ML17333A447

From kanterella
Jump to navigation Jump to search
Provides 30-day Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment.
ML17333A447
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/10/1996
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:0514Z, AEP:NRC:514Z, IEB-96-002, IEB-96-2, NUDOCS 9605140108
Download: ML17333A447 (5)


Text

CATEGORY 1 I

REGULA' ZNFORNATZON DZSTRZBUTZON SYSTEN (RZDS)

I ACCESSION NBR:9605140108 DOC.DATE: 96/05/10 NOTARIZED: YES DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION FITZPATRICK,E. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

/

SUBJECT:

Provides 30-day response to NRC Bulletin 96-002, "Movement of Heavy Loads Over Spent Fuel, Over Fuel in Reactor Core or Over Safety-Related Equipment."

DISTRIBUTION CODE: IE11D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Bulletin Response (50 DKT)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 PD HICKMANFJ INTERNAL. LE 1 NRR/DE/EMEB NRR/DRPM/PECB NRR/DSSA NRR/DSSA/SCSB 1 NRR/DSSA/SPLB NRR/DSSA/SPLB/A 1 NRR/DSSA/SRXB NRR/PD3-2 1 NUDOCS-ABSTRACT RES/DSIR/EIB 1 RGN3 FILE 01 EXTERNAL: NOAC NRC PDR D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE( CONTACT THE DOCUMENT CONTROL DESK,

'ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED)

TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCL

0 Indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216 INQMNA NlCHIGAM PQMfER May IO, 1996 AEP:NRC:0514Z Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

Donald C. Cook Nuclear Plant Units 1 and 2 NRC BULLETIN NRC BULLETIN 96-02, MOVEMENT OF HEAVY LOADS OVER SPENT FUEL, OVER FUEL IN THE REACTOR CORE, OR OVER SAFETY-RELATED EQUIPMENT This letter provides our 30-day response to NRC Bulletin 96-02, "Movement of Heavy Loads Over Spent Fuel, Over Fuel in the Reactor Core, or Over Safety-Related Equipment."

As requested by the bulletin, we have reviewed plans and capabilities for handling heavy loads at Donald C. Cook Nuclear Plant. Based on our knowledge of safe load paths, crane design, crane inspection programs, and operator training, and a review of planned actions and related procedures, we have concluded that our plans and capabilities for handling heavy loads are in accordance with our commitments to existing regulatory guidelines.

This conclusion is further supported by previous internal quality assurance surveillance. Specifically, a surveillance was perfor"..d in October 1985 to verify that the heavy load commitments reflected in AEP:NRC:0514 had been implemented. Another surveillance, conducted in October/November 1993, addressed preventative maintenance of the auxiliary building cranes to ensure that the requirements of NUREG 0554 were being met.

Additionally, our review confirmed that in special circumstances involving movement of heavy loads, specifically the unit 2 steam generator replacement and the spent fuel pool reracking project, license amendments were obtained. At this point, we have no plans for movement of unusual heavy loads during the next two years which would require technical specification changes or other license amendments.

9605140108 9605i0 PDR ADOCK 05000315 8 PDR ggII~ o

U. S. Nuclear Regulatory Commission AEP:NRC:0514Z Page 2 Because of the emphasis placed on NUREG 0612 by this bulletin and the relatively long time span since NUREG 0612 was implemented at Cook Nuclear Plant, we will initiate a self assessment to ens"-re that our commitments to NUREG 0612 are still appropriate and are being met. Any deviations or deficiencies found during the self assessment will fall under our corrective action program and will be subject to the appropriate regulatory reporting requirements.

It is our intention to complete this assessment by the end of 1996.

Sincerely, gP~p.m E. E. Fitzpatrick Vice President

~ ~ j 1 ~ay SWORN TO AND SUBSCRIBED BEFORE ME THIS~M DAY OF 1996 Notary Public

~d- -'. 9 msg cc: A. A. Blind G. Charnoff H. J. Miller NFEM Section Chief NRC Resident Inspector - Bridgman J. R. Padgett

0 O. 4' A

e~

)

s