ML17328A814
| ML17328A814 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 11/30/1990 |
| From: | Blind A, Gillett W, Schimmel E INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9012190115 | |
| Download: ML17328A814 (9) | |
Text
ACCELERATED D TRIBUTION DEMONS TION SYSTEM ACCESSION NBR:
FACIL:50-315 AUTH.NAME GILLETT,W.T.
SCHIMMEL,ETC.
BLIND,A.A.
RECIP.NAME REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) 9012190115 DOC.DATE:
NOTARIZED:
NO DOCKET g
Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana 05000315 AUTHOR AFFILIATION Indiana Michigan Power Co.
(formerly Indiana
& Michigan Ele Indiana Michigan Power Co.
(formerly Indiana
& Michigan Ele Indiana Michigan Power Co.
(formerly Indiana
& Michigan Ele R
RECIPIENT AFFILIATION I
SUBJECT:
Monthly operati for Nov 1990 for DC Cook Nuclear Plant Unit 1.
901206 ltr.
DISTRIBUTION CODE-IE24D COPIES RECEIVED-LTR L ENCL SIZE-TITLE: Monthly Operating Report (per Tech Specs)
NOTES D
RECIPIENT ID CODE/NAME PD3-1 LA COLBURN,T.
INTERNAL: AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB RGN3 EXTERNAL EG&G BRYCE iJ
~ H NSIC COPIES LTTR ENCL 3
3 1
1 1
1 2
2 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NR~/DB+Q/LPEB10 HRG FILE 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
R D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 16 ENCL 16
Indiana Michiga~
Power Company ~
Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 December 6,
1990 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit. 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of November 1990 is submitted.
Respectfully, A.A. Blind Plant Manager Attachment CI NRC Region III D.R. Hahn EPRI Nuclear Safety Analysis Center R.C. Callen S.L. Hall J.G.
Keppler INPO Records Center ANI Nuclear Engineering Department D.H. Williams, Jr.
M.P. Alexich J.F.
Kurgan J.J.
Markowsky D.A. Timberlake D.W. Paul T.O. Argenta S.H. Steinhart J.A.
Isom W.T. Gillett E.A. Smarrella J.C. Krieger B.A. Svensson E. C. Schimmel
~ qQ1+1$ 01'1 Q~QQQ31~
,.qQi130
~
DP, ADO~K
-PDR
~R
t V
E l
l N.R.C.
RATING DATA REPORT DOCKET NO.
50-315 DATE 03-Dec-90 COMPLETED BY WT GILLETT TELEPHONE 616-465-5901 OPERATING STATUS
- l. Unit Name D.
C.
Cook Unit 1
- 2. Reporting Period NOV.90
- 3. Licensed Thermal Power (MWt) 3250 4.
Name Plate Rating (Gross MWe).
1152
- 5. Design Electrical Rating (Net MWe) 1030 6.
Maximum Dependable Capacity (GROSS MWe) 1056 7.
Maximum Dependable Capacity (Net MWe) 1020 notes
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any {Net MWe) 10.
Reasons For Restrictions. If Any:
ll. Hours in Reporting Period 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Therm.
Energy Gen.
(MWH) 17.
Gross Elect.
Energy Gen.
{MWH)
- 18. Net Elect.
Energy Gen.
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six Thzs Mo.
Yr. to Date 720 '
8016.0 0.0 6944 '
0 ~ 0 0 ~ 0 0.0 6939.8 0.0 0.0 0
20541629 0
6559000 0
6301645 0.0 86.6 0.0
- 86. 6 0 ~ 0 77 F 1 0.0 76.3 0.0 Months (Type, Date, and Cumm.
