    • OPERATING DATA REPORT OPERATIN~ STATUS I.

Unit Name: Dresden I

_.;;;;..;;..;;;;,;;;..;;..=.;;~---------------------------------

2.

Reporting Period: __

A_p_r_i_l~, __

1_9~8_1 ______________________ ~

3.

Licensed Thermal Power (MWt):

700

4.

Namepl~te Rating (Gross MWe):

209 5,

Design Elect r i ca 1 Rating (Net M\\./e): 200

--......-------------~

6.

Maximum Dependable Capac.ity (G~oss MWe): 205 DOCKET NO. 050-010

. DATE May S. 1981 COMPLETED SY D *. c. Maxwell TELEPHONE (815) 942-2920 X-550 NOTES 7,

Maximum Dependable Capacity (Net MWe):

197

8.

If Ch;anges Occur in Capacity Ratings.-,.(-1-te_m_s_*_3 __ T __ h_r_o_u_g_h 7) Since Last Report, Give Reasons:

N/A

9.

Power Level to Which Restricted, If Any (Net MWe):

NA

.._...:~~---------------------------~

10.

Reasons For Res~rictidnsi If Any:

N/A

  • *lJ.

Hours* in Reporting Period

12.

Number of*Hours Reactor '../as.Critical

13.

Reactor Reserve Shutdown Hours

14.

Hours Generator On-Line

15.

Unit Res.erve Shutd.own Hours

16.

Gross Thermal Energy Generated (MWH)

17.

Gross* Electrical. Energy Generated (M\\.JH)

18.

Net Electrical Energy Generated. (MWH)

19.

Unit Servi~e Factor

20.

Unit Avai.lab.il ity Facto~

21.

Unit Capacity Factor (Using MDC Net)

22.

Unit Capacity Factor (Uslng DER Net)

23.

Unit For~ed O~tage Rate Th i. s

  • Mon th Yr-to-Date EXTENDED MODIF:ICATION OUTAGE C uruu:la t i. 'l~

24~

Shutdowns S~hed~led Over Next 6 Mo~ths (Type, Date, and Duration of Each):

N/A

25.

If Shut Down At.End Of Report ?er-iod,.Estimated Date of Startup: Extended Modificatior:

810. 5 {3 0 /{p 9 Outage -

Shutdo'W1'1 Until June, 1986

OPERATING DATA REPORT.

)*.

OP~RATING STATUS

1.

Unit Name: Dresden II

2.

Reporting Period :......;;.;;A=p=r.-i.-1...,.,-=-l"-98.;;..;;;..l_* ________ _._ __

3.

Licensed Thermal Power (MWt): 2 527

4.

Nameplate *Rating (Gross MWe):

828

5.

Desig'n Electrical Rating (Net M\\.Je):

794

6.

Maximum Dependable Capacity (Gross -M-\\v"""e....

)._:_8_1_2 _____ _

DOCKET NO. 050-237

-==~..;;;.;;;;-----...,-~

DATEMay 4, 1981 COMPLETED BYD. C. Maxwell TELEPHONE (815) 942-2920 Ext. 489 NOTES

7.

Maxim.um Dependable Capacity (Net MWe):

772

8.

If Ch'anges Occur in Capacity Ratings..,.(_1;....t_e_m_s ___ 3 ___

T_h_ro-ug_h_ 7) Since, Last Report, Give Reaso'ns:

NA

9.

Power Level to 1 *.Jhich Restricted, If Any (Net.MWe):

N/A

--~.;..._----------...,-----

10.

Reasons Fdr RestrictionsJ If Ariy:

NA

' _.........,=-----------------------~

  • 11.

Hours:in Reporting Period

12.

Nu~be~ of Hours Reactor Was Critical*

13.

Reactor Reserve Shutdown Hours*

14.

Hours Generator On-Line

15.

Unit Reserve Shutdo\\vn Hours

16.

Gross. Thermal Ener*gy Generated. (MWH)

17.

Gross Electrical Energy Generat.ed (M\\m)

18.

Net E~ectrical Energy G~nerated (MWH)

19.

Unit Service Factor

20.

Unit Av~ilability Factor

21.

