- 05000293/LER-2013-003, Regarding Loss of Off-Site Power Events Due to Winter Storm Nemo +
- ML18158A130 +
- ML18087A722 +
- ML18065A467 +
- LR-N06-0097, Special Report, Accident Monitoring Instrumentation Action 81, Due to the Filtration Recirculation Ventilation System Radiation Monitor Being Inoperable for Greater than 72 Hours +
- ML19225B573 +
- ML20040C607 +
- ML20077S219 +
- ML20091L093 +
- ML20141A483 +
- ML20246A756 +
- L-99-154, Monthly Operating Repts for Sept 199 for Bvps,Units 1 & 2. with +
- ML022540887 +
- 05000334/LER-1989-008-01, :on 890901,steam Generator a Level Increased to hi-hi Level Setpoint Initiating Automatic Feedwater Isolation.Caused by Failure to Install Channel N32 Fuses.All Control Rods Fully Inserted Upon Trip Signal +
- 05000155/LER-1989-008-01, :on 890822,reactor Pressure Increased Rapidly Causing Reactor Trip on High Neutron Flux.Caused by Rapid Closure of Turbine Admission Valves Due to Gross Leakage. Control Rods Inserted & Cooling Maintained +
- 05000352/LER-1987-030, :on 870604 & 05,failure to Perform Monthly Functional Tests of Channels D & B of Refueling Area Ventilation Exhaust Radiation Monitors Discovered.Caused by Personnel Error.Surveillance Tests Performed +
- 05000412/LER-1988-012-01, :on 880822,control Room Air Pressurization Sys Actuated.Caused by Oxidizing Gas Release.Air Compressor Placed in Svc for Repressurization +
- 05000277/LER-1992-016-01, :on 920911,discovered That Containment Venting & Outgoing Activities Had Been Started While SBGTS Awas Removed from Svc & Inoperable.Caused by Personnel Error. Containment de-inerting Terminated +
- 05000254/LER-1992-009-02, :on 920401,discovered That Radwaste Radiation Monitor & Steam Jet Air Ejector Radiation Monitor Did Not Meet Functional Requirements of TS Table 4.2-3.Caused by Inadequate Procedure.Procedure Changed +
- 05000285/LER-1990-011, :on 900402,inadvertent Actuation of Pressurizer Pressure Low Signal Occurred While Performing Calibr Procedure.Caused by Inappropriate Action by Technician Involved.Validation of Procedures Reviewed +
- 05000397/LER-1993-010, :on 940304,24 Reportable Problems Identified by Failure of Procedures to Fully Implement.Cause Was Less than Adequate Barrier & Controls for Program Changes.Corrective Actions Include Procedure & TS Changes +
- 05000397/LER-1988-030, :on 880825 & 26,full Reactor Protection Sys (RPS) Actuations Occurred.Caused by Switch Overtravel.Rps Power Supply Select Switch Returned to Normal Position & Scram Reset +
- 05000388/LER-1991-009, :on 910624,RWCU Steam Leak Detection Instrumentation Discovered to Be Inadvertently Actuated During Routine Functional Testing.Caused by Adequate Verbal Communication.Technicians Briefed +
- 05000315/LER-2010-001, For Donald C. Cook, Unit 1, Regarding 1AB EDG Fuel Oil Transfer Pumps Inoperable +
- 05000499/LER-2010-002, Regarding Unanalyzed Condition Regarding the Fire Protection System +
- 05000260/LER-2008-001, Regarding Automatic Turbine Trip and Reactor Scram Resulting from a Failure of the Design Change Process +
- 05000237/LER-2003-003, Reactor Feedwater Pump Trip and Automatic Reactor Scram +
- L-99-038, Monthly Operating Repts for Feb 1999 for Bvps,Units 1 & 2. with +