Ltr Contract:Mod 1 to Task Order 107,under Contract NRC-03-93-026
ML20132F885
Person / Time
Issue date: 12/17/1996
From: Wiggins E
NRC OFFICE OF ADMINISTRATION (ADM)
To: Lofy R
PARAMETER, INC.
References
CON-FIN-J-2407, CON-NRC-03-93-026, CON-NRC-3-93-26 NUDOCS 9612260125
Download: ML20132F885 (3)


Text

beb

. v. m,,

't utm eo emcs

,,j.!$ A 9 j 14UCLEAR REGULATORY COM.U.lSSIOl4 l

(Ygjgj j

wAsmucTcu. o.c. mssum g w.,. j L

s <.;

Parameter. Inc.

Attn: Richard A. Lofy l

13380 Watertown Plank Road j

Elm Grove. WI 53122

Dear Mr. Lofy:

Subject:

Modification No.1 to Task Order No.107. under Contract No.

NRC-03-93-026 In accordance with the task order procedures of the subject contract. this letter definitizes Modification No.1 to Task Order No.107 which: (1) increases the level of effort. (2) increases the obligated amount by 56.982.67 and (3) increases the task order ceiling amount by 56.982.67 from 529.296.33 to 536.279.00. The efforts are to be performed in accordance with the attached revisions to the statement of work and the contractor's technical l

proposal dated December 10. 1996.

i The total amount presently obligated by the Government with respect to this task order is $36.279.00. The total cost ceiling is $36.279.00 of which the sum of 6 represents reimbursable cost the sum of 6 represents facilities capital cost of money, and the sum ofMepresents fixed fee.

The obligated amount shall at no time exceed the cost ceiling. When and if the amount (s) paid and payable to the contractor hereunder shall equal the obligated amount. the contractor shall not be obligated to continue performance of the work unless and until the Contracting Officer shall increase the amount obligated with respect to this task order.

Accounting data for this task order is as follows:

B&R No.

720-15-11-10-00 Job Code:

J-2407-7 BOC:

252A RFPA No.

NRC-03-93-026 dtd 12/9/96 APPN No.

31X0200.720 Obligated Amount:

56.982.67 L

A Summary of obligations for the subject task order, from award date through the date of this action. is given below-l Total FY97 Obligation Amount:

5 36.279.00 Cumulative Total of NRC Obligations:

5 36.279.00 This modification obligates FY97 funds in the amount of: 5 6.982.67 The issuance of this modification does not amend any other terms or conditions of the subject task order i

DfW "

\\

mooln 9612260125 961217 PDR CONTR NRC-03-93-026 PDR

2 Please indicate your acceptance of this task order by having an official authorized to bind your organization execute three copies of this document in j

the space provided and return two copies to the Contracting Officer.

You should retain the third copy for your records.

If you have any questions regarding this matter please contact John Eastman.

Contract Specialist. on (301) 415-6590.

Sincerely.

j j

h:l.

, /c.f

~'

E ois J.

iggins-ntracting Officer Technical Acqui's lon Branch No. 2 Divisions of Contracts Office of Administration w.

?

ACCEP ~D:

f Im hk', h (J c<-

G*-

w NAME

(_) Q

% EJ-TilLE (7!73 1

DATE

i l

l l

CONTRACT NRC-03-93-026 Parameter. Inc.

l STATEMENT OF WORK REVISIONS l

Task Order 107. Mod 1 1

- 1.

Task 3.

Prepare the inspection report.

i Schedule Comoletion Documentation of inspection will take place the week of December 9-13. 1996.

at the contractor's offices. Region III offices and at the DC Cook site. and will continue during the week of December 16-20. 1996 at the contractor's offices.

II.

MEETINGS AND TRAVEL One. one-person. 2-day trip to the Region III offices and plant site to prepare for and participate in the exit meeting with the licensee.

(December 12-13. 1996)

III.

ESTIMATED LEVEL OF EFFORT Number Discipline Hours I

1 Mechanical /I&C Design Specialist 246 The estimated level of effort consists of 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> for on-site inspection preparation 132 hours0.00153 days <br />0.0367 hours <br />2.18254e-4 weeks <br />5.0226e-5 months <br /> for on-site inspection and review at the contractor's office. and 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> for inspection documentation.

(* Note

  • The number of hours for the Specialist has been increased from 202 hours0.00234 days <br />0.0561 hours <br />3.339947e-4 weeks <br />7.6861e-5 months <br /> to 246 hours0.00285 days <br />0.0683 hours <br />4.06746e-4 weeks <br />9.3603e-5 months <br /> and the number of hours for inspection documentation has increased from 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> to 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br />.)

<