Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16365A035 +
- PLA-7769, Annual Radiological Environmental Operating Report (PLA-7769) +
- ML20039G481 +
- ML041050744 +
- L-03-201, November 2003 Monthly Operating Report for Beaver Valley Units 1 and 2 +
- ML20059D735 +
- ML20082C049 +
- ML20081L310 +
- ML20096G199 +
- ML20072E047 +
- IR 05000352/1985044 +
- ML20133H479 +
- ML20149D775 +
- ML20149D517 +
- ML20066D473 +
- ML20065Q043 +
- ML20236C759 +
- ML20235U670 +
- ML20216H326 +
- 05000346/LER-2022-002, Strong Winds Result in Ultimate Heat Sink Low Water Level +
- 05000338/LER-1987-014-01, :on 870617,problem Developed W/Reactor Coolant Pump (RCP) Motor Requiring Replacement.On 870618,RCP Motor Uncoupled,Resulting in Small Leak in Pump Shaft.Corrective Actions Identified to Address Inadequacies +
- 05000461/LER-1987-034, :on 870707,process Radiation Monitor Declared Inoperable Due to Failed Channel Functional Test Not Placed in Tripped Condition within 1 H.Caused by Personnel Error. Personnel Counseled Re Communications +
- 05000324/LER-1986-022-01, :on 861003,reactor Shut Down Due to Unsuccessful Restart of Motor Generator Set.Caused by Opened Fuses.Fuse 7 Transformer Replaced,Motor Generator Restarted & Loop Returned to Svc +
- 05000440/LER-1997-007, :on 970713,loss of Electrical Power to Reactor Protection Sys Bus Occurred Due to Electrical Protective Assembly Trip.Trip Resulted in Esfas.Caused by Unreliable Operation of Control Board.Performed Review +
- 05000414/LER-1988-013-01, :on 880314,feedwater Isolation Caused Steam Generator High Level Setpoint.Caused by Equipment Failure & Personnel Error.Operations Personnel re-established Blowdown & Reduced Steam Generator Levels +
- 05000219/LER-1996-008, :on 961025,manual Scram Occurred Due to Main Generator Runback.Brought Plant to Hot Shutdown Condition, Troubleshooting Runback Circuit & Generator Runback Circuit Instrumented Down to Individual Switch Status +
- 05000354/LER-1995-033-01, :on 951114,TS Surveillance Requirement Implementation Deficiencies Occurred.Caused by Lack of Documentation of Annunciation for Previous Surveillances. SDV Bypass Logic Were Satisfactorily Tested +
- 05000413/LER-1985-024, :on 850409,Train B of Ventilation/Chilled Water Sys Became Inoperable Due to Failure of Filter Unit Preheater to Energize.On 850412,both Trains of Same Sys Inoperable for Several Hours +
- 05000354/LER-1996-033, :on 951114,two Events Occurred Due to Identification of TS Surveillance Test Inadequacy.Caused by Ineffective Procedures.Tssip Review Will Be Completed +
- 05000413/LER-1985-002, :on 841231,unit Entered Hot Shutdown W/Ice Condenser Lower Inlet Doors Blocked Closed.Incident Discovered on 850109.Caused by Personnel Error.Blocking Devices Removed & Training Sessions Held +
- 05000373/LER-1984-076, :on 841111,undervoltage Trip of Reactor Protection Sys Bus a Occurred.Caused by Deenergized Relays & Ruptured Hose.Regulating Transformer Installed to Limit Undervoltage Condition +
- 05000325/LER-1995-015, :on 950713,automatic Reactor Shutdown Occurred Due to electro-hydraulic Control Pressure Regulator Malfunction.Replaced Four Electronic Circuit Boards Comprising a EHC Pressure Regulator +
- PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095) +
- PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122) +
- 05000266/LER-1979-013-01, /01T-0:on 790830,Unit 1 Taken Off Line for Steam Generator primary-to-secondary Leakage Repair.Leakage Had Risen to 324 Gallons Per Day.Caused by 88% Defect Located Just Below Top of Tubeseheet.Tube Plugged +
- 05000280/LER-1995-003-02, :on 950412,Unit 1 Operating at 45% Reactor Power Due to Dropped Rod & Out of Band Delta Flux.Caused by Failed Stationary Coil Conductor for CR J-7.Plant Placed in Safe,Hot Shutdown Condition +
- 05000440/LER-2014-002, Regarding Division 2 Diesel Generator Inoperability Results in Loss of Safety Function and Condition Prohibited by Technical Specifications +
- ML033510593 +
- ML18152A232 +
- 05000354/LER-1995-033, :on 951114,TS Surveillance Requirements 4.8.3.1 & 4.8.3.2 Not Completed Fullfilled Due to Surveillance Test Inadequacies.Surveillance Procedures Revised & Surveillances Successfully Performed +
- 05000313/LER-1984-005-01, :on 841005,automatic Reactor Trip Occurred Due to Loss of Power to Two Reactor Coolant Pumps.Caused by Janitor Accidentally Bumping Handswitch on Feeder Breaker from Unit Auxiliary Transformer +
- 05000353/LER-1991-006-02, :on 910404,emergency Diesel Generator Inadvertently Started.Caused by Personnel Error.Operator Who Depressed Wrong Button Counseled & Procedural Enhancements Implemented +
- 05000353/LER-1994-003, :on 940420,primary Containment & Reactor Vessel Isolation Control Sys ESF Actuation Occurred.Caused by Blown Fuse as Result of Personnel Error.I&C Technician Counseled Re Attention to Detail +