OPERATING DATA REPORT DOCKET NO. 050-010
('}
DATE December 7.1981 COMPLETED BY D. C. Maxwell TELEPHONE (815) 942-2920 I-550 OPERATING STATUS NOTES 1.
Odit Name: Dresden I 2.
Reporting Period: November, 1981 3
Licensed Thermal Power (MWt):
700 4.
Nameplate Rating (Gross MWe): 209 5.
Design Electrical Rating (Net MWe): 200 6.
Maximum Dependable Capacity (Gross MWe): 205 7
Maximum Dependable Capacity (Net MWe): 197 8.
If Changes occur in Capacity Ratings (items 3 Through 7) Since Last Report, Give Reasons:
N/A 9
Power Level to Which Restricted, if Any (Net MWe): N/A 10.
Reasons For Restrictions, if Any: N/A This Month Yr-to-0 ate Cumuiative.
II.
Hours in Reporting Period 12.
Number of Hours Reactor Was Critical 13 Reactor Reserve Shutdown Hours t
14.
Hours Generator On-Line l
15 Unic Reserve Shutdown Hours 16.
Gross Thermal Energy Generated (MWH)
- V -
- 3 3
==<
17 Gross Electrical Energy Generated (MVH) 1/\\
J.1) 18.
Net Electrical Energy Generated. (MWH)
MOJ<hy7' -- " C A -- O N, 19 Unit Service Factor 20.
Unit Availability Factor n
g
"
l 21.
Unit Capacity Factor (Using MDC Net)
VU[
g j,,
i 22.
Unit Capacity Factor (Using DER Net) 23 Unit Forced Outage Rate 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
l N/A.
.. - ~ ~
I 25 If Shut Down At End Of Report Period, Estimated Date of Startup: Extended Modification j l
Outage - Shutdown Until June, 1986 1
i-e l
8202230550 820210 f
PDR ADOCK 05000010 R
l pop g
i
=
l s
OPERATING DATA REPORT DOCKET NO. 050-237 OATE December 7,1981 COMPLETED BY K. Zirvas TELEPHONE (815) 942-2920 OPERATING STATUS NOTES 1.
Unit Name: Dresden II 2.
Reporting Period: November, 1981 3
Licensed Thermal Power (MWt): 2,527 4.
Nameplate Rating (Gross MWe):
828 5
Design Electrical Rating (Net MWe): 794 6.
Maximum Dependable capacity (Gross MWe): 812 7
Maximum Dependable Capacity (Net MWe):
772 8.
If Changes occur-In Capacity Ratings (Items 3 Through 7) Since Last Report, Give Reasons:
N/A 9
Power Level to Which Restricted, If Any (Net MWe): N/A 10.
Reasons For Restrictions, if Any: N/A
(
This Month Yr-to-Date Cumulative.
11.
Hours in Reporting Period 720 8,016 101,256 12.
Number of Hours Reactor Was critical 640.5 4.797.3 77.934.5 13 Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 621.3 4.645.9 76.105.9 15 Unit Reserve Shutdown Hours 0
0 0
' ~ ' ' 16. Gross Thermal Energy Generated (MWH) 1,445,297 9,887,783 147,185,839
~~~ 17 Gross Electrical Energy Generated (MWH) 473.468 3,160,114 47,032,977-18.
~ ~ ^ 19~
Net Electrical Energy Generated. (MWH) 449.085 2.980.569 44.449.568 Unit SeFv~li:e Fictor 86 3 58.0 73.2
~
~ ' 20. ]Usi t Avillibl1 IEy Factor 86.3 58.0 73.2 T1.
Unit Capacity Factor (Using MDC Net) 80.8 48.2 56.9
~
22.
Unit Capacity Factor (Using DER Net) 78.6 46.8 55.3
- 23. ~ Unit Forse' ~0utage Rate 13.7 6.2 12.2 d
24.~ ~Sh'utdown's Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25, if Shut Down At End Of Report Period, Estimated Date of Startup:
a t
4
]e 4
N g
3
s OPERATlHG DATA REPORT' DOCKET NO. 050-249 m
(
DATE December 7, 1981 COMPLETED BY K. Zirwas TELEPHONE (815) 942-2920 OPERATING STATUS NOTES 1.
Unit Name:
Dresden III 2.
Reporting Period: Novebar, 1981 3
l.icensed Thermal Power (MWt):
2.527 4.
