- OPERATING DATA REPORT OPERATIN~ STATUS I.
Unit Name: Dresden I
_.;;;;..;;..;;;;,;;;..;;..=.;;~---------------------------------
- 2.
Reporting Period: __
A_p_r_i_l~, __
1_9~8_1 ______________________ ~
- 3.
Licensed Thermal Power (MWt):
700
- 4.
Namepl~te Rating (Gross MWe):
209 5,
Design Elect r i ca 1 Rating (Net M\\./e): 200
--......-------------~
- 6.
Maximum Dependable Capac.ity (G~oss MWe): 205 DOCKET NO. 050-010
. DATE May S. 1981 COMPLETED SY D *. c. Maxwell TELEPHONE (815) 942-2920 X-550 NOTES 7,
Maximum Dependable Capacity (Net MWe):
197
- 8.
If Ch;anges Occur in Capacity Ratings.-,.(-1-te_m_s_*_3 __ T __ h_r_o_u_g_h 7) Since Last Report, Give Reasons:
N/A
- 9.
Power Level to Which Restricted, If Any (Net MWe):
NA
.._...:~~---------------------------~
- 10.
Reasons For Res~rictidnsi If Any:
N/A
- *lJ.
Hours* in Reporting Period
- 12.
Number of*Hours Reactor '../as.Critical
- 13.
Reactor Reserve Shutdown Hours
- 14.
Hours Generator On-Line
- 15.
Unit Res.erve Shutd.own Hours
- 16.
Gross Thermal Energy Generated (MWH)
- 17.
Gross* Electrical. Energy Generated (M\\.JH)
- 18.
Net Electrical Energy Generated. (MWH)
- 19.
Unit Servi~e Factor
- 20.
Unit Avai.lab.il ity Facto~
- 21.
Unit Capacity Factor (Using MDC Net)
- 22.
Unit Capacity Factor (Uslng DER Net)
- 23.
Unit For~ed O~tage Rate Th i. s
- Mon th Yr-to-Date EXTENDED MODIF:ICATION OUTAGE C uruu:la t i. 'l~
24~
Shutdowns S~hed~led Over Next 6 Mo~ths (Type, Date, and Duration of Each):
N/A
- 25.
If Shut Down At.End Of Report ?er-iod,.Estimated Date of Startup: Extended Modificatior:
810. 5 {3 0 /{p 9 Outage -
Shutdo'W1'1 Until June, 1986
OPERATING DATA REPORT.
)*.
OP~RATING STATUS
- 1.
Unit Name: Dresden II
- 2.
Reporting Period :......;;.;;A=p=r.-i.-1...,.,-=-l"-98.;;..;;;..l_* ________ _._ __
- 3.
Licensed Thermal Power (MWt): 2 527
- 4.
Nameplate *Rating (Gross MWe):
828
- 5.
Desig'n Electrical Rating (Net M\\.Je):
794
- 6.
Maximum Dependable Capacity (Gross -M-\\v"""e....
)._:_8_1_2 _____ _
DOCKET NO. 050-237
-==~..;;;.;;;;-----...,-~
DATEMay 4, 1981 COMPLETED BYD. C. Maxwell TELEPHONE (815) 942-2920 Ext. 489 NOTES
- 7.
Maxim.um Dependable Capacity (Net MWe):
772
- 8.
If Ch'anges Occur in Capacity Ratings..,.(_1;....t_e_m_s ___ 3 ___
T_h_ro-ug_h_ 7) Since, Last Report, Give Reaso'ns:
NA
- 9.
Power Level to 1 *.Jhich Restricted, If Any (Net.MWe):
N/A
--~.;..._----------...,-----
- 10.
Reasons Fdr RestrictionsJ If Ariy:
NA
' _.........,=-----------------------~
- 11.
Hours:in Reporting Period
- 12.
Nu~be~ of Hours Reactor Was Critical*
- 13.
Reactor Reserve Shutdown Hours*
- 14.
Hours Generator On-Line
- 15.
Unit Reserve Shutdo\\vn Hours
- 16.
Gross. Thermal Ener*gy Generated. (MWH)
- 17.
Gross Electrical Energy Generat.ed (M\\m)
- 18.
