 11302-715-H604 ISI ...... ..... ...Fi.30F(1) 11302-715-H604 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE -............F-A V1 11302-716-H601 ISI -... .... .F1.30F(1) 11302-716-H601 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE .........F-A V1 11302-717-H601 ISI ...... ..... ...F1.30F(1) 11302-717-H601 LIN RESTRAINT AUG ...... ..... ...3 1302 OW N ..... ..... ....PRE --............F-A V1 11592-003-HOOl ISI ...... ..... ...F1.30F(1) 11592-003-H001 LIN RESTRAINT AUG .......... ...3 1592 OW N ..... ..... ....PRE ..............F-A V1 11592-003-H002 ISI .. ..... ..... ...F1.30F(i) 11592-003-H002 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ...... .... ....PRE .............F1.30F(1) 11592-003-H003 3 1592 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 83 -124 Southern Nuclear Operiating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 cc ar Period 2 U, ýcc>Period 3 Summary No.IComplD/System Scope I Method I Procedure F-A V1 11592-003-H004 ISIVT/ iSI ................

s ---F1.30F(1) 11592-003-H004 LIN RESTRAINT AUG 3 1592 OW N ..... ..... ....PR E ..............F-A V1 11592-003-1005 ISI ... ... ..... ...F1.30F(1) 11592-003-HOO5 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE ----....F-A V1 11592-003-H006 ISI ...... ..... ...F1.30F(1) 11592-003-1-1006 LIN RESTRAINT AUG 3 1592 OWN ...... ..... ...PR E ..............F-A V1 11592-003-1007 ISI ...... ..... ...F1.30F(1) 11592-003-1007 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ...... ..... ...PRE ..............F-A V1 11592-003-H621 ISi ...... ..... ...F1.30F(1) 11592-003-H621 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ...... ...PRE ..............F-A VI 11592-004-HOOl ISI ........ .............

F1.30F(1) 11592-004-HO0l LIN RESTRAINT AUG ...... ..... ...3 1592 OWN PRE F-A V1 11592-004-H003 SI ...... ..... ...Fl .30F(1) 11592-004-H003 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN PRE .........F-A V1 11592-004-H005 ISI ...... ..... ...F1.30F(1) 11592-004-1005 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ...... ..... ...PR E ..............F-A V1 11592-004-H006 Isi ...... ..... ...F1.30F(1) 11592-004-H006 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE--A V1 11b92-004-HU07 F1.30F(1) 11592-004-H007 3 1592 LIN RESTRAINT iSI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 84 -124

-dthernwNuclear Operatring Company"3r d Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 cc>Period 2 W NW>Period 3 cc cc Summary No./ComlDlDSvstem Scope / Method / Procedure F-A VI 11592-004-H008 IS] ...... ..... ...F1.30F(1) 11592-004-H008 LIN RESTRAINT AUG 3 1592 OWN PRE ..............F-A Vl 11592-004-H009 ISI F1.30F(i) 11592-004-H009 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN PRE ..............F-A V 11592-007-H001 ISI ...... ..... ...Fl30F(i) 11592-007-HOOl LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PR E ..............F-A V 11592-007-H002

[Si ...... ..... ...F1.30F(1) 11592-007-H002 LIN RESTRAINT AUG 3 1592 OW N ..... ..... ....PRE ..............F-A Vl 11592-007-H003 is] ... ....Fi.30F(i) 11592-007-H003 LIN RESTRAINT AUG ----....3 1592 OW N ..... ..... ....PRE ..............F-A Vi 11592-007-H004 ISI Fi.30F(i) 11592-007-1-1004 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PR E ..............F-A VI 11592-007-1-1005 ISI F1,30F(i) 11592-007-1-1005 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE F-A Vi 11592-007-1-1006 IS] ...... ..... ...Fl.30F(1) 11592-007-H006 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ...... ...PRE F-A Vi 11592-007-H007 ISI ...... ..... ...Fi.30F(1) 11592-007-H007 LIN RESTRAINT AUG .......... ..3 1592 OW N ..... ..... ....PR E ..............F-A Vl 11592-007-HOO0 F1i30F(i) 11592-007-H008 3 1592 LIN RESTRAINT iSI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 85 -124 Southern, Nuc~llear Operating Company 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Dwg/ISO No.Comp. Desc.Summary No./CompID/System Scope / Method / Procedure Code Case V1 11592.007-H009 ISI 11592-007-H009 LIN RESTRAINT AU Period 1 Period 2 Period 3 Category, Item No., Class F-A Fl .30 F(l)3 1592 Fl 30F(1) 11592-007-H010 3 1592 Fl.30F(1) 11 592-007-HOl 1 3 1592 F1.30F(1) 11592-008-HOOl 3 1592 Fl.30F(1) 11592-008-11002 3 1592 F1.30F(1) 11592-008-H003 3 1592 Fl.30F(1) 11592-008-H004 3 1592 F1.30F(1) 11592-008-H005 3 1592 F1.30F(1) 11592-008-H006 3 1592 F1.30F(1) 11592-008-H007 3 1592 8/31/2009 LIN RESTRAINT AUG OWN PRE ScheduleWorks V. 8.1 Page 86 -124 Souther n Nuclear Operating Company-I.3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class DwgI1SO No.Comp. Desc.Code Case Period 1> >Period 2 Period 3>= cc Summary NoJComplD/Svstem Scope / Method / Procedure F-A V1 11592-008-H008 ISI ...... ..... ...F1.30F(1) 11592-008-H008 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE F-A V1 111592-008-H009 ISI ...... ..... ...F1.30F(1) 11592-008-H009 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN P R E ..............F-A V1 11592-008-HO10 ISI/VT/ ISI ------ -- ---S F1.30F(1) 11592-008-HO10 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ...... .... ....PRE ..............F-A V1 11592-008-Hl1l ISI ...... ..... ...F1.30F(1) 11 592-008-HOl 1 LIN RESTRAINT AUG -..... ..... ..3 1592 OW N ...... ..... ...PR E ..............F-A V1 11592-008-H012 iSI ...... ..... ...F1.30F(1) 11592-008-HO12 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN PRE ..............F-A Vi 11592-008-H013 ISI .......... ...F1.30F(1) 11592-008-HO13 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN PR E ..............F-A VI 11592-008-Ho14 ISI ...... ..... ...F1.30F(1) 11592-008-H014 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE ..............F-A Vi 11592-008-HO15 ISI ... ..........F1.30F(1) 11592-008-HO15 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PR E ..............F-A V1 11592-008-HO16 ISINVT/ ISI ---- -- ---- ------ s ---F1.30F(1) 11592-008-HO16 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ...... ...PR E ..............F-A Vl 11592-U0U-HO48 F1-30F(1) 11592-020-H048 3 1592 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 87 -124 Southern Nuclear Operatin'g Company 3rd interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case m- n-o 0 Summary No./CompID/System Scooe / Method / Procedure F-A V1 11592-020-H049 iSI ...... ..... ...F1.30F(1) 11592-020-H049 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PR E ..............F-A Vi 11592-020-H050 ISI ...... ..... ...F1.30F(1) 11592-020-HO50 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ...... ..... ...PRE F-A V1 11592-020-HO51 ISI ...... ..... ...F1.30F(1) 11592-020-HO51 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ......... ....PRE ..............F-A VI 11592-020-H052 ISI ...... ..... ...F1.30F(1) 11592-020-H052 LIN RESTRAINT AUG 3 1592 OW N ......... ....PRE .............F-A V1 11592-020-H074 ISI ... ....F1.30F(1) 11592-020-H074 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE -....F-A V1 11592-020-H075 SIl .... .... .F1.30F(1) 11592-020-H075 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN ...... ..... ...PR E ..............F-A V1 11592-020-H076 Is[ I. .. .... .F1.30F(1) 11 592-020-H076 LIN RESTRAINT AUG -..... ..... ..3 1592 OW N ...... .... ....PRE ...... ..... ...F-A V1 11592-020-H077 ISI ...... ...F1.30F(1) 11592-020-H077 LIN RESTRAINT AUG .......... ...3 1592 OW N ..... ..... ....PRE ..............F-A V1 11592-020-H078 ISI -..... ..... ..F1.30F(1) 11592-020-H078 LIN RESTRAINT AUG -..... ..... ..3 1592 OW N -.... ..... ...PRE -............F-A V1 F1.30F(1) 11592-020-H079 3 1592 LIN RESTRAINT Is!AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 88 -124 Southern,1Nutclea ,Rerail ng Company 3rd Ifterval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/tSO No.Comp. Desc.Code Case Period 1 ro Period 2 ix M- w Period 3 Summary No./CompiD/System Scope / Method / Procedure F-A V1 11592-020-H080 SI .......... ...F1.30F(1) 11592-020-H080 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE --..... ----F-A V1 11592-020-HO81 ISI -..... ..... ..F1.30F(1) 11592-020-HO81 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN .......... ...PR E ..............F-A V1 11592-020-H082 ISI -......F1.30F(1) 11592-020-H082 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN ...... ..... ...PR E ..............F-A V1 11592-020-H083 ISI ...... ..... ...F1.30F(1) 11592-020-H083 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N -..... ..... ..PR E ..............F-A V1 11592-020-H084 ISI F1.30F(1) 11592-020-H084 LIN RESTRAINT AUG -..... ..... ..3 1592 OW N -.- ... ..... ..PRE ..............F-A V1 11592-020-HO85 ISI ...... ..... ...F1.30F(1) 11592-020-HO85 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ...... .... ....PRE ..............F-A V1 11592-031-H054 ISI ...... ..... ...Fl.30F(1) 11592-031-H054 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN -----....PRE F-A V1 11592-031 -HO55 ISI ...... ..... ...Fi.30F(i) 11592-031-HO55 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN ...... ..... ...PR E ..............F-A V1 11592-031-H056 ISI ...... ..... ...F1.30F(1) 11592-031-H056 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PR E ..............F-A V! 11592-031-HO57 F1.30F(1) 11592-031-H057 3 1592 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 89 -124 Southern Nuclear Operating'Co mpany 3rd Interval.VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 N) r a Period 3 on Summary No./ComplD/System Scope I Method I Procedure F-A V1 11592-031-H058 ISI ...... ..... ...F1.30F(1) 11592-031-H058 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN ----....PR E ..............F-A V1 11592-031-H062 ISI ...... ..... ...F1.30F(1) 11592-031-H062 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ...... ...PRE ..............F-A V1 11592-031-H063 SI ---Fl.30F(1) 11592-031-H063 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE ..............F-A V1 11592-031-H064 ISI .......... ...F1.30F(i) 11592-031-H064 LIN RESTRAINT AUG 3 1592 OW N ..... ..... ....PRE ..............F-A V1 11592-031-H072 ISI .. ..... ..... ...Fl.30F(1) 11592-031 -H072 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN P RE ..............F-A V1 11592-031-H073 ISI ...... ..... ...Fi.30F(1) 11592-031-H073 LIN RESTRAINT AUG 3 1592 OW N ..... ...... ...PR E ..............F-A V1 11592-031-H074 ISI F1.30F(1) 11592-031-H074 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....P RE ..............F-A V1 11592-031-H075 ISI ...... ..... ...F1.30F(i) 11592-031-H075 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ...... ..... ...PRE ..............F-A V1 11592-031-H076 ISI F1.30F(1) 11592-031-H076 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE--A Vi 11592-03i-HO77 F1.30F(1) 11592-031-H077 3 1592 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 90 -124 SouthernNuclea' Operatiing Company............

'......~~..