139512.0 103387.0 463 '
101628.8 321.0 295429648 96131230 92433473 73.9 73.9 65 '
64 F 1 7 ~ 1 Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
Jan a
- 26. Units zn Test Status (Prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
, AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
50-315 UNIT ONE DATE 03-Dec-90 COMPLETED BY WT GILLETT TELEPHONE 616-465-5901 DAY' 2
3 4
5 6
7 8
9 10 11 12 13 14 15 16 MONTH AVERAGE DAILY POWER LEVEL 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 NOV.90 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AVERAGE DAILY POWER LEVEL' 0
0 0
0 0
0 0
0 0
0 0
0 0
I'
UNIT SHVIDNNS AND HNER REDUCTIONS REPORT MDKS: Nov~ 1990 DOCKET NO:
UNIT NAME:
IRTE:
OOMPL'ETED BY:
TZXZXEONE'0-315 D.C.
COOK UNIT'1 December 6, 1990 E.C. Schiznmel (616) 465-5901 MEED OF SHVITING LICENSEE DURATION DGNN -
EVENT SYSTEM:
COMPONENTS CAUSE AND COEGKCZIVE ACTEON 'IO NO.
DATE TYPE HOURS REASON REACIQR3 REPORT NO.
CODE CODE PREVEÃZ RECURRENCE 290 10/20/90 S
720. 0 (cont.)
N/A zz zzzzzz The unit was removed from service at 0031 hours3.587963e-4 days <br />0.00861 hours <br />5.125661e-5 weeks <br />1.17955e-5 months <br /> on 901020 for the cycle 11-12 refueling outage.
'Ibe unit was in mode 6 at the end of the reporting period, with no fuel in the reactor.
1 2
F:
Forced Reason:
S:
Scheduled A:
Ecpipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Tra~'Lning and Lice'xamination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method 1'anual 2:
Manual Scram 3:
Other (Explain) 4 5
Exhibit G Instructions Exhibit I:
Same Source for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161)
DOCKET N UNIT N COMPLETED BY:
TELEPHONE:
DATE:
PAGE:
50-315 D.C.
Cook Unit 1 E.C.
Schimmel (616) 465-5901 December 6,
1990 1 of 2 MONTHLY OPERATING ACTIVITIES November 1990 HIGHLIGHTS
'The unit entered the reporting period in mode 5.
The unit entered mode 6 at 0202 hours0.00234 days <br />0.0561 hours <br />3.339947e-4 weeks <br />7.6861e-5 months <br /> on November 4, 1990.
Core alterations began at 1323 hours0.0153 days <br />0.368 hours <br />0.00219 weeks <br />5.034015e-4 months <br /> on November 8, 1990 and the core offload was complete at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> on November 10, 1990.
An unusual event was declared at 0507 hours0.00587 days <br />0.141 hours <br />8.382936e-4 weeks <br />1.929135e-4 months <br /> on November 16,
- 1990, due to the planned evolution of both emergency diesel generators being inoperable.
This was a planned outage activity while the reactor core was unloaded.
The unusual event was exited at 1615 hours0.0187 days <br />0.449 hours <br />0.00267 weeks <br />6.145075e-4 months <br /> on November 16, 1990.
An unusual event was declared at 1325 hours0.0153 days <br />0.368 hours <br />0.00219 weeks <br />5.041625e-4 months <br /> on November
- 28) 1990i due to the planned evolution of both emergency diesel generators being inoperable.
This was a planned outage activity while the reactor core was unloaded.
The unit exited the reporting period with the reactor coolant system in mode 6 and the reactor core unloaded.
Gross electrical generation for the month of October was 0
MWH.
DETAILS 11/04/90 0202 11/08/90 1323 11/10/90 2200 11/16/90 0507 1615 The unit is in mode 6.
Commenced reactor core offloading.
The reactor core offloading is complete.
An unusual event is declared due to the planned evolution of both emergency diesel generators being made inoperable.
The unusual event is exited.
11/28/90 1325 An unusual event is declared due to the planned evolution of both emergency diesel generators being made inoperable.
~
~
~
~
~
DOCKET N UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE PAGE 50-315 D.C.
Cook Unit 1 E. C.
Schimmel (616) 465-5901 December 6,
1990 1 of 1 t
MAJOR SAFETY-RELATED MAINTENANCE November 1990 K
There were no major safety-related maintenance items during the month of November.