Unit Capacity Factor (Using MDC Net)

22.

Unit tapacity Factor (Usirig DER ~et)

23.

Unit.Forced Outage Rate

24.

Shutdowns. Schedu 1 ed Over Next 6 Months Presently in refueling outage.

. This Month Yr-to-Date 719 2 879 o*

73.8 0

0 0

69.4 0

0 0

74 675 4

22,063

-4 338 9 106 0

2.4 0

2.4 0.4 0

0.4


~o"--

o (Type; Date, and Duration of Each):

C uruuJa t i. 'fe.

98 '2.79 73,211.7 0

69,529.5 0

137,372,731 43,894,926 41,478I10.S.

70.7 70.7 54.7 53.2 12.5

25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

May 9, 1981

I.

2.
3.
4.

I'" '.

I" o.

. J'.

OPERATING DATA REPORT OPERATING STATUS Unit rName:

Dresden III Re po r:t in g Period : __

A_.p_,r...,.i_l"""',....,_l..... 9_8..,..1 __________ _

Licensed Thermal Power (M\\.Jt): 2 527 Nameplate -Rating (Gross M\\.Je) : __

8_2_8-----..,..--..,..--

Design Electrical Rating (Net MWe): 794 Maximum Dependable Capacity (Gross

-M-\\.J-e~)-: __

8_1_2 ____ __

Maximum Dependable Capa~ity (Net MWe):

773 DATE May 4, 1981

  • COMPLETED SY D. C. Maxwell TELEPHONE (815) 942-2920 t~OTES
7.
8.

If Changes Occur in Capacity Ratings...,.(_l_t_e_m_s_3_T_h_r_o_ug-h 7) Since Last Report, Give Reasons:

N A

9.

Powe~ Level to.\\.Jhich Res~ricted, If Any (Net M' *.Je):_.:.:.N,_A:.:....*---------------

10.

Reasons For'Restrictions, If Any:

N/A 11* *.

12.

lj.

14.
15.

Hours in Reporting Pe~ i_od*

Namb~r of Ho~rs.Reac~or Was*c~jtical Reactor*Reserve Shutdown Hours.

Houri Ge~erator On-Line Unit *Reserve Shutdo\\vn Hours

16.

Gross* Thermal* Energy Generated (MWH) 1 7. **Gross E 1 ectr i ca 1

  • Energy Generated (M\\.JH) 18~

Net Electrical Energy Generated (MWH)

  • 19; Unit :Service*Factor
20.

Unit ',ll.vailability*Factor

21.

Unit *Capacity Factor (U~ing MDC Net) 22 *.

Unit Capacity Factor (Using DER Net)

This Month 729 688.4 0

. 650.5 0

1,475,117 476,981 453.268 90.5 90.5

81. 6 79.4 Yr-to:.. Date 2 879 2,806.1
  • o 2,769.0 0

6,428,421 2!103, 146 '.

2,004,459.

96.2 96.2 90.l 87.7

  • CuruuJati.Ye.

85, 70L 65,093.C c

62,402..:

c 122,912,891 40 '003' 7ll:

38,027,35~

72.E 57.l 55.*~

23.

Uni_t ~arced Dutage Rate 9.5 3 6 14.E

24.

Shutdowns Scheduled Over Next 6 Months (Type, D_ate, and Duration of Each):

N/A.
25. *If Shout Down At End Of Report Period, Est.imat-ed Date of Startup: N/A

...o.,;..__ ________

AVERAGE DAILY UNIT POWER LEVEL I.

[

MONTH APRIL, 1981 DAY AVERAGE DAI LY. PO\\./ER LEVEL.