.3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Cl~ass Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 E, r- F-Period 3 Summary No./ComolDiSvstem Scone/IMethod I Procedure F-A V1 11592-031-H078 ISI -.. ........F1.30F(1) 11592-031-H078 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....P R E ..............F-A V1 11592-031-HO79 ISI -.. ........F1.30F(1) 11592-031-H079 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN ...... ..... ...PR E ..............F-A V1 11592-031-HOBO ISI ...... ..... ...F1.30F(1) 11592-031-HO0O LIN RESTRAINT AUG 3 1592 OW N ..... ...... ...PRE ..............F-A V 11592-032-HO01 ISI ... ....Fi.30F(1) 11592-032-HOOI LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE ..............F-A V1 11592-032-HO16 ISI .. ..... ..... ...F1.30F(1) 11592-032-H016 LIN RESTRAINT AUG 3 1592 OWN PRE ----F-A V1 11592-032-H017 ISI F1.30F(1) 11592-032-HO17 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN PRE ..............F-A V1 11592-032-HO18 ISI ...... ..... ...F1.30F(1) 11592-032-H018 LIN RESTRAINT AUG 3 1592 OWN ----....PR E ..............F-A V1 11592-044-H037 SI ...... ...F1.30F(1) 11592-044-H037 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN P R E ..............F-A V1 11592-044-H038 ISI ...... .......F1.30F(1) 11592-044-H038 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN PR E ..............F-A V 11592-044-H039 F1.30F(1) 11592-044-H039 3 1592 UN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 91 -124 Southern Nucle~ar Operating Company': 9rd Interval VOGTLE-1 IS1 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Camp. Desc.Code Case Period 1 rn t Period 2)o N, co Period 3 c a Summary NoJCompID/System Scooe I Method / Procedure F-A V1 11592-044-H040 ISI -......F1.30F(1) 11592-044-H040 LIN RESTRAINT AUG 3 1592 OWN -----....PRE ..............F-A V 11592-044-HO41 ISI/VT/ ISI --S Fl.30F(1) 11592-044-H041 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN PRE ..............F-A V1 11592-044-H042 ISI .. .F1.30F(1) 11592-044-H042 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ...... ...PRE ..............F-A V1 11592-044-H043 SI ...... ..... ...Fl.30F(I) 11592-044-H043 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN PRE ..............F-A V1 11592-044-H-04 ISI ...... ..... ...Fi.30F(1) 11592-044-HO4 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ...... ...PRE F-A V1 11592-044-H047 ISI -.. ........F1.30F(1) 11592-044-H047 LIN RESTRAINT AUG 3 1592 OW N ..... ..... ....PRE F-A V1 11592-044-H048 ISI F1.30F(1) 11592-044-H048 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ...... ...PR E ..............F-A V1 11592-044-H049 ISI ...... ..... ...F1.30F(1) 11592-044-H049 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN PRE F-A V1 11592-044-HO50 ISI F1.30F(1) 11592-044-HO50 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ...... .... ....PR E ..............F-A V1 11592-044-HO51 Fl.30F(1) 11592-044-HO51 3 1592 ISI/VT/LIN RESTRAINT ISI AUG OWN PRE S -8/31/2009 ScheduleWorks V. 8.1 Page 92 -124 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Period 2 cccc mc Period 3 a,0 cccc Summary No./ComplD/System Scope I Method / Procedure F-A Vi 11592-044-H052 ISI ...F1.30F(1) 11592-044-H052 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE I F-A Vi 11592-044-H053 ISI ...... ..... ...F1.30F(1) 11592-044-H053 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....P RE ..............F-A Vi 11592-044-H054 ISI ...... ..... ...F1.30F(i) 11592-044-H054 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ...... ...PRE ..............F-A Vi 11592-044-H055 ISI ...... ..... ...F1.30F(i) 11592-044-HO55 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN ...... ..... ...PR E ..............F-A Vi 