- IR 05000237/2008003 +
- ML12093A252 +
- ML17325A102 +
- ML18170A268 +
- ML18136A682 +
- ML17311A846 +
- ML070310313 +
- ML20009C878 +
- ML18289A608 +
- ML18153C737 +
- ML18153B202 +
- NL-03-144, August 2003 Monthly Operating Report for Indian Point, Unit 3 +
- ML20059A083 +
- ML20058H902 +
- ML20087F079 +
- ML20086A834 +
- ML20079E727 +
- ML20101C347 +
- ML20100R429 +
- ML20097F480 +
- ML20126H158 +
- ML20178A472 +
- ML20153B310 +
- ML20150B301 +
- ML20150B297 +
- ML20155D396 +
- ML20211F735 +
- BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station +
- 05000333/LER-1997-005, :on 970525,manual Reactor Scram Occurred Due to Failure of Number 3 Main Tcv.Caused by Damaged Valve Spring Can Coupling.Replaced Valve Spring Can Coupling Bolt of Four TCVs & Four CIVs & Completed Review +
- 05000440/LER-1997-011, :on 970921,TS Surveillance Test Performance Resulted in Esfas.Caused by Procedure Weakness.Temporarily Revised SVI-B21-T2010 & SVI-B21-T2202 to Allow Completion of Instrument Check Valve Testing +
- 05000313/LER-1986-008-01, :on 861231,reactor Tripped on High RCS Pressure from 25% Power.Caused by Reduction of Feedwater During Troubleshooting of Integrated Control Sys.Module in RCS Average Temp Correction Circuitry Replaced +
- 05000301/LER-1985-005-01, :on 851231,reactor Trip Occurred Due to Loss of Electrical Load.Caused by Failed Lightning Arrestor. Lightning Arrestor Replaced,Msiv Repaired & Tested & Fast Bus Transfer Circuitry Response Verified +
- 05000311/LER-1985-018, :on 850827,component Cooling Water HX Svc Water Outlet Valve (22SW356) (Bi) Failed to Closed Position. Caused by Vibration Problems.Valve Actuator 22SW356 Replaced +
- 05000395/LER-1985-005, :on 850317,reactor Trip Occurred from 100% Power Due to lo-lo Level in Steam Generator A.Caused by Burned Contact in MSIV Test Switch.Msiv Switch Replaced & All MSIVs Tested +
- 05000254/LER-1991-009, :on 910427,Unit 1 RCIC Declared Inoperable Due to Failure to Meet Pump Requirements.Caused by Inadequate Calibr Procedure.Egm Controller & Governor Calibr,Changing Sys Parameters.Sys Declared Operable 910503 +
- ML20115C979 +
- 05000414/LER-1990-012-04, :on 900901,Tech Spec Violation Due to Pressurizer Heatup Limit Exceeded During RHR Pump Test. Caused by Inadvertent Action & Defective Procedure.Sys Pressurizer Heatup & Recovery Temp Secured +
- 05000311/LER-1990-005, :on 900117,Tech Spec Action Statement 3.0.3 Entered Due to Inoperability of Two High Head ECCS Subsys. Caused by Leak from Welded Pipe Cap on Boron Injection Tank. Pipe-to-cap Socket Welded Joint Repaired +
- ML20022A084 +
- ML19261B224 +
- ML19259B948 +
- ML18094A619 +
- IR 05000272/1988099 +
- 05000315/LER-1987-004, :on 870408,unit Shut Down Due to Unidentified RCS Leakage Per Tech Spec 3.4.6.2.Caused by Leakage Greater than 1 Gpm from Letdown Isolation Valve.Leakage Sources Repaired +
- 05000387/LER-2014-009, Regarding Loss of Both Trains of Control Structure Chilled Water During Application of Clearance Order +
- SVPLTR 07-0005, Request for Enforcement Discretion Technical Specification 3.1.7, Standby Liquid Control (SLC) System +