(M\\./e-Net) 2 3

0 4

0 5,

0 6

0 7

0 8

0 9

0 10 0 '

  • 11 12 13 0

14 0

1,.. ),

0 16 0

DAY 17

' 18 19 20

  • ', 21 22 23
  • .' 24 25 '

26 27 '

28 29

,* 30 31 DOCKET NO. 050-010 Ufl IT Dresden I DATE 5-4-81 COMPLETED BY D. C. Maxwell TELEPHONE (815) 942-2920 Ext. 489 AVERAGE DA I LY PO\\JER LEI/EL (M\\./e-Net)

. 0 0

0 0

0 0

0 0

a*

0 0

0 0

0

AVERAGE DAILY UNIT POWER LEVEL

. MONTH APRIL,. 1981

~~~---~~~~~~

DAY

. 1 2

3 4

5 6,

7 8

9 10 11 12 13 14 15 16

  • ~.

AVERAGE DA IL Y PO\\.JER LEVEL (MWe-Net) 0 Q.

0 0

0 0

0 0

0 0

b 0

. DAY 17 18 19 20 21

.22.*

23.

24.

25 26 2i 28

. 29 30 31 DOCKET NO. -050-237 UlllT Dresden II DATE 5-4-81 COMPLETED BY D. c. Maxwell.

TELEPHONE (815) 942-2920 AVERAGE DA IL Y. PO\\.JER *LEVEL (M\\.Je-Net) 0 0

0 0

0.

0 0

0 0

0 0

AVERAGE DAILY UNIT POWER.LEVEL DOCKET NO. 050-249 Ull IT Dresden III

  • DATE 5-4.;.81 COMPLETED SY D. C. Maxwe 11 TELEPHONE (815) 942-2920 MONTH. *APRIL, 1981 MY!.

AVERAGE DAI LY PO\\~ER LEVEL DAY AVERAGE DA I LY PO\\JER LE'lEL i

(MWe-Net)

. (M\\Je-:Net)

' 17 2 2 2

'i

18.

388 3

637 19

', 509 4

0 20 614' 5

0 21'

.709

  • 22 >

774 269 0

7 489 23 781 8

618 24 769 9

708 25 747'

743 26

'738

10.

27 774 768 11 12 700

.28 770 13 789 29 781 14 760' 30 779 15*

778 3 l 16 77.6 i*.

NO.

DATE

.8 781031

  • s 1

2 F:

Forc'ed s:

Sclie<lu led.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH __

A_P_R_I_L..L., _1_9_8_1 __ _

DURATION (HOURS) 719 Reason:

METHOD OF REASON2 SHUTTING DOWN REACTOR3 c

3

  • A-Ecj~ip'inent Failure (Explain)

B~Mai~tehance of Test C-Refueling D~Regulatory Restriction LICENSEE EVENT REPORT U

  • . 3 E-Operator Training & Lice~se Examin~tion F-Adrninistrative G-Operational grror II-Other (Explain)

SYSTEM CODE;4 Method:

  • 1-Manual COMPONENT CODES 2-Manual Scram

]~Automatic Scram 4-0ther (Explain) 4

. DOCKET NO. 050-010 UNIT NAME~D~r-e-s~d~e-n-I-.--'----

DATE May 4, 1981 COMPLETED BYD. C. Maxwell TELEPHONE (815) 942~2920, Ext 4E CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE Refueling, turbine overh~ul &

chemical cleaning outag~.

Exhibit G-Instr~ctions fo~

Preparation of Data Entr~ Sheets for Licensee Event' Report (

) File (NUREG-0161)

NO.*

DATE

'i'YPEl 1

810103 s

l 2

  • F:

Forced

  • S:
  • Scheduled UNIT SHUTDOWNS AND POWER REDUCTIONS.

REPORT MONTH APRIL, 1981 DU HAT ION (HOURS) 719 Reason:

METHOD OF REASON2 SHUTTING DOWN REACT(lR3 c

2 A-Etjuipmerit Failur~ (E~plain)

B-Maintenance of Test c..:.Refueling D-Regulatory Restriction

. LICENSEE

'EVENT

  • REPORT U.

3 E~O~erator Training & License Examinatiori F-Administtative G-Operation~l Error ll-Oti1er (Explain)

SYSTEM CODE4 Method:

1-Manual COMPONENT

  • conE5 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

DOCKET NO. 050-237

~~~~~~~~~

UNIT NAME Dresden II DATE May 4, 1981 COMPLETED BY D. C. Maxwe 11 TELEPHONE (815) 942-2920 CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE Refueling & turbine overhaul outage.