Net E~ectrical Energy G~nerated (MWH)
- 19.
Unit Service Factor
- 20.
Unit Av~ilability Factor
- 21.
Unit Capacity Factor (Using MDC Net)
- 22.
Unit tapacity Factor (Usirig DER ~et)
- 23.
Unit.Forced Outage Rate
- 24.
Shutdowns. Schedu 1 ed Over Next 6 Months Presently in refueling outage.
. This Month Yr-to-Date 719 2 879 o*
73.8 0
0 0
69.4 0
0 0
74 675 4
22,063
-4 338 9 106 0
2.4 0
2.4 0.4 0
0.4
~o"--
o (Type; Date, and Duration of Each):
C uruuJa t i. 'fe.
98 '2.79 73,211.7 0
69,529.5 0
137,372,731 43,894,926 41,478I10.S.
70.7 70.7 54.7 53.2 12.5
- 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
May 9, 1981
I.
- 2.
- 3.
- 4.
I'" '.
I" o.
. J'.
OPERATING DATA REPORT OPERATING STATUS Unit rName:
Dresden III Re po r:t in g Period : __
A_.p_,r...,.i_l"""',....,_l..... 9_8..,..1 __________ _
Licensed Thermal Power (M\\.Jt): 2 527 Nameplate -Rating (Gross M\\.Je) : __
8_2_8-----..,..--..,..--
Design Electrical Rating (Net MWe): 794 Maximum Dependable Capacity (Gross
-M-\\.J-e~)-: __
8_1_2 ____ __
Maximum Dependable Capa~ity (Net MWe):
773 DATE May 4, 1981
- COMPLETED SY D. C. Maxwell TELEPHONE (815) 942-2920 t~OTES
- 7.
- 8.
If Changes Occur in Capacity Ratings...,.(_l_t_e_m_s_3_T_h_r_o_ug-h 7) Since Last Report, Give Reasons:
N A
- 9.
Powe~ Level to.\\.Jhich Res~ricted, If Any (Net M' *.Je):_.:.:.N,_A:.:....*---------------
- 10.
Reasons For'Restrictions, If Any:
N/A 11* *.
- 12.
lj.
- 14.
- 15.
Hours in Reporting Pe~ i_od*
Namb~r of Ho~rs.Reac~or Was*c~jtical Reactor*Reserve Shutdown Hours.
Houri Ge~erator On-Line Unit *Reserve Shutdo\\vn Hours
- 16.
Gross* Thermal* Energy Generated (MWH) 1 7. **Gross E 1 ectr i ca 1
- Energy Generated (M\\.JH) 18~
Net Electrical Energy Generated (MWH)
- 19; Unit :Service*Factor
- 20.
Unit ',ll.vailability*Factor
- 21.
Unit *Capacity Factor (U~ing MDC Net) 22 *.
Unit Capacity Factor (Using DER Net)
This Month 729 688.4 0
. 650.5 0
1,475,117 476,981 453.268 90.5 90.5
- 81. 6 79.4 Yr-to:.. Date 2 879 2,806.1
- o 2,769.0 0
6,428,421 2!103, 146 '.
2,004,459.
96.2 96.2 90.l 87.7
- CuruuJati.Ye.
85, 70L 65,093.C c
62,402..:
c 122,912,891 40 '003' 7ll:
38,027,35~
72.E 57.l 55.*~
- 23.
Uni_t ~arced Dutage Rate 9.5 3 6 14.E
- 24.
Shutdowns Scheduled Over Next 6 Months (Type, D_ate, and Duration of Each):
- N/A.
- 25. *If Shout Down At End Of Report Period, Est.imat-ed Date of Startup: N/A
...o.,;..__ ________
AVERAGE DAILY UNIT POWER LEVEL I.
[
MONTH APRIL, 1981 DAY AVERAGE DAI LY. PO\\./ER LEVEL.
