Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000388/LER-2015-002 +
- ML18038A394 +
- PLA-7769, Annual Radiological Environmental Operating Report (PLA-7769) +
- ML19203A018 +
- ML19203A016 +
- L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG +
- ML19203A166 +
- ENS 43021 +
- ML20064F788 +
- ML20070R601 +
- ML20095J043 +
- ML20117K960 +
- ML20136G659 +
- ML20141M102 +
- ML20141A483 +
- ML20132G668 +
- ML20195B618 +
- ML20237G249 +
- ML20247B522 +
- ML20246H231 +
- L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with +
- ML20058K863 +
- 05000412/LER-1987-003-01, :on 870701,reactor Tripped Due to Steam Generator (SG) lo-lo Level Signal.Caused When Meter & Control Repairman Bumped SG Jumper During Surveillance Procedure.Repairman Counseled & Jumper Secured +
- 05000341/LER-1996-020, :on 961203,loss of Shutdown Cooling Was Noted Due to ESF Actuation.Control Circuitry for Closure of Valve Investigated & All Connections Having Potential to de-energize Relay Checked +
- 05000293/LER-1996-005, :on 960419,automatic Scram Occurred Due to Turbine Vibration During Planned Power Reduction.Turbine Vibration Trip Setting That Initiates Trip of Turbine Due to High Vibration Changed +
- 05000244/LER-1985-002, :on 850121,control Room Notified That Low Frequency of 59.9 Hertz Existed.Caused by Ny Power Pools Imbalance Between Load Demand & Electrical Generation Due to Cold Weather.Diesel Generator Operation Begun +
- 05000397/LER-1984-078, :on 840801,07 & 08,control Room Emergency Filtration Units Automatically Actuated.Caused by Spikes on Corresponding Control Room Outside Air Radiation Monitors. Filtration Units & Radiation Monitors Reset +
- 05000352/LER-1991-019-01, :on 910716,ESF Actuation Occurred Due to Loss of Power Distribution Panel.Caused by Spurious Actuations of Underfrequency Relay.Relay Replaced & Evaluation Performed Investigating Revs to Breaker Trip Logic +
- 05000395/LER-1983-042-01, /01T-0:on 830519,steam Leak Activated Smoke Detector,Tripping Open Intermediate Bldg Preaction Sprinkler Sys Deluge Valve.Caused by Personnel Error & Lack of Sys Knowledge.Deluge Valve Reset +
- 05000237/LER-1989-032, :on 891210,as-left Type B & C Local Leak Rate Test Data Exceeded Tech Spec Limit of 488.452 Std Cubic Ft/H.Caused by Degradation of Telephone & Electrical Conduit Penetration Seal.Conduit Cut & Capped +
- BECO-LTR-93-061, Monthly Operating Rept for Apr 1993 for Pilgrim Nuclear Power Station +
- 05000311/LER-1990-011, :on 900301,containment Ventilation Isolation Signal (ESF) Occurred.Caused by Equipment Failure.Frayed Wire Repaired & Functional Surveillance Requirement Modified to Include Insp of Wire +
- IR 05000395/1983017 +
- 05000346/LER-1990-001, :on 900118,reactor Protection Sys Channel 2 Bypassed Temporarily During Performance of DB-MI-03207. Caused by Inadequate Procedure Re Inoperable Channel Removal.Procedure SP1105.02 Revised +
- ML19345H410 +
- ML20041B347 +
- 05000353/LER-1989-011-02, :on 891027,outboard Nuclear Steam Supply Shutoff Sys Isolation Valves Isolated.Caused by Personnel Error Due to Lack of Attention to Detail by Technicians. Event Discussed at All Hands Meeting +
- 05000293/LER-2002-003, For Pilgrim Nuclear Power Station, Regarding Loss of Automatic Scram Safety Function Due to Age-Related Failure of Recirculation Flow Converter +
- ML18152A121 +
- 05000259/LER-1999-001-01, :on 990115,inoperable CR Emergency Ventilation Sys During Post Maint Testing Was Noted.Caused by Failure of Procedure Writers & Reviewers.Returned a Crev to Operable State & Revised B Crev Train Procedures.With +
- ML25014A244 +
- ML25013A280 +
- ML25224A258 +
- ML25224A258 +