4 Exhibit G-Instructions for Preparation of Data Entr~ Sheets for Licensee Event Report (

) File (NUREG-0161)

1 UNIT SHUTDOWNS AND POWER-REDUCTIONS REPORT MONTll.*

APRIL I 1981 METHOD *oF L.ICENSEE TYPEl REASON2 NO.

DATE DURATION SHUTTING EVENT SYSTEM COMPONENT (HOURS)

DOWN REACTOR)

REPORT u

. CODE4 CODES 5

810lt03

  • s 54:03 D

2 6

81041 L F

14:27.

H 3

3 F:. Forced Scheduled*

  • .Reason:

Method:

S.

A-Equipm~nt Pailur~ (Explain)

B-Maintenan~~ of Test C-Refueling **

D~Regulatory Restriction E-Oper~tor Training & Liriense Examination F-Administrative G-Operatibnal Erroi

  • II-Other (Explain)

I-Manual 2-Manual Scram 3-Automatic Scram 4~0ther (Explain)

DOCKET N0.~0~5~0_-~24~9~==~~-=

UNIT NAME Dr~sden III

. DATE May 4, 1981 COMP_LETED BY D. C. Maxwe 11 TELEPHONE {815) 942-2920

-*----~------~-*-*.

CAUSE & CORRECTIVE ACTION TO*

! PREVENT RECURRENCE NRC I.E. Bulletin 79 HPCI Steam Lin~ Supports R~wcirk

  • H = ~ontractor Error.

Contractor dragged scaffolding across MSIV high flow swl.'tches, causing a Group I Isolation.

4 Exhibit G-Instructicins for Prepar~tfon of Data Entr~ Sheets fo~* Licensee Event ~eport ( * ) File (NUREG-0161).

EQUIPMENT...

Forward Tubes for Mechanical Snubber a lf?CI Valve.

M0.2301-5 Toru*s. Sample Valve NATURE OF MA I llTENAl~CE

~rev~ntive WR #il540

.Preventive WR #12315 Control.

Refuelfr1g Preveritive WR /111129 Grapple.

SBLC Squib Preventive WR #9198 Valves Je~:Pump #J In Prev~ntive WR #11292

~et Pump Hold-Pieventive WR #11150 Down Beam In$pect Torus Preventive WR #11823 Hydraulic Snubb-r DRESDEN UN IT 2 *

. SAFETY RELATED HAINTENAHCE - APRIL, 1981 LER OR OUTAGE.

NUMOER MALFUNCTION*.

CAUSE RESULT N/A N/A N/A N/A N/A N/A Defective Wiring Upper Limit Out of Adjustment N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A CORRECTIVF~ACTIOH Fabricated per drawings Installed new ~elay. e Replaced limit switch.

Repaired wiring problem

& control transformer; adjusted limits.

-Installed & removed jumpers.

Replaced cable.

Tested & replaced per DMP 1100-1.

e Wire-brushed, then welded keeper per DMP 200-20.

Fabricated 4 cl~vises.

Added hydraulic fluid.

Replaced #9 & #20 jet pump hold-down beams.

Bench-tested snubbers 1110 & 1116.

NATURE OF EQUIPMENT

. HA I llTENAi~CE Check Valve Preventive WR f/:12239 2-301-122 Torus Ring #10

2D'LPCI Pump

~reventive ~R #12570 Breaker CRD Solerioid.

Preventiv~ WR #12241.

Valve 2-302....:19n SRM 21 Correcti~e WR #8076

)<e.stricting Ori *Preventive WR.//:ll963 fice 2-2301-1)2 Head Spray Line Preventive WR //:12013 Proce_ss Inst.

Preventive WR i/:12078 Lin~ Flow ~heck Valves Shorting Links Preventive WR 1110981 on Scram Ch. A

& B Sample *Valve Preventive WR //:836 7 9208A Sarn~le Valve Preventive. WR #8369 fl')n n

  • DRESDEN UN IT 2 SAFETY RELATED HAiNTENANCE.,... APRIL, 1981 LER OR OUTAGE NUMBER.

MALFUNCTIOtl*

CAUSE RESULT

.N/A

  • N/A N/A N/A Difective Portion of Cable - 15V DC N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Shorted Out.

