Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000265/LER-2005-002 +
- ML12207A111 +
- ML093280761 +
- ENS 44967 +
- L-03-201, November 2003 Monthly Operating Report for Beaver Valley Units 1 and 2 +
- ML093640783 +
- ML20086B827 +
- 05000219/LER-1982-060, Forwards LER 82-060/03L-0.Detailed Event Analysis Encl +
- ML20081F882 +
- ML20081C292 +
- ML20073F269 +
- ML20072U428 +
- ML20071Q145 +
- ML20129F549 +
- ML20069F635 +
- ML20195H469 +
- ML20206N226 +
- ML20247D145 +
- ML040980593 +
- BVY-98-053, Monthly Statistical Rept for Mar 1998 for Vynp +
- ML20129F418 +
- ST-HL-AE-3889, Special Rept:On 910904,SDG 22 Failed.Caused by Intermittent Malfunctioning of Instantaneous Preposition Board. Instantaneous Preposition Board Replaced & Applicable Relays in Emergency Mode Tested for Proper Resistance +
- 05000254/LER-1989-003-07, :on 890412,manual Reactor Scram Initiated Due to Main Turbine Bypass Valves Opening.Caused by Component Failure.Circuit Board Replaced +
- 05000324/LER-1986-022-01, :on 861003,reactor Shut Down Due to Unsuccessful Restart of Motor Generator Set.Caused by Opened Fuses.Fuse 7 Transformer Replaced,Motor Generator Restarted & Loop Returned to Svc +
- 05000293/LER-1996-005, :on 960419,automatic Scram Occurred Due to Turbine Vibration During Planned Power Reduction.Turbine Vibration Trip Setting That Initiates Trip of Turbine Due to High Vibration Changed +
- 05000219/LER-1984-033, :on 841203,automatic Scram Occurred Due to Low Condenser Vacuum.Caused by Operator Error.Event Will Be Reviewed During Operator Training & Caution Added to Startup Procedure +
- 05000373/LER-1985-008-01, :on 850202,exhaust Secondary Containment Isolation Dampers Inoperable.Caused by Failure of Solenoid Valves.Solenoid Valves Replaced +
- 05000325/LER-1995-011, :on 950519,manual Reactor Protection Sys Trip Initiated Due to Decreasing Condenser Vacuum.Unit 1 & 2 CW Intake Pumps Traveling Screens Cleaned & Monitored +
- 05000261/LER-1983-014-01, /01T-0:on 830704,svc Water Leak Discovered on Containment Fan Cooler HVH-2,resulting in Degradation of Containment Boundary Per IE Bulletin 80-24.Caused by Corrosion/Erosion of Cooler Tubing +
- 05000325/LER-1991-005, :on 910227,nonconservative Setpoint for High Steam Flow Isolation Instruments Resulted in Manual HPCI Isolation.Due to Error Induced by Formation of Loop Seals. Pressure Sensing Line Rerouted +
- 05000373/LER-1982-073-03, /03L-0:on 820725,during Heatup for Startup Testing,Heatup Max Rate of 100 F/H Exceeded.Caused by Overdependence on CRT Ramp Rate Display.Operating Personnel Reminded to Use Multiple Indications +
- IR 05000324/1993033 +
- 05000296/LER-1997-001-04, :on 970305,loss of Offsite Power on Unit 3 During Refueling Outage Resulted from Shorted Component. Replaced Relays Involved in Event W/Less Sensitive Relays +
- 05000315/LER-1988-010, :on 881011,unit Shut Down After Determination That Electrical Cables Not Configured Per Design Drawings. Caused by Pressurizer & Reactor Head Vent Valves Not Being in Configuration.Design Change Initiated +
- 05000315/LER-1988-010-01, :on 881004,unit Electrical Cables of Reactor Head Vent Valves & Pressurizer Steam Space Vent Valves Determined Not Physically Configured Per Design Drawings. Configuration Discrepancies Corrected +
- 05000286/LER-1917-002, Re Manual Isolation of Chemical and Volume Control System Normal Letdown to Stop a Valve Leak Resulted in an Exceedance of Technical Specification 3.4.9 Condition a Limit for Pressurizer Level +
- ML033510593 +
- PLA-7928, Annual Radiological Environmental Operating Report +
- 05000382/LER-1989-017, :on 890819,automatic Reactor Trip of Unit Occurred While Operating at 23% Power.Caused by Equipment Malfunction.Repairs Made to Control Element Assembly Circuitry +
- ML20129J050 +
- ML20057E742 +
- 05000374/LER-1985-010-02, :on 850215,CRD Hydraulic Control Unit Accumulator Pressure Switch Failures Occurred.Caused by Setpoint Drift.Low Pressure Accumulators Recharged & Accumulator Pressure Switches Recalibr +