Monthly Operating Rept for Oct 1992 for Davis-Besse Nuclear Power Station Unit 1
ML20116H894
Person / Time
Site: Davis Besse 
Issue date: 10/31/1992
From: Davis L, Sarsour B
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
KB92-1943, NUDOCS 9211130359
Download: ML20116H894 (5)


Text

-..

-_.... - _ _.~ _. ~....... - _..._...... _. - - - -. _ _

.. ~ _ _ _ _...,. -.. _ -.--

]

I e

TOLEDO EDIBON A Cemeru f regy coq;any

& DIGON PL AZA 300 MADISON AVE NUE TOL LDO ohio 4305E0001 November 9, 1992 KB92-1943 i

Docket No. 50-346 License No. NPF-3 2

U.S. Nuclear Regulatory Commission Document Cor. trol Desk Vashington, D.C.

20555-Gentlemen:

Honthly Operating Report October 1992 Davis-Besse Nuclear Power Station Unit 1 Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit ilo. 1 for the month of October 1992.

If you have any questions, pler.se contact Bilal Sarsour at (419) 323 -7384.

Very truly yours, fQ

)

-?'

~

g<a <

t-On - Z, Louis F. Storz Plant Hansger Davis-Besse Nuclear Power Station BHS/ tid Enclosures l

cc:

Mr. A. B. Davis l

Regional Administrator, Region III Hr. J. B. Hopkins NRC Senior Project Manager i.

S. Stasek E Senior-Resident Inspector 9211130359 921031 4

PDR' ADOCK 05000346

.l.

lJ h

R PDR

4VER AGE D ALLY l' NIT PO%ER LEVEL DOCKET NO.

50-346 I

Davis-Besse UNIT November 9, 1992 DATL

]

C0tiPLETED bY Bil 1 Sarsour (4I9}32I~7300 TELEPHONE MONTil October 1992 DAY AVER AGE D AILY POWER LEVEL DAY AVER AGE D AILY PO%ER LEVEL (Mbe Net) i Mwe.Neil

.i 879 880 l

l,e 876

g 883 876 3

39 882 4

878 20 882 880 5

882 880 6

27 882 880 867 23 g

877 24 856 9

878 882 25 10 879 26 880 871 881 ll 27 880 882 l

g 881 881 l3 79 878 881 g4 30 876 881 15 3,

i 877 16 I

INSTRUCTIONS On this format. list the aserage daily unit power lewt in MWe Net for each da) in the reporting month. Compute to the nearest whole megawatt.

(0 /77 )

a 4

1 1

I OPERA IthG DATA REPORT j

50-346 I

DOCKET NO.

DATL November 9, 1992 i

COMPLETED By Bilal Sarsour TELEP110NE (419)371-7384 i

i OPER ATING STATUS i

U"Vf8-Il088" pj N tes 1 Un i Name:

Oct her 1992 j

2. Reporting Period:

2D2

3. Licengd Thermal Power (MWil:

s 925

4. Nameplate Rating (Gross MWe):

906

5. Design Electrical RatingiNet MWe):

921 3

6. Matimum Dependable Capacity (Gross MWe):

877 j

7. Masimum Dependable Capacity (Net MWe):
8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
9. Power Lesel To which Restricted.lf Any (Net Mhe):
10. Reasons For Restrictions. lf Any:

i i

l This Month Yr. to Date Cumulath e 745.0*

7,320.0 124.969 ll. Ilours in Reporting Period

12. Number Of liours Reactor Was Critica]

745.0 7.295.2 73.471 0.0 24.8 5,532.0

13. Reactor Resene Shutdown flours 745.0 7.278.3 71,311.4
14. Ilours Generator On Line 1.'

8Jnit Resene Shutdown flours 0.0 0.0 1,732.5 2.060.372 20.020,270

_176,629,563

16. Gross Thermal Energy Generated (MWil) 17 Grow Electrical Energy Generated (MWill 687,965 6,683,441

,58,576,818 655,185 6.359.406 55.151,894

18. Net Electrical Energy Generated (MWill
19. Unit Senice Factor 100.0 99.4 57.1
20. Unit Asailability Factor 100.0 99.4 58.4 100.3 99.1 50.3-
21. Unit Capacity Factor (Using MDC Net) 97.I 95.9 48.7
22. Unit Capacity Factor (Using DER Net) 0.0 0.57 23.3
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Nest 6 Months (Ty pe. Date.and Duration of Eacht:

Scheduled maintenance and refueling outage - March 1,1993 1

25. If Shut Down At End Of Report Period. Estimated Date of Startup: -
26. Units in Test Status (Prior to Commercial operation):

Forecast Achiesed INITIAL CRiflCALITY INITIAL ELECTRICITY COMMERCI AL OPER ATION i

  • The extra hour in the reporting period is due (u/77 )

to the time change.

I twit smrctwis no rarR REncrzons 50-3?.6

- rio.

L tMIT ftAME Devis-Bessm J rart Novernber 9, 1992 OJMFIETED BY Bilal Sarsoor REswr nemi October 1992 TErzynant (4t9) 321-7304 i

c-c.,

pg 1.icensee

4 o

Cause 6 Corrective o =

O. ;.;

3 Event a e c u action to i

g 8a-Date 5,,g g

3s

...r t.

.re..ne.._ re_.

y p

F No significant sl utdowns I

or powr reductic ns.

t i

f i

1 I

4 F: Forced Reason:

Method:

Exhibit G - Instructions for Preparation of Data 5: Scheduled A-Equipment F Mlure (Explaint 1-Manual Entry Sheets for Li.:ensee Event Report (IIR)

B-Maintenance or rest 2-Manual Scras Fale ifGLMEG-0161) i C-Refueling 3-Autcu tic Scram i

IHLegulatory Restriction 4-Continuation from E-operator Training 6 License Examination Previous Month Exhibit 1 - Same Source 4

F-Administrative 5-toed Reduction

'Beport challenges to Power Operated Relief valves Wrational Error (Emplain) 9-Other (Explain)

(POR?s) and see surizer Code Safety valves (PCSvs) i Il-Other (Emplaan) i I

o

4 l

J Operational Summary i

October 1992 i

Reactor power was maintained at approximately 100 percent full power until 0202 hours0.00234 days <br />0.0561 hours <br />3.339947e-4 weeks <br />7.6861e-5 months <br /> on October 11, 1992, when a manual power reduction to approximately 96 percent of full power was initiated to perform turbine valve testing and control rod drive exercise testing.

After completion of turbine valve testing, reactor power was slowly decreased to approximately 93 percent of full power due to lov system demand as requested by the Systems Operation Center.

3 I

At 0605 hours0.007 days <br />0.168 hours <br />0.001 weeks <br />2.302025e-4 months <br /> on October 11, 1992, reactor power was slowly increased to approximately 100 percent full power, which was achieved at 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> on October 11, 1992.

Reactor power vas maintained at approximately 100 percent full power until j

1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br /> oi October 23, 1992, when a manual power reduction to approximately i

97 percent of full power vas initiated to perform Hoderator Temperature coefficient testing.

i After completion of Moderator Temperature Coefficient testiLg, reactor power vas slowly increased to approximetely 100 percent full power, which was achieved at 1915 hours0.0222 days <br />0.532 hours <br />0.00317 weeks <br />7.286575e-4 months <br /> on October 24, 1992, and maintained at this power level for the rest of the month.