N/A N/A N/A N/A N/A N/A CORRECTIVF~ACTION Cleaned di~t & debris, re-installed.

Added hydrauli~ fluid. -

Adjusted racking screw center piece.

Changed out Asco.

solenoid valve.

Replaced ba~ sectio~,

install coax connectors

& ~e~t shrink tubing; reinstall~d in cable pan Replaced 1/2" orifice with 3/16 11

also 2 old

Installed lower sect~

for field inspectio~

removed afterwards.

Removed, tested; & re-installed.

Removed~ jumpered; ~ re-installed after fuel lc>ading.

Rebuilt, teste-d, & re-installed.

Rebuilt, tested, & re-in!':t*nl lPd.

  • EQU I P/1ENT Sample Valve 9207A Sainple Valve 9208B
  • 2B SBLC PP Packing*.

2A. SBLC PP Packing

.Rx Vessel Level

. indicator SW NATURE Of*

HA I llTENAl~CE Preventive WR #8370 Preventive WR #8368 Corrective WR /112379

  • .Corrective.WR //12380

. *.Scrairi Discharge Preventive WR //12478

. Instrument Volu e *

,*Local Pushb~tto1 Corrective WR #1177, control 2-2301-:-1 f Fuel A~semblies Preventive WR #11499

  • LJ 7284, LJ 274' LJ 2702 IF~ Diesel Gen-

. e~ator Preventive WR //12352.

ORES DEN UN IT 2 SAFETY RELATED HAiNTENAHCE ~ APRIL, 1981 LER OR OUTAGE NUMBER MAL FUN CTI OU

. CAUSE RESULT CORRECTIVF~ACTIOH N/A.

N/A Worn Packing Worn Packing N/A N/A Bad Resifftor N/A N/A N/A N/4 Steady Stream Lea Rebuilt, tested, & re-installed.

Rebuilt, tested, & re-installed, Repacked &

leakage to e

adjusted 15 drops/min.

Steady Stream Leal Repacked & adjusted Leakage to 15 drops/min.

N/A N/A

.Replaced low side iso-

. lat ion valve.

Ground welds for ISi UT inspection.

No Close Indication Replaced resistor.

N/A N/A Replaced upper tie A plates.

9 Performed quarterly inspection *

. EQUIPMENT.

. NATURE OF MA I llTENANCE DRESDEN UNIT 2 SAFETY RELATED MAiNTENANCE~ APRIL, 1981 LER OR OUTA,GE NUMOER***

. MAL FUl4CT I Otl *

~--*~~~~---_..;.~11~~~~-~~-,-~-----'~~-1-~~~~-'--'---'--~~~~-t-~---~~~~~~-1--'-~~~---'-~~-*-~~~~~~~~~~---

CAUSE RESULT CORR~CTIVF'ACTION l25V DC Ground

.. R~ Bldg~ Oyer..:.

. head Crane

  • LPRM 24.:-09-:-C 3..;.2J01-3 Valve

."1..

. /ff Dies.el Gen-

._. era tor JA. SBLC Pump..

  • B.Recfrc. Pump Suction Valve
  • A Rec ire. Loop Man.ifold Cross tie Recirc~ Cross-tie MO 3-202-6B Pilot* Assembly o* Elec tromatic Pilot Assembly E Electromatic *

.. *'~

  • . Preventivi WR #lli79 Preventive W~ #12446 Pre~entive WR #9288 Preventive WR #12~59 Preventive WR #12349*

Preventiye.WR l/11833 Preventive WR. 1112486 Preventive WR 11125 25

. Preventive WR 1112523

  • Preventive WR l/12447 Preventive WR #12539 Preventive WR /112540 N/A N/A
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
  • N/A N/A N/A N/A N/A N/A N/A N/A Ground clea~ed itself before work commenced.

Inspected cable

  • Inspected per DIS-192c

' 22 - no defects.

Inspected fa~ seating leak - none found.

Replaced KS relay per

  • DIS 700-6.
  • Performed quarterly in..;.

spec.tion.

Adjusted pa~king to leak 15 drops/min

  • Tightened packirig.

Tightened packing.

Tightened packing.

_Changed pilot valve.