11592-044-H056 ISI ...... ..... ...Fi.30F(1) 11592-044-HO56 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PR E ..............F-A V1 11592-044-H057 ISI ...... ..... ...F1.30F(1) 11592-044-H057 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE .....F-A Vi 11592-044-HO58 ISI F1.30F(1) 11592-044-HO58 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ...... .... ....P R E ..............F-A V1 11592-044-H059 SI ...... ..... ...F1.30F(1) 11592-044-H059 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE .......... ..F-A V1 11592-044-H060 ISI ...... ..... ...F1.30F(1) 11592-044-HO60 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PR E ..............F-A V1 11592-044-H-61 F1.30F(1) 11592-044-HO61 3 1592 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 93 -124 Southern Nuclear Operating Company 3rd Interval VOGTLE-1 151 PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 I Er>2 Period 2 Period 3>2- 2>Summary NoJCompID/System Scope / Method / Procedure F-A V1 11592-044-H062 ISI ...... ..... ...F1.30F(1) 11592-044-H062 LIN RESTRAINT AUG .......... ...3 1592 OWN ----....PRE ---, ....F-A Vi 11592-044-H063 IS]/VT/ isI ....-----F1.30F(1) 11592-044-H063 LIN RESTRAINT AUG --...... ...3 1592 OWN ...... ..... ...PR E ..............F-A Vii 11592-044-H1064 ISI .......F1.30F(1) 11592-044-H064 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ...... ...P R E ..............F-A V1 11592-044-H065 ISI ...... .......F1.30F(1) 11592-044-H065 UN RESTRAINT AUG ...... ...3 1592 OW N ..... ..... ....P R E ..............F-A V1 11592-044-H066 ISI/VT/ ISI ---..... ...F1.30F(1) 11592-044-H066 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN ... ..........PRE ...... ..... ...F-A V1 11592-044-H068 ISI ...... ..... ...F1.30F(i) 11592-044-H068 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE ..............F-A V 11592-044-H069 ISIIVT/ IS ----s ..... ..F1.30F(i) 11592-044-H069 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE ...... ..... ...F-A V1 11592-044-H070 ISI ...... ..... ...Fi.30F(1) 11592-044-H070 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PR E ..............F-A V1 11592-044-H081 IS6 ...... ..... ...F1.30F(1) 11592-044-H081 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ...... ...PR E ..............I-A Vl 1b592-O44-IUO82 F1.30F(1) 11592-044-H082 3 1592 IlV I/LIN RESTRAINT ISI AUG OWN PRE S 8/31/2009 ScheduleWorks V. 8.1 Page 94 -124 Southern Nuclear, Oerating Company.3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 r wn Period 2 Period 3 R0 1. ZE 0M1w Summary No./CompID/System Scope / Method / Procedure F-A VI 11592-044-H602 ISI ...... ..... ...Fl.30F(1) 11592-044-11602 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN ----....PR E ..............F-A V1 11592-054-1-1005 ISIT ---. .s ..... ...F1.30F(1) 11592-054-HOOS LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE --- .-.-.-.-.-.

.F-A Vii 1592-054-1006 ISI ......---Fl.30F(1) 11592-054-H006 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ...... ..... ...PRE ..............F-A V1 11592-054-1-1008 ISI ...... ..... ...F1.30F(1) 11592-054-11008 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ...... .... ....PR E ..............F-A V1 11592-054-H028 ISI ...... ..... ...Fi.30F(i) 11592-054-H028 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN PRE F-A V1 11592-054-H029 ISI ...... ..... ...F1.30F(1) 11592-054-H029 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE ..............F-A VI 11592-054-H032 ISI ...... ..... ...Fl.30F(1) 11592-054-H032 LIN RESTRAINT AUG 3 1592 OW N ..... ..... ....PRE ..............F-A Vi 11592-054-H033 SIS ...... ..... ...Fl.30F(i) 11592-054-H033 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PRE ..............F-A Vi 11592-054-H034 