Nameplate Rating (Gross MWe):
828 5
Design Electrical Rating (Net MWe): 794 6.
Maximum Dependable Capacity (Gross MWe): 812 7.
Maximum Dependable Capacity (Net MWe): 773 8.
If Changes Occur in Capacity Ratings (items 3 Through 7) Since Last ReporWGive
~
Reasons:
N/A 9
Power Level to Which Restricted, If Any (Net MWe): N/A 10.
Reasons For Restrictions, if Any: N/A f
This Month Yr-to-Data Cumulative.
11.
Hours in Reporting Period 720 8,016 90,841 12.
Number of Hours Reactor Was Critical 633.3-7.773.1 69.954.9
~~ 13 Reactor Reserve Shutdown Hours 0
0 0
' 14. Hours Generator On-Line 617.5 7.576.7 67.209.7 15 Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 933.532 16.154,987 132.640,457
- 17. Gross Electrical Energy Generated (MWH) 285.436 5.171.400 43;171,968
'18.
Net Electrical Energy Generated. (MWH) '
265.872.
4.903.431 40.926.331
~ 19.~
Unit Service Factor 85.8 94.5 73.98
~
~
10.
Unit Availability Factor 85.8 94.5 73.98
~ ~ E ~~Uhit Capacity Factor (Using MOC Net) 47.8 79.0 58.3 2
22.
Unit Capacity Factor (Using DER Net) 46.5 77.0 56.7
- ~ '2'3.
Unit FoFced 0utage Rate 14.3 4.8 14.2
~
24.~ ~ Shutdowns' Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
_ _ _ _ Normal refueling outage starting approximately January 2, 1982, for 4 months.
25 lf Shut _ _Down At End Of Report Period, Estimated Date of Startup: 12-03-81 s
i 1
il t
l r
AVERAGE DAILY UNIT POWER LEVEL I
f-DOCKET-NO. 050-010 UNIT Dresden I DATE December 7, 1981 COMPLETED BY K. Zirwas TELEPHONE (815) 942-2920 MONTH NOVEMBER, 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
~
4 0
20 0
5..
0 21 0
6 n
22 0
7 a
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
~
12 0
28 0
13 0
29 0
14 0
30 0
15 0
3; 16 0
j s
O
~'
~
I l
l AVERAGE DAILY UNIT POWER LEVEL O
DOCKET NO. 050-237
(
UtilT Dresden II DATE December 7, 1981 COMPLETED BY K. Zirwas TELEPHONE'(815) 942-2920 MONTH NOVEMBER. 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 668 17 824 2
780 18 822 3
415 19 823 4
0 20 826 5
0 21 800 6
0 22 830 7
29 23 830 8
sos 24 778 9
594 25 761 i
10 667 26 821 I1 737 27 814 12 816 28 817
_ 3. __
820 29 789 I
( --
14 817
~ 30 818 l
_....... _.. 15 789 31 16 824
<(.
O k
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 050-249 UNIT Dresden III DATE December 7, 1981 COMPLETED BY K. Zirvas TELEPHONE (815) 942-2920 MONTH NOVEMBER, 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAll POWER LEVEL l
(NWe-Net)
(NWe-Net) 1 489 17 466 2
483 18 465 3
479 19 462 4
475 20 465 5
473
(
21 466 6
477 22 463 479 7..-
23 462 g
480 24 459 9
480 25 457 10.
476 26 458 11 139 27 327 12 265 28 0
13 412 29 0
14 418 30 0
. _ _. 5 474 1
31 16 467 l
l I
t'
^
. - :: ~,
1
i l
DOCEET NO. 050-010 m
~
UNIT NAME Dresden.
UNIT SHUTDOWN 8 AND POWER REDUCTIONS DATE December 7,1981 COLPLETED BY K, Zirwas-1 TELEP110NE (815) 942-2920 REPORT HONTH NOVEMBER, 1981 NETHOD OF LICENSEE CAUSE & CORRECTIVE NO.
DATE TYPEI DURATION REA80H2 SHUTTING EVENT SYSTEN COMPONENT ACTION 70 (NOURS)
DOWN REACTOR 3 REPORT d.