Changed pilot assembly.

. EQUIPMENT.

Spare Accumulato Spare FW Check Valves

. *NATURE OF MA I llTENANCE Preventive WR #10930 Preventive WR #12030 DRESDEN* UNIT 2/3 SAFETY RELATED MAINTENANCE ~ APRIL, 1981 MALFUNCTION*

LER OR OUTAGE NUMBER CAUSE RESULT N/A*

N/A

  • N/A N/A

---1*-~ *.

CORRECTIVr~ACTION Scrapped because of pits & gouges.

Rebuilt &. tested.

EQUIPMENT NATURE OF MA I llTENAIKE i HPCI 'turbine Preventive WR #11560 I

' Exhaust Drain Pot Trap I

Turbine Generato Preventive WR //:11585 Stop & Cont..

Valve.

IRM 1118 Drive Select Button MSIV A0-3~203-lC SOC Valve J-1001-lB Preventiye W~ #11040 Preventive WR #11820 Preventive WR #10718

-* Iso. Cond. Vent Preventive WR //10842 Valve 3-1301-14 Manual Vent Valv

. 3-1601-63 A Shutdown Cool Pieventive WR 1112524 ing i..oop Shut-down Valve DRESDEN UNIT 3

  • SAFETY RELATED MAINTENANCE - APRIL, 1981 MALFUl4CT I Otl *.

LER OR OUTAGE NUMBER CAUSE RESULT N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

. N/A N/A N/A N/A N/A N/A N/A N/A CORRECt1vr~ACTIOH Inspected*- no pr6blems.

Repaired SVMT--2* limit. -

Replaced drive select push button.

Te_sted found ok.

Tested -

found ok.

Repacl<ed valve.

Repacked valve.

Rebuilt air operato~

Tightened pa~king.

SUMMARY

.OF OPERATING EXPERIENCE UNIT ONE

. 4-1 to 4-30 MAY, 1981 Unit.One was shutdown. for the entire month, awaiting license approval for the chemical cleaning.

Major work scheduled to be completed following chemical cleaning is as follows:

HPCI installation for ECCS upgrading, equip-m.ent upgrade to IEEE 279, major in-service inspection, and refuel.

SUMMARY

OF OPERATING EXPERIENCE UNIT TWO 4-1 to 4-30 MAY, 1981 Unit Two was shutdown for.the entire month for. its scheduled refueling and equipment overhaul outage.

Major work included torus modification, CRD re-placements, and turbine overhaul.

SUMMARY

OF OPERATING EXPERIENCE 4-1 to 4-6 4.....:6 to 4-17 4-+/-7 to4-30 UNIT THREE MAY, 1981 Unit Three entered the month operating at a power level of 815 MWe and operated until 2306 hours0.0267 days <br />0.641 hours <br />0.00381 weeks <br />8.77433e-4 months <br /> of April 3, 1981, when the unit was m~nually taken out of service -to install the HPCI Steam Line Supports as required by I.E.Bulletin 79-14.

The reactor was sub-critical at 0130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> of April 4, 1981; and after the required maintenance was completed, it was brought critical at 1815 hours0.021 days <br />0.504 hours <br />0.003 weeks <br />6.906075e-4 months <br /> of May S, 1981.

The unit was brought in service on April 6, i981

~t 0508 hours0.00588 days <br />0.141 hours <br />8.399471e-4 weeks <br />1.93294e-4 months <br /> and 6perated continuou~ly.until 0913 hours0.0106 days <br />0.254 hours <br />0.00151 weeks <br />3.473965e-4 months <br /> of Aprii 17, 1981, when a reactor scram occurred. *. Con tractors working in the east

  • . scraim11ed the.reactor; The reactor was brougQt critical at 1902 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.23711e-4 months <br /> a.nd the turbine wa~ plac~d in service at 2340 hours0.0271 days <br />0.65 hours <br />0.00387 weeks <br />8.9037e-4 months <br /> ?f the 17th and ih~ ~nit operated ~ontinuously during the remainder'~f the month; reaching a* power
  • Jevel of.820. MWe with a capacity factor.of 79.74/~

arid an.availability of 90.48%.*.. *

"'