MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
.. __-___-_ . .- - _ _ _ - _ - _ ___- _.
i 2rn a3
$l[
CDD GVERAl!NG DATA REFORI DOCKET NO. 50-266 00 F **
Ci . DALE September 7, 1982 CCD O PJ CH3 COMPLETED b't C. U. F AY OO C pJ **
c&O TELEPHONE 414 277 leil 23 0-UPEFAIING SIATUS
- 1. UNIT NAnE: POINI EEACH tiUCLEAR PLANT UNIT 1 . NOTES .
- 2. REPORIING PERIOD: AUGUST 1982 . .
- 3. LICENSED THERnAL POWER inWI): 1518. . .
4 t. A 3 F h. A i c cATIhG (6xubb nUE): 523.8 . .
S. DESIGN ELECTRIC 4L RATING (hET MUE): 497. . .
- 6. MAXIdun DEFENDAPLE CAPACITY (GROSS nUE): 519. . .
- 7. MAXIMUM DEPENDABLE CAPACI1Y (NET nWE): 495. . . . . .. . . . . ...... . . . .....
- 8. IF CHANGES OCCUR IN CAPACIT) RATINGS (ITEMS NUnLER 3 1hnJUGH 7) SINCE LAST REPORT, GIVE REASON 3:
NOT APPLICABLE
?. POWEd LEVEL TO WHICH MtS1h1CIED, IF ant (NET nUE): 390.0 1 10. REASONS FOR RESTRICTIONS, (IF ANY): Power level restricted because of self-imposed hot leg temperature limitation in an attempt to limit steam generator tube corrosion.
IHIS n0 NTH ik TO DATE CunutATIVE
- 11. HOURS IN REPORTIh6 PERICD 744 5,831 103,607
- 12. NunSER Cr HOURS RCACTOR LAS CRITICAt ,H.C 5,407.1 83,?60.3
- 13. REACTOR RESERVE SHUIDOWN HOURS 0.0 11.4 618.7 14 HOURS GENERATOR CH LINE 744.0 5,376.5 83,348.7 lb. UNIT RESERVE SHUIDOWN hGbRS 0.0 27.4 791.7
- 16. GROSS THERnAL ENEEGY GENERATED (nUH) 868,056 6,548,830 113,901,670
. . 6RUSS ELtCTRICAL ENERGY CENixATED (numa 282,740 2,180,970 38,202,250
- 18. NET ELECTRICAL ENERGY GENERATED (nWH) 267,109 2,067,375 36,348,586 1?. UNIT SERVICE FACTOR 100.0 y2.2 30.4
- 20. Uhli AVAILABILITY FACTOR 100.0 92.7 81.2
- 21. UNIT CAPACITY FACTOR (USING nDC NEi> 72.5 /1.6 /1.8
- 22. L' NIT CAPACITY FACTOR (USING DER NET) 72.2 71.3 70.6
- 23. L' NIT FORCED OUTAGE RATE 0.9 0.2 2.9
- 24. SHUID0LNS SCHEDULED OVER NEXT e MONTHS (ItPt, DATE, AND DURATION OF LACH):
Seven week refueling outage scheduled to begin Octob er 22, 1982.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTINA1ED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND F AC! ORS CAtco AlED AS REQUE5f EU IN NRC LETTER DATED SEPitnBER 22, 1977
DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE September 7, 1982 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL l
MONTH September, 1982 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET i
1 370 11 351 21 365 2 367 12 353 22 365 3 365 13 364 23 365 4 367 14 354 24 372
- 5 366 15 238 25 368 6 367 16 366 26 369 7 363 17 364 27 369 8 353 18 363 28 366 9 362 19 368 29 365 10 343 20 368 30 360 31 355 AD-28A (1-77) j
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 i
September, 1982 DATE September 7, 1982 REPORT MONTH COMPLETED BY C. W. Fay TELEPHONE 414/277-2811
~
M c W tD o 4 oa N oc4 Ev c
,-i s to c *4 o eo en o au o co a as s 'o a0 y y
, No. Date g gg g jjg Licensee Event Cause and Corrective Action e om o va Report No. m eo To Prevent Recurrence Q~ M o to c o 2: 3 U o
1 820815 S O B 4 N/A HH ITEXCH Load reduced to complete condenser
~
tube leak test. Five small leaks were detected and repaired in No. 2 waterbox.