CODR4 CODE 5' PREVENT RECURRENCE 8
781031 5
720 C
3 Refueling, turbine overhaul, and 8
chemic.11 cleaning outage.
i s
l' i
\\
f 1
2 3
4 F
Forced Reason Methodt Exhibit C-Instructions for S: Scheduled A-Equipment Failure (Explain) i-Manual Prtparation of Data B-Haintenance of Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Autoestic Scram Ever.t Report (
) File D-Regulatory Restriction 4-Other (Explain)
(NOREC-0161)
E-Operator Training & License Examination
=
F-Administrative G-Operational Error ll-Other (Explain) f
~ - -
^ * ~
DOCKET NO. 050-237 'N
-~
UNIT NAME Dresden t1 UNIT SHUTDOWHS AND POWER REDUCTIONS DATE December 7.1981 C0tiPLETED BY K. Zirvas TEI2Pil0NE (815) 942-2920 REPORT HONTH NOVEMBER, 1981 HETHOD OF LICENSEE CAUSE & CORRECTIVE NO.
DATE TYPE 1 DURATION REASON 2 SHUTTING EVENT SYSTEM (XM(PONENT ACTION TO (HOURS)
DOWN REACTOR 3 REPORT f CODE 4 CODES pagVENT RECURRENCE I
8 11-03-81 F
98:44 A
1 Replaced recirc. pump seal.
{'
s p
s 1
1 1
2 3
4 F: Forced Reason:
Hethod:
Exhibit C-Instructions for S: Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data B-Haintenance of Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (
) File D-Regulatory Restriction 4-Other (Explain)
(NilREC-0161)
E-Operator Training & License Examination F-Administrative C-Operational Error l
H-Other (Explain)
~ P~-".~:
L -
j l
i t
i m
In00KET NO. 050-249 ~',
l UNIT HAME Dresden _fI UNIT SHUTDOWNS AND POWER REDUCTIONS DATE December 7, 1981 e
j COI:PLETED BY K. Zirwas TELEPil0NE (815) 942-2920 REPORT HONTil NOVEMBER, 1981 l
HETHOD OF LICENSEE CAUSE & CORRECTIVE NO.
DATE TYPEI DURATION REASON 2 SHUTTING EVENT SYSTEN COMPONENT ACTION TO I
(HOURS)
DOWN REACTOR 3 REPORT #.
CODE 4 CODES PREVENT RECURRENCE 3
11 11-11-81 F
25738 A
2 SDV alarm signal cleared.
12 11-27-81 F
77:03 A
1 81-38/03L-0 Repairad HPCI 2301-4 valve, s
l h
I i
a
=
.t t
t 1
2 4
3 F: Forced Reason:
Hethod Exhibit C-Instructions for S: Scheduled A-Equipment Failure (Explain) 1-Honual Preparation of Data B-Haintenance of Test 2-Hanual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (
) File D-Regulatory Restriction 4-Other (Explain)
(NUREC-0161)
E-Operator Training & License Examination F-Administrative
=
C-Operational Error ll-Other (Explain) i
. u -- " - - : : **
i
-~
DRESDEN UNIT 2
~
SAFETY RELATED NAINTENANCE - NOVEMBER,1981 l
NATURE OF LER OR OUTAGE HALFUNCTION-EQUIPMENT.
HAlHTENANCE NUMBER CAUSE RESULT CORRECTIVE? ACTION i.
Adjusted 'he feedback 8
' 1501-3A Valve &
Preventive WR #16322 N/A N/A t
,' controller pot wire to correct the problem.
IRM #12-Preventive WR,f15679 N/A N/A Resoldered center pin on preamp input connector
& adjusted range #6 to range #7 overlap checked l
via DIS 700-4.
at preampi took above
.res. readings. Pin to l
shield:.<4.8 x 108 6 50V l
8 x 108'O 100V ' Pin to ground: 5.7 x 108 0 50V 9.5 x 108 0 100V. Shield to groun4: 3 x 107 0 l
100V.
t 1
Terminal F22-2 Preventive WR #16478 N/A N/A Tightened screw on T.B.
SS Fuse 22-2.
i Pips Hanger Preventive WR #16373 N/A N/A Torqued bpits to 35 lbs.
2-1527-6 CRD Accumulator Preventive WR #16509 N/A N/A Changed out accumulator
- 58-31 58-31 for new.
Mechanical Preventive WR #16509 N/A N/A Manual stroke tested Snubbers for results.