(M\\./e-Net) 2 3
0 4
0 5,
0 6
0 7
0 8
0 9
0 10 0 '
- 11 12 13 0
14 0
1,.. ),
0 16 0
DAY 17
' 18 19 20
- ', 21 22 23
- .' 24 25 '
26 27 '
28 29
,* 30 31 DOCKET NO. 050-010 Ufl IT Dresden I DATE 5-4-81 COMPLETED BY D. C. Maxwell TELEPHONE (815) 942-2920 Ext. 489 AVERAGE DA I LY PO\\JER LEI/EL (M\\./e-Net)
. 0 0
0 0
0 0
0 0
a*
0 0
0 0
0
AVERAGE DAILY UNIT POWER LEVEL
. MONTH APRIL,. 1981
~~~---~~~~~~
DAY
. 1 2
3 4
5 6,
7 8
9 10 11 12 13 14 15 16
- ~.
AVERAGE DA IL Y PO\\.JER LEVEL (MWe-Net) 0 Q.
0 0
0 0
0 0
0 0
b 0
. DAY 17 18 19 20 21
.22.*
23.
- 24.
25 26 2i 28
. 29 30 31 DOCKET NO. -050-237 UlllT Dresden II DATE 5-4-81 COMPLETED BY D. c. Maxwell.
TELEPHONE (815) 942-2920 AVERAGE DA IL Y. PO\\.JER *LEVEL (M\\.Je-Net) 0 0
0 0
0.
0 0
0 0
0 0
AVERAGE DAILY UNIT POWER.LEVEL DOCKET NO. 050-249 Ull IT Dresden III
- DATE 5-4.;.81 COMPLETED SY D. C. Maxwe 11 TELEPHONE (815) 942-2920 MONTH. *APRIL, 1981 MY!.
AVERAGE DAI LY PO\\~ER LEVEL DAY AVERAGE DA I LY PO\\JER LE'lEL i
(MWe-Net)
. (M\\Je-:Net)
' 17 2 2 2
'i
- 18.
388 3
637 19
', 509 4
0 20 614' 5
0 21'
.709
- 22 >
774 269 0
7 489 23 781 8
618 24 769 9
708 25 747'
743 26
'738
- 10.
27 774 768 11 12 700
.28 770 13 789 29 781 14 760' 30 779 15*
778 3 l 16 77.6 i*.
NO.
DATE
.8 781031
- s 1
2 F:
Forc'ed s:
Sclie<lu led.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH __
A_P_R_I_L..L., _1_9_8_1 __ _
DURATION (HOURS) 719 Reason:
METHOD OF REASON2 SHUTTING DOWN REACTOR3 c
3
- A-Ecj~ip'inent Failure (Explain)
B~Mai~tehance of Test C-Refueling D~Regulatory Restriction LICENSEE EVENT REPORT U
- . 3 E-Operator Training & Lice~se Examin~tion F-Adrninistrative G-Operational grror II-Other (Explain)
SYSTEM CODE;4 Method:
- 1-Manual COMPONENT CODES 2-Manual Scram
]~Automatic Scram 4-0ther (Explain) 4
. DOCKET NO. 050-010 UNIT NAME~D~r-e-s~d~e-n-I-.--'----
DATE May 4, 1981 COMPLETED BYD. C. Maxwell TELEPHONE (815) 942~2920, Ext 4E CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE Refueling, turbine overh~ul &
chemical cleaning outag~.
Exhibit G-Instr~ctions fo~
Preparation of Data Entr~ Sheets for Licensee Event' Report (
) File (NUREG-0161)
NO.*
DATE
'i'YPEl 1
810103 s
l 2
- F:
Forced
- S:
- Scheduled UNIT SHUTDOWNS AND POWER REDUCTIONS.
REPORT MONTH APRIL, 1981 DU HAT ION (HOURS) 719 Reason:
METHOD OF REASON2 SHUTTING DOWN REACT(lR3 c
2 A-Etjuipmerit Failur~ (E~plain)
B-Maintenance of Test c..:.Refueling D-Regulatory Restriction
. LICENSEE
'EVENT
- REPORT U.
3 E~O~erator Training & License Examinatiori F-Administtative G-Operation~l Error ll-Oti1er (Explain)
SYSTEM CODE4 Method:
1-Manual COMPONENT
DOCKET NO. 050-237
~~~~~~~~~
UNIT NAME Dresden II DATE May 4, 1981 COMPLETED BY D. C. Maxwe 11 TELEPHONE (815) 942-2920 CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE Refueling & turbine overhaul outage.
