ML17312A764
| ML17312A764 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/10/1996 |
| From: | James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 102-03691-JML-A, 102-3691-JML-A, IEB-96-002, IEB-96-2, NUDOCS 9605210192 | |
| Download: ML17312A764 (4) | |
Text
CATEGORY 1~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSQN hBR:9605210192 DOC:DATE: 96/05/10 NOTARIZED: NO DOCKET I FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION LEVINEgJ,.M.
Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Requests for extension to response to NRC Bulletin 96-002, "Movement of Heavy Loads Over Spent Fuel, Over Fuel in Reactor Core or Over Safety-Related Equipment."
DISTRIBUTION CODE:
IE11D COPIES RECEIVED:LTR l ENCL 0 SIZE:
TITIE: Bulletin Response (50 DKT)
E NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
RECIPIENT ID CODE/NAME PD4-2 PD THOMAS,C INTERN L
C NTE B
NRR/DSSA/SCSB NRR/DSSA/SPLB/A NRR/PD3-2 RES/DSIR/EIB EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME CLIFFORD,J NRR/DE/EMEB NRR/DSSA NRR/DSSA/SPLB NRR/DSSA/SRXB NUDOCS-ABSTRACT RGN4 FILE 01 NRC PDR COPIES LTTR ENCL 05000528 05000529 05000530 R
0 N
NOTE TO ALL "RIDS" RECiPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 17 ENCL
'Cl
JAMES M. LEVINE VICE PIIESIDENT NUCLEAIIP~OCVCTICN Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P O BOX 52034
~
PHOENIX. ARIZONA85072-2034 102-0369'I-JML/AKK/SAB/DRL May 10, 1996 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, D.C. 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)'nits 1, 2, and 3 Docket Nos. STN 50-'528/529/530 Request for Extension to Response to NRC Bulletin 96-02, "Movement of Heavy Loads Over Spent Fuel,. Over Fuel in the Reactor Core, or Over, Safety-Related Equipment," dated April 11, 1996 On April 11, 1996, the NRC.issued Bulletin 96-02, "Movement of Heavy Loads Over Spent Fuel, Over Fuel in the Reactor Core, or Over Safety-Related Equipment."
In the Bulletin, the NRC requested licensees to review activities involving handling of heavy loads.
If licensees are planning the movement of heavy loads over spent fuel, fuel in the reactor core, or safety-related equipment within the next two years, then licensees are required, within 30 days, to review its plans and capabilities to handle heavy loads while the reactor is at power to ensure that these activities are in accordance with existing regulatory guidance, and report these results to the NRC.
Palo Verde has commenced a review of planned activities, however, as the controls of the activities and the licensing basis for the activities are quite extensive, Arizona Public Service Company requires an additional 60 days in which to respond to the Bulletin.
Should you have any questions, please contact Scott A. Bauer at (602) 393-5978.
Sincerely, J ML/AKK/SAB/DRL/rv cc:
L. J. Callan K. E. Perkins C. R. Thomas K. E. Johnston 9605210192 960510 PDR ADOCK 05000528 8
- ~
h hhh r
s
. h
=
hh
h SSh W S (J
41
'0
{I k