- ENS 52701 +
- IR 05000250/2006005 +
- ML17252A899 +
- ML17334A444 +
- ML17328A814 +
- ML091100083 +
- ML16294A328 +
- CNL-16-168, Request for Enforcement Discretion for Technical Specification 3.8.1, AC Sources - Operating +
- BSEP 13-0045, Request for Notice of Enforcement Discretion (NOED) Technical Specification 3.7.3, Control Room Emergency Ventilation (Crev) System, Technical Specification 3.8.1, Technical Specification 3.8.4 and Technical Specification 3.8.7 +
- ML19290A080 +
- 05000499/LER-1990-001-01, :on 900108,Train Low Steam Line Pressure Blocking Switch Placed in Blocked Position,Causing Actuation of Safety Injection & ESF Sys.Caused by Lack of Instructions.Training Program Modified +
- ML20063M704 +
- ML20084B026 +
- ML20082H974 +
- ML20076G196 +
- ML20107D724 +
- ML20092G332 +
- ML20085D147 +
- ML20116H894 +
- ML20150A607 +
- ML20147E642 +
- ML20132F885 +
- ML20128P828 +
- ML20128H733 +
- IR 05000271/1986001 +
- ML20065D065 +
- IR 05000333/1989008 +
- ML20216G056 +
- IR 05000317/1987006 +
- ML20210D661 +
- ML23277A108 +
- 05000313/LER-1989-002-01, :on 890120,reactor Trip Occurred Due to Failure in Main Generator Exciter & Two Reactor Coolant Pumps Tripped on Undervoltage When Bus H1 Failed to Fast Transfer to Offsite Power.Caused by Arcing in Exciter +
- 05000280/LER-1986-031, :on 861030,svc Water Flow to Charging Pump Svc Water Subsystem Lost When Pumps Became Air Bound After Svc Water Strainer Placed in Svc W/O Being Vented.Caused by Personnel Error.Personnel Instructed +
- 05000272/LER-1986-006, :on 860220,reactor Trip Occurred When Steam Generator Water Level Signal Drifted Closed.Caused by Broken Wire to Solenoid Valve Damaged During Installation. Connections on All Subj Valves Replaced +
- 05000254/LER-1997-008-01, :on 970402,high Pressure Coolant Injection Was Inoperable Due to Turning Gear Failure.Turbine Turning Gear Was Manually Engaged +
- 05000382/LER-1985-046, :on 851017,fire Watch Irregularities Discovered When Fire Watch Log Compared to Security Cardreader Computer Access History Printout.Caused by Individual Not Performing Assigned Fire Watch Consistent W/Tech Specs +
- 05000270/LER-1985-002-04, :on 850421,reactor Tripped During Zero Power Physics Testing.Caused by Malfunction in Power Range Recorder.Checks Made on Flux Trip Setpoints & Intermediate & Power Range Recorders +
- 05000254/LER-1992-004-03, :on 920207,Unit 1 Reactor Scram Occurred Due to Group I Isolation.Caused by Spurious Main Steam Line High Flow Trip Due to Unknown Cause.Applicable Instruments Calibr & Functionally Verified +
- 05000353/LER-1994-011-01, :on 941221,condition Was Prohibited by TS in That TS SR for D23 & D24 EDGs Was Not Met Due to Inadequate TS Change Review.Appropriate EDG Loca/Loop ST Procedures Revised +
- 05000499/LER-1994-003-01, :on 940429,inadvertent Test Mode Start of Standby DG 21 & 22 Occurred Due to fiber-optic Board Susceptibility to Noise in Conjunction W/Transient DC Spikes.Maint for Boards Initiated +
- 05000461/LER-1993-008, :on 931230,determined That TS SR for Setpoint Verification of APRMs flow-biased Simulated Thermal power- High RPS Trip Functions Not Completed within Specified Interval Due to Personnel Errors +
- 05000293/LER-1993-004, :on 930313,automatic Scram Occurred Resulting from Load Rejection During Severe Coastal Storm While at 100% Power.Caused by Environ Effects of Storm.Trip Settings of Main Input Circuit Breakers Increased +
- 05000498/LER-1993-007, :on 930204,TS Required Shutdown Commenced Due to Inoperability of turbine-driven AFW Pump.On 930203,Unit 2 Experienced Reactor Trip.Caused by Water Instrusion Into Pump.Extensive Testing & Analysis Performed +
- RBG-39193, Annual Operating Rept for 1992. W/ +
- NUREG-0227, Partial Draft of Nuclear Power Plant Operating Experience - 1978, Section 3.0, Plant Outages. Portions of NUREG-0483, NUREG-0366 & NUREG-0227 (Plant Operating Experience for 1977,1976 & 1974-75,respectively) Encl +
- 05000272/LER-1991-033, :on 911116,ESF Actuation & Unplanned Diesel Generator 1B Start Occurred.Caused by Improper Use of Test Equipment & Incorrect Labeling of Voltage Indications. Connections Reversed & Personnel Counseled +
- 05000255/LER-1991-003, :on 901219,determined That on 900520 & 0617 Emergency Diesel Generators Auto Start Initiating Circuits Had Not Been Tested Prior to start-up.Caused by Procedural Inadequacy.Tech Spec Test Procedures Developed +
- 05000296/LER-1989-005-02, :on 891025,two Radiation Monitors for Reactor & Refueling Zone Experienced Loss of Power & Tripped Upscale.Caused by Clearing of Fuse F1 on +24-volt Regulator Board.Power Supply Replaced +
- IR 05000410/1985044 +
- ML19338G427 +