4 Exhibit G-Instructions for Preparation of Data Entr~ Sheets for Licensee Event Report (
) File (NUREG-0161)
1 UNIT SHUTDOWNS AND POWER-REDUCTIONS REPORT MONTll.*
APRIL I 1981 METHOD *oF L.ICENSEE TYPEl REASON2 NO.
DATE DURATION SHUTTING EVENT SYSTEM COMPONENT (HOURS)
DOWN REACTOR)
REPORT u
. CODE4 CODES 5
810lt03
- s 54:03 D
2 6
81041 L F
14:27.
H 3
3 F:. Forced Scheduled*
- .Reason:
Method:
S.
A-Equipm~nt Pailur~ (Explain)
B-Maintenan~~ of Test C-Refueling **
D~Regulatory Restriction E-Oper~tor Training & Liriense Examination F-Administrative G-Operatibnal Erroi
- II-Other (Explain)
I-Manual 2-Manual Scram 3-Automatic Scram 4~0ther (Explain)
DOCKET N0.~0~5~0_-~24~9~==~~-=
UNIT NAME Dr~sden III
. DATE May 4, 1981 COMP_LETED BY D. C. Maxwe 11 TELEPHONE {815) 942-2920
-*----~------~-*-*.
CAUSE & CORRECTIVE ACTION TO*
! PREVENT RECURRENCE NRC I.E. Bulletin 79 HPCI Steam Lin~ Supports R~wcirk
- H = ~ontractor Error.
Contractor dragged scaffolding across MSIV high flow swl.'tches, causing a Group I Isolation.
4 Exhibit G-Instructicins for Prepar~tfon of Data Entr~ Sheets fo~* Licensee Event ~eport ( * ) File (NUREG-0161).
EQUIPMENT...
Forward Tubes for Mechanical Snubber a lf?CI Valve.
M0.2301-5 Toru*s. Sample Valve NATURE OF MA I llTENAl~CE
~rev~ntive WR #il540
.Preventive WR #12315 Control.
Refuelfr1g Preveritive WR /111129 Grapple.
SBLC Squib Preventive WR #9198 Valves Je~:Pump #J In Prev~ntive WR #11292
~et Pump Hold-Pieventive WR #11150 Down Beam In$pect Torus Preventive WR #11823 Hydraulic Snubb-r DRESDEN UN IT 2 *
. SAFETY RELATED HAINTENAHCE - APRIL, 1981 LER OR OUTAGE.
NUMOER MALFUNCTION*.
CAUSE RESULT N/A N/A N/A N/A N/A N/A Defective Wiring Upper Limit Out of Adjustment N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A CORRECTIVF~ACTIOH Fabricated per drawings Installed new ~elay. e Replaced limit switch.
Repaired wiring problem
& control transformer; adjusted limits.
-Installed & removed jumpers.
Replaced cable.
Tested & replaced per DMP 1100-1.
e Wire-brushed, then welded keeper per DMP 200-20.
Fabricated 4 cl~vises.
Added hydraulic fluid.
Replaced #9 & #20 jet pump hold-down beams.
Bench-tested snubbers 1110 & 1116.
NATURE OF EQUIPMENT
. HA I llTENAi~CE Check Valve Preventive WR f/:12239 2-301-122 Torus Ring #10
2D'LPCI Pump
~reventive ~R #12570 Breaker CRD Solerioid.
Preventiv~ WR #12241.
Valve 2-302....:19n SRM 21 Correcti~e WR #8076
)<e.stricting Ori *Preventive WR.//:ll963 fice 2-2301-1)2 Head Spray Line Preventive WR //:12013 Proce_ss Inst.
Preventive WR i/:12078 Lin~ Flow ~heck Valves Shorting Links Preventive WR 1110981 on Scram Ch. A
& B Sample *Valve Preventive WR //:836 7 9208A Sarn~le Valve Preventive. WR #8369 fl')n n
MALFUNCTIOtl*
CAUSE RESULT
.N/A
- N/A N/A N/A Difective Portion of Cable - 15V DC N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Shorted Out.
