Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17264A476 +
- ML17264A475 +
- ML17333A447 +
- Press Release-96-067, NRC Proposes Amendments to FITNESS-FOR-DUTY Rule +
- ML18008A045 +
- ML17353A689 +
- ML17312A764 +
- ML18101B357 +
- ML18101B352 +
- ML20117G613 +
- ML20117G510 +
- ML20117G448 +
- ML20117G125 +
- ML20117F420 +
- ML20117F259 +
- ML20117F217 +
- ML20117F101 +
- ML20117E881 +
- ML20117E516 +
- NRC-96-0048, Requests NRC Review & Approval of Proposed QA Program Change for Audit Program,Deleting Frequencies from Audits Specified by Regulations & Deleting Requirement to Perform Annual Audit of Fitness for Duty Lab +
- ML20117D886 +
- ML20117D702 +
- ML20116C684 +
- ML20114F060 +
- NRC-96-0051, Responds to NRC Bulletin 96-002 Re Movement of Heavy Loads +
- ML20111B475 +
- ML20111B342 +
- ML20111B066 +
- ML20138G356 +
- ML20138G346 +
- ML20128N048 +
- ML20128N698 +
- ML20128H011 +
- ML20128G971 +
- ML20149L612 +
- ML20198K019 +
- NG-96-1035, Forwards Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment +
- HL-5171, Discusses Gpc Determination to Follow BWR Vessel & Internals Project:Guidelines for Reinspection of BWR Core Shrouds (BWRVIP-07) for Hatch Units 1 & 2 +
- JAFP-96-0200, Responds to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment, +
- BSEP-96-0181, Provides Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment +
- HL-5160, Responds to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent,Over Fuel in Reactor Core or Over Safety- Related Equipment +
- HL-5172, Forwards Rev 1 to Ei Hatch Nuclear Plant Unit 1 Cycle 17 Colr. Rev Reflects Analysis & Associated Min Critical Power Ratio Penalties,Would Be Imposed for Operation W/Inoperable Main Turbine Bypass Valves +
- HL-5164, Forwards MOR for April 1996 for Ei Hatch Nuclear Plant & Revised Rept for Mar 1996 +
- TXX-9635, Submits Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment +
- ML20265E268 +
- ML20265E272 +
- ML20349H658 +
- 05000461/LER-1996-005, :on 960411,failure to Follow Procedures During Completion of one-rod-out Interlock Test Results in Reactor Mode Switch Not Locked in Refuel During Control Rod Exercising as Required by TS +
- 05000321/LER-1996-005, :on 960414,supply Breaker for 4160V/600V Station Svc Transformer 1D Opened de-energizing 600V Bus 1R23-S004.Caused by Personnel Error.Personnel Involved Counseled +
- 05000424/LER-1996-003-01, :on 960425,determined That Accumulator Crosstie Could Have Prevented Fulfillment of Safety Function of Sys Needed to Mitigate Consequences of Accident.Caused by Inadequate Procedures.Procedures Changed +