e i
i F: Forced Reason: 3 4 Method: Exhibit G-Instruc-S: Scheduled A- Equipment Failure (explain) l- Manual tions for Prepar-i B- Maintenance or Test 2- Manual Scram ation of Data Entry C- Refueling 3- Automatic Scram Sheets for LER File D- Regulatory Restriction 4- Other (explain) (NUREG-0161)
E- Operator Training & License Exam F- Administrative 5
' AD-28B Exhibit I- Same G- Operational Error (explain) Source (01-78) H- Other (explain)
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No. 50-266 Unit Name Point Beach Unit.1 Date September 7, 1982 Completed By C. W. Fay Telephone 414/277-2811 Unit 1 operated at an average of 359 MWe net from August 1, 1982 to the end of the reporting period with one significant load reduction. Load was reduced to 238 MWe net for approximately 23.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> to complete a condensor tube leak test. Five small leaks were detected and repaired in the No. 2 waterbox.
Other maintenance completed during the period included the annual inspection of the two instrument air compressors, comple-tion of the firestop inspection and the seal replacement of component cooling pumps 1PllA and 1PllB.
On the evening of August 31, 1982, testing of the original smoke detector system for the emergency Diesel generator area and the service water area found these detectors inoperable due to a blown fuse. This incident is still under investigation,
.however, a 30-day Licensee Event Report will probably be filed with the NRC.
1
~
S 22 60 1 38 9 6
. . N E .
O V 254682 08 889 81
. . S I 97 977554S 877 A T 3,2,1 8,1 7,6,1
. . E A ,
. R L 8 9 7 8 4 5
. . U S7 7 505
. . V E M U
3, 4, 6, I C 7 c4
- . . G 03 3 1
7 7
. . , Y
- T 1 1 . . R
- 1
. P O
2 2 8 .
N Y 2 E 2 8 8200 6 6 7 4 W 9 A . . R 1 F 7 E . O R
- 1 7 . . T T 1 4 1 80 80222 880 : D E
. 2 S A 38 1 04 8887 1 ) I B H U M 7
W 4
. . A L
D 8, 8, 8, 9,6 6, C H E
- 1 0
3 r
e C
. 1 4
. C E
O T
5 4 4 1 087 1
1 1
, 3 2, A
E S
T T
P E
0
- b m . . I N
E R
Y 722 F
O O
N S
D
. 5 e Y B
E N . .
S l b N E t
O
- . p O ) A C I P
- T A
O N
e D E
H P
. . ?
I T U D S
- T T
E E
L
. . H G
L P 9 2 40 555 1 0 A
R T
R R E L E . . U P H . . U A E K E P I O A T 4 1 1 0 050555 0 0 0D T T
. C I M . S . R N 4 3 1 21 1 9999 S T O A O E H T O 7 7 7 6,7,1 D E C D C . T . T O M , N F L O N 293 A O
. N . 3 S 5 4 3 C E I 0,3 3 ,
E R
. . . . . . . . R : L H E T N E ) E T 1 T A B EA A D N
~ n WC D I
. u nI D 2 9 N L ,
E D E E
- 1 . l P T T 55S EF P A T
. I 9 M N A Y M S N . 4 E ( T I E
. U 7 : l T ( l U 9 ) I T O ) S Q 4 E : ( N N H S E E
- T 8 U ) A W ) H R
- ) T N . N E S L ) M H ) ,
A 8 3 : WG F : A H( W T l N D S
- L 1 2 ) S M N I ) C W M E E O O A
- ! P 55 E S I Y I MD ( M N M I K 2 1 W OTT , N I ( E R D U R8 nR E A . A l T D C ! 6 E E F A9 G NR i RS DA E D E P T
- E R
E1 : : l L ) ) E
( (
Y
. F C I CR U
ERI T E A M D T X T A
L CT T E N Y Y T I ( S U S A NR G G E R U A US W W ( I T I F A H R REE N N N O C T N U nn I I C T , D U UE G N I I P L A G ( G C C A S S O N O N E R S S R E A OU UEE R C D
d HU C A RS l A
SiPPAt A AP EO i A A C E N R O I
I R W E H E Y G R OUN E T DI N GG R Y I
C
( ( I V AD F S f
h 1
E b
W R A C C OG s P ( E EI L I I N EC C HT P CI LW Y EG A U G E HNDREE 0 N R S D I E OG N R RF C 0 A R RR T f EE N 1 Y C C G L D
O D
N R
O T
C A 1 : L L L B HR E h D L G 6 F ER A W T I U N LE CT A A AU E A E 1 O A NC A AUC S T S ER HEA AI F F TD F F 0I N I I D D C I UE R R VOS C L FL UE T 0 PR RT aN NC LI R O U RT LI A I Y Y O H A D S E E Al E E OP P OE AEARCEB T T C N U P H R C PP P L R E HSR V nT I C A I I DS E N A