ISI ...... ..... ...Fl.30F(i) 11592-054-H034 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN PRE ..............F-A V1 11592-054-H035 F1.30F(1) 11592-054-H035 3 1592 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 95 -124 9'dui~~St~hern'A Nucla Operating Compakny 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Period 1 Period 2 Period 3 Category, Item No., ClIass Dwg/ISO No.Comp. Desc.Code Case ,r t'D r: v a, 0 SuImmary No./ComolD/lSvstem Scooe / Method I Procedure F-A V1 11592-054-H036 ISI ...... ..... ...F 1 .3 0 F ( 1 ) 1 1 5 9 2 -0 5 4 -H 0 3 6 L I N R E S T R A I N T A U G ..............3 1592 OW N ...... ..... ...PRE ..............F-A Vi 1592-054-H37 ISI F 1 .3 0 F ( 1 ) 1 1 5 9 2 -0 5 4 -H 0 3 7 L I N R E S T R A I N T A U G ..............3 1592 OW N ...... ..... ...P R E ..............F-A V1 11592-054-H038 ISI ...... ..... ...F1,30F(1) 11592-054-H038 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....P R E ..............F-A V1 11592-054-H039 ISI ...... ..... ...F 1 3 0 F ( 1 ) 1 1 5 9 2 -0 5 4 .- H 0 3 9 L IN R E S T R A IN T A U G ..............3 1592 OWN ...... ..... ...PRE ..............F-A V1 11592-054-H040 ISI/VT/ ISI ---s ..F 1.3 0 F ( 1 ) 1 1 5 9 2 -0 5 4 -H 0 4 0 L I N R E S T R A IN T A U G ..............3 1592 OW N ...... ..... ...PR E ..............F-A V1 11592-054-HO65 ISI ...... ..... ...F 1 3 0 F ( 1) 1 1 5 9 2 -0 5 4 -H 0 6 5 L IN R E S T R A I N T A U G ..............3 1592 OW N ..... ..... ....PR E ..............F-A V 11592-054-H066 ISI ...F1.30F(1) 11592-054-H066 LIN RESTRAINT AUG -... .3 1592 OW N ..... ...... ...P R E -. -.- .- ..- .- .....F-A V1 11592-054-H067 ISI/VT/ SI ---s ....F I.3 0 F ( 1 ) 1 1 5 9 2 -0 5 4 -H 0 6 7 L I N R E S T R A I N T A U G ..............3 1592 OWN ...... ..... ...PRE ..............-F-A V1 11592-054-H068 ISI ...... ..... ...F1.30F(1) 11 592-054-HO68 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ...... ..... ...PRE ..............F-A Vi 11592-054-H069 F1,30F(1) 11592-054-H069 3 1592 LIN RESTRAINT ISI AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 96 -124 Southern Nuclear Oper-ating Comnpany 3rd Interval VOGTLE-1 ISI PLAN, VERSION 3.0 Category, Item No., Class Dwg/ISO No.Comp. Desc.Code Case Period 1 Ir 0 Period 2 Period 3 a: w 0C ccý: > > .>Summary NoICompID/System Scope / Method / Procedure F-A V1 11592-054-H070 ISI ...... ..... ...F1.30F(1) 11592-054-H070 LIN RESTRAINT AUG 3 1592 OW N ..... ...... ...PR E ..............F-A V1 11592-054-H071 SI ...... ..... ...F1.30F(1) 11592-054-HO71 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ...... .... ....PRE F-A V1 11592-054-H072 SI ...... ..... ...F1.30F(1) 11592-054-H072 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN ...... ..... ...PR E ..............F-A V1 11592-054-H073 SI ...... ..... ...F1.30F(1) 11592-054-H073 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ..... ..... ....PR E ..............F-A V1 11592-054-H074 ISI Fl.30F(1) 11592-054-H074 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ...... .......PRE ----....F-A V1 11592-054-H075 ISI ...... ..... ...F1.30F(1) 11592-054-H075 LIN RESTRAINT AUG -----....3 1592 OWN PRE ..............F-A V1 11592-954-H076 ISI ...... ..... ..F1.30F(1) 11592-054-H076 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N .. .... ..... ....PR E ..............F-A V1 11592-054-H077 ISI ...... ..... ...F1.30F(1) 11592-054-H077 LIN RESTRAINT AUG ...... ..... ...3 1592 OW N ...... .... ....PR E ..............F-A V1 11592-054-H079 ISI .. ..... ..... ...F1.30F(1) 11592-054-H079 LIN RESTRAINT AUG ...... ..... ...3 1592 OWN ...... ...PRE ..............F-A V 11592-054-HOBO F1.30F(1) 11592-054-HOBO 3 1592 LIN RESTRAINT ISl AUG OWN PRE 8/31/2009 ScheduleWorks V. 8.1 Page 97 -124