- 05000354/LER-2001-001 +
- 05000220/LER-2001-001 +
- 05000440/LER-2017-001 +
- ML17263A827 +
- ML070310101 +
- ML063470429 +
- ENS 44561 +
- NOC-AE-05001941, Comprehensive Annual Financial Report +
- 05000311/LER-1982-045, Forwards LER 82-045/03L-0.Detailed Event Analysis Encl +
- ML032390052 +
- 05000311/LER-1982-080, Forwards LER 82-080/01T-0.Detailed Event Analysis Encl +
- ML20085H745 +
- ML20083P571 +
- ML20082H545 +
- ML20082C003 +
- ML20096C652 +
- ML20107L860 +
- ML20137T719 +
- ML20148F097 +
- ML20133A587 +
- ML20178A472 +
- ML20153F383 +
- ML20217B118 +
- ML20215B415 +
- 0CAN069802, Monthly Operating Repts for May 1998 for ANO Units 1 & 2 +
- 0CAN029805, Monthly Operating Repts for Jan 1998 for Ano,Units 1 & 2 +
- 05000414/LER-1987-025-01, :on 870903,automatic Main Feedwater Isolation & Main Turbine Generator Trip Occurred Due to hi-hi Steam Generator Water Level.Caused by Personnel Error & Mgt Deficiency.Incident Reviewed W/Personnel +
- 05000325/LER-1986-029, :on 861116,automatic Reactor Scram on High Pressure Occurred.Caused by Exceeding Bypass Capacity of Main Steam Turbine Bypass Valves During Runback of Main Generator.Valve Controller Properly Configured +
- 05000313/LER-1986-008-01, :on 861231,reactor Tripped on High RCS Pressure from 25% Power.Caused by Reduction of Feedwater During Troubleshooting of Integrated Control Sys.Module in RCS Average Temp Correction Circuitry Replaced +
- 05000400/LER-1987-009, :on 870224 & 25,containment Leak Detection Radiation Monitor Noble Gas Channel Declared Inoperable. Caused by Procedural Deficiency.Advance Change 1/2, Correcting Deficiency,Approved +
- 05000267/LER-1988-006, :on 880407,expansion Joint Failure Caused Loss of Circulating Water & Resulted in Manual Scram.Decay HX Cleared Out So Steam Routed Through Circulator & Out Reheat Power Relief Valves.Valves Inspected +
- 05000461/LER-1996-006, :on 960529,degraded Control Room HVAC Train Declared Inoperable.Caused by Personnel Error.Briefed Personnel Re Event & Developed Standing Order +
- 05000254/LER-1996-006, :on 960210,TS 3.0.A Incorrectly Invoked Due to Procedural & Operator Knowledge Deficiencies.Policy Statement Developed & Presented to Licensed Operator Re Expectations for Use & Entry Into TS 3.0.A +
- 05000354/LER-1995-016, :on 950708-09,SDC Bypass Event Occurred, Rendering SDC Mode of RHR Sys Inoperable Due to Procedural non-compliance & Inadequate Operator Knowledge,Skills & Training.Special Training on Event Conducted +
- 05000461/LER-1990-017, :on 901206,RHR Sys Not Bypassed During Performance of HX B Room Differential Temp Channel Calibr. Caused by Procedural Errors.Individuals Counseled +
- 05000338/LER-1991-011, :on 910511,source of Leakage Identified Between B Cold Leg Loop Stop Valve & Isolation Valve for 3/4 Inch Upper Disc Pressurization Line.Caused by High Cycle Fatigue. Action Statement of Tech Spec 3.4.6.2 Entered +
- 05000311/LER-1990-008, :on 900120,plant Vent Noble Gas Monitor 2R41C Failed Low,Resulting in Closure Signal for Waste Gas Decay Tank Vent Control Valve 2WG41.Caused by Personnel Error. Operator Aid Will Be Posted on Panel +
- ML20022A084 +
- ML20055G236 +
- NUREG-0227, Partial Draft of Nuclear Power Plant Operating Experience - 1978, Section 3.0, Plant Outages. Portions of NUREG-0483, NUREG-0366 & NUREG-0227 (Plant Operating Experience for 1977,1976 & 1974-75,respectively) Encl +
- 05000280/LER-1997-002-01, :on 970116,one Train of Auxiliary Ventilation Sys Declared Inoperable.Caused by Personnel Error.Properly Adjusted Damper 1-VS-MOD-58B & Exited Seven Day LCO on 970116 +
- 05000280/LER-1997-002, :on 970116,one Train of Auxiliary Ventilation Sys Was Inoperable Outside of Ts.Caused by Personnel Error. Submitted Deviation Rept Re Reverse Rotation of Fan & Work Request to Adjust Linkage +
- 05000311/LER-1992-008, :on 920501 & 0713,main Steamline Isolation Resulted in ESF Signal Actuations & Trip of Low T Bistables. Caused by Design,Mfg,Const/Installation Inadequacy.Mods to Correct Flow Sensing Line Concerns Underway +
- ML17252A654 +
- 05000311/LER-1982-045-03, /03L-0:on 820522,operator Discovered Leakage Rate of 100-ft Elevation Containment Air Lock Exceeded Tech Spec Limits.Caused by Failed Inner Door Latch Mechanism.Latch Mechanism Repaired & Tested +