- T A EG
- T EEES AE O E L DDE VF R EER RCRI LC CE F R NEEET V I A A CS O N W O D I M NDT E G T E N U ESH LCR A PP R N N D E S A I EA nM NO L S I R G E T E EE V A A OW I T
- N T SL N UUA N N RO R LS A L C FO U R
. G R NPG M MH RO S E T S SSE D H O N T O EEI I I C ES R BC RTS S T T T T T T S P I I P C M S X X WA U nA UI OOI I I I I I U E
.- T A
N E I A E A A F UR LN D H MI OE P R O uEONR REN N N N NH H N RHUG G N UUU UUS F
I R
R A E . . . . . . . . . . . . . . . . . . . . . . . . T P 1 2 3 4 5 67 6 9 0 1 2 3 4 5 67 b9 0 1 23 4 5 A O 1 1 1 1 1 1 1 1 l 1 22 2 22 2 D
- l!I jl!iIlf
DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 DATE September 7, 1982 COMPLETED BY C. N. Fay TELEPHONE 414/277-2811 I
AVERAGE DAILY UNIT POWER LEVEL MONTH September, 1982 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POTER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 480 11 464 -
21 476 l l
2 479 12 468 22 465 l l
3 481 13 469 23 465 l l
l 4 483 14 480 24 448 l
5 478 15 480 25 452 6 469 16 479 26 484 7 479 17 479 27 466 8 476 18 478 28 -3 9 476 19 484 29 187 10 455 20 480 30 453 31 473 AD-28A (1-77)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-301 .
UNIT NAME Point Beach Unit 2 DATE September 7, 1982 REPORT MONTH September, 1982 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811
~
m c w mo 4 c) 32 eu "co 4t
'o a to o""o a
En eo v'g No. Date g gg y jyy Licensee Event g o'g Cause and Corrective Action e am o oa Report No. m eo To Prevent Recurrence Q- M <D m c o '
2* > U l 1
8 N/A 7ALVEX Shutdown resulted from replacement 1 820828 S 33.6 A 1 CB of isolation valve 2-560A of reactor coolant system's RTD manifold from what is believed to be a plug stem separation.
I 3 F: Forced Reason: Method: Exhibit G-Instruc-S: Scheduled A- Equipment Failure (explain) 1- Manual tions for Prepar-B- Maintenance or Test 2- Manual Scram ation of Data Entry C- Refueling 3- Automatic Scram Sheets for LER File D- Regulatory Restriction 4- Other (explain) (NUREG-0161)
E- Operator Training & License Exam 5
F- Administrative Exhibit I- Same AD-28B G- Operational Error (explain) Source (01-78) H- Other (explain)
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date September 7, 1982 4 Completed By C. W. Fay Telephone 414/277-2811-Unit 2 operated at an average of 472 MWe not from August 1, 1982 to the end of the period.with one shutdown.
The shutdown was the result of repairs to isolation valve 2-560A in the "A" loop of reactor coolant system's resistant temperature detection manifold, which developed a leak in the packing. Load reduction commenced on August 27, 1982 and Unit 2 turbine was taken off line at 0202 hours0.00234 days <br />0.0561 hours <br />3.339947e-4 weeks <br />7.6861e-5 months <br /> on August 28, 1982.
The valve was replaced due to what is believed to be plug-stem separation. Maintenance also rebalanced the "A" reactor coolant pump, greased the containment fans and plugged 8 tubes in the "C" moisture separator reheater. Unit 2 turbine was synchronized back on line at 1137 hours0.0132 days <br />0.316 hours <br />0.00188 weeks <br />4.326285e-4 months <br /> on August 29, 1982 and achieved full load at 1730 hours0.02 days <br />0.481 hours <br />0.00286 weeks <br />6.58265e-4 months <br /> that same day.
Other maintenance completed during the period included the seal replacement of 2Pll6 boric acid recirculating pump and the replacement of the 2A charging pump vari-drive system.
_ . , , . . . . _ _ _ . _ . . _ _ _ _ _ _ _ , _ _ _ _ _ _ . .