Rx Bldg. Fuel Prdventive WR #16419 N/A N/A Rezeroed monitpr; checked Pool Rad Monitor for proper operation via Channel D1S 1700-7.
\\
u
n DRESDEN UNIT 2 SAFETY RELATED NAINTENANCE - NOVEMEER, 1981 i
NATURE OF LER OR OUTAGE HALFUNCT10N-EQUIPHENT.
HAlllTENANCE NUMBER CAUSE RESULT CORRECTIVE' FACTION r.
- ; i-8, l.
Preventive WR #15960
,H/A N/A EMD performed inspection.
l,l#2 Dies'elCen.
Hech. Maint, completed j ;
inspection.
. D2 1 n. Cond.
Preventive WR'f16523 N/A N/
Filled both 1 5 2 i
- ! Snubbera Crinnell snubbers with i' '
Q.E. S.F. 1154 oil.
1510-5 C.CSW Preventive WR #16620 N/A N/A Tightened as requested.
J Hinger i
CCSW Hanger Preventive WR #16285 N/A N/A Repaired hanger 2-1510-
,17 per Haint. modifica-tion procedure.
N/A N/A Removed bad grout &
, CCSW System Preventive WR #16265 filled with hydraulic
- cement, l 1510-7 CCSW-
' Preventive WR #16618 N/A N/A Adjusted as requested.
j Hanger i
l 1510-7 CCSW Preventive WR #16619' N/A N/A Adjusted as requ'ested.
Hznger e
- '*^
i DRESDEN-UNIT 3 SAFE 1Y RELATED MAlHTENANCE - NOVEMBER, 1981 i
NATURE OF LER OR OUTAGE HALFUNCTION-EQUIPHENT.
MAlllTENANCE NUMBER CAUSE RESULT CORRECTIVE? ACTION j
fLPRM24-49D Preventive WR #16054
.N/A N/A Performed DIS 700-22 & 26.
8 3
i I APRM #5 Preventive WR #16055 N/A N/A Checked K7 relay &
- l !
checked okay. Also per-formed DIS 700-22 &
l DIS 700-26; appeared to l-have burned off a wisker on LPRM 08-17C.
SBLC Tank Preventive WR #16070 N/A N/A Checked out system &
Bubbler.
blew down bubbler; found bubbler transmitter ok.
Did find 903-5 indicator
'2.9% high & rezeroed.
All indicators in i
agreement.
Yarway Lo Level Preventive WR #16402
.N/A N/A Tightened down on equal-izer valve packing nut as requested.
Low Oil Torus Preventive WR #16526 N/A N/A Added oil to 3 anubbers j Ring Header
- 8-9-12 C.E. S.F. 1154 Snubbers oil.
4 U3 Diesel Cen.
Preventive WR #14914 N/A N/A Tightened exhaust flange
& found one a little loose.
SRM 23 Preventive WR #16479 N/A N/A Repair integrator, com-pleted DIS 700-3.
LPCI Line Preventive WR f16341 N/A N/A Replaced missing bolt 1" x 6".
A0-1601-20B Torus Preventive WR #16647
- N/A N/A:
Replaced solenoid gtore Rx Bldg. Vac Bkr Viv.
- 580D57.
pa JT 7?_ * ~' '
l
s c.
f i
DRESDEN-UNIT 3 SAFETY RELATED HAINTENANCE.- NOVEMBER,1981 i
NATURE OF LER OR OUTAGE HALFUNCTl0N-CAUSE RESULT CORRECTIVE? ACTION l
EQUIPHENT.
HAlllTENANCE NUH8ER
! D3 DC Cooling Preventive WR #16626 N/A a'
N/A Cleaned E adjusted. C I H2O Pp.
phase would not trip on first attempt at 225 amps.
j 3
- U3 Refuel Plat-Preventive WR #16421 N/A N/A Lubricated track switch..I form Plug N/A N/A AA109 wire relugged.
DW H2 Supply Preventive WR #16753 125V Supply to Lug confirmed tight; all
] Velve 4722 temporary jumpers re-moved. No loss of any
'i operating eq~uipment during repair.
J'
1 H2O Pp.
took. reading.
Diecel Cenerator Preventive WR #16631 N/A.