N/A N/A N/A N/A N/A N/A CORRECTIVF~ACTION Cleaned di~t & debris, re-installed.
Added hydrauli~ fluid. -
Adjusted racking screw center piece.
Changed out Asco.
Replaced ba~ sectio~,
install coax connectors
& ~e~t shrink tubing; reinstall~d in cable pan Replaced 1/2" orifice with 3/16 11
- also 2 old
- flex gaskets.
Installed lower sect~
for field inspectio~
removed afterwards.
Removed, tested; & re-installed.
Removed~ jumpered; ~ re-installed after fuel lc>ading.
Rebuilt, teste-d, & re-installed.
Rebuilt, tested, & re-in!':t*nl lPd.
- EQU I P/1ENT Sample Valve 9207A Sainple Valve 9208B
- 2B SBLC PP Packing*.
2A. SBLC PP Packing
.Rx Vessel Level
. indicator SW NATURE Of*
HA I llTENAl~CE Preventive WR #8370 Preventive WR #8368 Corrective WR /112379
- .Corrective.WR //12380
- Pieventive WR #10604
. *.Scrairi Discharge Preventive WR //12478
. Instrument Volu e *
,*Local Pushb~tto1 Corrective WR #1177, control 2-2301-:-1 f Fuel A~semblies Preventive WR #11499
- LJ 7284, LJ 274' LJ 2702 IF~ Diesel Gen-
. e~ator Preventive WR //12352.
ORES DEN UN IT 2 SAFETY RELATED HAiNTENAHCE ~ APRIL, 1981 LER OR OUTAGE NUMBER MAL FUN CTI OU
. CAUSE RESULT CORRECTIVF~ACTIOH N/A.
N/A Worn Packing Worn Packing N/A N/A Bad Resifftor N/A N/A N/A N/4 Steady Stream Lea Rebuilt, tested, & re-installed.
Rebuilt, tested, & re-installed, Repacked &
leakage to e
adjusted 15 drops/min.
Steady Stream Leal Repacked & adjusted Leakage to 15 drops/min.
N/A N/A
.Replaced low side iso-
. lat ion valve.
Ground welds for ISi UT inspection.
No Close Indication Replaced resistor.
N/A N/A Replaced upper tie A plates.
9 Performed quarterly inspection *
. EQUIPMENT.
. NATURE OF MA I llTENANCE DRESDEN UNIT 2 SAFETY RELATED MAiNTENANCE~ APRIL, 1981 LER OR OUTA,GE NUMOER***
. MAL FUl4CT I Otl *
~--*~~~~---_..;.~11~~~~-~~-,-~-----'~~-1-~~~~-'--'---'--~~~~-t-~---~~~~~~-1--'-~~~---'-~~-*-~~~~~~~~~~---
CAUSE RESULT CORR~CTIVF'ACTION l25V DC Ground
.. R~ Bldg~ Oyer..:.
. head Crane
- LPRM 24.:-09-:-C 3..;.2J01-3 Valve
."1..
. /ff Dies.el Gen-
._. era tor JA. SBLC Pump..
- B.Recfrc. Pump Suction Valve
- A Rec ire. Loop Man.ifold Cross tie Recirc~ Cross-tie MO 3-202-6B Pilot* Assembly o* Elec tromatic Pilot Assembly E Electromatic *
.. *'~
- . Preventivi WR #lli79 Preventive W~ #12446 Pre~entive WR #9288 Preventive WR #12~59 Preventive WR #12349*
Preventiye.WR l/11833 Preventive WR. 1112486 Preventive WR 11125 25
. Preventive WR 1112523
- N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
- N/A N/A N/A N/A N/A N/A N/A N/A Ground clea~ed itself before work commenced.
Inspected cable
- Inspected per DIS-192c
' 22 - no defects.
Inspected fa~ seating leak - none found.
Replaced KS relay per
- DIS 700-6.
- Performed quarterly in..;.
spec.tion.
Adjusted pa~king to leak 15 drops/min
- Tightened packirig.
Tightened packing.
Tightened packing.
_Changed pilot valve.
Changed pilot assembly.