N/A Found hahger as indi-catsd. Put back to-l
- C.ooling Outlet s
gether'& tightened l
lLine lines.
i, l
t I
i i
6
---.. :.; ~
DRESDEN UNIT 2/3 SAFETY RELATED HAINTENANCE - NOVEMBER,1981 NATURE OF LER OR CUTAGE HALFUNCTION-EQUIPHENT.
HAlllTENANCE NUMBER CAUSE RESULT CORRECTIVE?ACT Hua
'N/A -
I N/A Insta11ed'2 heat ex-
! 2/3 Diesel Cen.
Preventive WR #15211 Coolant Head changers, 6 zink rods
.i Tenk 256.472.
Racctor Head Preventive WR #14958 N/A N/A Removed paint'from upper Lifting Rig section of lifting rig using neddle gun & re-l painted gray per Q.C.
Quid Cities Rx Preventive WR #15263 N/A N/A Tore down safety valve i
& rebult. Tested at lSafatyValve BK 7158 1240# + 1%.
t Qutd* Cities Rx Preventive WR #15262 N/A N/A,
' Set'& tested valve per-Safety Valve.
' package.
S/N BK 7163 f
2/3-4699-188 Preventive WR #14347 N/A N/A Replaced; valve 575315.
1 l Qutd Cities Rx
' Preventive WR #15264 N/A N/A Had to rebuild & retest Safety Valvd safety valve. Set pres-
} BK 7167 sure per specification.
t Spare Versa Preventive WR #15861 N/A N/A Rebuilt yalves with re-Valves pair kit #502-C22.
2/3 Rx Bldg.
Preventive WR #14919 N/A N/A Installed plat per pro-Crane cedure & M.T. yelds on crane.
2/3 Diesel Cen.
Preventive WR #164;i4 N/A N/A Performed inspection per l
DMP 6600-2 & DHP 6600-6, 2/3 DC Cooling Preve'tive WR #16625 N/A N/A Set overloads to auto.
n Checked all wiring H2O Pumps connections.
- _7..'
s
\\
f
SUMMARY
OF OPERATING EXPERIENCE UNIT ONE NOVEMBER, 1981 s
11-1 to 11-30 Unit One was shutdown for the entire month, awaiting license approval for the chemical cleaning. Major work scheduled to be completed following chemical clean-ing is as follows: HPCI installation for ECCS upgrading, equipment upgrade to IEEE 279, major inservice inspection, and i
refuel.
~
,i I
l 1
w"
.r~
SUMMARY
OF OPERATING EXPERIENCE UNIT TWO NOVEMBER, 1981 11-1 to 11-7 Unit Two entered the month operating at a power level of 596 MWe and operated until November 3, 1981, at 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br />, when while shutting down for recirc. pump seal repair, a scram occurred due to IRM spike.
The reactor was brought critical on November 7, 1981 at 0502 hours0.00581 days <br />0.139 hours <br />8.300265e-4 weeks <br />1.91011e-4 months <br />.
I 11-7 to 11-30 The Unit was placed back in service on November 7,1981, at 2042 hours0.0236 days <br />0.567 hours <br />0.00338 weeks <br />7.76981e-4 months <br />, and operated centinuously during the remainder of the month, reaching a power lerel of 834 MWe, with a capacity factor of 78.85% and an availability of 86.29%.
i I
t l'
)
s
SUMMARY
OF OPERATING EXPERIENCE UNIT THREE NOVEMBER, 1981 11-1 to 11-11 Unit Three entered the month operating at a power level of 492 MWe and operated until November 11, 1981, at 0741 hours0.00858 days <br />0.206 hours <br />0.00123 weeks <br />2.819505e-4 months <br />, when the reactor was manually scrammed due to SDV hi-hi alarm. The reactor was brought critical on November 11, 1981 at 2005 hours0.0232 days <br />0.557 hours <br />0.00332 weeks <br />7.629025e-4 months <br />.
.(
11-12 to 11-30 The Unit was placed in service on November 12, 1981, at 0919 hours0.0106 days <br />0.255 hours <br />0.00152 weeks <br />3.496795e-4 months <br />, and operated continuously until November 27, 1981, at 2134 hours0.0247 days <br />0.593 hours <br />0.00353 weeks <br />8.11987e-4 months <br />, when while shutting down to repair EPCI inboard steam isolation valve a scram occurred on a pressure spike after the Unit was shutdown. The Unit was shutdown at the end of the month for re-pairs. Unit 3 availability was 85.74%, with a capacity factor of 47.65%.