. EQUIPMENT.
Spare Accumulato Spare FW Check Valves
. *NATURE OF MA I llTENANCE Preventive WR #10930 Preventive WR #12030 DRESDEN* UNIT 2/3 SAFETY RELATED MAINTENANCE ~ APRIL, 1981 MALFUNCTION*
LER OR OUTAGE NUMBER CAUSE RESULT N/A*
N/A
- N/A N/A
---1*-~ *.
CORRECTIVr~ACTION Scrapped because of pits & gouges.
Rebuilt &. tested.
EQUIPMENT NATURE OF MA I llTENAIKE i HPCI 'turbine Preventive WR #11560 I
' Exhaust Drain Pot Trap I
Turbine Generato Preventive WR //:11585 Stop & Cont..
Valve.
IRM 1118 Drive Select Button MSIV A0-3~203-lC SOC Valve J-1001-lB Preventiye W~ #11040 Preventive WR #11820 Preventive WR #10718
-* Iso. Cond. Vent Preventive WR //10842 Valve 3-1301-14 Manual Vent Valv
. 3-1601-63 A Shutdown Cool Pieventive WR 1112524 ing i..oop Shut-down Valve DRESDEN UNIT 3
- SAFETY RELATED MAINTENANCE - APRIL, 1981 MALFUl4CT I Otl *.
LER OR OUTAGE NUMBER CAUSE RESULT N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
. N/A N/A N/A N/A N/A N/A N/A N/A CORRECt1vr~ACTIOH Inspected*- no pr6blems.
Repaired SVMT--2* limit. -
Replaced drive select push button.
Te_sted found ok.
Tested -
found ok.
Repacl<ed valve.
Repacked valve.
Rebuilt air operato~
Tightened pa~king.
SUMMARY
.OF OPERATING EXPERIENCE UNIT ONE
. 4-1 to 4-30 MAY, 1981 Unit.One was shutdown. for the entire month, awaiting license approval for the chemical cleaning.
Major work scheduled to be completed following chemical cleaning is as follows:
HPCI installation for ECCS upgrading, equip-m.ent upgrade to IEEE 279, major in-service inspection, and refuel.
SUMMARY
OF OPERATING EXPERIENCE UNIT TWO 4-1 to 4-30 MAY, 1981 Unit Two was shutdown for.the entire month for. its scheduled refueling and equipment overhaul outage.
Major work included torus modification, CRD re-placements, and turbine overhaul.
SUMMARY
OF OPERATING EXPERIENCE 4-1 to 4-6 4.....:6 to 4-17 4-+/-7 to4-30 UNIT THREE MAY, 1981 Unit Three entered the month operating at a power level of 815 MWe and operated until 2306 hours0.0267 days <br />0.641 hours <br />0.00381 weeks <br />8.77433e-4 months <br /> of April 3, 1981, when the unit was m~nually taken out of service -to install the HPCI Steam Line Supports as required by I.E.Bulletin 79-14.
The reactor was sub-critical at 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> of April 4, 1981; and after the required maintenance was completed, it was brought critical at 1815 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.906075e-4 months <br /> of May S, 1981.
The unit was brought in service on April 6, i981
~t 0508 hours0.00588 days <br />0.141 hours <br />8.399471e-4 weeks <br />1.93294e-4 months <br /> and 6perated continuou~ly.until 0913 hours0.0106 days <br />0.254 hours <br />0.00151 weeks <br />3.473965e-4 months <br /> of Aprii 17, 1981, when a reactor scram occurred. *. Con tractors working in the east
- LPCI room, above the MSIV high flow switches, dragged scaffolding across the switches,* causing a turbine trip andthe resultant high flux
- . scraim11ed the.reactor; The reactor was brougQt critical at 1902 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.23711e-4 months <br /> a.nd the turbine wa~ plac~d in service at 2340 hours0.0271 days <br />0.65 hours <br />0.00387 weeks <br />8.9037e-4 months <br /> ?f the 17th and ih~ ~nit operated ~ontinuously during the remainder'~f the month; reaching a* power
- Jevel of.820. MWe with a capacity factor.of 79.74/~
arid an.availability of 90.48%.*.. *
"'